Instruction manual

Similar documents
MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

Installation & Operation Manual Proven Quality since 1892

OPERATING MANUAL. Contents. Bottom outlet ball valve Type ecoline

Operating instruction

97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly.

200 PSI COMPRESSORS - MODEL NUMBERS

Type BBS-03, BBS-05, BBS-06, BBS-25

100C Air Compressor Kit

IMPORTANT SAFETY INSTRUCTIONS

420C AIR COMPRESSOR KIT PART NO C AIR COMPRESSOR KIT PART NO

BUTTERFLY VALVES Series 800

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

INSTALLATION, OPERATION and MAINTENANCE MANUAL

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

FLANGED TWO-PIECE BALL VALVES

Technical Data Sheet TI-F50 Locking Units series KFH

400H HARDMOUNT AIR COMPRESSOR KIT PART NO H HARDMOUNT AIR COMPRESSOR KIT PART NO

444C DUAL PERFORMANCE VALUE PACK

FLANGED TWO-PIECE BALL VALVES

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

Engineering Data Sheet

Pneumatic proportional controller Types M Types FM Function tested for use of the float in Ex-zone 0

400C & 450C DUAL PERFORMANCE VALUE PACKS

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Type 2000 INOX. Quickstart. English Deutsch Français. 2/2-way angle seat valve 2/2-Wege Schrägsitzventil Vanne à siège incliné 2/2 voies

KECKLEY. Installation, Operation, and Maintenance Manual. Style KGV - Knife Gate Valve

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

INSTRUCTIONS AND MAINTENANCE MANUAL SERIES: RT

Installation, Operating & Maintenance Instructions. All-metal gate valve with extended pneumatic actuator. Series 48 DN mm (I.D.

Manual Actuated Boiler Blowdown Valves

Contents. 1. General information BROEN BALLOMAX Steel Ball Valves Approvals Quality Management...2

Installation, operation & maintenance manual - original version

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

INSTRUCTIONS AND MAINTENANCE MANUAL SERIES: K

Telefon (+45) Telefax (+45)

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

Pneumatic switch module 3/2-way valve (On/Off) Types P Types FP Function tested for use of the float in Ex-zone 0

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

PC3_ and PC4_ Pipeline Connectors

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Type 0404 / /2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation

Operation Manual Air Saver Unit ASV5000 Series

MODEL NUMBER: M20005 AIR SOURCE KIT. 30% Duty Compressor on. 2.0 Gallon Air Tank SAVE THIS MANUAL FOR FUTURE REFERENCE

Model PSI Compressor with 3-Gallon Air Tank 12VDC

lead water to the next level NEEDLE VALVES

DelVal Flow Controls Private limited

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

FLANGED MULTI-PORT BALL VALVES

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

Type 2080 FALTENBALGVENTIL BELLOWS VALVE VANNE A SOUFFLET. Operating Instructions. Bedienungsanleitung Manuel d utilisation

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

200 PSI HIGH-FLOW AIR SOURCE KIT

200 PSI FAST-FILL AIR SOURCE KIT

OPERATION and MAINTENANCE Guide

INSTRUCTIONS AND MAINTENANCE MANUAL SERIES: FK

MUELLER. Xp, & Lineseal 350 Butterfly Valves

MODEL NUMBER: PSI AIR SOURCE KIT 200 PSI Compressor on 2.0 Gallon 200 PSI Air Tank

42045 Heavy Duty ADA Base Model Kit: 85/105 PSI (ADA Compressor Only) Heavy Duty ADA Base Model Kit: 110/145 PSI (ADA Compressor Only)

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Translation assembly instructions with operating manual and technical appendix

Index Table. Model 794. Installation, Operating and Maintenance Instructions

ATD LB PRESSURE BLASTER INSTRUCTION MANUAL

RARS5000 AIR BODY SAW OWNER S OPERATING MANUAL

ULTRA-LIGHT DUTY ONBOARD AIR SYSTEM

Operating Manual FSV, FSÖV, SSVF

KTM V-PORT CONTROL BALL VALVES INSTALLATION AND OPERATION MANUAL

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

USER MANUAL Version: 1/2017

30T A/Manual Hydraulic Shop Press

Mounting and operating instructions EB 2530 EN. Self-operated Pressure Regulator. Pressure Reducing Valve Type M 44-2

accidents which arise due to non-observance of these instructions and the safety information herein. SPECIFICATIONS

Type 3709 Pneumatic Lock-up Valve. Translation of original instructions. Mounting and Operating Instructions EB 8391 EN

Mounting and Operating Instructions EB 3007 EN. Self-operated Pressure Regulators. Differential Pressure Regulators (opening) Type Type 42-25

450P AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

ATEX installation and service instruction

Control Valves ZK 610 ZK 613

CARTRIDGE FILTERS TECHNICAL MANUAL MT 080. Installation, commissioning and maintenance instructions. 08/02 Edition

INTENDED USE TECHNICAL SPECIFICATIONS

Mounting and Operating Instructions EB 2558 EN. Self-operated Pressure Regulators. Type Pressure Build-up Regulator

HEAVY DUTY KNIFE GATE VALVE

TITAN FLOW CONTROL, INC.

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

SIX R (P ) AND SEVEN R (P ) POSITION CYLINDERS Service Information

Operating and Maintenance Instructions. VAG BETA 200 Gate Valve

Declaration of Conformity as per Directive 97/23/EC

Type /2-Way Globe Valve 3/2-Wege-Geradsitzventil Vanne à siège droit 3/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation

120 PSI FAST-FILL AIR SOURCE KIT 25% Duty Compressor on 1.5 Gallon Air Tank

Operating Manual. R280 Pressure regulator made of brass. 1. Intended Use

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

Installation and operating manual. Pneumatic control station LK product no: PCS 1-10

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

450P- RV AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

Transcription:

Instruction manual 2.30.12 Wey Knife Gate Valve MF / MG / MH weyvalve.com

Instruction Manual Wey Knife Gate Valves MF / MG / MH 1. GENERAL 1.1 - Safety 1.2 - Designated service, ATEX 1.3 - Structure and function 1.4 - Marking 2. TRANSPORTATION, STORAGE 2.1 - Transportation 2.2 - Storage 3. INSTALLATION 3.1 - Preparation before installation 3.2 - Installation site 3.3 - Installation position 3.4 - Flow and pressure direction 3.5 - Mounting 4. COMMISSIONING 4.1 - General measures 4.2 - Safety measures 4.3 - Function test 4.4 - Pneumatically operated valves 4.5 - Hydraulically operated valves 4.6 - Electrically operated valves 5. MAINTENANCE 5.1 - Inspection 5.2 - Operating cycles 5.3 - Repacking 5.4 - Seal replacement 5.5 - Cleaning / Lubrication 6. TROUBLE SHOOTING 7. REMOVAL 8. DISPOSAL 9. FINAL REMARKS Version 2012.04 SISTAG AG, Alte Kantonsstrasse 7, 6274 Eschenbach, Switzerland Phone +41 41 449 9944, Fax +41 41 448 3431 weyvalve.ch, info@weyvalve.ch

1. GENERAL 1.1 Safety Prior to any work or start-up and in order to ensure a proper functioning of our products. The instruction manual must be observed. Alterations on the products need our written approval. For consequential damages due to neglect of this direction, we have to reject any liability. This symbol marks safety and risk advice. Follow all such advice in order to prevent any damage to human life and objects. The installation must be carried out according to established procedures and only by qualified personnel. Project related data of valves, e.g. dimensions, materials and service range are found in the respective documentation. The responsibility for the service application remains the sole duty of the end-user. 1.2 Designated service Wey Knife gate valves are deigned to shut-off pressurized piping systems. Depending of the construction, finishing equipment and material valves can be used in fluid group 1 and 2 according to PED 2014/68/EU up to category III. Wey Knife gate valves may be installed as end-of-line service, provided that the valves are classified according to Art. 4 (3) PED 2014/68/EU. The max. working pressure must not exceed 0.73-times of the max. nominal pressure at room temperature. In addition the chapter 3.5 must be considered. For the valve design working limitations refer to the relevant project data documentation and the maintenance manual. Should the Wey Knife gate valve be installed in an explosion-protected area, the valve and the electrical and non-electrical equipment must meet the explosion zone RL 2014/34/EU, ATEX 1.3 Structure and function 1. Body with seal 2. Gate 3. Manual actuation 4. Pneumatical actuation 5. Electrical actuation 6. Hydraulic actuation Fig. 1 page 2 / 11

1.4 Marking Manufacturer Type / Material Size / Flange drilling Year / Fabr. No. Nominal pressure Operating pressure Medium temp. Ambient temp. Air supply pressure 1) Conformity / No notified body 1) Example 1) If applicable 2. TRANSPORTATION, STORAGE 2.1 Transportation Transportation of the valves to their final destination (building site) shall take place in solid crates adapted to the valves size. The valves shall be protected against exterior damage and atmospheric exposure. Depending on the duration of transportation or storage and in view of the conditions, preservation shall take place by welding valves into PE-film or adding sufficient drying agent or equal. 2.2 Storage Until final installation the valves shall be stored in a dry, vented area. All function relevant parts shall be suitably covered against humidity, dust or other contamination. For longer storage periods or in case of unfavourable storage conditions, which might affect later functioning, all blank surfaces, e.g. stem, piston rod, sealing surfaces shall be suitably protected by long-term preservatives against corrosion. Factory applied preservatives shall be checked for possible transport damages and appropriately repaired, if necessary. For accessories mounted to the valves, such as electric actuators, limit switches, solenoids, etc., the respective storage instructions of the manufacturer shall be observed with priority. 3. INSTALLATION 3.1 Preparation before installation Before installation, please make sure that the subject Wey Knife gate valves is in conformance to the service conditions. The responsibility regarding applied service medium (corrosion resistance, pressure, temperature etc.) is with the end-user. Please check, if the valve to be installed in an explosion protected area, the valve meets the rules for the relevant zone. Not correctly aligned pipelines must, by all means, be corrected before installation in order to avoid tensions or even cracking of the valve body. Before final installation of the Wey Knife gate valves, any possibly applied corrosion protection shall be thoroughly removed. All parts, and in particular the gate, stem and piston rod shall be free of dust and dirt. 3.2 Installation site The mounting position must be chosen in such a way, that the knife gate valve can be checked and repaired at any time without risks. For repacking purpose the small side of the valve body shall be freely accessible (fig. 2). page 3 / 11

= Repacking feature Fig. 2 Additional directives and guidelines for installation and operation of explosion protection equipment, when installed into Ex-zones, must also be observed. Check if the equipment fulfils the safety requirements at site. For outdoor installations, the valves shall be protected at site with shields or covers against severe weather conditions like snow and ice. 3.3 Installation position Wey Knife gate valves will be installed in one of the positions shown in fig.3. Avoid a different installation position whenever possible. Fig. 3 Valves from size DN400 up with extended or heavy actuators, which are not vertical installed, should be supported on site. This is also recommended, if vibrations of the piping line may occur. 3.4 Flow and pressure direction The Wey Knife gate valve is a bi-directional design (fig.4). Depending on applications and valve design options a preferred flow direction must be considered. Liquid, gaseous and pneumatic conveyed solid fluids Flow direction Bi-directional possible (A,B) With the application of a wear ring from the entry side (B) Pressure direction Against gate bevel preferred (A) Powder and granulate at gravity discharge (vertical piping) Flow direction Pressure direction The gate bevel is positioned on the descending side, also when a cone insert is used (B) The preferred pressure direction must especially be considered, if the valve is working at 60 100% of the nominal pressure. page 4 / 11

A B B 1 2 3 1 Fig. 4 1 Gate bevel shape 2 Wear ring (option) 3 Cone insert / contracted bore (option) For difficult service conditions or for custom-made valves, please contact the manufacturer regarding the installation position. 3.5 Mounting Before mounting, check valves for possible transportation or storage damages. The valves shall be protected against construction work at site. For additional painting of the valves, the stem, piston rod, electric accessories and the valve gate protruding the body shall not be painted. Before any sand blasting, the valves shall be protected with covers. For valves with a stem extension, the pipeline flange must be exactly in line with the extension. The exact position of the flange holes in relation to the extension shall also be observed. Wey Knife gate valves are installed between two piping flanges with thru bolts and with bolts for body blind holes. Piping system misalignments must never be corrected using the valve body. Tighten bolts with caution, so that tensions in the body do not cause any cracking or breaking. No tilting, steady crosswise tightening. Bolt torques are to be observed. Table 1 Apply flange bolts according to fig. 5 into tapped blind holes. Pos. 1 : Pos. 2 : Pos. 3 : Pos. 1 Pos. 2 Pos. 3 Wrong assembly Tightened bolts shall not touch the bottom of the tapped blind holes. Correct assembly Also correct assembly. Insert stud, then tighten nut. Fig. 5 Valves of the middle flange design have flanges with through holes. page 5 / 11

Mounting acc. to fig. 6. Mounting as head valve Mounting between flanges Fig. 6 Wey Knife gate valves MF, MG, MH are provide as wafer type valve and as end-of-line valve. The chapter 1.2 must be considered. The dimensions of the flange bolts, its number are found in the documentation. Bolt thread [mm] Torque [Nm] Table1 Torque for flange screw M16 60 M20 120 M24 220 M27 320 M30 440 M33 600 M36 770 Based upon type of flange gasket, manufacturer's instructions are to be observed. It is to ensure that the flange connection is tight. Leakage can be dangerous to humans and environment The installation as an end or head valve requires special attention. In service, the downstream side must not be accessible for persons. See also chapter 1.2 and 4.2. For hazardous service media double transverse seals with respective leakage ports are incorporated and must be compellingly connected to ensure a controlled drain-off of possible leak fluids. After installation a correct earthing connection must be verified. This is normally done through the flange bolt connection. If this is not the case, the potential or guard wire must be drawn to the terminal clamp. Should there be a longer time period between mounting and power connection of electrically operated valves, it shall be ensured that the integral heater of the actuator is already connected during mounting of the valves in order to avoid the formation of condensate water (or protect actuator with suitable drying agent). 4. COMMISSIONING 4.1 General measures Before taking the valves into service, all function relevant parts (gate, stem, piston rod, etc.) shall be thoroughly cleaned. Damages, in particular to the seal caused by remains of grit, welding beads, and foreign rust or similar on the gate, are not covered by the warranty. For powder or granular service, it should be observed that wetted or humid media which has tendency to cake to the gate is thoroughly removed before start-up. page 6 / 11

The valves are factory preserved and lubricated for transportation and storage, but they require depending on the service conditions, another lubrication before start-up. Recommended are water-repellent, temperature resistant and long lasting lubricants. (Get your nearest supplier s recommendation). 4.2 Safety measures For automated valves installed in an area where valve movement could be dangerous for people (or animals/objects), it must be ensured by the user on-site that all moving parts are fenced with a suitable cover or protection shield. Should they not already be mounted, such covers are optionally available from manufacturer. Protection goals can also be reached through suitable on-site measure. Unprotected valves must not be commissioned. If hot gases or fluids are transported in the pipeline, ensure that no persons can touch the hot surfaces. It is also to ensure that no external interference of the control circuits can actuate the valve unintentionally. 4.3 Function Test Before commissioning a function test must be performed. Open and close the valve one time as a minimum. If the pipeline is pressure tested, it is to ensure that the applied pressure is not higher than the maximum allowed test pressure of the valve. 4.4 Pneumatically operated valves Preventive measures must be taken, that the maximum tank pressure is not exceeding ( 8 bar), also not in a breakdown situation. For operation of the actuator use only dry, filtered air acc. Class 4/5 ISO 8573-1 max. dust particle size 40 µm max. dust particle concentration 10 mg/m3 max. excess oil concentration 5 mg/m3 pressure dew point below minimal ambient temperature Solenoid valves shall be mounted as close as possible to the actuating cylinder. Air hoses, especially plastic pipes must be mounted and secured so that they cannot be unintentionally interrupted or torn. In order to keep a valve tight in its closed position, the piston must be permanently under pressure. The size of the air supply pipes has to be in relation to the air volume. Before start-up, all on-site mounted supply pipes and solenoid valves shall be thoroughly flushed and cleaned, if necessary. Factory mounted solenoid valves are normally provided without accessories like throttle or muffler. On-site regulations must therefore be observed. Pneumatically operated valves shall not be closed instantly in order to avoid the risk of pressure shocks. page 7 / 11

4.5 Hydraulically operated valves Before start-up, all on-site mounted supply pipes shall be thoroughly cleaned. Hydraulically actuated valves shall not be closed instantly in order to avoid the risk of pressure shocks. The maximum design air-supply pressure must not exceed. Higher air-supply pressure may damage the valve. 4.6 Electrically actuated valves For electrical installations observe local rules, standards and directives. Additional directives and guidelines for installation and operation of explosion protection equipment, when installed into Ex-zones must also be observed. Check if the equipment fulfils the safety requirements at site: After installation a correct earthing connection must be verified. This is normally done through the flange bolt connection. If this is not the case, the potential or guard wire must be drawn to the terminal clamp. For trouble-free commissioning of electric actuators, we recommend to call on our specially trained customer service specialist. On-site electric installations shall be in accordance with respective connecting diagram of the supplier. In addition, the specific operating instructions of the actuator supplier shall be observed. Before the first electrical operation, the valve gate shall be set to an intermediate position with the manual override, and then started. When connecting to the power supply, the phase sequence has to be observed. With wrong phase sequence, limit and torque switches are ineffective. The switch off-shall be in accordance to our instructions/diagrams, i.e.: - Switch-off in closing direction: usually by limit switches, exceptionally by torque - Switches (for abrasive service applications). - Switch-off in opening direction: by limit switches only, as the torque switch serves as overload protection. 5. MAINTENANCE 5.1 Inspection When in operation with dangerous fluids especially the leak-tightness against atmospheric area must be controlled on a regular basis. At possible indication of leakage must be repacked. 5.2 Operating cycles During one service year, at least four (4) operating cycles shall take place, whereby all components shall be checked. Under severe service conditions, such functional checks shall take place more frequently. 5.3 Repacking During a longer storage period of the Wey Knife gate valves or in case of great temperature fluctuations, the packing material in the transverse seal may shrink. This could lead to slight leakage through the transverse seal in the body chest area. Should a leakage be detected at the transverse seal which remains even after repeated actuation of the gate, the valve can be repacked easily and quickly while installed. During this work however, the valve should possibly not be under full service pressure. page 8 / 11

Mostly, it is only necessary to firmly tighten the four (4) packing screws on the side by 1-2 turns. Did the leakage not stop (after packing screws are fully tightened), then remove the screws from the valve body (fig. 7) Insert packing pellet into holes and compress firmly with packing tool. Repeat until valve is absolutely tight. Please observe that the valve gate is not pressed against the valve body due to the repacking. One-sided and too powerful repacking can cause the valve gate to jam. Seal cartridge Repacking screw Repacking tool 5.4 Seal replacement Fig. 7 Should a leakage through the bore passage occur, the cause is mostly damage or wear of the body seal. The valve body seal can only be replaced when the valve is removed from the pipeline. Seal replacement can be performed by trained personnel according instructions or at any time in our works. 5.5 Cleaning / Lubrication Stem rods, pull and piston rods shall be free of dirt and contamination and shall always be well lubricated. Lubrication points on handwheel bearings shall be regularly lubricated, based on the operating conditions, but at least every 3 months. Pneumatic cylinders with closing cushion are fitted with a self-lubricating rod seal. Any leakages on the cylinders require the exchange of all sealing components. For valves with electric actuators, the lubrication point on the drive should be especially observed. The respective operating instructions of the actuator supplier are binding. Depending on the service conditions of the valves, the gate is to clean and needs possibly slight lubrication. page 9 / 11

6. TROUBLE SHOOTING Trouble Possible Cause Elimination Leakage at gate in body chest area. Leakage in bore passage of valve Leakage through valve body halves Valve gate is not movable Closing or opening stroke ceasing or stagnating Transverse seal untight Transverse seal damaged Valve gate not completely closed; jammed particles between gate and body internals Jammed particles between stem nut, resp. clevis and body chest Body seal damaged Valve distorted during mounting Sealant between body halves damaged Actuating components damaged Valve clogged; Valve gate contaminated Insufficient supply pressure Solenoid valve dirty Piston rod seal damaged Valve clogged Repacking of transverse seal according to instructions Replacement of transverse seal according to instructions, cleaning of valve gate, if necessary replacement of gate Manual valves: - Open valve slightly and repeat closing action - Remove jammed particles Pneumatically and hydraulically operated valves: - Open valve slightly and repeat closing action - Check, if necessary new setting of clevis, resp. stroke - Remove jammed particles Electrically actuated valves: - Open valve slightly and repeat closing action, check, possibly reset switches (upon supplier s recommendation) - Remove jammed particles Remove valve, replace seals according to instructions Untighten flange bolts and re-tighten according to instructions Remove valve and replace sealant according to instructions Manual valves: - Check, clean stem or stem nut, replace if necessary, lubricate Pneumatically and hydraulically operated valves: - Check supply pressure Check if current onto solenoid exists. Check solenoid for damages Check hydraulic cylinder for damages (seal) - Clean and lubricate; if necessary replace damaged components acc. to supplier s instructions Electrically actuated valves: - Check if current exists - Check if motor defect - Check if limit switches defect or adjusted - Check if gear, stem or stem nut damaged - Clean and lubricate; if necessary replace damaged components acc. to supplier s instructions Remove valve, clean, possibly disassemble completely Pneumatically and hydraulically operated valves: Check supply pressure, possibly increase supply pressure Remove and clean solenoid valve, possibly install filter Remove and clean piston rod seal, exchange and lubricate cylinder seals Clean valve and lubricate Pressure loss on supply net Control pipe connection damaged Check pipe connections, tighten, replace if necessary Cylinder seals damaged - Check and replace cylinder seals, lubricate - Check piston rod seal, clean, lubricate page 10 / 11

7. REMOVAL Before removing the valve, consider that the pipe system can be under pressure and that hazardous media could get into the environment. Respective precaution measures must be taken. Actuators must, in principle, not be removed if pipeline system is under pressure. Electric actuators must be made current less, respectively disconnected from circuit. Pneumatic and hydraulic actuators must be pressure less and disconnected from supply lines. In case the pipe is removed on one side only, ensure before that the valve cannot be operated. Unintentional opening of the valve can be hazardous to people and environment due to drain-off of service medium. Unintentional closing can be very harmful, if a person (or body part) is within the area of the valve gate travel. 8. DISPOSAL Observe that sediments inside of valve or pipe can be harmful to people and environment. Respective precautions measures are to be taken. After finished service life the valve must be disposed skilful and in conformity with environmental regulations. 9. FINAL REMARKS All details given above are to our current up-to-date knowledge and shall provide, together with our technical documentation, information about our products and their range of applications. They are not thought to assure particular features of the products nor their suitability for a specific application. Faultless quality is assured within our General Sales Conditions. For any further information, please call any time on our Customer Service Department. Alterations reserved page 11 / 11