7th meeting of Steering Group Priority Area 1a of the Danube Region Strategy on Inland Waterways

Similar documents
Fairway Rehabilitation and Maintenance Master Plan for the Danube and its Navigable Tributaries

Innovative approaches on the Danube and its navigable tributaries

15 th Meeting of the Steering Group for Priority Area 1a of the EUSDR Vienna, Austria 09 October 2018

Conclusions. on effective waterway infrastructure rehabilitation and maintenance on the Danube and its navigable tributaries. Danube Ministers Meeting

SPEECH. by Deputy Director-General of the Danube Commission s Secretariat. Mr. Pjotr Suvorov. (Linz, April 2013)

Status of the Fairway Rehabilitation and Maintenance Master Plan for the Danube and its navigable tributaries (dated )

THE PEP Partnership on Cycling

THE PEP Partnership on Cycling Pan-European Master Plan for Cycling

Monitoring system on implementation of waterway maintenance declaration & short-term measures

The Pan-European Masterplan for Cycling Promotion - A framework for starter, climber and champion countries

FAIRway Danube. a milestone for the realization of the Masterplan of the Danube and its navigable tributaries , Katja Rosner / viadonau

Centre Albert Borschette, 36 Rue Froissart - Room CCAB-0B, 1040 Brussels

Report of the third meeting of THE PEP Partnership on Cycling Promotion

Waterway management projects co-funded by CEF Programme rkm Danube section in Hungary -

Planning for tennis in your Local Government Area. A resource from Tennis Australia

WORKSHOP ON SAFE AND HEALTHY WALKING AND CYCLING IN URBAN AREAS 30 September 1 October 2010 Batumi, Georgia

Pan-European 2020 Strategy for Biodiversity

GIZ Support to Ministry of Urban Development Training on Preparation of City Sanitation Plan Part III State of Telangana

Service Business Plan

Outline of the Position Duties and Responsibilities

Integrated Waterway Management of the Danube in Austria

A national cycling strategy for more and safer cycling

Rhode Island Moving Forward Long-Range Transportation Plan 2040 Municipal Roundtable Providence County

Eugene s Strategic Pedestrian and Bicycle Plan

Rhode Island Moving Forward Long-Range Transportation Plan 2040 Municipal Roundtable Newport County

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE

A national cycling strategy for more and safer cycling

Implementation of CEVNI Rev 5. Reinhard Vorderwinkler Austria

Economic and Social Council

Good Navigation Status

The German Spatial Data Strategy

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685

University of Leeds Travel Plan

NATIONAL POLICIES TO PROMOTE CYCLING

PROJECT BACKGROUND/DESCRIPTION

Capacity of transport infrastructure networks

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

Active Travel Strategy Dumfries and Galloway

Section 9. Implementation

Reporting on progress made since 2009 on the attainment of the Amsterdam Goals

TRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031

Bicycle Master Plan Goals, Strategies, and Policies

High Performance Playbook

INSTRUCTIONS TO PROSPECTIVE CHARTERING SERVICE PROVIDERS FOR FOREIGN YACHTS AND BOATS - ACCOMMODATION SERVICES ON BOARD YACHTS AND BOATS -

FEASIBILITY STUDY FOR A WATERWAY MAINTENANCE MANAGEMENT SYSTEM (WMMS) FOR THE DANUBE

Reporting on progress made since 2009 on the attainment of the Amsterdam Goals

Safety of Decommissioning: International Cooperation under the IAEA Coordination

Strategic Plan for Sevens Rugby. September 2006

Thank you for the opportunity to comment on the Draft Freshwater Fisheries Management Plan on behalf of Victoria s recreational fishing sector.

Agenda : Self-assessment : Coffee break : Action plan

Introduction. You may find detailed information about the network from the EuroVelo website: Page 1/5

UK/JAPAN SEASON OF CULTURE

I N V I T A T I O N TO THE. 10 th STEERING GROUP MEETING

Caltrain Bicycle Parking Management Plan

CONFÉDÉRATION EUROPÉENNE DE VOLLEYBALL BEACH VOLLEYBALL. World Tour 1 Star & 2 Star Events in Europe CANDIDATURE APPLICATION GUIDELINES

Table of. contents. Photos: viadonau, NEWADA duo, Haslinger, Zinner Layout: viadonau

CFE certification Bicycle-friendly Employer

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Questionnaire for reporting on progress made on the attainment of the Paris Goals

ECW Operational Model & Results Framework Consultation process and overview. November 22, 2016

G u i d e l i n e C Y C L I N G C O S T - E F F E C T I V E M E A S U R E S Version: November 2015

APLC/MSP.16/2017/WP.1

Learning from other Geographies North Sea

INDEPENDENT EVALUATION GROUP - IFC APPROACH PAPER

FISHERY PRODUCTS (JAPANESE TRUST FUND VI)

Stakeholder Communication and Public Involvement Plan

CYCLING PLAN UPDATE. DIY Workshop FACILITATOR GUIDE

Date: 21 March General observations:

Economic and Social Council

Combating ALDFG and Ghost Fishing Development of International Guidelines on the Marking of Fishing Gear

PL AN. To be the premier swimming state in Australia by Photo courtesy of Delly Carr/Swimming Australia

TOWARDS A BIKE-FRIENDLY CANADA A National Cycling Strategy Overview

2018 FIFA World Cup Stakeholder Engagement First Phase: Verifying the sustainability strategy

DRAFT FOR DISCUSSION Water Forum Terms of reference: September 2016

Revised as of 25 January 2018 Draft Roadmap to the Fourth Session of the UN Environment Assembly. Assembly

Sustainable Development Goals in Colombia

AGENDA. Stakeholder Workshop

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

5. Pedestrian System. Accomplishments Over the Past Five Years

SDG statistics in Voluntary National Reviews: Practical Suggestions for Statistical Annexes Christoph Lang

July 2016 JD No 6 Post No 6 JOB DESCRIPTION

UNISPACE+50 AND THE SPACE2030 AGENDA

POINTS = SINGLE POINTS OF CONTACT SPORTS INTEGRITY

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

County Donegal Public Participation Network Work Plan

(centre) Destination Ontario; and (right) Great Lakes Waterfront Trail (GLWT)/ Simon Wilson/ Waterfront Regeneration Trust..

GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL

INTERREG IVC. CycleCities Project (1307R4) Priority 2: Environment and risk prevention Sub-Theme: Energy and sustainable transport

2015/16 Annual review of Sport and Recreation New Zealand

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

Progress with the Road Investment Strategy

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number:

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

BIKE PLAN CONTENTS GATEWAY

Infrastructure measures

Metropolises on the move ALLIANCE FOR CYCLING

AEPF Governance and Structure

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

BICYCLE PROGRAM IMPLEMENTATION UPDATE. Transportation and Trinity River Project Council Committee June 13, 2016

Transcription:

7th meeting of Steering Group Priority Area 1a of the Danube Region Strategy on Inland Waterways Vienna 9 May 014 7th Steering Group meeting Priority Area 1a of the EUSDR Vienna, 9 May 014 Reinhard Vorderwinkler 1

EUSDR PA 1a projects: Status quo Status: 06/05/014 Waterway Infrastructure Waterway Management Ports and Sustainable Transport Fleet Modernisation River Information Services 3 projects are in preparation (proposal, feasibility study etc.) 41 projects are currently under implementation Education and Jobs IWT Policies TOTAL 31 11 6 11 9 4 5 97 Definition 3 1 1 1 0 1 0 7 Preparation 10 16 1 1 1 1 3 Implementation 16 3 9 6 4 1 41 Completion 5 0 3 4 1 17 TOTAL Slide No. 3 Milestones since last Steering Group meeting Facilitate discussion on future of Joint Statement process Informal brainstorming session on future of Joint Statement Process together with key stakeholders (8 th May 014) organised with PA6 (Biodiversity) Study on Innovative Danube Vessel: Final report delivered in December 013 according to plan Presentation of key results in framework of Annual Forum in Vienna in June 014 Working group on administrative processes: Intensification of links with PA11 (Security) Analysis of administrative forms and identification of potential improvements Coordination meetings with DARIF project and Hungarian Ministry of Interior Slide No. 4

Milestones since last Steering Group meeting Preparations for Annual Forum 6-7 June 014: INDUSTRY MEETS POLICY HIGH-LEVEL ROUND TABLE initiated by Pro Danube in coordination with PA1a PA1a Participation in workshops on PROTECTING THE ENVIRONMENT Follow-up on Luxemburg declaration: Distribution of Appeal of the PA1a Steering Group on the implementation of the Luxemburg Declaration distributed to Danube ministers of transport (Feb14) Preparation of draft Fairway Maintenance Master Plan in cooperation with the NEWADA duo project (main topic on the agenda today) Support in preparation of Conclusions on Fairway Maintenance Master Plan by the Danube Ministers of Transport Slide No. 5 Fairway Maintenance Master Plan Draft version 6 th May 014 3

Purposes of Fairway Maintenance Master Plan Highlight national needs and short term measures in the field of fairway maintenance Definition of coordinated maintenance measures that lead to efficient and effective measures and investments Provide fairway continuity : continuous availability of minimum fairway parameters (common minimum Levels of Service as defined by NEWADA duo) Main addressees of the Fairway Maintenance Master Plan: Danube Transport Ministers Slide No. 7 Fairway Maintenance Master Plan: Structure Introduction Country sections Characteristics Execution Information Monitoring Critical Locations Identification of Key Issues and Action Points based on Waterway Maintenance Cycle Planning Synthesis & Action Plan Investment costs and operational costs per need area and country Slide No. 8 4

Data are mainly based on information provided by waterway administrations and PA1a Steering Group members To be finalised: Discussion on Master Plan by PA1a Steering Group (today) Inclusion of Executive Summary (1 page) Display of critical locations on maps Completion of information on status of maintenance works and required budgets in non-newada duo partner countries (notably Germany, Bosnia and Herzegovina, Moldova, Ukraine) Slide No. 9 Feedback on contents of draft Fairway Maintenance Master Plan Reactions and feedback per country 5

LUNCH BREAK Proposed next steps towards adoption of the Fairway Maintenance Master Plan by Danube Transport Ministers 6

Proposed next steps 15 May 014: SG members to mobilize administrations which can provide data for currently lacking/incorrect data SG members / country representatives provide PA1a with contact data on institutions and administrations responsible for additionally required data 18 May 014: PA1a to contact the mentioned institutions/administrations (CC: Steering Group members), with the request to provide data for draft Fairway Maintenance Master Plan 18 June 014: Deadline for data input and validation of data (in parallel) by identified institutions and administrations 30 June 014: Finalisation of Fairway Maintenance Master Plan as input for written procedure by Danube Transport Ministers in July 014 (request for endorsement) Slide No. 13 Miscellaneous topics 7

Letters of Recommendation - applications 3D Waterway Mapping (Diving club Dunav/Serbia) Improvement of the navigation conditions on the Danube River between Calarasi and Braila : Solution for critical point n 10 Bala Branch (Egis Group / France in association with Egis Romania) Slide No. 15 Technical Assistance Facility (PA10) - Submitted proposals: "DanubeShipwreck Removal" (from waiting list 1 st Call) - Concivis UG "Sustainable economic development through enhanced logistics services linked to ports in small and medium-sized cities in the Danube Region" - Municipality of Dunaújváros "Technical assistance for preparation of project modernisation and optimisation of the maintenance activities in the common BG-RO sector of the Danube River" - Executive Agency for Exploration and Maintenance of the Danube River Decision (PA10 and Advisory Committee) to be announced next week Slide No. 16 8

Vizijármű neve/ Schiffsname Üzemmód / Betriebsform székhelye szerinti állam megnevezése / Staatsangehö rigkeit lajstromszám a / Einklarierung snummer hajótulajdon os / Schiffseigent ümer Merülése / Tiefgang üzemképessé gi érvényesség (ig) Hajó neve / Schiffsname Típusa / Typ Name und Art des Schiffes Name und Art des Schiffes name of the ship Name des Schiffes nationality / Nationality flag of vessel Registration/I MO No name of ship type flag za brod naziv broda Zastava Name und Art des Schiffes Name und Art des Schiffes Name of ship description of ship nationality of ship certificate of registry (Port; date; number) Name und Art des Schiffes Name und Art des Schiffes Heimathafen Registerort Registerort Registerort gross tonnage tonnage (inland navigation vessel) on board? Y/N company power in KW ford atest is good name and adress of ship's agent ship's owner gross tonnage net tonnage ship's power ship's draught 09.05.014 Working Group on Administrative Processes Analysis of administrative forms and identification of potential improvements Collecting feedback from shipping sector on practical administrative barriers Coordination meetings with DARIF project and Hungarian Ministry of Interior on 3 rd April and 13-14 th May 014 name of ship ship type nationality of ship certificate of registry port of registry name and adress of ship's agent ship owner gross tonnage net tonnage ship power ship draught atest is valid until 14 7 9 6 4 3 Control Exemption/Control Certificate 1 Slide No. 17 Reflection on targets for PA 1a (1) Increase the cargo transport on the river by 0% by 00 compared to 010. () Solve obstacles to navigability, taking into account the specific characteristics of each section of the Danube and its navigable tributaries and establish effective waterway infrastructure management by 015. (3) Develop efficient multimodal terminals at river ports along the Danube and its navigable tributaries to connect inland waterways with rail and road transport by 00. (4) Implement harmonised River Information Services (RIS) on the Danube and its navigable tributaries and ensure the international exchange of RIS data preferably by 015. (5) Solve the shortage of qualified personnel and harmonize education standards in inland navigation in the Danube region by 00, taking duly into account the social dimension of the respective measures. Definition of intermediate targets/milestones? Slide No. 18 9

Planning of next PA1a Working and Steering Group Meeting Kind offer of Port Authority Vukovar to hold next PA1a Working and Steering Group meetings in Vukovar / Croatia Possible time frames for two day event: 8-9 October Vukovar Slide No. 19 Any other business 10

PA 1a coordinators Austria Romania = Coordinator = Technical Secretariat Reinhard Vorderwinkler reinhard.vorderwinkler@bmvit.gv.at Gert-Jan Muilerman gert-jan.muilerman@viadonau.org Gudrun Maierbrugger gudrun.maierbrugger@viadonau.org = Coordinator & Technical Secretariat Monica Patrichi monica.patrichi@mt.ro Cristina Cuc cristina.cuc@mt.ro Slide No. 1 11