Following are our comments and findings based on the site visit and review of the complete Traffic Impact Study:

Similar documents
Traffic Impact Analysis Chatham County Grocery Chatham County, NC

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

Transportation Impact Study for Abington Terrace

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Harrah s Station Square Casino

King Soopers #116 Thornton, Colorado

TRAFFIC STUDY GUIDELINES Clarksville Street Department

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Troutbeck Farm Development

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Highway 111 Corridor Study

PEER REVIEW. This letter is to provide a peer review to the City of Leavenworth for the Leavenworth Adventure Park TIA dated October 2018.

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

THIS PAGE LEFT BLANK INTENTIONALLY

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Marina Loft (DRC 51-R-12)

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

Shockoe Bottom Preliminary Traffic and Parking Analysis

Simons Run Corridor Study

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

D.13 Transportation and Traffic

Joe Rocca P.Eng., Traffic and Asset Management Supervisor. Review for Proposed Kingsway Sports and Entertainment Complex, City of Greater Sudbury

Traffic Impact Memorandum. May 22, 2018

Truck Climbing Lane Traffic Justification Report

Henderson Avenue Mixed-Use Development


TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

BICYCLE FACILITIES INVENTORY: SUMMARY REPORT

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

19 July 2016 OUR REF:

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Introduction...2. Multi-Modal Transportation Analysis TIA & Recommendations Design Proposal...3. Campus Pointe Development

APPENDIX E: Transportation Technical Report

DUNBOW ROAD FUNCTIONAL PLANNING

REDEVELOPMENT TRAFFIC IMPACT STUDY

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

MEMORANDUM. Our project study area included the following locations:

4.0 TRAFFIC IMPACT STUDIES

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park

Chapter 16: Traffic and Parking A. INTRODUCTION

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Traffic Impact Study for Rolling Ridge Redevelopment

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Chapter 4 Traffic Analysis

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

6060 North Central Expressway Mixed-Use Site Dallas, Texas

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Request for Authorization to Open Public Comment Period

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Atlanta Braves Stadium and Mixed- Use Development

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

MEMORANDUM. Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT. Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger

CDOT s Transportation Plan for the Obama Presidential Center in Jackson Park

TRAFFIC IMPACT STUDY CRITERIA

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Cricket Valley Energy Project Dover, NY Updated Traffic Impact Study

Glenn Avenue Corridor Traffic Operational Evaluation

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Detailed Description of Work

Gateway Transportation Study

North Shore Transportation Improvement Strategy

Low Level Road Improvements Traffic Analysis. Report

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

December 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

Focused Traffic Analysis for the 200 Nellen Avenue Project

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT

New Seward and 36 th Avenue Intersection Conceptual Design

NO BUILD TRAFFIC OPERATIONS

ALLEY 24 TRAFFIC STUDY

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

Government of the District of Columbia Department of Transportation

Sixth Line Development - Transit Facilities Plan

Traffic Impact Analysis

Transcription:

3600 Horizon Boulevard Suite 250 Trevose, Pennsylvania 19053-4900 Voice 215.355.3577 Fax 215.355.3147 www.ekcorp.com November 1, 2006 Pennsylvania Department of Transportation Bureau of Highway Safety and Traffic Engineering Commonwealth Keystone Building 400 North Street, 6 th Floor Harrisburg, PA 17064 RE: Pennsylvania Gaming Control Board Pinnacle Delaware Riverfront Casino TIS Review PennDOT Agreement E00229, Work Order 14 Dear Mr. Rowe: In accordance with Agreement E00229, Work Order 14, Edwards and Kelcey (EK) has completed its review of the Pinnacle Delaware Riverfront Site Traffic Impact Study (TIS), prepared October 11, 2006 for Pinnacle Entertainment Inc., by Pennoni Associates, Inc. Our review considered the applicant s completeness in meeting the standards set forth by PennDOT and the Institute of Transportation Engineers (ITE), as well as the completeness and reasonableness of their assumptions, calculations, findings, and conclusions. Pennoni Associates, Inc. also submitted a letter in response to the preliminary TIS review prepared by EK, dated September 11, 2006. The consultants have complied with most of the recommendations outlined in the review letter. Following are our comments and findings based on the site visit and review of the complete Traffic Impact Study: Review of the submitted TIS for conformance with applicable standards 1. This study is for a gaming facility to be located in an industrial area along the Delaware Riverfront. The facility would include 3,000 electronic gaming units, a 12-screen multiplex movie theatre, 3,000 car parking garage/lot, 5 restaurants plus a food court, a water feature and seasonal waterfront ice-skating rink, and 36,000 sq. ft. of retail and entertainment outlets. Pinnacle has proposed to open a Temporary Casino with 1,500 slot machines in mid 2007 and the Phase I Permanent Casino with 3,000 slot machines in early to mid 2009. The site is located near the intersection of Dyott Street and Delaware Avenue/Richmond Street in the City of Philadelphia. Fifteen intersections with proximity to the subject site were reviewed.

Page 2 of 8 2. The consultant has not analyzed the future conditions with and without the development 10 years beyond the opening year of the casino, as required by PennDOT. It is imperative to project the volumes to 10 years beyond the opening year and study the impact of the development on the roadways in the study area. Validation of the traffic data that has been presented in the TIS 3. Existing conditions including lane geometry, pavement markings, bike lanes, pedestrian crossings, and trolley lines have been adequately described. 4. Safety concerns related to deteriorated or missing signing/striping (e.g. see Figure 1 and 2), use of shoulder as a travel lane, use of bicycle lane as a travel lane (e.g. see Figure 3), abrupt ending of bicycle lanes and pedestrian crossings, missing guide rail around I-95 pier columns (see Figure 4), and travel lanes and trolley lines lying directly on top of each other have been identified in the study. Figure 1: Deteriorated pavement markings at Columbia Avenue and Beach Street

Page 3 of 8 Figure 2: Missing pavement markings at Port Richmond Village Shopping Center exit Figure 3: Bike lane used as right turn lane at Cumberland Street and Aramingo Avenue intersection

Page 4 of 8 Figure 4: Missing guiderail around I-95 pier at Cumberland Street and Richmond Street intersection 5. The study does not indicate when the Saturday peak hour turning movement counts were done. Also, the Saturday peak hour turning movement counts have not been provided in the Appendix of the report. 6. To estimate the proposed site s trip generation, traffic counts were performed at four other sites including Delaware Park and Dover Downs in Delaware, Philadelphia Park in Pennsylvania, and Freehold National in New Jersey, in year 2003. The trip generation rates for Delaware Park were utilized for estimating the trip generation of the proposed site due to the similarity of the two sites. Delaware Park has a horse racing facility, which is closed on Saturday. The Saturday counts were used to extrapolate the weekday trip generation with the help of the hourly breakdown percentages of daily casino traffic provided in the ITE Journal article, March 1998, by Paul C. Box and William Bunte. The calculations for obtaining the trip generation rates per gaming unit should be provided in an Appendix. The trip generation for associated facilities including the movie theater, restaurants, retail, and ice skating rink have been accounted for partially and not considered as entirely auxiliary uses for a conservative approach. More information should be provided on the percentage of the trip generation of these facilities used for the overall trip generation of the proposed site.

Page 5 of 8 7. The consultants have referred to the article Gaming Casino Traffic by Paul C. Box and William Bunte published in March 1998 in the ITE Journal, for estimating the trip generation rates for the Philadelphia Park site. The article reported May, July and August as the peak gaming months and recommends using these as the design months. Multipliers have been provided to adjust for monthly variation in the data. It is not clear from the report whether the data from Delaware Park was adjusted for this monthly variation. 8. Trip generation and distribution summary provided in Appendix C does not include calculations for 2007 and 2011 pre- and post- development scenarios. 9. Trip Distribution assumptions were discussed in detail. Generally, the methodology is acceptable and Figures 9A 9B are excellent in representing the distribution pattern through an otherwise complicated interchange configuration. The legend for Figures 9A and 9B should specify the time period that the percentages outside and inside the parenthesis represent e.g. 4%(4%). 10. A modal split has not been applied to the site for a conservative approach. However, it was found that 23% of gamers either walk or use casino bus and public transit at a similar site in North Delaware. However, as mentioned in our preliminary TIS review, the transit trips should be assigned to the nearby bus or trolley stop and considered as pedestrian traffic between the casino and the transit stop. The pedestrian traffic may have an impact on the operation of intersections between the transit stop and the casino and should be evaluated for adequate provision for both pedestrian and vehicular traffic. Although the conservative analysis will likely result in actual volumes that are less than projected in the TIS, the effect of pedestrians on the transportation network should be evaluated. Analytical Approach / Tools Used 11. Two separate analyses should be performed for recommended improvements considering scenarios before and after the completion of the Girard Avenue Interchange. The casino is anticipated to open in 2007 and fully completed in 2009 while the Girard Avenue Interchange is expected to be completed in 2012. The traffic impacts between the 2009 and 2012 years should be more fully evaluated. 12. Other planned developments identified include the Waterfront Square Condominium Development comprising of a total of between 780 and 966 residential units. The units have not been occupied yet, however 50% of the trips generated by the development have been considered during the analyzed peak hours. The general practice is to use 100% of the trips generated by any committed development for a TIS. For scenarios 10 year beyond the opening year of the casino, the use of 50% generated is not desirable.

Page 6 of 8 13. Synchro analysis reports incorporating the recommended improvements have not been provided in the Appendix of the report. 14. CORSIM analysis reports have not been provided in the Appendix for review. 15. Synchro Analysis Turning movement volumes at the intersection of Columbia Avenue and Delaware Avenue in Figures 2A and 2B and Synchro files, do not match with the traffic counts in Appendix B. Turning movement counts for Belgrade Street should be verified and corrected in Figure 2A and 2B and Synchro files to match with the traffic counts presented in Appendix B. Lane configuration for eastbound Richmond Street at the intersection of Richmond Street and Dyott Street has been incorrectly input in Synchro as either a shared thru-right lane or a thru lane and an exclusive right turn lane in various scenarios. It should be corrected to a single shared left-thru-right lane. Evaluation of recommended improvements 16. Signal warrant analysis should be performed for the recommended new signal at the intersection of Richmond Street and Dyott Street. 17. The Girard Avenue Interchange project is anticipated to be completed in 2012 while the temporary casino will be operational by mid 2007 and the permanent casino is anticipated to open in early to mid 2009. The traffic patterns before and after the completion of the interchange project will be significantly different in the study area and therefore, two separate mitigation analyses before and after the completion of interchange project should be completed. (see No. 10, above) 18. The trips generated by the proposed site coming from and going to I-95 South will have to follow a circuitous route on the local roads before reaching the freeway as shown in TIS Figure 1D-1. Adequate directional signs should be proposed to minimize the impact to the local roads. 19. A conceptual plan should be provided for the proposed improvements at the intersection of Aramingo Avenue and Cumberland Street indicating if additional right-of-way is required for providing three lanes on eastbound Cumberland Street approach. Utility relocation might also be an issue at this intersection (see Figure 5).

Page 7 of 8 Figure 5: Eastbound Cumberland Street approach at Aramingo Avenue Special Event and Opening Day Plans 20. Although the response letter to the preliminary TIS review discusses how the special event traffic might be handled, the discussion was found missing in the complete TIS report. CONCLUSIONS EK reviewed the Pinnacle Delaware Riverfront Site TIS, prepared October 11, 2006 for Pinnacle Entertainment Inc. by Pennoni Associates, Inc. The study analyzed the impact of a 3,000 gaming units facility with a 12-screen multiplex movie theatre, 3,000 car parking garage/lot, 5 restaurants plus a food court, a water feature and seasonal waterfront ice-skating rink, and 36,000 sq. ft. of retail and entertainment outlets. Pinnacle has proposed to open a Temporary Casino with 1,500 slot machines in mid 2007 and the Phase I Permanent Casino with 3,000 slot machines in early to mid 2009. The site is located near the intersection of Dyott Street and Delaware Avenue/Richmond Street in the City of Philadelphia. Fifteen intersections with proximity to the subject site were reviewed. As required by PennDOT, the pre- and post-development scenarios for 10 years beyond the opening year of the casino have not been analyzed by the consultant. Also, the traffic pattern in the study area will be

Page 8 of 8 affected by the completion of the Girard Avenue Interchange project. Therefore, mitigation measures should be identified for two different scenarios before and after the completion of Girard Avenue Interchange project. EK also identified a number of instances where further information is required to validate the preparer s assumptions or methods. Additionally, as the plans are further refined and developed, the designers should: Review recent traffic accident statistics to determine the need for any safety measures. Be prepared to making operational adjustments to adapt to changing conditions. Resolve geometric design details. Initiate early coordination with utility agencies and companies regarding relocation needs associated with street and intersection improvements. Integrate public bus operations and stops with the roadway and site design. Ensure that vehicles entering the parking garage will not backup into public streets due to internal congestion. Develop a comprehensive signage system in coordination with other nearby destinations. Ensure compliance with all ADA requirements throughout the improvement areas. This summarizes our comments related to the Traffic Impact Study for the Pinnacle Delaware Riverfront Casino. We will be happy to further discuss any of these issues with you or you staff, or meet to clarify or elaborate on any of our findings. Please let me know if we can be of further assistance. Very truly yours, Stephen E. Cunningham, P.E. Project Manager SEC/akg cc: Paul Resch, Acting Secretary, Pennsylvania Gaming Control Board Devang Patel, P.E., Pennsylvania Department of Transportation Richard Sesny, Pennsylvania Department of Transportation EK Project Team