High Pressure Iron (HPI) Recertification Guidelines & Procedures

Similar documents
Product Bulletin No.: D99-RRV2015-PIB-001

Technical Standard. API6D Ball & Plug Valve. Inspection & Test Procedure

BVM CORPORATION TYPE AAX TONG 55,000 FT/LBS. TORQUE Part number: Serial Number:

Installation, Operation and Maintenance Manual for Back Pressure Regulator

WHEATLEY Series 500 Swing Check Valve

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints

THE PROCESS OF JOINT INTEGRITY

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

PRESSURE RETEST. 49 CFR, (g) Co#: Vin#: DOT Spec: MAWP:

Telefon (+45) Telefax (+45)

WHEATLEY Series 822/820 Swing Check Valve

KMB 18/28 (BANDMASK) OVERHAUL, MAINTENANCE, AND INSPECTION CHECKLIST APPENDIX A

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

SECTION BUTTERFLY VALVES

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE

MANUAL: Jumbo Siamese and Jumbo Wye

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part , , , , , & ANSI B30.5, ANSI B30.

TactAir PCP Fill Kit/Adapter. Operation Manual

Sterile Visual Flow Indicator

INSPECTORATE FOR DIVING EQUIPMENT SERVICING & TESTING CODE OF PRACTICE CP11:2011

INSPECTION OF RECOVERY BOILERS

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

HYDROSTATIC LEAK TEST PROCEDURE

SPECIFICATIONS - DETAILED PROVISIONS Section Butterfly Valves C O N T E N T S

External-Style Pressure Relief Valve A Series. Installation, Operation & Maintenance (IOM) Manual. P/N: A-19075, Rev. 2.2

Guide for Evaluating Your Hose Assembly Supplier

Installation and Service Manual

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

WKM Model 320F Floating Ball Valve

// ADapters GUIDelines

Aluminum 13 cu tank Includes regulator Fill pressure: 3,000 psi (200 bar) Output: 1,100 psi +/- 10% (75bar)

PIP PNE00012 Piping Examination and Leak Test Guide

Fluid Sealing Association

product use, care, & inspection Document Released: January, 10, 2012 Approved By: Bryce Merrick

Beverage Systems. Component Inspection and Service TSB-Y Date: Subject: Products Affected: Description: July Inspection of CO 2

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

Summary of Accumulators These operating instructions apply to the accumulators listed in the table shown below.

STANDARD METHOD OF IMPACT TEST AND PERFORMANCE REQUIREMENTS FOR FOOTBALL FACEGUARDS. NOCSAE DOC ND087-17m17c

General Performance Data Hose Ref Minimum Bend. Safety Pressure at 20 C (BAR) Working Pressure at. Flow Rate at 3 bar (lit/min) Working Pressure

DRAFT 12/17/03 KMB 18/28 (BANDMASK) OVERHAUL, MAINTENANCE, AND INSPECTION CHECKLIST APPENDIX A

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Solid Indicator (Non-mixer) Model CP-30SI

Speed control assembly model A-1

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

MUELLER. Mega-Lite Drilling Machine. Reliable Connections. table of contents PAGE. Equipment 2. Operating Instructions 3-4. Parts Information 5

RG3100 and RG3100Ice Regulator System

INSTALLATION, OPERATION & MAINTENANCE MANUAL

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

LARGE R/W GATE VALVES

SECTION FACILITY FALL PROTECTION PART I - GENERAL

Rubber Dock Hose care, Use & Maintenance

Reliance Industries, LLC Operating instructions for the / Bolt-on D-Ring Anchorage. Model # 3071

Lab Cock. Contents. User s Manual (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Operation and Maintenance Instructions

Homestead Series 820 AWWA Butterfly Valves

INSTALLATION MANUAL Matheson Tri-Gas Cabinet Enclosures

1700ESL Kamvalok Coupler

A REFERENCE GUIDE FOR REQUALIFICATION OF GAS CYLINDERS

Atmospheric relief valve type 1100 Installation and maintenance instructions

Gemini Owner s Manual

TITAN FLOW CONTROL, INC.

QUALITY ASSURANCE SPECIFICATION NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7

Health & Safety Policy and Procedures Manual SECTION 25 RIGGING AND HOISTING EQUIPMENT

Instruction Manual Updated 7/26/2011 Ver. 2.2

CS150 CAP STAPLER OWNER S MANUAL

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

SERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Operating Instructions Model and Hydrostatic Test Pump

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

NAVSEA STANDARD ITEM. 2.2 T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

Binks SG-2 Plus TM Rotary 2 QT. PRESSURE CUP

1.3 LIMITATIONS: The following application limitations must be recognized and considered before using this product:

Common Discrepancies Uncovered on ADCI Diving Contractor & Training Program Audits

LARGE DRY CHEMICAL, TWIN-AGENT, AFFF, HALON 1211, AND AQUASONIC (NITROGEN-OPERATED SYSTEMS) Pressure Regulator Test Manual

ULTRA HIGH PRESSURE PAINT GRATE CLEANER FCT-JS OPERATION AND MAINTENANCE MANUAL

User Information Sheet 013

Annex G (normative) Requirements for Nondestructive Examination

GUIDELINES. Systems. Pressure. Guidelines for Competent Person In-service examination of pressure systems pipework

1 Exam Prep. Tabs and Highlights

MODEL UM UNIVERSAL MANIFOLD ASSEMBLY (With or Without Control Valve) 1¼", 1½", 2", 2½", 76.1mm, 3", 4", 6",165.1mm, 8"

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Welker Magnetic Indicator (With Gravity Mixer) Model CP2GM-HP

5k Slickline Lightweight Pressure Control Equipment 4 ID

INSTALLATION, OPERATION & MAINTENANCE GUIDE

FIREFIGHTING EQUIPMENT

Installation Instructions and valve Maintenance Rev. 0 of 21/09/15

ROPV R40 E Series User Manual

Hydraulic Punch Drivers

PP-1, PP-1W, PP-2, & PP-3

INSTALLATION / OPERATION / MAINTENANCE INSTRUCTION

Transcription:

Page 1 of 5 HPI Shop 6201 Andrews Hwy Odessa, Tx 79762 Ph: 432-362-1818 Fx: 432-362-3118 Howard Supply Company www.howard-supply.com High Pressure Iron (HPI) Recertification Guidelines & Procedures

Page 2 of 5 Purpose The purpose of this document is to represent Howard Supply Company's (HSC) standard operating procedures (SOP) used in inspection, repair, testing, and recertifying high-pressure iron (flow control and stimulation equipment). This SOP is to ensure that all products serviced by HSC meet, or exceed Customer, OEM, and/or Industry Standards/Specifications. Scope - HPI Inspection & Recertification Processes performed by HSC (as a third party), are to ensure that a customer s HPI equipment is free of flaws, damages, defects, or excessive wear that would render the equipment out of conformance and unsafe for use under high pressures and/or it s intended application. Types of inspection performed by HSC, dependent upon Customer Specified Recertification Level: Visual, Ultrasonic Thickness (UT), Hydrostatic Pressure Test (PT) & Magnetic Particle (MPI). Responsibility Technician Qualifications Level 1 - HPI Technician Onsite and/or prior experience & training of processes, measurements (Non-NDE related) and procedures. Duties could include teardown, clean up, dimensional measuring/gauging, visual inspections, service/repairs, re-assembly, blasting, painting, and pressure testing. Level 2 HPI Technician All requirements of Level 1 HPI Technician plus Certificate of Training for Level 1 or 2 NDE (either MPI or UT) Level 3 HPI Technician All requirements of Level 1 HPI Technician plus Certificate of Training for Level 2 NDE (both MPI & UT) * Certificate of Training to be conducted and approved by ASNT Level 3 Certified Personnel

Page 3 of 5 Section 1 - Inspection Visual Inspection: (Required for Recertification) A thorough visual inspection will be performed on every piece of High-Pressure Iron (HPI). The visual inspection will include all visible surfaces (internal & external) and all components of the assembly to identify any flaws, damages, defects or excessive wear. Visual Inspections will be performed in all stages of the recertification process: Prior to beginning any work After contaminates (paint, rust, grease, etc.) are removed After disassembly (if applicable) During reassembly (if applicable) Prior to Hydrostatic Pressure Testing (PT) Prior to customer delivery Ultrasonic Thickness Inspection (UT): (Required for Recertification) Ultrasonic Thickness Inspections will be performed on every piece of High Pressure Iron (HPI). The UT process will verify that wall thicknesses meet acceptable minimum specifications, and that no material defects exist. UT readings will be taken at multiple locations, sufficient to ensure product is within compliance. Hydrostatic Pressure Test (PT): (Required for Recertification) Hydrostatic Pressure Testing will be conducted on every piece of High Pressure Iron (HPI), excluding flanges and swages (optional). HPI will be tested to its specified Cold Working Pressure (CWP) rating for a minimum of 3 continuous minutes, or longer if needed to meet customer specifications. Manifold Trailers will undergo PT at CWP for a minimum of five minutes. Magnetic Particle Inspection (MPI): (Optional Performed per Customer Request) Magnetic Particle Inspection is optional, and will only be performed per customer request. MPI is the best option for detecting cracks and other surface indications undetectable by the human eye during visual inspection. Due to the nature of the operation of Manifold Trailers, HSC recommends that MPI be performed on all components that make up the assembly. Inspection Rejections: All High-Pressure Iron (HPI) that fails any of the inspection processes will be documented, marked appropriately and disposed of per customer guidance. HSC can offer permanent deformation of failed HPI and disposal at no additional expense to customer. If failed HPI is to be returned to customer, all existing ID/Certification Bands will be removed (Cut-off) and returned separately to further ensure the iron doesn t mistakenly get returned to service.

Page 4 of 5 Section 2 High Pressure Iron Recertification Levels Level 1 HPI Recertification: Level 1 Recertification is a basic level of inspection/recertification, and does not include the complete disassembly of the item. Wing nuts and segments are removed to expose all inspection points (if applicable). Sub ends (male, female and threaded) are cleaned for thorough visual and NDE inspection. UT inspection is performed at various OEM and/or customer specified locations for minimum wall thickness. Nuts are ground to remove and repair irregularities of the wings. Seals and retainer rings are replaced, and properly lubricated. Equipment passing inspection is Hydrostatic Pressure Tested (PT) at Cold Working Pressure (CWP). Equipment is banded with HSC, the unique ID#, date tested, CWP and Customer Name. Equipment failing initial PT can be moved to Level 2 Recertification, per customer request, if the problem appears to be correctable by a complete rebuild. Inspection reports are prepared and provided to the customer in either hard copy or digital format. Level 2 HPI Recertification All the benefits of Level 1 Recertification, plus complete disassembly and rebuild, including all new rebuild kits. HSC recommends Level 2 Recertification whenever possible to ensure the most thorough inspection and preventative maintenance is performed. HSC Level 2 Inspection and Recertification not only ensures operational compliance, but also a higher level of safety assurance and extended life of the equipment. Recertification Service Level 1 Level 2 Remove Wing Nut / Segments X X Clean Sub Ends X X Visual Inspection X X Ultrasonic Testing (UT) X X Grinding Wing Nuts X X Magnetic Particle Inspection (MPI) Optional Optional Disassemble / Re-Kit / Rebuild Lev 2 Only X Hydrostatic Pressure Test Cold Working Pressure (CWP +5%/-0%) X X Banding (HSC, ID#, Date, CWP & Customer Name) X X Paint Optional Optional Inspection Reports X X HSC guarantees product conformity at the time of shipment/delivery to customer. Customer is responsible for supplying proper training in product use to ensure the integrity of product conformance is preserved through proper handling and use. All product(s) that have been modified or damaged through misuse, abuse, accident, neglect, or mishandling should be removed from service immediately and sent through the inspection & recertification process.

Page 5 of 5 Section 3 High Pressure Iron Documentation Equipment Quick Reference: (Requirements & Options) Equipment Level 1 Level 2 Visual UT MPI PT Ball Injector Required Optional Required Required Optional Required Bull Plug Required N/A Required Required Optional Required Check Valve Required Optional Required Required Optional Required Cross Required N/A Required Required Optional Required Crossover Required N/A Required Required Optional Required Ell Required N/A Required Required Optional Required Flange Required N/A Required Required Optional N/A Hose Loop Required Optional Required Required Optional Required Lateral Required N/A Required Required Optional Required Plug Manifold Required Optional Required Required Optional Required Plug Valve Required Optional Required Required Optional Required Pressure Relief Valve Required Optional Required Required Optional Required Pup Joint Required N/A Required Required Optional Required Swage Required N/A Required Required Optional N/A Swivel Joint Required Optional Required Required Optional Required Tee Required N/A Required Required Optional Required Wye Required N/A Required Required Optional Required Banding Process: If equipment arrives banded from prior certification, band will remain affixed until such time as the equipment has passed all stages of inspection and is ready to have new recertification band attached. HSC uses uncoated stainless steel bands as a normal practice, however coated-color stainless steel bands are available per customer request to meet customers color coding scheme. No equipment is deemed Safe and/or Approved for operation without a band. (If items physical shape doesn t allow for band to be affixed, Certification Criteria will be Stamped or Stenciled directly onto item). Reporting & Traceability: The following information will be recorded into HSC s online High Pressure Iron Management Database and will be accessible to our customer s: HSC Job# Job Date HSC Location Customer Customer Location Customer Unit# Inspection Results UT Results Inspection Level HSC ID# Item Description CWP Test Pressure *Affixed to each inspection report will be the Hydrostatic Pressure Test Results in Chart Form. Please make sure to initial and date each page and complete the below information. Customer Name: Customer Representative (Print): Customer Representative (Sign):