Bus Rapid Transit: How Delhi Compares

Similar documents
CHAPTER 3: INFRASTRUCTURE AND BUS TRANSPORT INFRASTRUCTURE AND BUS TRANSPORT ROUTE PLANNING BASED ON DEMAND ASSESSMENTS

New State of the Art BRT systems Walter Hook, Executive Director, ITDP NYU, February 2010

BRT Standard 2016 Edition. Jacob Mason Transport Research and Evaluation Manager July 26, 2016

Delhi BRT System Lessons Learnt

CAI-Asia and Sustainable Urban Mobility in Asia (SUMA): Bus Rapid Transit Systems

28th Nov 2014 Chandramauli Shukla CEO, BCLL, Bhopal

Scope of the Transit Priority Project

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Integrated Corridor Approach to Urban Transport. O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012

Experience from India Future Perspectives

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

A STUDY ON BRT APPLICABILITY ON LARGE CITIES IN DEVELOPING COUNTRIES

Roadways. Roadways III.

Bus Rapid Transit (BRT) sets a new global trend in public transportation

Bus Rapid Transit on City Streets. How Does It Work

PESHAWAR Bus Rapid TRANSIT. By Engr. Haroon Rashid Ph. D Scholar, MS in Transportation Planning and B.Sc Civil Engineering

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

BURGAS INTEGRATED PUBLIC TRANSPORT PROJECT. Information day, 5 th July 2011, Burgas

DDI s Can Move More Than Cars! 2016 Western ITE Conference Albuquerque, NM July 12, 2016 Alex Ariniello, P.E. Public Works Director, Town of Superior

Modal Integration with other modes. Jorge Minteguiaga

Traditional Public Transport Priority. Priority/Traffic Management? What is Integrated Public Transport Priority/Traffic management? Why? How?

Safety impacts of pedestrian crossing configurations and other features of signalized junctions on public transport routes

Global BRT Trends COST Action Conference

James Gast Deputy Project Manager DMJM+HARRIS 1550 Wilson Boulevard, Suite 300 Arlington, VA Tel

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Speaker: Brian Dranzik, Fiscal & Policy Administrator Milwaukee County

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Chapter 3 BUS IMPROVEMENT CONCEPTS

Creating the Future Bruce B Downs Blvd

Copenhagen Cycling Map. Red Lines Cycling facilities

Standard. Version 1.0

The City. Population of BH. Population of RMBH. 2.4 million inhabitants. 5.7 million inhabitants. 6.3 million trips a day

Urban Mobility Designing focusing on potential of buses

The Moscow Department for Transport and Road Infrastructure

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Public Comment Meeting Geary BRT Project Draft Environmental Impact Statement/Report

North Turnaround. Option 3: Best facilitates transfers from local to rapid transit services. High cost

Joe Routt Boulevard. Access Design Options

9. TRANSIT ACCOMMODATIONS

Operational Comparison of Transit Signal Priority Strategies

Richmond-Adelaide Cycle Tracks

M14A/D Select Bus Service

Introduction: Janmarg also known as Ahmadabad

Road Safety and Bus Rapid Transit

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

ALTERNATIVE A ONLY. Right Turn Only. BOTH ALTERNATIVES on southbound Mission from 23rd St to 25th St and on northbound Mission from 20th St to 23rd St

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

Multimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Traffic Engineering and Operations for BRT in Los Angeles

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Bus Rapid Transit Plans

Broadway Complete Streets Project

Welcome. If you have any questions or comments on the project, please contact:

SUPERSTREETS IN TEXAS. ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011

URBAN AGE CONFERENCE GOVERNING URBAN FUTURES

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

SOCIALLY AND ENVIRONMENTALLY SUSTAINABLE URBAN TRANSPORT

David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

ADVANCED TRANSIT OPERATIONS AND MODELING

Frequently Asked Questions (FAQ)

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

7 June 2018 OUR REF:

Draft North Industrial Area-Wide Traffic Plan

Arterial Transitway Corridors Study. Sept. 26, 2011

VOLUME 5 Technology and Option Evaluation

Preliminary Transportation Analysis

Urban Transportation Planning and TOD Research in Japan

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

How To Encourage More Efficient Transportation in Brazilian Cities

Public Transport and NMT Facilities in Santiago, Chile

Aurora Corridor to E Line

DELHI BUS CORRIDOR: AN EVALUATION

Understanding Road Safety Impact of High-Performance Bus Rapid Transit and Busway Design Features

122 Avenue: 107 Street to Fort Road

Tonight is for you. Learn everything you can. Share all your ideas.

Alternatives Public Workshop

WELCOME BUS RAPID TRANSIT PUBLIC MEETING. MEETING TIME: 5 p.m. - 8 p.m.

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Arterial Transitway Corridors Study. Ave

York Region Rapid Transit Corporation

2017 The first stage of the DFS was completed and Interim Public Consultation is launched Study Background

Public Information Meeting

Classification Criteria

9. TRANSIT ACCOMMODATIONS

Central Jersey Transportation Forum. March 2007

Bluffdale/ UDOT South High-T Intersection Project Type Operations

5. RUNNINGWAY GUIDELINES

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

Transcription:

Bus Rapid Transit: How Delhi Compares

Delhi BRT Modern Low Floor CNG Buses are a big improvement: Lower Particulate emissions than TransMilenio

Grade A Cycling Facilities Bike flows at peak are as high as 1200, highest in world after China

Grade A Pedestrian Facilities set a new high standard for BRT

At grade pedestrian crossing is fine and Normal

Central lane bus configuration is NORMAL and critical to increasing speeds Bus express lane Lanes of mixed traffic Achieving high capacities with express lanes

The QUINTESSENTIAL BRT: Quito EcoVia Line

Central lane BRT ends conflicts with bikes and peds Delhi BRT Corridor before BRT

Bike lane and central buslane configuration ends bus bike conflict

Issues; Delhi HCBS allows Non-BRT Buses in the Buslane, many DETERIORATED BUSES: frequent stalls and breakdowns Only newer buses regulated by DIMTS and meeting quality standard and maintenance should be allowed

Non-BRT Buses interrupt the planned function of the BRT station

Station Comfort is only FAIR

Ahmedabad Station Design is Nicer AHMEDABAD MUNICIPAL CORPORATION AND AHMEDABAD JANMARG LIMITED

TransMilenio feels like a metro station

TransMilenio is as comfortable as a metro station Bogota

Station configuration creates very wild weaving motions at intersections contributing to accidents

Sao Paulo Novo de Julio Before and After reconstruction to central median station configuration

Delhi: 12,000 pphpd, 13km/hr Passenger Volumes are Good: Speed is slow 19

Bus speed slow, Mixed traffic speeds deteriorated Line Speed KPH Ridership (passengers / hour / direction) Impact on Mixed Traffic Bogotá TransMilenio 29 42,000 Improved a lot São Paulo 9 de julho 12 34,910 Improved some Porto Alegre Assis Brasil 18 28,000 N.A. Belo Horizonte Cristiano Machado 15 21,100 N.A. Delhi 13 12,000 Deteriorated Significantly Curitiba Eixo Sul 21 10,640 N.A. Mexico City Metrobus 21 8500 Deteriorated a little Quito EcoVia 18 10,200 Improved significantly TransJakarta 18 4500 Deteriorated significantly Beijing 15 7500 No effect, new road

Bus speeds are slow because buses cue at the station OR the intersection Sao Paulo only 12kph because of bus cueing at station They need passing lanes and route reconfiguration, and to increase boarding speed.

Taipei BRT has similar bus cueing problem to Delhi

Delhi Bus speeds slow because of junction/bus station interference

Delhi BRT is getting 13 buses/direction through the junction on one cycle only because passengers are boarding up the road off the platform. This is the cause of pedestrian danger, NOT the at grade crossing

JUNCTION DESIGN INITIAL CONCEPT

JUNCTION DESIGN FINAL DESIGN

80% of Old buses remained in mixed traffic lanes TransJakarta Jammed the Corridor Also, but for different reasons.

Junction conflict with BRT station and turning movements are the cause of mixed traffic delay. Six signal phases, each six minutes. TransMilenio is three phases, three minutes max

Space for BRT system (stations and runways) Space for mixed traffic (roadway)

Seoul stations have one long platform, one passing lane (consumes 3 rather than Delhi s 4 lanes), and are far from the junction, allowing more mixed traffic turning lanes at the junction

JUNCTION DESIGN INITIAL FINAL DESIGN CONCEPT Fewer lanes to cross to reach BRT station Synchronized signals for safe pedestrian crossing Median Station allows for easy transfers More space for mixed traffic at intersection

Delhi has six phase junctions, TransMilenio has 2 or 3 phases

What Can Delhi do now? Making Right Turning and left turning buses enter mixed traffic lanes would eliminate 2 signal phases

Simplifying the routing structure simplifies the signal phases Local service only Add routes to simply transfers Add limited-stop services Add express services

No turning routes simplifies intersection the most

Some turns allowed: a compromise between directness of routing and intersection simplicity

Operational Control System helps buses follow schedule to avoid cueing problem SATELLITE WIRELESS NETWORK GPS-GPRS module on entire Bus fleet (BRT and AMTS) Automatic transmission of Vehicle Location to Central Control Center (CCC) CCC - Bus Driver communication for desired Level of Service Operator Performance Reports Automatically generated Operator Payment Advice. Short payment cycles. CONTROL CENTRE BUS GPS-GPRS COMMUNICATION MODULE REPORTS

Bus routes can be relocated or eliminated

OPERATIONAL PLAN Trunk, Feeder and complimentary routes could be considered

Contract out more of the system to private sector Curitiba URBS Bogota TransMilenio Santiago TransSantiago Delhi Bus Procurement Private Private Private Public Bus Operations Private Private Private Public and Private Fare Collection Public Private Private Public Trust Fund Public Private Private None Control Center Public Public Private None Operational Planning Public Public Private None Setting the Fare Public Public Public Public System Design Public Public Public Public Service Standards Public Public Public (none)