SITE INSPECTION PROCEDURE FORM

Similar documents
HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

(b) Venting or flaring shall only be authorized by the Commission under the following circumstances:

High-Pressure Boiler Inspection Procedures: A Complete Checklist

RULE 36 & H 2 S SAFETY

NORMAL OPERATING PROCEDURES Operating Parameter Information

Frequently Asked Questions Directive 056 Facilities Technical

Introduction to Emergency Response & Contingency Planning

Flammable Environments Guideline

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

SEMIC05 Installing mechanical equipment

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

OPERATING PROCEDURES

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

WARNING: FOR OUTDOOR USE ONLY

Standard Operating Procedure

Oil & Gas Hazard Alerts: Past, Present and Future. J.D. Danni Safety and Occupational Health Specialist (Oil & Gas) OSHA - Region VIII

Veriforce TG CCT 609OP. Training Guide

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

Draft. Not yet Approved

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

SAFEWORK PRACTICES EQUIVALENCY PROCEDURE FOR ACCESSING FLOATING ROOF TANKS ON STORAGE TANKS IN SERVICE CAT A-2 SOP #33

In addition to this SOP, the policies and procedures of each operating company will be strictly observed by Rockwater personnel.

HOT SHOT OPERATING INSTRUCTIONS AND OWNER S MANUAL. Model SPC-500. (Propane Torch)

UTAS EH&S INSTRUCTION No. 036 June 2012 Revision No. 3. Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard)

Safe Work Practices / Procedures / Instruction CONFINED SPACE

Standbys. (Owner: Risk Management Section Supervisor)

JOSOP 603 flaring and venting Standard

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

Risk Management Resources

H 2 S in the Oilfield Fact Sheet. Introduction to H 2 S. Where does H 2 S come from? Hazards of H 2 S

Casing and Cementing Requirements

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

General Precautions for handling compressed gases

Safety Powder Spray Systems

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

In addition to this SOP, the policies and procedures of each operating company will be strictly observed by Rockwater personnel.

Method Statement: Testing Dry Riser System

Temporary Equipment Checklist

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

Pressure Systems Safety Regulation

Fire's Edge. Fire Pit or Fire Pit Insert Model 100A-M (Manual Operation) OWNER S MANUAL / OPERATING AND MAINTENANCE INSTRUCTIONS

H2S (HYDROGEN SULFIDE) SAFETY TRAINING

CUSTODIAL Safety Inspection Checklist

Label 2.2: Non-flammable, Non-toxic gas 1. IDENTIFICATION OF THE SUBSTANCE/PREPARATION AND OF THE COMPANY/UNDERTAKING

What is an induction? Contribute to OH&S Processes

Estates and Facilities Management Policy for Working in Confined Spaces

CITY OF THIBODAUX GAS AND WATER DISTRIBUTION DIVISION

CITY OF THIBODAUX GAS AND WATER DISTRIBUTION DIVISION

Installation and Operation Instructions

STCW Code Table A-V/1-1-1 Specification of minimum standard of competence in basic training for oil and chemical tanker cargo operations

ESSENTIAL SAFETY RESOURCES

CONFINED SPACE ENTRY PROGRAM

WorkSafeBC Occupational Health & Safety (OH&S) Regulation: Hazardous Atmospheres and Confined Spaces in Compost Operations

TK Torch Match Lit WARNING: FOR OUTDOOR USE ONLY

Monte Besler Consultant FracN8R Consulting LLC UNITED STATES

Material Safety Data Sheet (MSDS)

Recognition, Evaluation, and Control of Hazards

GAS SAFETY Information Bulletin

GUIDELINES FOR CONDUCTING HYDROGENATION REACTIONS

Fire Safety Hot Work Permit Policy/ Procedures

MATERIAL SAFETY DATA SHEET

Operating and Maintenance Instructions

OPERATION and MAINTENANCE Guide

HSE guidelines. SMay 2015 ELECTRICAL SAFETY HSE LIFE THE NATIONAL OIL&GAS INDUSTRY STANDARD FOR PROFESSIONALS

Responsibilities / Accountability

SOPAN O & M COMPANY PVT. LTD.

SAFEsystem. Safety Apparatus Filter Enhancement. Filtration Systems. Now you can safely control your filtering process

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

Contractor handbook. Purpose

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

Project Specific Information Package Kakwa Expansion Pipeline Project

Gas Cabinets and Valve Manifold Boxes: Applying CGA G13- Rev 2015 to Gas Delivery Equipment

IMPERIAL CHEMICAL INDUSTRIES LIMITED PETROCHEMICALS DIVISION. SAFETY NEWSLETTER No. 53

Well Failure at Todd Energy Canada Ltd. January 2019

CP10 Sensor Installation and Maintenance Instructions

TSS21 Sealed Thermostatic Steam Tracer Trap

Risk assessment. Assessment details. Task. Introduction. Please complete the form as fully and accurately as you can. Assessors job title

MATERIAL SAFETY DATA SHEET Q.D. ENAMEL

TP1 and TP2 Temporary Cone Shaped Strainers

SEMEMI SQA Unit Code H2B7 04 Assisting in the installation of compressed air equipment

In addition to this SOP, the policies and procedures of each operating company will be strictly observed by Rockwater personnel.

DF1 and DF2 Diffusers

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

INSTRUCTIONS FOR THE KOBUKI TORCH

Confined Space Entry - Permits


IFTGS14 Ball Float Steam Trap ½" and ¾" with Integral Spiratec Sensor

Safety Data Sheet. Section 1: Identification. Section 2: Hazard(s) Identification

NATURAL GAS RESPONSE SOG

HEAT EXCHANGE AND TRANSFER, INC. 500 Superior Street Carnegie, PA (412) Fax: (412)

GAS SUPPLY APPLICATION GUIDE

Material Safety Data Sheet. Helmar Crystal Kote Picture Varnish Gloss

Compressed Gases and Cryogens

For use with select HPC Fire Pits ONLY- refer to product catalog or website. 100K BTU Maximum WARNING: FOR OUTDOOR USE ONLY

Hampstead Hill School Health and Safety Policy: Confined Spaces

MATERIAL SAFETY DATA SHEET

DATA SHEET Revised edition no : 0. o óm MÁM M« : Industrial and professional. Perform risk assessment prior to use. Company identification

Transcription:

SITE INSPECTION PROCEDURE FORM The Oil and Gas Commission, as regulators of British Columbia s oil and gas industry focuses on effectively regulating and managing the Provinces oil and gas sector. The following procedures are designed to assist the Commission in the fulfillment of its mandate of protecting public safety, conserving the environment, and conserving and supporting resource development. The Commission ensures resources are dedicated by: 1. Helping to ensure Industry compliance with relevant Acts, Regulations, and Permit authorizations. 2. Providing for consistency and transparency in the Commissions inspection processes. 3. Encouraging continuous improvement. 4. Supporting positive working relationships. Prior to starting inspection ensure proper PPE is being worn and all applicable safety procedures are being adhered to. Conditions/Site Plans Review permit(s) and site plan. Observable permit conditions are met and the site plan is being followed. Harvesting activities are in compliance: a) Master License to Cut (MLTC) conditions\requirements are being met. b) Potential fire hazards have been abated as per "Schedule A" of the MLTC. c) Wood has been properly utilized as per "Schedule B" of the MLTC. Gas analysis has been submitted. (Proponent obligated to submit one time). Well site status verified. Compliance with construction plan verified. Equipment list matches equipment on site. Site Access Road prism appears stable. Drainage structures and erosion prevention are functioning properly. Bridges, culverts, and other structures associated with access are functional and appropriate for the uses of the access. 1

Access can be used safely by the permit holder. Drainage is directed around and away from the lease. Signage Well signage is present and contains all necessary information: a) The name of the well permit holder; b) Emergency notification information, including a telephone number; c) The location of the surface site of the well as specified in the well permit; d) If the well may produce flammable gas, a flammable gas symbol; e) A poisonous gas symbol if the well is sour. (Sign must not indicate sour if the well is sweet.) Each well on the site is identified. Wellhead(s) No leaks are present. Surface casing vent can vent freely (perform flow check). Where surface casing leaks have been detected, the company has completed testing and submitted results to the Commission within 30 days. Wellhead is protected from excessive force. Valves are available and can be operated safety when well is flowing, and chained and locked if inactive. Fencing or access control measures are in place for wells within 800 metres of populated area or where a populated area falls with emergency planning zone of the well. 2 master valves are installed for sour wells. Production equipment is not made of wood. Oil wells are equipped with shutdown if stuffing box fails, or vibration switch shutdown on artificial lift with H2S content > 100 PPM. (Applies to locations completed on or after 2010/10/04). Flowlines 2

Sour well(s) has an automated system to isolate the well in the event of an uncontrolled flow of oil or gas. Sour well located within 1,600 metres of a populated area contain a hydrogen sulphide detection and alarm system that is continuously monitored and capable of activating the automated isolation system. ESD bypass are locked closed. Safety device valves are locked open. Pressure alert chains are be connected and of correct length (as applicable). Process Equipment Process building has a safe atmosphere (exhaust, CO levels within acceptable limits) Measurement Fluid meters are maintained in good operating condition and suitably safeguarded from weather and from interference by unauthorized persons. Tanks & Berms Dykes and firewalls are free of weeds, grass and combustible material. Storage tanks and production equipment are located more than 60 meters from road allowances, public utilities. Flare System Flare stack is adequately anchored. Flaring does not result in the emission of black smoke. Venting of gas is not causing off site odors. Sufficient area beneath and around the flare stack is free of combustible materials and vegetation. Un-supervised flare stacks with intermittent flaring are equipped with an adequate auto-ignition system. Sour unsupervised flare stacks with continuous flaring are: a) Equipped with a flame-out detection device 3

b) Has operation shut down capability c) Provides an immediate alarm to the permit holder d) Has a flare stack with a minimum height of 12 m. Spillage Leaks, spills and odours precautions are taken (e.g. bull plugs, sight glass guards). If spillage has occurred, the permit holder or person carrying out an oil and gas activity has promptly: a) remedied the cause or source of the spillage; b) contained and eliminate the spillage; c) remediated any land or body of water affected by the spillage. Leaks have been fixed as soon as practicable. Leaks have been reported to the Commission. Shutdown Systems Shutdowns are not bypassed and alarms are functional. Electrical Electrical wiring is free from defects and in good maintained condition. Grounding For metal barrels, pigging barrel containment is grounded. For plastic barrels, the pigging barrel is either be grounded or company has procedures to minimize static electricity. Tanks are grounded, with the above considerations kept in mind regarding plastic and metal. Exhausts Catadyne heaters are hooded and vented outside. Ignitable vapours are vented to atmosphere i.e. regulators. Vegetation No invasive plants have become established on sites. Areas of disturbed ground have been re-seeded with ecologically suitable species as soon as practicable. 4

Crossings All activities are proceeding in accordance with approval and/or permit conditions. Crossing(s): a) are built and maintained in a manner unlikely to harm fish or destroy, damage or harmfully alter habitat to do no harm to fish or fish habitat. b) do not prevent fish movement or impede them in harmful way. c) protect the sides of stream, lake, or wetland. d) disturbances have been mitigated in or around the stream, lake and/or wetland. Environment Hazards on the site have been eliminated or minimized (e.g. cellars, rat holes). The site is free of garbage and debris The site is not used to store un-used equipment. Earthen pits used for drilling fluids are made not to leak and built with suitable clearances to water courses and other structures. The site does not cause excessive noise. (Refer to noise guidelines for noise level parameters). During construction schedule A and/or B are followed and soil piles are separated. Lease area drainage is controlled to prevent erosion. 5