Nordiko Metal Sputtering System Standard Operating Procedure

Similar documents
THERMAL EVAPORATION UNIT (for Al evaporation)

Oerlikon Sputtering Evaporator SOP

Revised: June 7, 2017

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

Standard Operating Manual

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

March CS-1701F Reactive Ion Etcher

Angstrom Dielectric Sputterer Operation Manual

Standard Operating Manual

SPUTTER STATION STANDARD OPERATING PROCEDURE

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100

Chapter 2 General description of the system

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

[needs to be discussed with faculty if any new material to be done]

Approved by Principal Investigator Date: Approved by Super User: Date:

Nanofabrication Facility: Sputter Evaporator SOP Rev. 04, June 2007

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

Plasma Asher: March PX-500 User guide (May-30, 2017)

Standard Operating Manual

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

Operating Procedures for Metal Evaporator I

2 Switching off ECRIS 3. 4 Acquire Beam Spectrum 4. 6 Vent Instrument Chamber 5. 7 Pump down Chamber 5. 8 Baking out Chamber 5.

MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE

RAPID THERMAL PROCESSOR (Annealsys AS-ONE 150) Lab Manual

Standard Operating Manual

Angstrom E-Beam Instructions. PROCESS CHECKS: the tooling factors of each metal; Ti/Au layer for wire bonding pull test.

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

Plasma II (AXIC) Standard Operating Procedure. Revision: 1.0 Last Updated: Feb.6/2013, Revised by Grace Li

Usage Policies Notebook for Parylene Coating System

Cryo-Evaporator Operation

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

Burner Management System DEMO Operating instructions

Standard Operating Procedure. For. PVD E-Beam

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

QUORUM TECH 150RES THE FIRST AND THIRD WEEK WILL BE SET UP FOR CARBON COATING THE SECOND AND LAST WEEK WILL BE SET UP FOR GOLD COATING

COMELEC C-30-S Parylene Coating System

MMRC PVD Evaporator Instructions

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

Plasma Cleaner. Yamato Scientific America. Contents. Innovating Science for Over 125 Years. Gas Plasma Dry Cleaner PDC200/210/510 PDC610G.

Arizona State University Center for Solid State Electronic Research. Table of Contents. Issue: C Title: Oxford Plasmalab 80plus (Floey) Page 1 of 8

Edge Isolation Tool. Standard Operating Procedure. Version 1.1. Date: Prepared by, Sandeep S S. Department of Electrical Engineering

STS ICP-RIE. Scott Munro (2-4826,

Standard Operating Manual

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

Fig. 1: Mechanical vacuum gauge (left) and capacitive vacuum gauge (right)

Standard Operating Manual

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35

Plasma 1 (Technics) Standard Operating Procedure. Revision: 1.0 Last Updated: Feb.5/2013, Revised by Grace Li

EXERCISE 2: THE VACUUM SYSTEM

SINGULUS TECHNOLOGIES

Approved by Principal Investigator Date: Approved by Super User: Date:

Standard Operating Procedure

ABM MASK ALIGNERS. NanoFab 26 March 2009 A Micro Machining & Nanofabrication Facility

Standard Operating Manual

Operating Procedures for the. SAMCO ICP RIE System

March Asher Operation

The SPI Sputter Coater Handbook

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

Table of Contents Want full page pictures with most important parts labeled in the beginning.

NORDSON MARCH PX-1000 PLASMA ASHER STANDARD OPERATING PROCEDURE Version: 1.0 July 2016

University of MN, Minnesota Nano Center Standard Operating Procedure

Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No

CHEMICAL ENGINEERING SENIOR LABORATORY CHEG Initiated Chemical Vapor Deposition

Short Introduction to Cryo-Pumps and Refrigerators. Dr Graham Rogers Leybold UK Ltd.

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

Usage Policies Notebook for Trion RIE / ICP Dry Etch

Notes-PECVD: Chamber 1

Basic ICP Operating Procedures

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch

University of Minnesota Nano Center Standard Operating Procedure

COBILT CA-800 Mask Aligner Equipment Operation

Customer Responsibilities

Operating Instructions

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

Savannah S100 ALD at SCIF, UC Merced Standard operating Procedure

Usage Policies Notebook for STS DRIE System

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300

OLED vacuum deposition cluster system Sunicel Plus 400 / Plus 400L (Sunic Systems)

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1

7250 Sys. Ruska Multi-Range Pressure Calibration System. GE Sensing & Inspection Technologies. Features. Applications

Inert Air (N2) Systems Manual

Agilent ICP-MS Interactive Troubleshooting tool for Plasma ignition problem

Operation of the contact mask aligner Canon PPC 210 Projection Print Camera

OXFORD PLASMALAB 80PLUS (CLOEY)

Oxford Instruments Austin, Inc.

University of MN, Minnesota Nano Center Standard Operating Procedure

Warnings: Notes: Revised: October 5, 2015

A NOVEL SENSOR USING REMOTE PLASMA EMISSION SPECTROSCOPY FOR MONITORING AND CONTROL OF VACUUM WEB COATING PROCESSES

Thermcraft Tube Furnace General Use

Plasma-Therm PECVD. Operating Characteristics. Operating Instructions. Typical Processes. I. Loading. II. Operating

Approved by Principal Investigator Date: Approved by Super User: Date:

RC102 & RC110 Sample in Vacuum Continuous Flow Cryogenic Workstation Cryostats

REPRODUCIBILITY IN OPTICAL THIN FILM PROCESSING PART 1, THE VACUUM AND PUMPING

Indian Institute of Technology Kanpur Samtel Centre for Display Technologies

Trillium US Inc. Cryo-Plex 10 Cryogenic High Vacuum Pump User s Manual Rev A / November 2015

Login to ilab Kiosk. Revised 05/22/2018. Load your sample:

Adsorption Unit Operating Procedures: CO2 Adsorption on to Activated Carbon

Transcription:

Nordiko Metal Sputtering System Standard Operating Procedure Specifications : Target Size Gases used in the system Base pressure Sputtering pressure Substrates used Substrate size : 2 inch or 4 inch : Ar for sputtering and Nitrogen for venting : 1.3 x 10-5 mbar : 2.7 x 10-3 mbar : Si, Ge, Glass, polymer, PDMS. : Small coupons, 2" and 4 diameter wafer. Substrate temperature : Room temperature to 400 C Materials that can be deposited : Cr, Au, Ti, Pt, Ir, Cu, Ag, W, ITO, AZO, Mo, Pd

Check the following facilities before using the system: 1. Check the cylinder pressure of N 2 and Ar cylinder. If it is less than100 psi (below red line), then immediately report to the facility team and get it changed. 2. Check the line pressure of N 2 and Ar cylinder. The line pressure of N 2 cylinder should be 5-6 mbar and for Ar it should be 4 mbar. 3. Check the temperature of the micro 1 chiller (It should be 20-2 C). 4. Check the water lines (both the inlet and outlet should be ON). Metal sputtering Process: 1. Switch ON N 2 knob from back side of the tool. 2. Check if gate valve is 100% closed. 3. Vent the Chamber by pressing V button on front panel and after venting, switch off the vent button.(observe vacuum levels in A1(roughing) and B1(base vacuum)) 4. Open the door of the Chamber & load the wafer. 5. Close the door & press MP button ON. 6. Switch ON the Roughing Valve (R). 7. Check the Sensor A2 (pirani gauge for process chamber). It should indicate 3.9x10-2 mbar. 8. Switch OFF Roughing Valve (R). 9. Switch OFF MP. 10. Open Gate Valve by 100%. 11. If you want to heat the substrate during deposition, press HR (to start the heater) and adjust the knob for required temperature 12. Sensor B1 should indicate 1.3x10-5 mbar (varies depending upon condition of the tool, however higher base vacuum gives smoother films). 13. Close the Gate valve by 80%. Make sure that shutter is closed.

14. Switch ON Argon Gas flow (using toggle switch on front panel). 15. B1 should indicate 2.7x10-3 mbar. If the value is different, then adjust the pressure by using flow meter. 16. Switch on RF generator and set forwarding power (according to deposition set the required RF power). 17. Close the gate valve by 100%. 18. After plasma creation, open the gate valve by 20%. 19. Match the reflected RF value in single digit (0-6 watt) only for position B (Pt) and C (Au). For target position A, it will be automatically matched. If the RF reflected power is higher, then you can set it manually for all positions (A, B and C). 20. Start deposition by removing the shutter (using knob above the gate valve). 21. Do deposition as per your thickness requirement by refereeing to updated deposition rates from the chart. 22. After deposition, close the shutter. Switch off the RF and RF generator. 23. Switch off the Argon gas flow (using toggle switch on the front panel). 24. Open the Gate valve by 100%. 25. B1 should indicate 1.3x10-5 mbar, (varies depending upon condition of the tool, however wait at least for 5min if it does not reaches base vacuum). 26. Close the Gate valve by 100% (Make sure that it is closed properly). 27. Vent the process chamber by pressing V button and after venting switch off the vent button and open the chamber. 28. After taking out your sample from the substrate holder, close the chamber and switch on MP and Roughing Valve (R) to create a vacuum up-to 3.9x10-2 mbar. 29. Switch OFF Roughing Valve(R) and MP. 30. Switch off N2 knob from back side of the tool. 31. Please fill all the details in the log book.

Steps to be followed when the cryo is off (to be done ONLY by system owner, co-system owner, operator and EMT) 1. Make Sure that gate valve for Cryo Pump is fully closed. 2. Start the system by Switching on the Power. 3. Switch ON the Main button on front panel. 4. Switch ON the Mechanical Pump (MP). 5. Switch ON Fore line Valve (F). 6. Wait till the sensor A1 (pirani gauge) shows pressure of 3.9 x 10-2 mbar. 7. Switch OFF the Fore line (F). 8. Switch OFF the MP. 9. Switch ON CryoPump (CrP) (Its take 5-6 hrs to get high vacuum) 10. Do not start the process before cryo reaches vacuum of the order 10-8 mbar. Safety and Precautions: If the cryo gets condensed then immediately switch off the cryo, main power, close the gate valve completely and inform the SO, Operator, Lab In charge and EMT through mail. Always check that gate valve is 100% closed before venting. Otherwise nitrogen gas may enter in the Cryo pump and condensation will take place and high vacuum will be lost, so always take care of it. If chiller goes OFF Or UPS goes OFF then switch OFF the Cryo Pump and Power supply. Micro1 chiller is connected to the Nordiko. Always check the line pressure of cylinders (5-6 mbar). Always check the circulated water temperature. Always mention the target position in the log book. Before trying any new material, an approval is REQUIRED from faculty in charge, Process committee and SO. Authorized users are not allowed to change the target from position B (Pt) and C (Au) at any circumstances. Only target from position A can be changed.

Useful Information: Sensor A1 (Pirani gauge for Fore Line) Fore line Valve. Sensor A2 (Pirani gauge for process chamber) Chamber (Roughing vacuum). Sensor B1 High Vacuum Pump ( Base vacuum). During roughing vacuum (while pressing MP and R) and when gate valve is completely closed (100%), B1 vacuum reading should we constant. If it is fluctuating during MP and R is ON. Please inform to SO, operator, EMT through mail and note down in the log book. For deposition rates, please have a look on the deposition rate chart pasted on the body of the tool above the gate valve. Training and Authorization Policy: Interested student should fill up the new user request form available on CEN website. Based on the request one trainer will be assign to the student. Multiple trainee students will be allowed for a training session. In first session trainer will describe the system and one demo run will be given to the trainee student. From the next session student will do the run with the help of trainer. After training one final test run have to be done in front of trainer without trainer s help. Violation Policy: 1. User should not violate any of the steps mention in SOP. 2. Don t forget to make a log book entry for process. 3. Don t try new material and do not make any hardware changes in the system without System owner s permission. 4. User should activate and then use the slot that he/she has booked. 5. For a fair distribution of slots, don t over-book them. 6. If you measure the thickness, resistivity or other characterization parameter s of the metal deposited, you have to report it to the operator and in the log book. Please measure thickness in Center, Right and Left. If it is found that user is not following the above rules and regulations, then his/her authorization may be cancelled or any other punishable measure can be taken after discussion with faculty in-charge of this tool. Note: Please inform to SO, co-so, Operator and EMT, if any mis-operation happened and any observation of the tool through mail. Thanks (SO)

Name SO/AU/Operator e-mail ID Contact No. V S Raju M SO ashok2738002@gmail.com 9930840259