Purpose. Scope. Responsibility. Qualitative measures of Likelihood

Similar documents
Responsibility. Qualitative measures of Likelihood. A Almost certain Daily Occurrence: Common or frequent. Qualitative Measures of Consequence

Blast Bag SOLO is now the Blast Bag ZERO The industry leading gas bags are now even safer...

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

CIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS

PLANT RISK ASSESSMENT REPORT

THE UNIVERSITY OF NEWCASTLE- DISCIPLINE OF MEDICAL BIOCHEMISTRY. STANDARD OPERATING PROCEDURE PROCEDURE NO: GLP 022 MOD: 1st Issue Page: 1 of 8

SUMMARY INFORMATION ONLY

WORK METHOD STATEMENT CARPET LAYING

COMMISSIONING TESTS FOR NEW HV CABLES (UP TO 33 KV) JOB SAFETY ANALYSIS

SAFETY MANAGEMENT SYSTEM

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

WORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

SAFETY MANAGEMENT SYSTEM

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

Archery Risk Management Plan Lutanda Yarramundi

Abseiling Risk Management Plan Lutanda Yarramundi

Material Safety Data Sheet

Faculty/School: Pharmacy Initial Issue Date: Oct 2016

Faculty/School: Pharmacy Initial Issue Date: Oct Dr. Alpesh Patel and Padmaja Dhanvate

SAFETY MANAGEMENT SYSTEM

SAFE WORK METHOD STATEMENT Part 1

SAFE WORK METHOD STATEMENT SWMS No Version

SAFETY MANAGEMENT SYSTEM

WORK METHOD STATEMENT TERMITE PROTECTION

WORK METHOD STATEMENT STRUCTURAL STEEL

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

EVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1

SAFETY MANAGEMENT SYSTEM

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

AC1810 / AC1810-A TECHNICAL SPECIFICATIONS. Operating Pressure psi ( kgs/cm²) [AC1810] Displacement. Net Weight

Material Safety Data Sheet. Helmar Crystal Kote Fixative

Product Risk Assessment

HAZARD MANAGEMENT PROCEDURE

MATERIAL SAFETY DATA SHEET. ACTION LANOSPRAY Commercial Grade Lanolin Protection

THE UNIVERSITY OF NEWCASTLE - DISCIPLINE OF MEDICAL BIOCHEMISTRY

Faculty/School: Pharmacy Initial Issue Date: Oct 2016

SEAGO LIFERAFT GX MODEL

Safe Work Method Statements (SWMS)

WHS F029 Job Safety Analysis (JSA) and volume less than 10m2

WORK METHOD STATEMENT ELECTRICAL

Material Safety Data Sheet. Helmar Crystal Kote Picture Varnish Gloss

METHODOLOGY RISK TABLES TABLE 1 - QUALITATIVE MEASURES OF CONSEQUENCE OR IMPACT TABLE 2 - QUALITATIVE MEASURES OF LIKELIHOOD

TERMATRIX TERMITE FOAM AEROSOL

SAFETY DATA SHEET According to Regulation (EC) N 1907/2006

LPG SAFETY INFORMATION. Kwik-Gas. Safety Manual. Less talk more energy

Abseiling Risk Management Plan

MSDS Interspiro Spiroscape EEBD (compressed breathing air)

MATERIAL SAFETY DATA SHEET

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Faculty/School: Faculty of Pharmacy Initial Issue Date: Oct 2016

MATERIAL SAFETY DATA SHEET COMPRESSED HELIOX

POSITION OF PERSON COMPLETING REPORT: IN CONSULTATION WITH: David Radolovic POSITION: HSR/ Program Coordinator

Conducting An Effective. Welcome!

Important Safety Information Enclosed

1. Product And Company Identification

Safety Data Sheet. 1. IDENTIFICATION OF THE MATERIAL AND SUPPLIER Product Name Occlude Aerosol Indicator Marking Spray

Inflatable Packers for Grouting 11/10/00

Rock Climbing Risk Management Plan Lutanda Yarramundi

SAFETY DATA SHEET FILE NO.: NTP/SBC/1002 Product Name: Nanoman Stone Brick & Concrete Coating MSDS DATE: 01/01/2017 PAGE 1 OF 5

Phalanx Alpha Phalanx Beta and Ultra Elite

PLANT RISK ASSESSMENT REPORT

Faculty/School: Pharmacy Initial Issue Date: Oct 2016

Mountain Bike Risk Management Plan

RB 80 HYDRAULIC PROP RISK ASSESSMENT

Safety Data Sheet. Product Name Occlude Aerosol Indicator Marking Spray

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

ROLLGLISS TOP/R350. Safety and rescue system. Operating and Maintenance Instructions

PLANT RISK ASSESSMENT REPORT

Label 2.2: Non-flammable, Non-toxic gas 1. IDENTIFICATION OF THE SUBSTANCE/PREPARATION AND OF THE COMPANY/UNDERTAKING

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

Operator s Manual. with Maintenance Schedule. Fourth Edition Second Printing Part No

Respiratory Protection. Program

Bhadwasi Gypsum Mine, Rajasthan State Mines & Minerals Limited CHAPTER VII Additional studies

Telco Antennas SWMS Working At Height Above 2m

Potential hazards People at risk and how? Actions already in place Further action required Action by

Risk Assessment Form

PLANT RISK ASSESSMENT REPORT

Supervisors guide for managing reported hazards and incident (HS714)

Standard Operating Procedure (SOP)

Installation Instructions Air Compressor Part # 2780, 2781

Australian Standards. Constraints

SAFE WORK METHOD STATEMENT

!!!!! MATERIAL SAFETY DATA SHEET Section 1 Identification of Chemical Product and Company. Action Corrosion Clear Coat Aerosol 400g

MATERIAL SAFETY DATA SHEET COMPRESSED LASER-GAS

Accident /Incident/Injury Report & Investigation Form

Material Safety Data Sheet. Aerosol Nuart Mat Spray

HS329 Risk Management Procedure

SAFETY DATA SHEET Guardian Products - Shoe Fresh

ASSOCIATED DOCUMENTS:

Safe Work Method Statement

In an emergency the safety of all personnel and the public is of priority.

Guide to reporting hazards and incidents (HS713)

Safe Work Method Statement

SAFE WORK METHOD STATEMENT CARPENTER

Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028. Name Date Signature. Author Jarred Hearle 30/11/2014. Reviewed John Nulty 30/11/2014

SAFETY TRAINING LEAFLET 06 CARBON DIOXIDE

ANNUAL SELF INSPECTION / SERVICING INSTRUCTION SHEET

Transcription:

Authorised by: MTi GROUP Rev Date: 30.03.15 Purpose Scope Responsibility This procedure defines the processes to be followed in order to identify health and safety hazards, assess the risks associated with hazards relating to use of aerosol inflated blast hole blocker. This risk Assessment details the safe handling procedures for aerosol-inflated blast hole blockers and positioning of the blast hole blocker in a blast hole. Any personnel using Hero blast bag products are responsible for compliance with and implementing this procedure in their area of responsibility. 1 Introduction This procedure defines the processes to be followed in order to identify health and safety hazards, assess the risks associated with each hazard and apply controls (where required) to reduce associated risks. 2. Assessment When assessing risk, the likelihood of the hazard occurring and the potential consequences if the hazard occurred are to be considered, as described in the following tables. Qualitative measures of Likelihood Level Descriptor Description A Almost certain Daily Occurrence: Common or frequent. B Likely Weekly Occurrence: Has happened or a near miss has occurred within PDL Toll. C Possible Monthly Occurrence: Could occur or has been known to have occurred else where. D Unlikely Annual Occurrence: Feasible to occur, not known to have occurred else where. E Rare Once in 5 years: Whilst feasible, considered to be highly unlikely but not impossible. F Extremely Rare < Once in 5 years: Practically impossible. Qualitative Measures of Consequence Level Descriptor Example Detail Description 1 Insignificant No injuries would be expected, possible minor discomfort. Insignificant financial loss 2 Minor Minor / in-house first aid treatment, able to return to work immediately with no lost time. Minor financial loss 3 External medical treatment required possible lost time injury. Financial Loss 4 Major Extensive injuries, lost time injury, hospitalisation. High financial loss 5 Catastrophic Potential death or permanent disability. Detrimental financial loss

Qualitative Analysis Matrix Level of Consequences Likelihood Insignificant Minor Major Catastrophic 1 2 3 4 5 A (Almost certain) H H E E E B (Likely) M H H E E C () L M H E E D (Unlikely L L M H E E (Rare) L L M H H F (Extremely Rare) L L L M M Legend - E: Extreme ; H: High ; M: ; L: RISK ASSESSMENT: OPERATING HERO BLAST BAG STEP ACTIVITY HAZARD(S) IDENTIFIED 1. Selection: Select correct size BlastBag plug for appropriate hole. and remove from carton just prior to use. Check Chemeleon safety logo to make sure bag has been stored safely If DANGER is activated use in accordance with 6.2 2. Positioning: Determine depth. Grasp the canister firmly in one hand and with one firm movement of the thumb activate the latching mechanism of the aerosol until the latch clicks and a steady stream of gas is expelling from the canister. 3. Quickly lower the BlastBag plug down to the required depth until the drop cord is tight. Bag Bursting/heari ng/ slumping / misfire Aerosol Can exploding Can bursting Can Bursting Pinch Point Muscular /joint pain Slip/trip RSI Muscular /joint pain Slip/Trip RISK(1) E3 C1 D2 RISK CONTROL(S) REQUIRED Check bag size range and compare with actual hole diameter. Use correct bag for hole range. See chart Storage in accordance with AS2278-2008. Do not expose to direct sunlight. Check label and understand how it works before handling. Read SOP. Dispose correctly PPE-Gloves Stretch prior to RISK (2) F2

4. After 15-30 seconds the BlastBag plug will grip walls of the blast hole. Tugging the drop line will confirm the bag has gripped the walls of the blast hole. 5. A firm upward pull on the drop line will break the tag from the top of the BlastBag plug when in position allowing the drop cord to be retrieved. 6. Removal: If the bag needs to be removed from the blast hole this can be done by bursting the bag in situ, waiting for deflation and then retrieving the bag. 7 Important Steps: For best results in all ground types, wait 10-15 min before loading on top of BlastBag TM plug and 30 min if ambient is less than 15 degrees C Always kick in at least 2 boot loads of drill cuttings to protect bag from falling stemming or debris Muscular/Joint Pain Slip/Trip Muscular/Joint Pain Slip/Trip Foreign body in eye Cut/Impale Asphyxiation, Freeze burn from liquid gas, Stored energy constrained by bag. Hole slumping and misfires Slip /Trip E4 High D3 High Correct PPE Clear working Area Well ventilated area Do not breathe in gas vapour. Conduct risk assessment to ensure there is no stored energy held in place by bag. Follow SOP Stretch prior to and ensure even footing E2 E2 For shale bands or muddy condition it is best to use 2 bags to increase wall contact and reduce the chance of slippage. Hole slumping and misfires High Wait at least 5 minutes for lower bag to complete inflation otherwise risk overpressure and bursting E3

2 SAFETY AND HAZARDS 2.1 Aerosol canister prone to de-crimp if exposed to elevated temperatures or direct sunlight for prolonged periods of time. 2.2 Aerosol canister exploding after being punctured or incinerated. 2.3 Debris in eyes and or propellant in face if lanced incorrectly. 2.4 Freeze burn from liquidified gas propellant. 2.5 Inhalation risk where inflated bag is discharged in enclosed area or many bags are lanced in quick succession - hazard inherent in all self-inflating bags due to oxygen displacement. 3 SAFE HANDLING PROCEDURES 3.1 Storage: Store as per AS2278-2008 and Australian dangerous goods code. Do not store above 50C, do not store in direct sunlight, keep BlastBag plugs in box until ready for use. 3.2 Transport: Transport as UN1950 Class 2.2, Hazchem code 2Y. 3.3 Disposal: If Chemeleon Label reads safe bag can be disposed of normally by first initiating the bag and allowing it to fully inflate with no gas in liquid form. Bag should then be pierced in a well-ventilated area and allowed to deflate prior to disposal. If an inflated bag needs to be removed from a blast hole, lance in position and remove from hole using drop cord, avoid breathing in gas. Although gas is non-toxic, excessive levels can present asphyxiation risks as gas cannot be substituted for breathable air. 3.4 Overheating: Aerosol cans may explode due to expansion of gas if overheated. Do not approach if Chemeleon Indicator reads DANGER and HOT! Make all crew and supervisor aware and allow product to cool, remove from heat source if safe to do so. 3.5 Spills: Spills or leaking cans should be moved to a well-ventilated area and handled with correct PPE. 3.6 Enclosed areas: Although contents of aerosol are non-toxic, injuries may be sustained through asphyxiation if cans are allowed to discharge in a confined space.

4 MATERIALS / EQUIPMENT 4.1 BlastBag Plug 4.2 Drop cord (string or rope) 4.3 PPE 4.4 Bust and Retrieval Tool 5 SAFE WORKING PROCEDURE 5.1 Select correct size BlastBag plug for appropriate hole and remove from carton just prior to use. 1. Bag has a label with design hole size on it, check table below for safe range: Table 1: Sizing Chart Model Part # Design Hole Safe Hole Range Diameter (mm) (mm) EMU HERO 33-034 311mm 290mm 320mm WOMBAT HERO 33-059 270mm 250mm 290mm PLATYPUS HERO 33-046 230mm 215mm 240mm BILBY HERO 33-028 203mm 170mm 203mm KOALA HERO 33-039 165mm 115mm 165mm QUOKKA HERO 33-051 102mm 76mm 102mm

5.2 Determine what depth the bag is to be placed in the hole. 5.3 Prepare drop cord allowing an extra 1.5m to prevent a RSI from bending. 5.4 Either tie or clip the drop cord onto the hang tab: 1. Top hole for shallow hole (requires low force ~7kg force to break) 2. Bottom hole for deep holes (requires high force ~15kg force to break) 5.5 Grasp the canister firmly in one hand and with one firm movement of the thumb push in the latching mechanism of the aerosol until the latch clicks and a steady stream of gas is expelling from the canister. 1. First indent for fast inflation 2. Second indent for slow inflation (ensure hand is not obstructing trigger from the back) 5.6 The BlastBag plug will now begin to inflate. Note after the mechanism has been latched the inflation process can not be stopped, but can be slowed by turning bag upside down. 5.7 Quickly lower the BlastBag plug down to the required depth until the drop cord is tight. 5.8 After approximately 15-30 seconds the BlastBag plug will grip the walls of the blast hole. 5.9 Tugging the drop line will confirm the bag has gripped the walls of the blast hole. 5.10 A firm upward pull on the drop line will break the tag from the top of the BlastBag plug when in position allowing the drop cord to be retrieved. 5.11 If the bag needs to be removed from the blast hole this can be done by bursting the bag in situ using a special tool, waiting for deflation and then retrieving the bag with the drop cord. 5.12 If a slower inflation time is required, the HERO model is equipped with a second speed achieved by pressing the trigger to the second notch. An additional tag can also be attached to the bottom of the bag and the bag introduced into the hole inverted. This will slow the release of gas further but is only recommended in holes up to 230mm, do not invert bag if there is no hangtab to facilitate connection with drop cord. 5.13 For best results in all ground types, wait 10-15 min before loading BlastBag TM plug and 30 min if ambient is less than 15 degrees C (double times if bag has been inserted upside down) a. For shale bands or mud condition (or when heavy rain is predicted) it is best to use 2 bags to increase wall contact and reduce the chance of slippage. b. Always kick in at least 2 boot loads of drill cuttings to protect bag from falling stemming and larger debris. 6 SOP for Chemeleon TM Safety Label 6.1 How it Works SAFE Green / Black Product has been stored correctly and is safe for use.

SAFE HOT Green / Yellow Product been stored incorrectly and has reached 50 deg C. Activate immediately or move to cooler storage area until HOT disappears. Product is now SAFE. DANGER HOT Green / Red / Yellow DANGER storage temperature has reached in excess of 70 deg C and product is unsafe to use. Do not handle, remain a safe distance from product and allow it to cool down. SAFE lettering has disappeared. DANGER Green / Red / Black Product has cooled but storage temperature has at some point reached in excess of 70 dec C and product could have been stressed beyond serviceability HOT will disappear but DANGER remains visible, use product in accordance with Safe Use Procedure (6.2) 6.2 Safe Use Procedure The following outlines manufactures recommendations for safe use of Blast Bags that have been exposed to excessive heat as depicted by the Chemeleon safety label As per table above, If the following is visible: Product has cooled but storage temperature has at some point reached in excess of 70 dec C and product could have been stressed beyond serviceability HOT will disappear but DANGER remains visible, use product with care. 1. If DANGER activated label is noticed, handle with care being sure to keep product cool, the cooler the product gets, the safer it becomes 2. If possible wait until temperature is below 25C 3. With necessary PPE gloves, eye protection, protective footwear, face bag away from person on the ground face up (trigger window pointing to the sky) 4. With top of can facing away from person ensure there is no plant or personnel in line of fire 5. While bending to a crouched position, place protective footwear on base of can and activate latch with caution. 6. Bag will begin to inflate, pressure has been released and bag is now safe as propellant cools product further, risk has been eliminated and it is safe to use bag and allow inflation to complete. Exclusion of Liability MTi Group Pty Ltd does not accept any liability for any loss or damage suffered or incurred by any person or entity however caused relating in any way to the improper use of this product or the failure to follow the operating procedures of the product. This exclusion of liability does not seek to exclude any liability that cannot be excluded under statute. Disclaimer by MTi Group Pty Ltd This is an important document that should be read in its entirety. If you do not understand it you should consult MTi Group Pty Ltd without delay and seek guidance prior to the use of the product.