USG Ceiling Solutions USG DONN ADVANCESPAN, DXAS AND DXTAS CORRIDOR ACOUSTICAL SUSPENSION SYSTEM INSTALLATION GUIDE

Similar documents
USG Ceiling Solutions USG DONN ADVANCESPAN, DXAS AND DXTAS CORRIDOR ACOUSTICAL SUSPENSION SYSTEM INSTALLATION GUIDE

USG Ceiling Solutions. LOGIX Integrated Ceiling Systems INSTALLATION GUIDE

Installation Instructions Topo Ceiling System

Domed Ceilings and Barrel Vaults

USG EXTERIOR CEILING SYSTEMS

Ceiling System. Installation Instructions Curvatura 2 x 2

CLEANROOM GEL GRID CEILING SYSTEM PRODUCT DATA Division

INSTALLATION & OPERATION MANUAL AORCS ATLAS OPERATING ROOM CEILING SYSTEM. Redefine your comfort zone.

rondo aluminium components

1. Main Tees: Product: Donn T38 FR QRC Main Tee. Main tees shall be spaced at 1200mm centres.

Chicago Metallic 4000 Tempra 9/16

dividers (Converted)-1 12/2/05 10:05 AM Page 5 Donn Ceil Ceil Donn

9) BOM DOES NOT ACCOUNT FOR THE USE OF SCRAP OR EXCESS MATERIAL CUT FROM OTHER ITEMS.

Acoustical. Lighting

Price Guide

STRONGER THAN STEEL SṂ

STRONGER THAN STEEL SṂ

Page 1 of 1 04/19/13 SBR

Expanding Your Solutions. Viper-X Product Catalog. Interior Non-Load Bearing Wall Framing

6.0 ENGINEERING. Build Anything Better. REPRINTED 2017

#1 Selling Drywall Framing Product in USA

Standard Model Coolers, Freezers and Combination Cooler/Freezers In Stock for SAME DAY SHIPMENT

THOR 10 HAMMER CAGE INSTRUCTIONS

FireHalt TM Flexible Cavity Fire Barrier Systems

Installation of 2 Tier In Line Greeting Card Rack

COPY. **For U.S. and Canada Customers ONLY:** IF ASSISTANCE IS NEEDED,

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

RBI Solar One-Piece Ground Mount Solution GM-GS

Boat Boat Loader Fitting Instructions

NO LAKE. Standard Model Coolers, Freezers and Combination Cooler/Freezers In Stock for SAME DAY SHIPMENT

Product Identification

600 / 600FC OWNER'S MANUAL

Steel Wire Cable Tray. Fabrication Guide

3190A NEO-ANGLE DOOR INSTALLATION INSTRUCTIONS. Series MODEL NO

CI/SfB (35) Xy May Installation just got easier

worksurface supports & accessories

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

Price List. Box Edge Plus Steel Shelving. Rivet-Span. Automotive Storage. Shop Equipment STEEL SHELVING HD DRAWERS RTA STORAGE CABINETS

steel wire cable tray system accessories

OPERATION AND INSTRUCTION MANUAL Flat Roof Anchor Model: FRA250L-10X-CTS

ORNAMENTAL CANTILEVER GATE INSTRUCTIONS

HANGERS & SUPPORTS CLIP-IT CLIP-IT STUD STRAPS BAR JOIST CLIP CONDUIT HANGERS CLIP-IT

Exterior Trim. Product Specification Guide

Read through all the steps first before working on the camera. Make sure you know what to do.

It allows you to. is the Best Option. More information at

For use with the STEICOjoist System

for Cold-Formed Steel Framing Products

PRISMA. Installation, Operation, & Maintenance Manual. Climbing Panel + FREEMount System. NOTE TO INSTALLERS Always Read Instructions Before Use

PARK AVENUE 7' POOL TABLE WITH TABLE TENNIS & BENCHES ASSEMBLY INSTRUCTIONS

SASK-A-POLE OWNERS AND USERS MANUAL

ZODIAC CH 601 XL. Tail Dragger (TD) or tail wheel configuration. TD configuration (shown with dual stick option and center console).

PRODUCT CATALOGUE WHATEVER YOU RIDE WHATEVER YOU DRIVE...

How to Anchor in Hollow Materials

RITEWAY CABLE TRAY AND SUPATRAY

Trampoline Installation Instructions

Standard Hangers and Adapters

Fisher Lever-Lock Handlever Actuators for POSI-SEAL A81 Rotary Valves

Kon-Tiki / E700 Series

INTRODUCTION. Disclaimer

LPCorp.com

Extension Platform. Base Platform. Crossover. Exit railing. Exit Railing

TOWER INSPECTION REPORT

TECHNICAL HANDBOOK nvent CADDY Speed Link Manual. SLS Locking Device

TruckSkin System Installation Manual

7 FOOT POOL TABLE WITH TABLE TENNIS TOP ASSEMBLY INSTRUCTIONS

OWNER'S MANUAL. Copyright 2003 GAMMA - All Rights Reserved

FRAMING SYSTEM product catalog HDS STRONGER THAN STEEL. INTERIOR AND EXTERIOR FRAMING

OWNER'S MANUAL. Copyright 1999 ATS - All Rights Reserved

6146XX-X OPEN STYLE HOSE REELS

Features Forward facing doors which allow expansions to the side of existing cabinets.*

Fall Arrest Anchor Solutions

X-PRESS STAGE SYSTEM OWNER S MANUAL. TOOLS REQUIRED Allen Wrench (provided)

NEXT GENERATION FLEX FENCE

Installation Instructions

ADA Operations Contact Info

INFERNO 20-IN-1 MULTI-GAME TABLE ASSEMBLY INSTRUCTIONS

Installation Guide, MPower Echelon Console

200 STRINGING MACHINE

Technical information for hinges

SPOOLER INSTRUCTIONS. STEP 12 If you are going to paint your posts, that should be done at this time.

INSTALLATION AND USAGE HANDBOOK

Squeegee Unit for MRS Multi-Recovery System

Preferred Instruments Danbury, CT USA

Originally Issued: 10/08/2010 Revised: 10/27/2017 Valid Through: 10/31/2018

CADDY SPEED LINK MANUAL SLK LOCKING DEVICE

[Title of the course]

Originally Issued: 10/08/2010 Revised: 10/30/2015 Valid Through: 10/31/2016

RESIDENTIAL BUILDING PLAN REVIEW CHECKLIST

5. Tailplane assembly

accidents which arise due to non-observance of these instructions and the safety information herein. SPECIFICATIONS

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

Installation, Operation and Maintenance Manual

Installation & Assembly Instructions

Fisher Lever Lock Handlever Actuators for POSI SEAL A81 Rotary Valves

OWNERS MANUAL. Model Shown with optional Primary Mooring Cleats. Portable Mooring System SAFETY OPERATION MAINTENANCE PARTS

Standard Collection Setup Manual

Reviewed: New Effective: 5/18/12 Supersedes: New Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene

steel wire cable tray system accessories

HAI UPB Wall Switch and Auxiliary Switch Installation and Operating Instructions

READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT.

Transcription:

USG Ceiling Solutions USG DONN ADVANCESPAN, DXAS AND DXTAS CORRIDOR ACOUSTICAL SUSPENSION SYSTEM INSTALLATION GUIDE

INSTALLATION GUIDE USG DONN ADVANCESPAN, DXAS AND DXTAS CORRIDOR ACOUSTICAL SUSPENSION SYSTEM UNDERSTAND YOUR SYSTEM Page Overview.... 1 Components.... 1 Non-Seismic Installation... 3 Seismic Installation... 7 FOR MORE INFORMATION Technical Service... 800 USG.4YOU (874-4968) WEB SITE usg.com OVERVIEW USG Donn AdvanceSpan acoustical suspension systems are designed for use in corridors and other areas with crowded plenum spaces that make installing hanger wires difficult. The system is available in DXAS 15/16" and DXTAS 9/16" profiles. The main tees are compatible with all Donn DX/DXL and DXT/DXLT cross tees. The main tees are used in conjunction with the US44 reversible structural wall channel to span distances up to 8' with no hanger wires. COMPONENTS ADVANCESPAN MAIN TEES DXTAS DXAS 2 3 /4" 2 3 /4" 9 /16" 15 /16" 1

ATTACHMENT CLIPS US44 AdvanceSpan Reversible Structural Wall Channel Molding 1 /2" 2 7 /8" 1" ASMTP: AdvanceSpan Main Tee Splice Plate US44CC: AdvanceSpan Channel Clip 5" 1" 15 /16" 2 1 /2" 4 1 /2" 2" 5 /16" 2 7 /8" 3 /32" 1 /8" 2 1 /2" 1" 2 5 /16" ASCBC: AdvanceSpan Cross Brace Clip 2" 1 1 /2" 2 1 /4" 2 1 /2" 3 /8" 1 1 /2" 5 /16" 1 1 /2" 2

NON-SEISMIC INSTALLATION INSTRUCTIONS A1: Install the structural wall channel. The wall channel is reversible and can be installed with either the 1/2" leg or 1" leg on the bottom. Using drywall screws, attach the structural wall channel through the upper half of the body to each stud typically 16" or 24" max OC. Powder actuated fasteners or similar can be used for masonry or concrete walls. A2: Install the main tees Measure from the center cross tee punch and trim the necessary amounts from each end of the main tee according to the corridor width. Adjust as needed to ensure the main tee center remains aligned with the ceiling panel layout (Figure 1). Bend the US44CC as shown in Figure 2 to from a right angle. Snap the US44CC into the wall channel with the two longer tabs down. If the 1/2" leg is on the lower side, bend the two long tabs up so that the clip to snaps in securely (Figure 3). Use a framing screw to attach the US44CC to the in the upper screw hole. For masonry walls, attached the US44CC clip to the US44 channel molding through the top leg into the pilot hole on the top of the clip (Figure 3). Install the main tees by screw attaching the US44 channel clip to the web of the main tees through the hole on the upper tab (Figure 4). Important: All main tees must be attached with US44 channel clips on each end. For distances exceeding maximum unsupported spans, install hanger wires on main tees, or use the AdvanceSpan cross brace clip method to provide intermediate support (Figure 9, 10). To join main tees together, use the ASMTP splice plate as shown in Figure 7. When splicing main tees together, ensure that the center to center cross tee punch spacing is maintained between tees. Trim main tee ends if necessary to maintain module spacing. For corridor intersections, use the ASMTP splice plate as shown in Figures 5, 6, 11, and 12. Figures 11 and 12 show typical three way and four way intersection framing layouts. Note: The splice plate requires two screws on each main tee as shown. A3: Install the infill cross tees using the appropriate DX/DXL or DXT/DXLT cross tees. The US44CC and be trimmed to provide additional clearance for tile installation if desired (Figure 15). The US44CC is compatible with 1-1/2" tall cross tees only. Figure 1 102", 126", & 150" Standard Lengths (+/- 1/4") 12" o.c. 2 3 /4" 6" o.c. Figure 2 Figure 3 90 1 2 Bend tabs up when installing US44 channel molding with 1 /2" leg exposed 3

NON-SEISMIC INSTALLATION INSTRUCTIONS CONT. Figure 4 US44 channel molding 5 /8" gypsum board US44 channel molding 5 /8" gypsum board screw stud screw stud DXAS Main Tee with US44CC Channel Clip to US44 Wall Channel Attachment, Drywall Partition - Fixed DXTAS Main Tee with US44CC Channel Clip to US44 Wall Channel Attachment, Drywall Partition - Fixed Figure 5 Figure 6 90 AdvanceSpan DXAS Main Tee Intersection with ASMTSP Splice Plate Figure 7 AdvanceSpan DXTAS Main Tee End Splice with ASMTSP Splice Plate 4

NON-SEISMIC INSTALLATION INSTRUCTIONS CONT. Figure 8 Up to 8'-0" 1 US44CC Channel Clips on all main tees Up to 8'-0" 1 US44CC Channel Clips on all main tees AdvanceSpan Main Tees ncespan Main Tees 2' Cross Tees as required 2' Cross Tees as required 1. 8'-0" max. for intermediate duty performance, 7'-0" max. for heavy duty performance Non-Seismic Installation, No Hanger Wires Non-Seismic Installation, No Hanger Wires Figure 9 US44CC Channel Clips on all main tees Up to 16'-0" 1 US44CC Channel Clips on all main tees 8'-0" max. 3 Hanger wires Up to 16'-0" 1 8'-0" max. 3 Hanger wires AdvanceSpan Main Tees ASMTSP splice clip 2 ASMTSP splice clip 2 2' Cross Tees as required 1. 14'-0" for heavy duty load rating 2. Requires splicing main tees with ASMTSP splice clip 3. 7'-0" for heavy duty load rating an Main Tees 2' Cross Tees as required 1. 14'-0" for heavy duty load rating 2. Requires splicing main tees with ASMTSP splice clip 3. 7'-0" for heavy duty load rating Non-Seismic Installation, One Hanger Wire Non-Seismic Installation, One Hanger Wire 5

NON-SEISMIC INSTALLATION INSTRUCTIONS CONT. Figure 10 Using additional AdvanceSpan main tee as a cross brace support for repositioning hanger wires. Attached to system main tees using ASCBC AdvanceSpan Cross Brace Clip. Hanger wire offset from lower main Hanger wire offset from lower main US44CC Channel Clips on all main tees US44CC Channel Clips on all main tees ASCBC Cross Brace Clip Up to 16'-0" 1 Cross lip Up to 16'-0" 1 Hanger wires 4'-0" o.c. Hanger wires 4'-0" o.c. 8'-0" max. 3 8'-0" max. 3 an Main Tees 2' Cross Tees as required AdvanceSpan Main Tee ASCBC Cross Brace Clip ASMTSP splice clip 2 AdvanceSpan Main Tees 1. 14'-0" for heavy duty load rating 2. Requires splicing main tees with ASMTSP splice clip 3. 7'-0" for heavy duty load rating 2' Cross Tees as required Non-Seismic Installation, One Hanger Wire Using ASCBC Cross Brace Clip AdvanceSpan Main Tee ASCBC Cross Brace Clip ASMTSP splice clip 2 1. 14'-0" for heavy duty load rating 2. Requires splicing main tees with ASMTSP splice clip 3. 7'-0" for heavy duty load rating Non-Seismic Installation, One Hanger Wire Using ASCBC Cross Brace Clip Figure 11 One hanger wire within center 1/3 of AdvanceSpan main tee Hanger wires within 8'* or wall of AdvanceSpan main tee intersection KEY DX/DXT AS Main Tee US44CC ASMTSP Splice Plates * 7'-0" for heavy duty rating Typical Main Tee Layout 3-Way Intersection Figure 12 One hanger wire within center 1/3 of AdvanceSpan main tee Hanger wires within 8'* or wall of AdvanceSpan main tee intersection One hanger wire within center 1/3 of AdvanceSpan main tee KEY DX/DXT AS Main Tee US44CC ASMTSP Splice Plates * 7'-0" for heavy duty rating Typical Main Tee Layout 4-Way Intersection 6

SEISMIC INSTALLATION INSTRUCTIONS For installations in seismic zones C, D, E, & F, the system has been tested in accordance with AC156 by the University of California, Berkeley Seismology Laboratory. All tests were conducted without perimeter wires, lateral bracing splay wires, and compression posts. B1: Install the structural wall channel For seismic installation, the structural wall channel must be installed with the 1" leg down. Using Drywall screws, attach the structural wall channel through the upper half of the body to each stud, drywall 16" or 24" OC max. Powder actuated fasteners or similar can be used for masonry or concrete walls. B2: Install the main tees The system is installed with two adjacent walls fixed to the channel molding, and on opposing adjacent walls floating to provide +/- 3/4" movement between the tees and the wall molding. Trim the main tees leaving a 3/4" gap on one wall, keeping the center of the main tee aligned with ceiling panel layout (Figure 1). Bend the US44CC as shown in Figure 2 to from a right angle. Snap the US44CC into the wall channel with the two longer tabs down. Use a framing screw to attach the US44CC to the in the upper pilot hole (Figure 3). For masonry walls, attached the US44CC clip to the US44 channel molding through the top leg into the pilot hole on the top of the clip. Fixed side: Install the main tees by screw attaching the US44 channel clip to the web of the main tees with one framing screw through the pilot holes on the upper tab (Figure 13). Floating side: Attach the main tees to the US44CC channel clips with one framing screw through at the center of the slot located at the top of the clip. Do not overtighten the screw (Figure 14). For distances exceeding maximum unsupported spans, install hanger wires on main tees, or use the AdvanceSpan cross brace clip method to provide intermediate support (Figures 22-23). B-3: Install the infill cross tees using the appropriate DX/DXL or DXT/DXLT cross tees Perimeter cross tees are installed either fixed or floating on the adjacent walls corresponding with the main tees. The cross tees are attached to the US44 structural channel molding using the US44CC channel clip. Fixed side: attach the cross tee to the US44CC with a framing screw through the pilot hole into the bulb of the tee (Figure 15). Floating side: cut the perimeter cross tees to length leaving a 3/4" gap between the cross tee and channel molding. Attach the cross tee to the US44CC with a framing screw in the center of the slot to the cross tee bulb (Figure 16). Important: The US44CC is compatible only with 1-1/2" tall cross tees. B-4: Floating main tee splices and expansion joints are constructed using the ASTMP splice plate and appropriate tee face sleeve, TFS -1 for DX and TFS-2 for DXT For expansion joints between longitudinal mains, leave the prescribed gap between the main tees and attach the ASTMP splice clip to each main through the center of the slot using a framing screw (Figure 18). The ASMTP splice plate can be used to attach cross tees to main tees at off module locations. The cross tees can be installed either fixed or floating, see Figures 19-20. B-5: Framing intersections and corners For seismic category three way and four way corridor intersection framing layouts, see Figures 24 and 25. For expansion joints at corners, bend the ASTMP splice plate to form a 90 angle. Attach the ASTMP to the longitudinal main tee using two screws. Install the face sleeve over the intersecting main tee and attach to the ASTMP through the center of the slot leaving the prescribed gap between the tees (Figure 17). 7

SEISMIC INSTALLATION INSTRUCTIONS CONT. Figure 13 Figure 14 US44CC Channel Clips on all main tee US44 channel molding 5 /8" gypsum board US44CC Channel Clips on all main tee US44 channel molding 5 /8" gypsum board one screw in either upper pilot hole screw stud screw screw stud AdvanceSpan Main Tee AdvanceSpan Main Tee 3 /4" gap Fixed DX/DXT AS Main Tee to Attachment Floating DX/DXT AS Main Tee to Attachment Figure 15 Figure 16 Trim the US44CC by snipping the tabs at the top slot to facilitate tile installation Trim the US44CC by snipping the tabs at the top slot to facilitate tile installation Cross Tee Attached to with Trimmed US44CC Channel Clip Cross Tee Attached to with Trimmed US44CC Channel Clip Figure 17 Figure 18 1" gap face sleeve face sleeve 1" gap AdvanceSpan DXAS Main Tee Intersection with ASMTSP Splice Plate AdvanceSpan DXAS Main Tee End Splice with ASMTSP Splice Plate 8

SEISMIC INSTALLATION INSTRUCTIONS CONT. Figure 19 Figure 20 AdvanceSpan DXAS Main Tee to Cross Tee Intersection with ASMTSP Splice Plate - Fixed AdvanceSpan DXAS Main Tee to Cross Tee Intersection with ASMTSP Splice Plate - Floating Figure 21 US44CC Channel Clips on all tees, two adjacent sides fixed, two floating Up to 7'-0" Light fixtures screw attached to tees, two slack wires attached to light fixture See US44CC Channel Clip installation details AdvanceSpan Main Tees 2' Cross Tees as required. Infill 2' tees may be 1" high (e.g. Donn DX/DXL216) 1-1/2" high cross tees field cut at all perimeters Seismic Installation, No Hanger Wires Figure 22 US44CC Channel Clips on all tees, two adjacent sides fixed, two floating Up to 14'-0" Light fixtures screw attached to tees, two slack wires attached to light fixture See US44CC Channel Clip installation details 7'-0" max. Hanger wires AdvanceSpan Main Tees 2' Cross Tees as required. Infill 2' tees may be 1" high (e.g. Donn DX/DXL216) 1-1/2" high cross tees field cut at all perimeters Seismic Installation, One Hanger Wire 9

SEISMIC INSTALLATION INSTRUCTIONS CONT. Figure 23 Hanger wire offset from lower main US44CC Channel Clips on all tees, two adjacent sides fixed, two floating ASCBC Cross Brace Clip Up to 14'-0" Light fixtures screw attached to tees, two slack wires attached to light fixture See US44CC Channel Clip installation details 7'-0" max. Hanger wires 4'-0" o.c. AdvanceSpan Main Tee AdvanceSpan Main Tees ASCBC Cross Brace Clip 2' Cross Tees as required. Infill 2' tees may be 1" high (e.g. Donn DX/DXL216) 1-1/2" high cross tees field cut at all perimeters Seismic Installation, One Hanger Wire Using ASCBC Cross Brace Clip Figure 24 3-Way Seismic Intersection Typical Main Tee Layout One hanger wire within center 1/3 of AdvanceSpan main tee Hanger wires within 8'* or wall of AdvanceSpan main tee intersection KEY DX/DXT AS Main Tee US44CC ASMTSP Splice Plates * 7'-0" for heavy duty rating Typical Main Tee Layout 3-Way Intersection (Non-Seismic) Figure 25 4-Way Seismic Intersection Typical Main Tee Layout One hanger wire within center 1/3 of AdvanceSpan main tee Hanger wires within 8'* or wall of AdvanceSpan main tee intersection One hanger wire within center 1/3 of AdvanceSpan main tee KEY DX/DXT AS Main Tee US44CC ASMTSP Splice Plates * 7'-0" for heavy duty rating Typical Main Tee Layout 4-Way Intersection (Non-Seismic) 10

PRODUCT INFORMATION See usg.com for the most up-to-date product information. CUSTOMER SERVICE 800 950-3839 TECHNICAL SERVICE 800 USG.4YOU (874-4968) WEBSITES usg.com PRODUCT LITERATURE Data Sheet AC3325 LIMITATIONS Interior applications only NOTICE We shall not be liable for incidental and consequential damages, directly or indirectly sustained, nor for any loss caused by application of these goods not in accordance with current printed instructions or for other than the intended use. Our liability is expressly limited to replacement of defective goods. Any claim shall be deemed waived unless made in writing to us within thirty (30) days from date it was or reasonably should have been discovered. SAFETY FIRST! Follow good safety/industrial hygiene practices during installation. Wear appropriate personal protective equipment. Read SDS and literature before specification and installation. AC3325/5-16 2016 USG Corporation and/or its affiliates. All rights reserved. Printed in U.S.A. The trademarks USG, ACOUSTIBOND, CENTRICITEE, COMPÄSSO, DONN, DX, DXI, DXF, DXFF, DXL, DXLT, DXT, FINELINE, TRUE WOOD, IT S YOUR WORLD. BUILD IT., The USG logo, the design elements and colors, and related marks are trademarks of USG Corporation or its affiliates.