CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP January 19, 2015 Volume 2, Issue 105 DOUG s CORNER COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE Doug s Corner.1 3 Traffic/Active Work 4-6 Construction Notices.7-12 Project App.. 13
CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP DOUG s CORNER MY WEEK IN PICTURES
CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP DOUG s CORNER MY WEEK IN PICTURES Doug St. Stevens
CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP WORK ACTIVITIES AND TRAFFIC CONTROL WEEK OF 1.19.15 Dunlap / 19th Intersection Traffic signals Two lanes eastbound and one lane westbound. Left turn lanes will be maintained January 12, 2015 to January 22, 2015 Dunlap to Butler Ductbank One (1) lane both north and southbound will be maintained NORTH DUNLAP ORANGEWOOD Butler to Northern Guideway curb, OCS, ductbank One (1) lane both north and southbound will be maintained Turns at the signalized intersections will be maintained Northern / 19th Intersection One lane east and westbound-left turns maintained beginning January 23, 2015 Northern to Orangewood Curb, gutter, sidewalk, driveways, traffic signals, water removals One (1) lane both north and south bound will be maintained Turn lanes at the signalized intersections will be maintained Augusta, Frier, Morten closures thru January 31, 2015 Orangewood closed January 16, 2015 thru January 19, 2015 Orangewood daytime closures January 20, 2015 thru January 23, 2015 Orangewood closed January 23, 2015 4PM thru January 24, 2015 10PM
WORK ACTIVITIES AND TRAFFIC CONTROL Orangewood to Glendale Water, removals Curb, gutter, sidewalk, driveways, traffic signals One (1) lane both north and south bound will be maintained Turn lanes at the signalized intersections will be maintained State and Myrtle closures thru January 31, 2015 Glendale / 19th Intersection One lane east and westbound-left turns maintained January 5, 2015 to January 22, 2015 Glendale to Maryland Form/pour track, sig-comm, set station steel CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP WEEK OF 1.19.15 SOUTH ORANGEWOOD -MONTEBELLO One (1) lane both north and south bound will be maintained Turn lanes at the signalized intersections will be maintained Maryland to Bethany Home Road Curb, gutter, sidewalk, driveways, ductbank, OCS One (1) lane both north and south bound will be maintained Turn lanes at the signalized intersections will be maintained Rose to Rovey alternating closures thru January 31, 2015 Bethany Home / 19th Intersection Bethany Home Road Track Crossing February 12, 2015 to February 17, 2015 Bethany Home Road to Montebello Guideway curb, ductbank installation, OCS One (1) lane both north and south bound will be maintained Turn lanes at signalized intersections will be maintained
CONSTRUCTION NOTICE Roadway Widening & Paving Northern Ave Superintendent January 23, 2015 to February 28, 2015 Roadway widening and paving Installation of new sidewalk, curb and gutter Traffic Restrictions Shell access from 19th Ave will be closed. Enter Shell gas station from Northern Restricted to one lane east and west bound 24-Hour Project Hotline 602-254-RAIL (7245)
CONSTRUCTION NOTICE -Superintendent 24-Hour Project Hotline 602-254-RAIL (7245) Augusta, Frier, and Morten Roadway Widening Paving Through January 31, 2015 Pipe removal, roadway widening, and paving on the East side of 19th Ave TRAFFIC RESTRICTION Intermittent road closure will take place for Augusta, Frier and Morten Frier will remain open if Augusta or Morten are closed Augusta and Morten can close at the same time. Use 18th Ave as alternate access to Augusta, Frier, and Morten
19th AVE CONSTRUCTION NOTICE Superintendent Orangewood East Side Closure Roadway Widening January 16, 2015 to January 19, 2015 10pm Roadway widening. TRAFFIC RESTRICTION No east bound traffic from 19th Ave. Morten Ave detour State and Myrtle will alternate closures during this time frame and serve as the south detour W MORTEN AVE 24-Hour Project Hotline 602-254-RAIL (7245) W ORANGEWOOD AVE Work W STATE AVE W MYRTLE AVE
19th AVE CONSTRUCTION NOTICE Superintendent Ryan Clark (480) 271-4117 Orangewood East Side Closures Roadway-Grade-Paving January 20, 2015 to January 24, 2015 Asphalt Paving TRAFFIC RESTRICTIONS Tuesday, Thursday, closed 9AM to 2PM & 4PM to 7PM Wednesday closed 9AM to 1PM & 4PM to 7PM Friday closed 9AM to 2PM & 4PM Friday thru Saturday 10PM No east bound traffic from 19th Ave Morten Ave Detour State Ave Detour W MORTEN AVE 24-Hour Project Hotline 602-254-RAIL (7245) Extended Due to the recent rains the scheduled paving operations have been delayed. Despite remediation efforts the soil continues to have an excessive amount of moisture. We apologize for the continued inconvenience. W ORANGEWOOD AVE W STATE AVE W MYRTLE AVE Work
CONSTRUCTION NOTICE Superintendent State Ave. & Myrtle Ave. Civil-Demo-Replace October 13, 2014 to January 31, 2015 Demo and replace curb, gutter, sidewalk, roadway TRAFFIC RESTRICTION Intermittent road closure will take place between State Ave. & Myrtle Ave. State and Myrtle will not close simultaneously. Use Orangewood or Myrtle to 17th Ave. as alternate access to State. Use Orangewood or State to 17th Ave. as alternate access to State and Northview
19th 19th Ave 19th 19th Ave N 18th Dr N 18th Dr CONSTRUCTION NOTICE Superintendent 24-Hour Project Hotline 602-254-RAIL (7245) Rose Rd Closure and Rovey Rd Closure Roadway Paving November 12, 2014 to January 31, 2015 Roadway widening, and paving. TRAFFIC RESTRICTION Intermittent road closure between Rose, and Rovey. Rose and Rovey will not close simultaneously. restrictions may change, due to weather or unforeseen conditions. Rose Rose Work Rovey N 18th Ave Bethany Home Road Rovey N 18th Ave Bethany Home Road
19th Ave CONSTRUCTION NOTICE Superintendent Bethany Home Road & 19th Ave Track Guideway Construction February 12, 2015 (8pm) to February 17, 2015 (5am) Constructing track and pouring concrete. TRAFFIC RESTRICTION No left turns from 19th Ave (Northbound) No left turns from 19th Ave (Southbound) Right only from Bethany Home Road (Eastbound) Right only from Bethany Home Road (Westbound) Glendale Ave Bethany Home Road 24-Hour Project Hotline 602-254-RAIL (7245) Work Zone Camelback Road
CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP PROJECT APP City of Phoenix