Appendix BELGIUM Brussels Belliard Tunnel

Similar documents
Appendix FRANCE Annecy Tunnel Courier

Appendix FRANCE Lyon Croix-Rousse Tunnel

Appendix ITALY Valsassina Tunnel near Lecco (Lombardy)

On the design and control of complex tunnel ventilation systems applying the HIL tunnel simulator

VENTILATION DURING TUNNEL CONSTRUCTION INDUSTRY CONSIDERATIONS

PROBLEMS ON VENTILATION IN COMPLEX CITY TUNNELS

T10:2012 Site Category 1a) T10:2012 Site Category 1b) Railway Level Crossing Approach Traffic Signal Approach Event Code F Event Code E

THE TÚNEL LA LÍNEA - A CHALLENGE FOR VENTILATION AND SAFETY

Tunnel Ventilation The Actual State of the Art

Introducing STAMP in Road Tunnel Safety

TUNNEL KASTELEC - PLANING, REALISATION, TESTING, EXPERIENCES

LONGITUDINAL AIR VELOCITY CONTROL IN A ROAD TUNNEL DURING A FIRE EVENT

AUSTRIAN RISK ANALYSIS FOR ROAD TUNNELS Development of a new Method for the Risk Assessment of Road Tunnels

METRO System Design. Witt&Sohn AG Aug-11

AN INVESTIGATION OF LONGITUDINAL VENTILATION FOR SHORT ROAD TUNNELS WITH HIGH FIRE HRR

VENTILATION OF PROTECTED AREAS IN ROAD TUNNELS

Road Traffic Signs in Germany

Blair/Williamson Intersection Expressed Needs

Safety, ventilation and climate in rail tunnels

Lighting of short tunnels

VENTILATION AND ESCAPE FACILITIES FOR SHORT CUT-AND- COVER URBAN TUNNELS

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

ROAD ENVIRONMENT AS A FACTOR OF OF ROAD ROAD SAFETY SAFETY do we understand the concept?

Tools for safety management Effectiveness of risk mitigation measures. Bernhard KOHL

COMPLEX COMMISSIONING AND QUANTITATIVE TESTING OF THE GOTTHARD BASE TUNNEL VENTILATION SYSTEM

Evaluation of the optimum conditions for a local ventilation system in connection with the mine ventilation network

High Speed Rail Tunnel Aerodynamics: Transient pressure and loadings on fixed tunnel equipment

Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios

FLOW CONSIDERATIONS IN INDUSTRIAL SILENCER DESIGN

Driver Education Ch. 4: Safe Driving Rules & Regulations. Ms. Marx

IRIS 2 MOBILITY PLAN Brussels-Capital Region

Frequently Asked Questions

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

Redesign of Motorized and Non-motorized Transport in Cities and Sustainable Mobility

CHAPTER 1 STANDARD PRACTICES

FEASIBLE SOLUTIONS FOR REDUCING TRAFFIC FROM MEERAMAKKAM MOSQUE JUNCTION TO THOPAWANA TEMPLE AREA IN KANDY

New Technologies applied to the design and optimization of tunnel ventilation systems

2017 SWRMRA Mine Rescue Contest

Full Address Primary Result Description Grand Total MOSQUE CARPARK COLUMN ROUNDABOUT

This page intentionally left blank.

CHAPTER 3. Transportation and Circulation

STATISTICAL DISTRIBUTION OF AIR FLOWS IN RAIL TUNNELS AND RESULTING RISK OF FLOW REVERSAL DURING FIRE INCIDENTS

C.A.R.S. Project Design Report.

Jetfoil & Large JM Aerofoil Fans For Tunnel Ventilation. FläktWoods

THE INFLUENCE OF PRESSURE GRADIENTS ON VENTILATION DESIGN SPECIAL FOCUS ON UPGRADING LONG TUNNELS

Traffic safety manual for the citizens of the Sultanate of Oman.

Konstantin Glukhenkiy Economic Affairs Officer

March, 2017 Christophe Najdovski, Deputy Mayor of Paris for transport, street network, mobility and public space. Roads and Mobility Parisian Policy

TUNNEL SAFETY BY VENTILATION AN ILLUSION?

FROM THE CLASSICAL FIRE FIGHTING WATER SUPPLY TO STRUCTURE AND SMOKE GAS COOLING TAKING GLEINALMTUNNEL AS AN EXAMPLE; PART II

Quantitative risk assessment and risk-based decision making

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

Safety, health and environment values that are expected of all persons who are working and visiting the Quattro Ports Port Kembla Grain Terminal,

Application of the QMRS GAG at Crinum North Mine

INDEX. Geometric Design Guide for Canadian Roads INDEX

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Signs. signs, signals and road markings. in this chapter

11.2 Detailed Checklists CHECKLIST 1: FEASIBILITY STAGE AUDIT. 1.1 General topics Scope of project; function; traffic mix

E A C S. Engine Altitude Conditions Simulator. Technical description

M1 Smart Motorways Junctions 32 to 35a

Relation between traffic safety and environmental protection

CROSSRAIL INFORMATION PAPER A4 VENTILATION AND INTERVENTION SHAFTS

Gas Accumulation Potential & Leak Detection when Converting to Gas

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Eglinton West/Allen Road Station Preliminary Design Online Consultation

MUTCD Part 6: Temporary Traffic Control

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Subsonic Wind Tunnel 300 mm

Fitting Light Rail through Well-established Communities

Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona

Distributed Control Systems

Grade Separated Intersection

Teaching Your Teen To Drive Checklist

Federal Railroad Administration. HUDSON TUNNEL PROJECT: WEEHAWKEN COMMUNITY MEETING January 18, 2018

Simon Peggs, dipl. eng. FH AlpTransit Gotthard Ltd., Lucerne, Switzerland / Project Manager Mechanical Equipment GBT

Tonight is for you. Learn everything you can. Share all your ideas.

HORN PROHIBITED NO PARKING NO STOPPING STRAIGHT PROHIBITED NO ENTRY

Study by numerical simulations on the breathing effect in a semi-underground highway with beams and a roof above it

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls

Proposal for amendments to Regulation No. 79 to include ACSF > 10 km/h

Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks

RZC Appendix 8A Marymoor Subarea Street Requirements

COMPLETE STREETS DURING CONSTRUCTION

Development, transport and traffic management in Copenhagen

Road Safety Facilities Implemented in Japan

NUMERICAL INVESTIGATION OF THE FLOW BEHAVIOUR IN A MODERN TRAFFIC TUNNEL IN CASE OF FIRE INCIDENT

Traffic Engineering Research Centre Department of Civil and Environmental Engineering, NTNU

T.I. Mayes and A.D.S Gillies. A Review of Current Australian Longwall Mine Ventilation Practice, Proceedings, First Mine Environment and Ventilation

OPTIMISATION OF VENTILATION IN THE CASE OF A FIRE IN ROAD TUNNELS

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access

THE TUNNELS IN GUADARRAMA FOR THE HIGH SPEED RAILWAY

For Immediate Release September 14, 2015 Contact: Sue Chrzan Tampa Hillsborough Expressway Authority ext.

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

Identify the letter of the choice that best completes the statement or answers the question.

Comprehensive strategies to manage mobility and reduce air pollution

2017 Edition GUIDANCE NOTE GN 8 INVERTER DRIVES FOR FANS AND PUMPS GN 8 - INVERTER DRIVES FOR FANS AND PUMPS

Chapter 2 Preparations for Tank Cleaning Work

Automatisch rijden, het gedrag van bestuurders en verkeersstromen

FTS SUBMERSIBLE PRESSURE TRANSMITTER USER S MANUAL

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Transcription:

Appendix 2.3 - BELGIUM Brussels Belliard Tunnel 1. INTRODUCTION The Belliard tunnel is located in the city of Brussels and the city of Schaarbeek (170,000 & 130,000 inhabitants), in the centre of a metropolitan area of about 1,100,000 inhabitants. It is a one-way tunnel leading to the Brussels-Liege E40 motorway. It starts at the bottom of Rue Belliard, passes under the Schuman roundabout then in succession under Avenue Cortenbergh, Place Jamblinne de Meux and Avenue Roodebeek to emerge in the open at the Reyers portal. The covered part of the Belliard tunnel runs for 2,026m (Figure 1). The tunnel has one curve and one reverse curve before becoming practically straight as far as the Reyers portal. Under the Schuman roundabout, the tunnel has a Y-shape branch leading to the Cinquantenaire tunnel. The Belliard tunnel has one approach at the level of Avenue de la Joyeuse Entrée and one exit, via the Y branch, at the level of Avenue de la Renaissance and the Brussels Mosque. Figure 1 - Belliard tunnel location The Belliard tunnel has been constructed in several stages: The Kennedy section from 1966 to1967, The Roodebeek section from 1970 to 1973, The Belliard-Schuman, Schuman roundabout and Cortenbergh sections from 1989 to 1993. 2. CHARACTERISTICS 2.1 GE OME TR Y The Belliard approach is oriented to the west, the exit for the E40 to the east-north-east, and the exit to the Cinquantenaire to the east-south-east. The tunnel is comprised of a single passage. Hence it is a single tube one-way structure. The global length of the tunnel is 2,026 m.iit is divided into five sections: Belliard-Schuman section: 382 m, Schuman roundabout section: 156 m, Cortenbergh section: 784 m, Roodebeek section: 704 m, Kennedy section: 252 m. 1/6

2.2 GENERAL LAYOUT The general layout and the functions of the diverse underground space are shown Figure 2 below. VTB1: free technical space Belliard 1 VTB2: free technical space Belliard 2 LTF: technical room Froissard LTSN: technical room Schuman North LTSS: technical room Schuman South LTJE: technical room Joyeuse Entrée LTRe: technical room Renaissance LTJM: technical room Jambline de Meux LTRk: technical room Rodebeek LTRs: technical room Rayers LTC: technical room Cinquantaine LTK: technical room Kennedy TEB :access ramp Belliard TEJE : access ramp Joyeuse Entrée TSCh: exit ramp Cortenbergh TSC: exit ramp Cinquantenaire TSE 40 : exit ramp to E40 PJ : parking lot Juste Lipse SPB1: exit ramp to parking Berlaymont 1 SPB2: exit ramp to parking Berlaymont 2 Figure 2 - Belliard tunnel general layout 2/6

2.3 DE TAILE D CONCEPT AND CROSS SECTION The Belliard tunnel is made of several complex underground structures with numerous interfaces between them. The detailed concept is shown figure n 3. tunnel Belliard metro lines 1 & 5 rail tunnel Schuman Josaphal road tunnel Loi road tunnel exit ramps Rayers rail tunnel line 26 underground pedestrians link Schuman metro lines 23, 24 & 25 safety recess - emergency exit Figure 3 - Belliard tunnel detailed concept 3/6

Figure 4 below shows some cross sectional profiles of the Belliard tunnel in particular in places with interfaces between the diverse structures: profile 1: Belliard tunnel and exit ramp, profile 2: on the upper part: tunnel Belliard, technical room and exit ramp on the lower part railway tunnel, profile 6: same organization as for profile 2 without the technical room. Shifting of the upper part versus the lower part, profile 3: tunnel Belliard, merging ramp and free underground space. Figure 4 - Belliard tunnel cross section and main structures 2.4 EMERGENCY EXITS There are eight emergency exits along the tunnel, leading out to the surface. These emergency exits are not pressurized. 2.5 TR AFFIC CONDITION 2.5.1 Traffic The AADT (Annual Average Daily Traffic) is estimated at 44,000 vehicles a day with a speed limit of 70 km/h. 2.5.2 R oad tunnel Speed limit 70 km/h. Gauge 3.80m and < 3.5 t. The tunnel is prohibited to Heavy Goods Vehicles and to the Transport of Dangerous Goods. Bicyclists and pedestrians are prohibited. 2.5.3 Incident Fire: on average there is one fire every three years. Accidents: on average there are 18 accidents per year. Breakdowns: on average 41 breakdowns per year. 4/6

2.6 VE NTIL ATION 2.6.1 Ventilation s ys tem in the road tunnel The Belliard tunnel has 10 exhaust fans, 14 supply fans, and 44 Jet-fans. The ventilation installation is longitudinal with massive extraction (air renewal) at six points in the direction of the traffic. The supply of fresh air and the exhaust of polluted air are achieved using variable flow supply or exhaust fans combined with jet-fans. The incoming new air or outgoing polluted air passes through shafts emerging at the surface of the tunnel. The air intakes in these shafts are equipped with sound traps and grilles. These shafts are equipped with grilles most of which are located on surface roads. The plants are accessible from the tunnel. Ventilation for pollution control is linked to the pollution monitoring and to the traffic in the tunnel (TRAFICON link). 2.6.2 S moke extraction ventilation The exhaust fans also perform the mechanical smoke extraction ventilation (Figure 5). Extraction flow rate Q Fire detection equipment operates on the smoke extraction ventilation by means of the PLC and SCADA systems. Figure 5 - Fire simulation 2.6.3 Ventilation of the emergency exits The emergency exits are not fitted with ventilation systems. They all give access the outside. Some of them have however a very long and tortuous path. 2.7 E NVIR ONMENT 2.7.1 Air quality The carbon monoxide (CO) content is measured using electrochemical cells (ADOS 592 sensors, arranged in boxes in the refuges). These different sensors are assembled in eight groups and interfaced by a central unit that transmits the measurements to the PLC and SCADA systems: four thresholds are defined for each group 50, 75, 150 and 200ppm of CO. All this information is sent to the Froissart room. The PLC and SCADA systems ensure the automation of the ventilation according to the values read in the different tunnel sections. 2.7.2 Noise protection The Jet-fans and axial fans are all fitted with silencers in order to reduce the sound nuisance. 2.7.3 Water Water is collected by a drain system specific to the tunnel which discharges to a pumping station where there are submerged pumps and a mixer pump. 2.7.4 E quipment The tunnel is equipped with the usual safety systems, i.e. fire detection, CCTV and emergency phones. 5/6

2.8 OPER ATION The Belliard tunnel is managed by the MOBIRIS control centre (open 24/7) which manages all the tunnels of the Brussels-Capital Region. This control centre is also responsible for the surface traffic of the main roads and motorways. 6/6