Job Hazard Analysis Form (JHA)

Similar documents
Job Hazard Analysis. University of Washington Seattle Campus Facilities Services Campus Engineering & Operations Seattle, WA 98195

Portland Community College Facilities Management Services ENERGIZED ELECTRICAL WORK PERMIT AND WORK PLAN

Minimum Safety Requirements for Contractors Working on Railway Property

Return the completed questionnaire, OSHA 300A Summary form and EMR Rating via e- mail.

JOB HAZARD ANALYSIS (JHA)

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

Proper use of the JOB SAFETY ANALYSIS (JSA) FORM

SafeLandUSA - Syllabus

OFFICE OF STATE HUMAN RESOURCES

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Job Hazard Analysis

Identify, evaluate and assess workplace improvements to reduce hazards. Provide personal protective equipment based on hazard assessment

Health & Safety Policy

SAFETY POLICY Office Address 5195 W. 58 th Ave. Unit F Arvada, CO 80002

SITE SAFETY PLAN AND NEW EMPLOYEE SAFETY ORIENTATION

Job Hazard Analysis and Mitigation page 1 of 8. February 7, 2008 Rev. 6. Task or Employee: AEG Field Core Functions (Rev. 6) Routine Non-routine

OSHA Federal Standards October 1, 2016 September 30, 2017

Accident/Illness Prevention: 6 Keys

Instructions: Use this format to prepare the security plans for ACP contracts. EVERY point has to be covered; if they do not apply, write N/A.

New Hire Safety Orientation. Welcome to Flexicrew, our number one priority is you and your safety.

DUQUESNE UNIVERSITY PERSONAL PROTECTIVE EQUIPMENT (PPE) PROGRAM

JOB HAZARD ANALYSIS (JHA)

NC DWM Underground Tank Section SITE HEALTH AND SAFETY PLAN

SITE SAFETY PLAN AND NEW EMPLOYEE SAFETY ORIENTATION LOCATION: BROWN-MINNEAPOLIS TANK-SOUTHWEST (ALBUQUERQUE FABRICATION PLANT) REVISED:

Job Hazard Analysis. JHA No. FBP-JHA Revision No. Draft General or Job-Specific Description of Work

Conducting An Effective. Welcome!

PERSONAL PROTECTIVE EQUIPMENT SAFETY PROGRAM

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

RISK ASSESSMENT AND MANAGEMENT PLAN

Personal Protective Equipment (PPE) Hazard Assessment Certificate Instructions

Orchard Farm Fire Protection District Standard Operating Procedure

Harley-Davidson Motor Company

Staffing Services Client Evaluation Form

Contractor OHS Induction. AOHS-05-GUI September 2016

HAZARD ASSESSMENT FOR PERSONAL PROTECTIVE EQUIPMENT

X. PERSONAL PROTECTIVE EQUIPMENT

PERSONAL PROTECTIVE EQUIPMENT

10-Hour OSHA Training

Started in 1954 by James E. Simon

Date of Site Visit: Project Site Location: Contract Number: Task Order Number: Contractor s Name: Contractor s Address: Prepared by: Signature: Date:

Appendix 4C - Sample SWMS Trenching

Omega Safety Training, Inc Hwy 6 North, Ste. 207 Houston, Texas Ph:

RISK MANAGEMENT AND SAFETY COURSE DESCRIPTION CATALOG & CONTACT INFORMATION

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS

JOB HAZARD ANALYSIS (JHA)

Recognition, Evaluation, and Control of Hazards

Risk Controls Proposed: (in hierarchy order from the most preferred control)

RISK ASSESSMENT, DISASTER MANAGEMENT AND SAFETY MEASURES. A well - defined Risk Management Plan is made as follows:

Work Activity (e.g. Road Work): Work Location:.

Temporary load-bearing support for structural alterations or repairs

NUS Safety & Health Guidelines Procedure No: OSHE/SOP/GL/08

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

MAKE THE WORKPLACE SAFER Maintenance Staff

Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028. Name Date Signature. Author Jarred Hearle 30/11/2014. Reviewed John Nulty 30/11/2014

Committed to Providing Quality Safety Products and Services. Online Training

SAFE WORK METHOD STATEMENT SWMS No Version

Processing Fire Extinguishers Safe Work Procedure PTES_HSE_SWP_038. Name Date Signature. Author Jarred Hearle 21/09/2015

Safe Work Method Statement

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

Effective Date: 24-April-2017 Version: 6 Page: 1 of 8 TITLE: SAF-370, PERSONAL PROTECTIVE EQUIPMENT GUIDELINES. Table of Contents

Written Programs Listing

POLICY & PROCEDURE #502 EFFECTIVE DATE: 6/5/02 LAST REVISED: 7/12/12 LAST REVIEWED: 7/8/15

Accident Investigation For Everyone AED (Forerunner Model) Aerial Lifts in Industrial and Construction Environments

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

CONFINED SPACE PROGRAM

CONSTRUCTION SAFETY PROGRAM FOR. Golder Acoustics Inc.

Fall and Slip Prevention Test. 1. Fall protection is required in construction at and on scaffolds at.

Contractor Safety Expectations

EMPLOYEE SAFETY HANDBOOK. IT Safco Employee Safety Guidelines

University of Vermont Department of Physical Plant Personal Protective Equipment Program

ASSOCIATED DOCUMENTS:

Responsibilities / Accountability

Safe Work Method Statement

PPE PERSONAL PROTECTIVE EQUIPMENT PROGRAM

Potential risk of injury to staff

Occupational Health Safety and Welfare. Our Policy

SH&EWMS No.: F-C-QLD-10 Revision Date: July 2018 Revision Due: July 2019

High Pressure Washer Safe Work Procedure PTES_HSE_SWP_006. Name Date Signature. Author John Nulty 12/05/2015. Reviewed Jarred Hearle 12/05/2015

APPENDIX A. Appendix A: Fall Hazards Lesson Test Instructor Copy (answers bold/italic), Student copy to distribute follows

ENVIRONMENTAL HEALTH AND SAFETY PERSONAL PROTECTIVE EQUIPMENT HAZARD ASSESSMENT AND CERTIFICATION GUIDELINES

A Health and Safety Tip Sheet for School Maintenance Staff. Did you know? Step 1. Identify job hazards. Step 2. Work towards solutions

JOB HAZARD ANALYSIS (JHA)

SAFE WORK METHOD STATEMENTS

Personal Protective Equipment Policy & Procedure

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Join t Op e ra tion s CHESM Fie ld I n s p e ction Ch e cklis t

SH&E Training Matrix (Americas, all Business Groups)

Code of Practice and Instructions to Contractors Working for Viridor

CONTRACT MANAGEMENT Document 10a: Guideline for Job Safety Assessments

Job Safety & Environment Analysis

Job Hazard Analysis (JHA) What is Job Hazard Analysis (JHA)?

Access Interactive Training Courses at Any Time

SPECIALIZED ONLINE TRAINING COURSE LIST

ENVIRONMENTAL HEALTH AND SAFETY PERSONAL PROTECTIVE EQUIPMENT

2.0 Management Systems and Documentation

Date Issued: January 2012 Revision Date: December 2012 Review Date: December 2015 Revision #

Student Shop Safety. University of Tennessee Safety Guide GS-005. Purpose. Scope and Applicability. Definitions and Abbreviations.

Personal Protective Equipment. Individual Unit Function: Safety Procedure No.: SOP-0147 Page: 1 of 9

OSHACAMPUS.com TM. powered by 360training. Course Catalog

STReSS Laboratory Safety Training Memorandum

General Requirements for Personal Protective Equipment

Transcription:

Job Hazard Analysis Form (JHA) This form can be used by all Sanford Underground Research Facility (SURF) employees as well as contractors, subcontractors, and science collaborators. This is a dynamic document which may require modification as the project moves from start to finish and must be readily available at the location where the work is being performed. New Hazard Analysis Job Title: Location: Revision Revision Reason: JHA # Draft: Yes Final: Yes Date: Contractor / SURF Personnel: Contract/Work Order # *Note: For cases where information is not required, please respond with NA. Hazard Analysis Performed By: Date: Affiliation: 1) General Job and JHA Information 2) SURF Project Manager and Work Leader Contacts 3) Contractor Contacts (if Applicable) Project Manager Name: Work Leader Name: Contractor: Project Manager: Project Supervisor: Project EHS Rep: 4) Engineering Review and Approval / Rejection (if Applicable) Accept Name Signature Date Reject Rejection reasons: 5) EHS Review and Approval/Rejection Accept Name Signature Date Reject Rejection reasons: Supersedes: 01/05/2015 Page 1

Emergency Contact #s: Underground: Ross Hoist Op. 605-722-4881 Yates Hoist Op. 605-722-1037 Surface: 911 if fire or medical emergency services are needed; otherwise: 605-722-6039 Security: 605-920-0000 Other # s: Any time work steps change, the JHA must be revised! When a JHA is revised; training in the new job methods, procedures, or protective measures must be provided to all persons affected by the changes. Description of Work: Personal Protective Equipment: (Check all protective equipment required for the job) Hard Hat Reflective clothing Safety glasses w/side shields Goggles (type): Respirator (filter type): Self-Rescuer Steel/hard toed boots Face shield / Welding Hood Hearing protection Fall protection (type): Kevlar sleeves Chemical splash goggles Gloves (type): Other PPE (specify): Environmental Hazards: (Check all hazards that may exist and document mitigation within this JHA) Air pollution potential Ground water pollution potential Surface water pollution potential Weather Conditions Biological concern Other pollution potential Mitigation: Chemicals required for the job? Yes No (if yes, list each chemical below and attach MSDS sheet to this JHA) 1) 4) 2) 5) 3) 6) Body Motion: (Check all hazards that may exist) Lifting Grasping Pushing Pulling Bending Kneeling Reaching Squatting Standing Sitting Carrying Climbing Twisting Other Supersedes: 01/05/2015 Page 2

Potential Hazard: (Check all hazards that may exist and document mitigation within this JHA) Caught on / Between / Under Slip / Trip / Fall Struck by / Against Puncture Heights / Elevation Ladders / Scaffolds Explosion Fire High Voltage / Electrical LOTO Dust Noise Fumes Temperature Extreme Confined space Hoisting / Rigging Cranes Trenching / Excavation Forklifts / Powered Ind. Trucks Welding / Grinding / Hot Work Entanglement Chemical contact Cumulative trauma Over exertion High pressure or vacuum Asbestos Radiation Reactive/oxidizing materials Cryogenics/compressed gasses Housekeeping Insects or animals Loss of air Loss of water Loss of power Other Mitigation: Other Hazards: (Check all hazards that may exist and document mitigation within this JHA) Mitigation: Permits / Special Authorization Required Hot Work / Welding / Burning Lock-Out / Tag-Out Electrical Work Confined Space Waste Storage/Disposal Trenching & Shoring Digging - one-call made? Building Surface Penetration Concrete removal / application Hoisting and Rigging Cryogenics Asbestos Lead (Pb) Work Working Alone Other Additional JHA, Procedure, or Plan required for the job? Yes No (if yes, list each and attach to this JHA) 1) 3) 5) 2) 4) 6) Equipment required for the job: (List the tools/equipment required to perform the job and any special requirements for use or storage of the equipment) Transportation and handling of equipment: (Describe how equipment/items will be transported to the location) If use of a forklift or rail system is required, check the appropriate box Forklift Rail system Other: Multiple contractors / entities: Yes No (if yes, list all involved contractors or entities) 1) 3) 2) 4) 5) 6) Supersedes: 01/05/2015 Page 3

Utilizing the format below, identify hazards and environmental aspects, and their corresponding safety precautions/procedures/controls to mitigate each hazard. Use as many sheets as necessary. JOB HAZARD ANALYSIS (JHA) Step Work Steps Hazards Precautions / Procedures / Controls 1 2 3 Supersedes: 01/05/2015 Page 4

Step Work Steps Hazards Precautions / Procedures / Controls 4 5 6 Supersedes: 01/05/2015 Page 5

Step Work Steps Hazards Precautions / Procedures / Controls 7 8 9 Supersedes: 01/05/2015 Page 6

Step Work Steps Hazards Precautions / Procedures / Controls 10 11 If applicable, add another sheet for additional steps. Supersedes: 01/05/2015 Page 7

6) Signatures and Approvals (For Contractor JHAs: the Project Manager and the Contractor Supervisor must sign. For SURF JHAs: the Director, Supervisor, or Leadman must sign. EHS approval is on cover page.) By signing this document, it is understood that the hazards have been assessed and controls identified to the best of my knowledge. Name (print) Title and Affiliation Signature Date For projects not involving contractors, signatures must be attained from the SURF Project Manager and Work Leader. For work involving contractors, a signature from the SURF Project Manager and the Contractor s Project Manager, Supervisor, or EHS representative must be obtained. JHA Title: Job Briefing Attendance JHA Approval Date: My supervisor has reviewed this hazard analysis with me and I understand the hazards and required precautionary actions. I understand that there are Environment, Health and Safety Professionals on staff if I need further assistance or clarification. By signing below, I agree to the following: I agree to follow the work steps and implement the controls as written or notify my supervisor if I am unable to do so. I agree to stop work when conditions or hazards change or when I encounter unexpected conditions during the execution of work, or when work cannot be performed as written, or instructions become unclear during execution. I confirm that I am authorized, qualified, and fit to perform the work. Print Name Company Signature Date Supersedes: 01/05/2015 Page 8