Classical Event Tree Analysis and Dynamic Event Tree Analysis for High Pressure Core Melt Accidents in a German PWR

Similar documents
Comparison of the partner s approaches for physical phenomena assessment in level 2 PSA

V.H. Sanchez Espinoza and I. Gómez-García-Toraño

Event tree analysis. Prof. Enrico Zio. Politecnico di Milano Dipartimento di Energia. Prof. Enrico Zio

COMPUTING SOURCE TERMS WITH DYNAMIC CONTAINMENT EVENT TREES

Level 2 PSA for the VVER 440/213 Dukovany Nuclear Power Plant

SAFETY APPROACHES. The practical elimination approach of accident situations for water-cooled nuclear power reactors

Recent Research on Hazards PSA

Effects of Delayed RCP Trip during SBLOCA in PWR

IAEA Training in Level 2 PSA MODULE 8: Coupling Source Terms to Probabilistic Event Analysis (CET end-state binning)

Loss of Normal Feedwater Analysis by RELAP5/MOD3.3 in Support to Human Reliability Analysis

The «practical elimination» approach for pressurized water reactors

Accident Management Strategies for Mark I and Mark III BWRs

Verification and validation of computer codes Exercise

Probabilistic safety assessment of fire hazards

IEM on Severe Accident Management in the light of the accident at the Fukushima Daïchi NPP

Nuclear safety Lecture 4. The accident of the TMI-2 (1979)

MELCOR code application to VVER440/V213 analyses

IAEA SAFETY STANDARDS for protecting people and the environment

Tools and Methods for Assessing the Risk Associated with Consequential Steam Generator Tube Rupture

REGULATORY OBSERVATION

IAEA SAFETY STANDARDS for protecting people and the environment

Considerations for the Practical Application of the Safety Requirements for Nuclear Power Plant Design

DETAILS OF THE ACCIDENT PROGRESSION IN 1F1

EXPERIMENTAL SUPPORT OF THE BLEED AND FEED ACCIDENT MANAGEMENT MEASURES FOR VVER-440/213 TYPE REACTORS

An Improved Modeling Method for ISLOCA for RI-ISI and Other Risk Informed Applications

TEPCO s Safety Assurance Philosophy on Nuclear Power Generation Plants

Extensive Damage Mitigation Guidelines (EDMG)

DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS

Integrated Coping Strategies for Beyond-Design-Basis External Events

DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS

Engineering & Projects Organization

RESULTS FROM THE APPLICATION OF UNCERTAINTY METHODS IN THE UMS AND IN BEMUSE

CONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION

Dynamic Context Quantification for Design Basis Accidents List Extension and Timely Severe Accident Management

ACCIDENT MANAGEMENT AND EPR AT DUKOVANY NPP

ASVAD THE SIMPLE ANSWER TO A SERIOUS PROBLEM. Automatic Safety Valve for Accumulator Depressurization. (p.p.)

Instrumentation systems of BWR

SENSITIVITY ANALYSIS OF THE FIRST CIRCUIT OF COLD CHANNEL PIPELINE RUPTURE SIZE FOR WWER 440/270 REACTOR

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS. A high-capacity EBA system [CSVS] [main purge]

Engineering Risk Assessment of Space Thruster Challenge Problem

PI MODERN RELIABILITY TECHNIQUES OBJECTIVES. 5.1 Describe each of the following reliability assessment techniques by:

NUBIKI Nuclear Safety Research Institute, Budapest, Hungary

RISKAUDIT GRS - IRSN Safety assessment of the BELENE NPP

Containment Isolation system analysis and its contribution to level 2 PSA results in Doel 3 unit

Steam generator tube rupture analysis using dynamic simulation

NKS PODRIS project. Importance of inspection reliability assumptions on piping failure probability estimates

EMERGENCY CORE COOLING SYSTEM SIMPLIFICATION

Appendix 12 Consequences

How to reinforce the defence-indepth in NPP by taking into account natural hazards?

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC)

Transient Analyses In Relief Systems

Ing. JOZEF BALÁŽ Ph.D. and Ing MILAN CVAN CSc

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

Assessing Combinations of Hazards in a Probabilistic Safety Analysis

Evaluation of the fraction of Unit-3 vent gas that flowed into Unit-4 reactor building

USA Parkway Traffic Operations Analysis, Roundabout Option. Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy Travis, NDOT

HEALTH AND SAFETY EXECUTIVE HM NUCLEAR INSTALLATIONS INSPECTORATE

Safety and efficiency go hand in hand at MVM Paks NPP

Workshop Information IAEA Workshop

SHUTDOWN SYSTEMS: SDS1 AND SDS2

Safety Analysis: Event Classification

International Agreement Report

Workshop Information IAEA Workshop

Office for Nuclear Regulation

Comparison of MARS-KS to SPACE for counter current flow limitation model

PRA Methodology Overview

HIGH WIND PRA DEVELOPMENT AND LESSONS LEARNED FROM IMPLEMENTATION Artur Mironenko and Nicholas Lovelace

Tokyo Electric Power Company Holdings, Inc. November 30, 2017

Research Article Remarks on Consistent Development of Plant Nodalizations: An Example of Application to the ROSA Integral Test Facility

How to Optimize the Disposal System With Staggered Analysis Using BLOWDOWN Technology. Jump Start Guide

EUROPEAN COMMISSION 5th EURATOM FRAMEWORK PROGRAMME KEY ACTION: NUCLEAR FISSION

DISTRIBUTION LIST. Preliminary Safety Report Chapter 19 Internal Hazards UK HPR1000 GDA. GNS Executive. GNS all staff. GNS and BRB all staff CGN EDF

HTR Systems and Components

ON TRANSIENTS IN PUMA

Regulatory requirements with respect to Spent Fuel Pool Cooling

Office for Nuclear Regulation

Justification of Risk Reduction through In-Service Inspection / REDUCE

International Agreement Report

HYDROGEN RISK ANALYSIS FOR A GENERIC NUCLEAR CONTAINMENT VENTILATION SYSTEM

Development of a new bench for puncturing of irradiated fuel rods in STAR hot laboratory

The Nitrogen Threat. The simple answer to a serious problem. 1. Why nitrogen is a risky threat to our reactors? 2. Current strategies to deal with it.

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER F: CONTAINMENT AND SAFEGUARD SYSTEMS 7. CONTAINMENT HEAT REMOVAL SYSTEM (EVU [CHRS])

UKEPR Issue 01

NE 405/505 Exam 2 Spring 2015

Experimental Investigation of CCFL in Pressurizer Surge Line with Air-Water

Tube rupture in a natural gas heater

IAEA Headquarters in Vienna, Austria 6 to 9 June 2017 Ref No.: CN-251. Ivica Bašić, Ivan Vrbanić APoSS d.o.o.

Safety Engineering - Hazard Identification Techniques - M. Jahoda

The Advancement of Pressure Independent Technology

Risks Associated with Caissons on Ageing Offshore Facilities

DSC 204 HP Phoenix. High-Pressure Differential Scanning Calorimetry up to 15 MPa Method, Technique and Applications

Influence of real phase equilibria on the sizing of pressure relief devices

Quantitative Risk Analysis (QRA)

THE NITROGEN INJECTION THREAT IN PWR REACTORS

Simulation of Experiment on Aerosol Behaviour at Severe Accident Conditions in the LACE Experimental Facility with the ASTEC CPA Code

Preliminary Failure Mode and Effect Analysis for CH HCSB TBM

Evaluation and Demonstration of Safety of Decommissioning of

MDEP Common Position No AP

THE LOVIISA NUCLEAR POWER PLANT DECOMMISSIONING PLAN UPDATE Matti Kaisanlahti NKS-R Decommissioning Seminar, Halden, Norway, November 2013

SAFETY DEMONSTRATION TESTS ON HTR-10

Transcription:

OECD International Workshop on Level 2 PSA and Severe Accident Management Koeln, Germany, March 29-31, 2004 Classical Event Tree Analysis and Dynamic Event Tree Analysis for High Pressure Core Melt Accidents in a German PWR H. Loeffler, J. Peschke, M. Sonnenkalb Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbh, Schwertnergasse 1, D-50667 Koeln, Germany 29.03.04 1

Introduction This presentation intends to explain two different approaches to evaluate the risk-dominant issue of primary system depressurisation in case of a high pressure core melt accident. GRS has performed a PSA level 2 for a 1400 MWe PWR of the Konvoi type - methodology is similar to NUREG-1150 - based on detailed accident simulations, but these are limited in number - event tree set up and branching probabilities based on expert judgement - accident management measures taken into account in PSA level 1 and 2 About 26% of all plant damage states have high primary pressure. The depressurization before RPV failure is an important risk reducing issue. This issue has been adressed by two methods: - Classical event tree analysis - Dynamic event tree analysis 29.03.04 2

Classical event tree analysis Large event tree (similar to the NUREG-1150-study) - starting point: core begins to melt (plant damage states - PDS) - end point:: final plant status including release to environment - Properties of PDS (e.g. pressure) determined by PSA level 1 - Uncertainties in accident progression represented by branching points - Branching probabilities (stochastic uncertainties) determined by expert judgement - Uncertainties of knowledge (epistemic) modelled by Monte Carlo simulation Dynamic event tree analysis Large number of integral code runs (MELCOR), each run associated with a different probability (see companion paper by Peschke, Sonnenkalb) - starting point: initiating event (here limited to SBO) - end point: 12000s (or earlier RPV failure) - stochastic uncertainties (aleatory) have been taken into account associated with the MELCOR runs -> generation of a sample of Dynamic Event Trees - State of knowledge uncertainties (epistemic) not considered (lack of ressources) 29.03.04 3

Three different ways for depressurisation have been taken into account in both approaches Delayed manual depressurisation according to emergency procedure Manual depressurisation is due before core melt, but might be delayed, so that it becomes effective after core melt begins. Failure of primary piping due to elevated temperature at system pressure The core degradation process generates very hot gases passing through the primary piping. Combined with the high pressure, this could lead to a failure. Stuck open safety valve During core degradation, the safety valves operate beyond their design basis. There is an elevated failure probability. 29.03.04 4

Delayed manual depressurisation Classical event tree analysis - Success probability for manual depressurisation between PDS and 3000 s after PDS has been determined by PSA level 1 methods for each PDS. - Success probabilities are rather low, because previously (before PDS) the depressurisation was not successful. Dynamic event tree analysis - Depressurisation before and after PDS is handled consistently - MELCOR process data determine time when signal to depressurise is generated (between 4500 s and 6100 s after initiating event). - Time needed by operators to depressurise is a distribution between 300 s and 3600 s 29.03.04 5

Failure of primary piping due to elevated temperature Classical event tree analysis - failure temperature in hot leg determined by finite element analysis is between 1093 K and 1118 K (uniform distribution) - maximum temperature in hot leg is correlated to hydrogen production. Based on MELCOR results and expert judgement: 1050 K 1350 K - other potential failure locations (surge line, steam generator tubes) are not significant Dynamic event tree analysis - state of knowledge uncertainty of failure temperature for reactor coolant line is given as a uniform distribution between 1023 and 1103 K. - In the calculations only the mean value of 1063 K was considered as failure temperature of the reactor coolant line (Epistemic uncertainties have not been analyzed in this MCDET-analysis). 29.03.04 6

Stuck open safety valve Classical event tree analysis - temperature in pressurizer before core relocation does not significantly exceed design value -> no failure in this phase - temperature in pressurizer short after core relocation is much higher than design value (up to 1000 K)-> failure possible, large uncertainty, failure assumed in 50 % of all Monte Carlo simulations. Dynamic event tree analysis - Each failure mode (stuck open; stuck close) of the safety valves is explicitly considered in the Dynamic Event Tree analysis - The probability distributions of the respective failure modes depend on the demand cycles the valves have seen during their operating history. - The time and demand cycle, at which each of the safety valves stuck open or close, were randomly sampled for each dynamic event tree, respectively. 29.03.04 7

Accident progression after depressurisation Classical event tree analysis - availability of HP and LP ECCS is part of PDS attributes - flooding of core is assumed if ECCS is available and RPV pressure lower than pressure head of pumps - probability for retention of partly molten core estimated by expert judgement based on MELCOR analyses. Dynamic event tree analysis - time and probability for restoration of HP and LP ECCS availabilty determined for each MELCOR run - flooding of core calculated by MELCOR for each run - retention of partly molten core calculated by MELCOR for each run 29.03.04 8

Dynamic event tree analysis: Example for results of a part of the simulations 2.1e+07 MCDET/MELCOR alle Pfade aus Lauf 8 150000 MCDET/MELCOR alle Pfade aus Lauf 8 1.75e+07 125000 1.4e+07 100000 1.05e+07 75000 7e+06 50000 3.5e+06 25000 0 4000.0 6000.0 8000.0 Zeit [s] 10000.0 12000.0 0 4000.0 6000.0 8000.0 Zeit [s] 10000.0 12000.0 Pressure in RPV Molten fuel mass 29.03.04 9

Results for SBO with high pressure at beginning of core melt Classical event tree analysis - probability for high pressure RPV failure: 0.10 - probability for low pressure RPV failure: 0.76 - probability for corium retention in core region: 0.01 - probability for corium retention in lower plenum: 0.13 Dynamic event tree analysis - probability for high pressure RPV failure: 0.018 - probability for low pressure RPV failure: 0.815 - probability for corium retention in core region: 0.068 - probability for corium retention in lower plenum: 0.099 29.03.04 10

Summary and conclusions (1) A comparison of assumptions and results for the conventional event tree analysis and the dynamic event tree analysis is given. The comparison is limited to accident sequences from incipient core melt under high pressure until RPV-failure. Assumptions of the manual depressurization, of safety valve failure, failure of primary piping due to elevated temperature are given for each of the respective methods. Given the uncertainties involved, the overall results show a rather good agreement, while details vary considerably. 29.03.04 11

Summary and conclusions (2) In addition to the conventional Event Tree method, future research in PSA Level 2 should explore the advantages of Probabilistic Dynamics methods, because they allow a much more detailed analysis. Specific issues, where the confidence in expert judgment is low, may be analyzed by advanced methods of Probabilistic Dynamics. The results obtained can then be used in future PSA work and an improvement of the quality of a PSA is to be expected. 29.03.04 12