PERFORM, ACHIEVE AND TRADE (PAT) Presentation By: ARUN KUMAR MINISTRY OF POWER INDIA

Similar documents
ADVANCING NATURAL GAS IN THE MULTIFAMILY BUILDINGS MARKET

The Changing Global Economy Impacts on Seaports and Trade Dr. Walter Kemmsies

klima:aktiv mobil Reinhard Jellinek Austrian Energy Agency

Climate protection and energy efficiency in Poland: the impact of White Certificates

BOXING FEDERATION OF INDIA

IMO Data Collection System

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer)

Recommendation to the Minister of Energy by the Gas Industry Co on the Specification for Reticulated Natural Gas

National Road Safety Campaign / Road Safety Audit. International Road Federation (IRF) India Chapter

HOCKEY INDIA / HOCKEY INDIA LEAGUE TICKET MANAGEMENT AND DISTRIBUTION GUIDELINES

FREIGHT DYNAMICS IN THE LOW PRICE CLIMATE METAL BULLETIN INTERNATIONAL IRON ORE SYMPOSIUM

1. Introduction. The Easy Guide to TMV3 Approval

To Enhance the Engineering Properties of Clay Bricks with use of Fly Ash

The Western and Central Pacific Fisheries Commission (WCPFC):

Debenture Servicing Audit

NATIONAL REPORT OF THE REPUBLIC OF SOUTH AFRICA

All TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU)

IST-203 Online DCS Migration Tool. Product presentation

Feeding fish to fish is this a responsible practice?

Violation Risk Factor and Violation Severity Level Assignments Project Generator Verification

Below this line not for printing

UKAS calibration laboratory 8809 Temperature, pressure and electrical signals calibration guide

FAPRI 2006 Preliminary Baseline December 15-16, 2005

The future of UK Gas Security. Findings of a survey of major energy users conducted on behalf of:

The IFFO Global Standard for the Responsible Supply of fish oil

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

Understanding the world of voluntary environmental schemes

ADDITIONAL MARKET OUTLOOK for the year ended 31 December 2015

Fabric and Elastomer Expansion Joints. System solutions for reliable connections in plant engineering and construction.

TURKISH CERAMIC INDUSTRY & RAW MATERIALS in TURKEY

Mexico sugar towards 2014/15. Forget the inflexion point?

AUDIT REPORT. Department of the Interior Office of Inspector General

Thesis Proposal. Table of Contents. Executive Summary...2. Analysis 1 Joint Ventures...3. Analysis 2 LEED Improvement (Breath Topic)...

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

IMO WORK PROGRAMME. Alternative arrangements for the bottom inspection requirements for passenger ships

MANAGING POLICY INTERACTION WITH THE EU ETS 27 September Alex Luta

Techno-economic assessment of potential CCS deployment in the Southern African region

Greenhouse gas emissions and energy

Gas Distribution Connection Forms

Introducing Friend of the Sea. Certification of seafood products from sustainable fisheries and aquaculture

Changes to the Gas. (Safety and Measurement) Regulations. effective 1 July 2013

australian cement industry Statistics 2012

Electricity Price Impacts from CO2 Restrictions

The Material Basis of the Global Economy

Demand Responsive Lighting Control Acceptance Document (Page 1 of 5)

U.S. 1, , 2000 JANUARY

UK Energy Futures. Richard Smith Head of Energy Strategy & Policy

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

The data inputs and assumptions underlying this Reference Case are described in the Assumptions Book.

Review of Taiwan s SBT Fishery of 2005/2006

TITLE 11. DEPARTMENT OF JUSTICE NOTICE OF PROPOSED RULEMAKING

The best design acknowledges that you can't disconnect the form from the material.

TEXAS LOTTERY COMMISSION INTERNAL AUDIT DIVISION

Percent

IMO Data Collection System

Developing an Effective Safe Routes to School Funding Program for Hawai i

Impacts of CO2 Restrictions on Indiana Electricity Prices

How to achieve less air pollution and GHG emissions from long distance freight transport

SANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES. Policy No Draft Div Pol Yr

STATISTICS BOTSWANA INTERNATIONAL MERCHANDISE TRADE STATISTICS. Monthly Digest February 2017

EFFECTS OF EXTENDING AND EXPANDING ENERGY-EFFICIENCY TAX DEDUCTION FOR COMMERCIAL BUILDINGS

Market Report Series Oil 2017

Mandatory Self-Disclosure of Product Problems to the CPSC

FLY ASH GENERATION AND UTILIZATION DURING

REVISED PROCUREMENT PLAN 30-Dec-12

SIL explained. Understanding the use of valve actuators in SIL rated safety instrumented systems ACTUATION

AGREEMENT ON PORT STATE MEASURES TO PREVENT, DETER AND ELIMINATE ILLEGAL, UNREPORTED AND UNREGULATED FISHING

Amendment 80 Non-AFA Trawl Gear Catcher/Processor

APPENDIX P U.S. EPA WARM MODEL OUTPUT

Tuas Power Supply. Gas Retailer Handbook

OFFICIAL 2016 A YEAR OF CHANGE IN THE REGULATION OF DECOMMISSIONING?

Audit Report. Department of the Interior Office of Inspector General

Status of Lebanese Energy Statistics. Joseph Al Assad, Ph.D.

Learning from other Geographies North Sea

Transparency Frameworks in Japan

Constitution of Ukraine

Economy-wide (general equilibrium) analysis of Philippines mitigation potential

Opinions expressed in this paper are those of the author and do not necessarily reflect views of the Institute.

District Cooling System at Kai Tak Development Content

AEO 2007 Projections. John Cymbalsky Presentation to EFG May 3, EFG 2007 Meeting 1

2016 Integrated Resource Plan Public Webinar Series

Milestones Towards PGC2025: Putrajaya Green City Initiatives Dato Omairi bin Hashim, Vice President (City Planning) Perbadanan Putrajaya

Ontario Horse Racing Industry Performance Results [Fiscal Year Q1]

Protector Aluminium Fencing and Balustrades

Global growth prospects

General. Procurement Plan

Fisheries Improvement Project Indonesian Blue Swimming Crab - gillnet/trap

WESTERN AND CENTRAL PACIFIC FISHERIES COMMISSION (WCPFC) NORTHERN COMMITTEE (NC) MEETING OUTCOMES

Dr Neil J. Bristow. 8 th WSD Steel Success Strategies European Steel Conference London, 30 th November H & W Worldwide Consulting

Screening report Serbia

ROLE OF COPPER IN CHILEAN ECONOMY

Alternative architectures for distributed ledgers. Sarah Meiklejohn (University College London)

Translation NOTIFICATION OF THE MINISTRY OF FINANCE RE: THE PERMISSION TO ISSUE BAHT-DENOMINATED BONDS OR DEBENTURES IN THAILAND

Oregon Global Warming Commission

Issue Date: Effective Date: Supersedes: V-15 (rev. 2)

BOXING FEDERATION OF INDIA

California Efficiency Standards: Progression to Zero Net Energy Buildings. Martha Brook California Energy Commission

TÜV Rheinland Japan Ltd. (TÜV Rheinland) VERIFICATION REPORT. Verification of the Joint Implementation Project. ITL Project ID: UA

Pacific Gas and Electric Company Monthly Report On Interruptible Load and Demand Response Programs for June 2012

Order No. 55/18 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, April 26, 2018

Transcription:

PERFORM, ACHIEVE AND TRADE (PAT) Presentation By: ARUN KUMAR MINISTRY OF POWER INDIA

NMEEE FOUR NEW INITIATIVES Energy Intensive Industries Stimulate Funding for ESCOs Targets for Mandatory Energy Saving PAT EEFP NMEEE Energy Efficient Appliances BLY SEEP DSM MTEE FEEED Fiscal Instrument for EE PRGF VCF Public Procurement

Processes Involved Stakeholders Perform, Achieve & Trade (PAT) Mechanism The market based mechanism to enhance the cost effectiveness in improving the Energy Efficiency in Energy Intensive industries through certification of energy saving which can be traded Reward over achiever Market Based Mechanism Penalize under performer Administrator Designated Consumers Auditing Agencies Market Place Set target and compliance period 8 sectors Thermal Power Plant, Steel, Cement, Fertilizer, Pulp & Paper, Textile, Aluminium, Chlor-alkali Independent Monitor, verify and certify Transaction of energy efficiency instrument Set Targets Monitoring & verification of targets by Accredited Energy Auditors (AEA) Trading of ESCerts Setting targets on the basis of current specific energy consumption Set compliance period May take into account Location, Vintage, Technology, raw materials, product mix etc. Check if designated consumer has achieved targets Underachievement: Obligations to buy ESCerts or pay penalty Overachievement: Issuance of ESCerts for banking for later use or trade Participation by Designated consumers on platform provided by Power Exchanges Symmetrical flow of information

PAT Activity Flow Sheet Getting Information Through Base Line Format Data Compilation/ Evaluation Target Setting [Declaration of Base Year, Target Year ] Baseline & Target Setting (based on last three years) Communication to BEE and SDA Preparation Performance Assessment Document (PAD or Form A) Communication to Designated Consumer Issuance of ESCerts after successful M&V Verification of PAD through AEA (Form B) Check Verification of PAD (Form C) through AEA & submission of compliance doc (Form D). Market for Trade

Time lines Submission of Form 1 Submission of Form A (Performance Assessment Document) Submission of Form B (Verification by AEA) Once in a year Once in 3 years Once in 3 years Issuance of ESCerts Once in 3 year Submission of Form D (Performance Compliance Document) Once in 3 years Mandatory Voluntary 30 th June NA NA 30 th June 2015 30 th June 2015 31 st Aug 2015 30 th Nov 2015 Before Compliance year Before Compliance year Before Compliance year NA 30 th June 30 th June 31 st Aug NA

PAT Scheme : Background & Scope Covers 478 designated consumers in 8 sectors All DCs consume about 165 million toe of energy Targets given to all DCs to achieve the same within a time frame Achievement > Target Achievement < Target ECScerts Purchase ECScerts / Penalty National Target = 6.6 million toe at the end of 1st PAT Cycle (by 2014-15)

Concept of Target, Compliance, ESCerts & Penalty Baseline SEC Issued Escerts Penalty Target Target SEC Achieved SEC Purchase Escerts Compliance Scenario 1 Scenario 2

Trading of ESCerts

Baseline and Target Baseline Year : 2009-10 Baseline Production (P base ) : Avg. of 2007-8, 2008-9 & 2009-10 Baseline SEC (SEC base ) : Avg. of 2007-8, 2008-9 & 2009-10 Baseline CU% (CU base ) : Avg. of 2007-8, 2008-9 & 2009-10 Target SEC (SEC target ) : SEC as estimated in 2014-15

Target is Plant Specific Less for Energy Efficient & High for Energy Inefficient Plant Covers units using about 165 million toe/year Gate-to-gate specific energy consumption, collectively, to be about 5.5% less in 2014-15 than it was in 2009-10 Less efficient units have larger SEC %-reduction targets so that the collective SEC reduction is 5.5% Energy Savings Certificates (and penalties) would be based on difference between the achieved SEC & the target SEC and the base year Production

Estimation of Energy Saving (TOE) : P base ( SEC base SEC target ) 1 Energy Saving Certificate = 1 metric ton of oil equivalent

Example Baseline SEC : 10 toe/unit of production Baseline Production: 10000 units Target: 4% reduction in baseline SEC SEC at the end of 2014-15: 9.6 toe/unit of production (Target) ESCerts: Case1 (Achieved SEC = 9.8): -2000 toe (Purchase) Case2 (Achieved SEC = 9.4): +2000 toe (ESCerts)

Advance ESCerts Baseline, SEC(b) = 10 toe/t Target, SEC (t) = 7 toe/t Achieved after year 1, SEC (a) = 8.5 toe/t Production = 10000t AFTER YEAR 1 ESCerts =[(SEC(b) (SEC (b) SEC (t))/3) SEC(a)] x 80% x prod = ((10 (10-7)/3) 8.5)) x 0.8 x 10000 = (9-8.5) x 8000 = 4000 ESCerts Revised Target = SEC(t) (ESCerts/Prod) = 7 (4000/10000) = 6.6 toe/t

Value of ToE P = Wc x Pc + Wo x Po + Wg x Pg + We x Pe Where- P =Price of one metric ton of oil equivalent(1toe); Pc=Average price of delivered coal; Po=Price of fuel oil as declared by Indian Oil Cop. Ltd, MoPNG; Pg=Price of gas as declared by GAIL, MoPNG; Pe=Average price of electricity; Wc= Amount of coal consumed across all DCs in the year (in toe); Total energy consumption across all DCs in the year (in toe) Wo= Amount of oil consumed across all DCs in the year (in toe); Total energy consumption across all DCs in the year (in toe) Wg= Amount of gas consumed across all DCs in the year (in toe); Total energy consumption across all DCs in the year (in toe) We=Amount of electricity consumed across all DCs in the year (in toe) Total energy consumption across all DCs in the year (in toe) The value of per metric ton of oil equivalent of energy consumed is Rupees 10154 for the year 2011-12

Market Design ESCerts are issued When energy efficiency improvements surpass targets 1 ToE = 1 ESCert Banking of ESCerts allowed during each cycle 1 st cycle ESCerts to 2 nd cycle 2 nd cycle ESCerts to 3 rd cycle Partial issuance of ESCerts allowed on Ex-ante basis to DC

Proposed Institutional Design Schematic MoP BEE Market Regulator & Administrator Updated list of DCs and AEA SDA Any Baselines Improvement Verified Result of DCs Regular updates Any Baselines Improvement AEA Apply for Empanelment Energy Return Form A Information Verification Apply for ESCerts through Performance Assessment Document (Form A) Designated Consumers (DCs) Issuance of EScerts Updated Obligation of DCs: Deficit or Surplus Regular Checks & Levy Penalties in case of defaults Central Registry ESCerts Trading Updated ESCerts Account Info Settlement Details Trading Exchange

THANK YOU