Urban Transportation Issues. BRT Developments in China PURPOSE

Similar documents
Integrated Corridor Approach to Urban Transport. O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

Bus Rapid Transit Plans

REYKJAVÍK - NEW MOBILITY OPTIONS

Durham Region Long Term Transit Strategy

PESHAWAR Bus Rapid TRANSIT. By Engr. Haroon Rashid Ph. D Scholar, MS in Transportation Planning and B.Sc Civil Engineering

BURGAS INTEGRATED PUBLIC TRANSPORT PROJECT. Information day, 5 th July 2011, Burgas

INSTRUCTOR VERSION. Better but not best: Incremental improvements and bus rapid transit planning Jinan, China

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

Presentation to the City of Ottawa Transit Commission. February 20, 2013

Designing Streets for Transit. Presentation to NACTO Designing Cities Kevin O Malley Managing Deputy Commissioner 10/24/2014

Charlotte Region Fast Lanes Study Phase III

Gerald Ollivier Lead Transport Specialist World Bank, New Delhi. Transforming Cities through Integrated Planning Corridor Scale

Seattle Transit Master Plan

BRT Standard 2016 Edition. Jacob Mason Transport Research and Evaluation Manager July 26, 2016

South King County High-Capacity Transit Corridor Study

2017 The first stage of the DFS was completed and Interim Public Consultation is launched Study Background

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

OVERVIEW OF CIRCULATION

Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher

Arterial Transitway Corridors Study. Sept. 26, 2011

ASIA PACIFIC RAIL 2006

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

Planning Cities for People. A Guide to Prosperous, Low-Carbon Urbanization

Wilshire Boulevard Bus Rapid Transit Project

URBAN AGE CONFERENCE GOVERNING URBAN FUTURES

Spring Lake Park Mounds View North Oaks. Arden Hills. Shoreview. Roseville. Little Canada. Falcon Heights SNELLING. Lilydale. West Saint Paul 35E

Arterial Transitway Corridors Study. Ave

BELFAST ON THE MOVE Transport Masterplan for Belfast City Centre

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

M14A/D Select Bus Service

Item B1 November 19, 2009

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

Rochester Downtown Bicycle Study 2009

PHNOM PENH CAPITAL CITY (PPUTMP) OUTLINE OF THE PPCC RAIL TRANSIT SYSTEM

Roadways. Roadways III.

Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

SMART 1 Public Meeting #1. February 24, 2016

7 Oct., EcoMobility World Festival

The Development and Policy Recommendations for Dockless Bike Share (DBS) in China

The Who and What: Bus Rapid Transit Riders and Systems in the U.S.

How familiar are you with BRT?

Previous Transit Studies MTTF MEETING #

Metropolitan Council Transportation Committee

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

EVAN GLASS. Montgomery County Council District 5

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Linking Land Use & Transportation in Minneapolis

Experience from India Future Perspectives

Linking Transportation and Health in Nashville & Middle Tennessee

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

An Incentive-Based Approach to Curbing Automobile Use in the Washington, DC Metropolitan Area

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

Advancing Obesity Solutions through Investments in the Built Environment. Roundtable on Obesity Solutions September 12, 2017

Regional Bicycle System Master Study. Preliminary Results Update

ENFIELD TOWN THE REVISED DESIGN

Decision on North Waterloo Routing

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

BICYCLE FACILITIES INVENTORY: SUMMARY REPORT

Simulated Analysis of Exclusive Bus Lanes on Expressways: Case Study in Beijing, China

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

Public Comment Meeting Geary BRT Project Draft Environmental Impact Statement/Report

Aaron s European Transportation Vacation Slide Show

Technical Working Group November 15, 2017

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

VILNIUS SUMP. Gintarė Krušinskaitė International project manager place your logo here

Wellington Public Transport Spine Study

Project Narrative. Albuquerque, NM. July 31, 2015

Public Works and Infrastructure Committee. General Manager, Transportation Services

MEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE AGENDA

Simulation Study of Dedicated Bus Lanes on Jingtong Expressway in Beijing

York Region Rapid Transit Corporation

The Moscow Department for Transport and Road Infrastructure

1. Provide a dedicated westbound approach bus lane at the intersection;

Light Rail Proposal. June 13, 2016 Presentation for the Joint Sustainability Committee by the Central Austin Community Development Corporation

Comprehensive Collection of Stakeholder Alternatives by Mode

Appendix A-2: Screen 1 Alternatives Report

CAI-Asia and Sustainable Urban Mobility in Asia (SUMA): Bus Rapid Transit Systems

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

Public Bicycle Sharing Scheme

The City. Population of BH. Population of RMBH. 2.4 million inhabitants. 5.7 million inhabitants. 6.3 million trips a day

Auckland Council Finance & Performance Committee Presentation

C Line Rapid Bus Preliminary Station Design

4. Mobility and Transportation Element. Page Bikes and Pedestrians

Assessment of Infrastructure and Institutional Framework for Integration of Cycling and Mass Rapid Transit System: The case study of Taipei

Cluster 5/Module 2 (C5/M2): Pedestrians and Transit Oriented Development (TOD)

Frequently Asked Questions (FAQ)

Scope of the Transit Priority Project

A Selection Approach for BRT Parking Lots Nicolls Road Corridor Parking Study

Operational Comparison of Transit Signal Priority Strategies

North Coast Corridor:

W Seattle Bridge / Duwamish Corridor

Transcription:

Pre-Conference Workshop Environment 2005 Conference Sustainable Transport and Cities: Improving Transit Systems BRT Developments in China S.K. Jason CHANG, Ph.D. Professor, Dept of Civil Engineering National Taiwan University Technical Advisor, China BRT Project Sustainable Energy Program of the Energy Foundation skchang@ntu.edu.tw PURPOSE Briefing on Planning and Operation of Bus Rapid Transit Systems in Chinese Cities Discuss Some Critical Issues in Development of BRT Urban Transportation Issues China has announced Public Transport Policy in 1995

Urban Rail + Bus Beijing BRT Network By 2008 Urban Rail 300 km + BRT 100 km Future Network Total Length: 360km 22 Routes: Rail Extension: 2 Radial Line: 11 Branch Line: 2 Inner City: 5 City Center: 2 Beijing BRT Network Short Term 2008 Olympic Park The First BRT in Beijing 16km from City Center to the South 18.3 m Low Floor Buses (First Stage: 50 veh; then 80 Veh) 18 Stations; Collect Fare in the Stations 2004.12.25 First Stage Commercial Operation (5km) $4 Mi per KM

South Gate of Tienanmen Low Floor Bus Exclusive Right of Way

Station ITS Applications Key Factors for Success 2003.03.18~2004.12.25 - Support from Mayor (s) - Support from City Council - Coordination Effort of the new Transportation Commission - Comprehensive planning/design works - Contribution of international teams 2003.03.18. BRT in Other Chinese Cities Shanghai (1) 250 KM BRT Network has been proposed; (2) Feasibility study of BRT implemented in the middle ring road (elevated expressway) is conducted; (3) BRT implemented in Pudong South Road and other potential corridors is also under planning; (4) BRT has been considered for new towns in Shanghai Metropolitan.

BRT in Other Cities (Cont.) Chengdu: an original design of 28 km fullyelevated expressway has been changed to a full BRT in the 2nd ring road. The new design has 30 BRT stations in which design of two bus lanes in the station area is proposed. Chongqin: A preliminary planning of 15km BRT has been proposed. Hanzhou: Two dedicated bus lanes are under operation while two full BRT routes will be implemented by 2006. Jinan: Dedicated Bus Lane has been implemented in one arterial road while BRT is under planning for two major streets. BRT in Other Cities (Cont.) Xian: a planning for BRT network of 48 km has been proposed and preliminary design works are conducted. Kunming: A Double Ten Network of 42 km has been developed and two third of the routes are under operation. Tienjing: A BRT Network of 145 km has been proposed. Shenyang: A BRT network is under planning; two BRT lines of 16 km have been considered for the first phase. Exclusive Bus Lane Shenyang Bus Lane Kunming Dedicated Bus Lane Suzhou Bus Lane Shijiazhung Bus Lane

Kunming Dedicated Bus Lane - Upgrade to BRT - Bus route optimization 黄土坡至云纺路口 6.7KM 全长 13.9KM 岷山至大树营 9.9KM 北站至南站 5KM 全长 6.8KM 全长 8.9KM Shanghai BRT BRT Planning for World Expo in Shanghai : A double ten BRT network connecting Pudong and Puxi has been considered for the World Expo 2010 Feasibility Study of Implementing BRT in Middle Ring Road Physical Condition Total length: 70 km Puxi: 39 km Pudong: 31 km Total 8 lanes w/ dsign speed of 80 kph BRT Service Areas More than 20 residential areas and commercial districts More than 14 transfer stations will be considered for future rail integration

Integration of Middle Ring Road BRT and Urban Rail Proposed BRT Design in West Section of the Middle Ring Road Chengdu BRT in the 2nd Ring Road Chengdu BRT in the 2nd Ring Road

Conceptual Plan of ChongQing BRT 已通車捷運路線未通車捷運路線高鐵路線公車專用道 Bus Lanes on 8 Streets Total Length: 57 km Connecting 4 MRT Lines Taipei Public Transportation Network Before and After 2000.01 Under Construction 2001.04.

CRITICAL ISSUES & FURTHER WORKS National Public Transport/BRT Policy Automobile/Economy Policy Bus Priority Schemes vs BRT System BRT + Bicycles BRT and Urban Development/Land Use Policy Integration on Network/Routes, Payment and Ticketing Systems, Pricing Public Private Partnership Approach for BRT development Education and Training Programs for Various Levels and Purposes

Thank you! www.brtchina.org skchang@ntu.edu.tw