Tysons-Old Meadow Road Bike/Ped Improvements

Similar documents
PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Financial Project ID No(s).: and ETDM No(s).: and 14181

City of Wilsonville 5 th Street to Kinsman Road Extension Project

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Fairfax County Parkway Widening Fairfax County

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Public Information Meeting

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

WELCOME. City of Eden Prairie West 70 th Street

Capital Beltway HOT Lanes Project

Charlottesville Regional Chamber of Commerce. October 28, 2014

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Transportation Planning Division

NOVEMBER 2017 DESIGN PUBLIC HEARINGS COMMENT SUMMARY (November 13, 14, and 16, 2017)

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

City of Fairfax, Virginia City Council Work Session

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Washington DC Section of ITE Project Briefing

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

Outer Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015

Agenda. Citizen Advisory Committee. CSAH 101 (CSAH 62 to Hutchins Drive) City of Minnetonka May 29, :00 pm

'Tis the Season...for Construction Multi Modal Project Updates

Public Workshop #2. September 14, 2016

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

Encouraging Taxi Drivers to Behave: Grafton Bridge Taxi and Bus Lane Trial. Rob Douglas-Jones Tim Segedin, Edin Ltd.

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

HILLSDALE/US101 BICYCLE/PEDESTRIAN BRIDGE PROJECT

Town of Ashland. Downtown Planning Initiative 2 nd Community Workshop. March 29, Presented by:

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( )

County of Fairfax, Virginia. Department of Transportation

Building Great Neighbourhoods QUEEN ALEXANDRA

Route 79/Davol Street Corridor Study

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

2018 HR & PAYROLL Deadlines

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Culpeper District. Albemarle County Monthly Report October, 2011

Interstate 66 Tier 1 Environmental Impact Statement. Cooperating and Participating Agencies Meeting March 19, 2012

I-66 Corridor Improvements Route 15 to I-495. November 2014

Application of a Complete Street

Transportation Planning Division

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

EXHIBIT U THE SCOPE DOCUMENT

The Year Ahead: Virginia Department of Transportation Northern Virginia District

Fairfax County Bicycle Program

West LRT Workshop Session Welcome Stony Plain Road from 149 Street to 124 Street May 12, 2010

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Meade Street Bridge Design Alternative Study

South King County High-Capacity Transit Corridor Study

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report

Building Great Neighbourhoods BONNIE DOON

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

VT15 / Allen Martin Drive Intersection Scoping Study

Capital Beltway HOT Lanes - Frequently Asked Questions

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

Central Avenue Corridor Study FPID Number:

Capital Beltway HOT Lanes Project

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Terwillegar Drive Expressway Draft Concept Plan

Freeway ramp intersection study

91 Express Lanes Model Update 2006 State Route 91 Implementation Plan. Gerald V. Nielsten May 18, 2007

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

McLEAN CITIZENS ASSOCIATION

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016

Riverside Drive Complete Streets Project 3 rd Community Meeting. March 26, 2015

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Managing Dulles Rail Construction in Tysons Corner

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

We All Count: Collaboratively Collecting & Using Biking and Walking Data in Minnesota. Agenda. Why collect info about people biking and walking?

CUSTOMER ADVISORY COMMITTEE

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Prince George s County plans, policies, and projects

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Bicycle Crashes. Number of Bike Crashes. Total Bike Crashes. are down 21% and severe bike crashes down 8% since 2013 (5 years).

Wilshire Boulevard Bus Rapid Transit Project

Item No. 14 Town of Atherton

PUBLIC COMMENT SUMMARY REPORT Public Information Meetings

Transcription:

Tysons-Old Meadow Road Bike/Ped Improvements Design Workshop #1 Thursday, November 9, 2017, 7:00 pm to 9:00 pm Westgate Elementary School, Falls Church, VA Fairfax County

Agenda Open house Presentation Project overview Current design efforts Bridge over I-495 Noise analysis Shared used path Workshop at tables Report-out Next steps 7:00 pm 7:30 pm 7:30 pm 7:45 pm 7:45 pm 8:30 pm 8:30 pm 8:50 pm 8:50 pm 9:00 pm

Project Overview

Project Need and Objective Need for enhanced bicycle and pedestrian connectivity in Tysons Connections to either side of Capital Beltway/I-495 Fairfax County Comprehensive Plan and Countywide Bicycle Master Plan includes multiple crossings of I-495 Objective of this project: Design and construct one of the bike/ped projects connecting each side of I-495

HOT Lanes Project Public Hearing 2014 Concept Design Path passes under Westpark Drive Path passes under Beltway Path crosses ramp at grade Path crosses ramp at grade Legend Path

VDOT Planning 2015-2016 Options A through G Route 123 Bicycle and Pedestrian Access Option A Option B Option C Option E Option F Option D Option G

VDOT Planning 2017 Build Options Route 123 Bicycle and Pedestrian Access Options B and G emerged as feasible Community meetings, January - March 2017 PIM, May 2017 Completed study to select Preferred Option Option B Option 1 Option G Option 2 Option B 1 Option G 2

Option 2 Shared-use Path along Old Meadow Road Route 123 to Tysons One Place PREFERRED ALTERNATIVE Screening by sound wall and mature trees Bike/ped bridge over I-495 Path behind Dolley Madison Apartments Old Meadow Road path connection

Schedule Concept Planning/PE Report Oct 2016 July 2017 Preliminary Design Phase Oct 2017 Dec 2017 Design Public Hearing Jan Mar 2018 Design Approval Apr Jun 2018 NEPA Reevaluation Apr 2017 Jul 2018 Detailed Design Phase Jun Dec 2018 Final Design Phase March Oct 2019 Right-of-Way Acquisition May Oct 2019 Utility Relocations Nov 2019 Apr 2020 Construction Phase Apr Nov 2020

Current Design Efforts Bridge over I-495 Noise analysis Shared use path

Bridge over I-495

Bridge over I-495 Location of Possible Pedestrian Bridge Possible removal of 6 X 20 sound wall panel

Bridge over I-495 West End Approximate location of bridge deck

Bridge over I-495 / Noise Analysis

Shared Use Path (SUP)

Workshop at Tables Choose a spokesperson Discuss details on project design Discuss and choose design options: 1. Bridge type 2. Bridge pier 3. Fencing 4. Sound wall 5. Lighting on bridge 6. Lighting on shared use path (non-roadway) 7. Lighting on shared use path along Old Meadow Road Complete your ballot Report out summarize discussion at tables VDOT Project Manager: Abraham (Abi) Lerner, abraham.lerner@vdot.virginia.gov Project Web Page: http://www.virginiadot.org/projects/northernvirginia/bike-ped_improvements.asp

Report Out Summarize discussion at tables Provide general comments on design Discuss choices made, pros/cons Offer other things for the design team to consider are we missing anything?

Next Steps Noise abatement analysis November 2017 Public Workshop #2 November 28, 2017 Westgate Elementary School Preliminary design December 2017 Design Public Hearing Spring 2018

More information VDOT Project Manager: Abraham (Abi) Lerner abraham.lerner@vdot.virginia.gov Project Web Page: http://www.virginiadot.org/projects/northernvirginia/ bike-ped_improvements.asp

Tysons-Old Meadow Road Bike/Ped Improvements THANK YOU!! Design Workshop #1 Thursday, November 9, 2017, 7:00 pm to 9:00 pm Westgate Elementary School, Falls Church, VA Fairfax County