STIP Scoping and Design Projects November Administrative Amendment

Similar documents
ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

MN 5 Corridor Performance. Current Corridor Characteristics Highway: MN AADT: 2,400 73,000

FDOT Treasure Coast Traffic Report

Route 117 Review of Ownership Transfer October 2014

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

I-90 Corridor Performance Corridor Result

APPENDIX D COST SUMMARY TABLES

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

TRASBURG RANSPORTATION

FDOT Treasure Coast Traffic Report

Mandan Commission Meeting August 2, 2016 Mandan City Hall

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Population Trends. MN 73 Corridor Performance

FDOT Treasure Coast Traffic Impact Report

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Annual Listing of Obligated MPO Projects

FDOT Treasure Coast Traffic Impact Report

Legislative Update Williamsburg Residency

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Route 29 Solutions Projects

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Culpeper District. Albemarle County Monthly Report October, 2011

KY s s RSA Evolution. Jo Anne Tingle, PE Kentucky Transportation Cabinet (KYTC) AASHTO TIG/FHWA RSA PEER Exchange Little Rock, AR - April 29, 2008

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Highway Construction

IDOT Suspends Non-Emergency Road Work for Memorial Day Holiday Weekend Lanes Opened to Improve Traffic Flow

General References Definitions. (1) Design Guidance. (2) Supporting Information

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

West Circle Drive (CSAH 22) Traffic Operations Study

Secondary Road Program

Design Criteria. Design Criteria

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

Basalt Creek Transportation Refinement Plan Recommendations

FDOT Treasure Coast Traffic Impact Report

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Culpeper District. Albemarle County Monthly Report September, 2011

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Kentucky s Surface Transportation System

District LPA Federal Project Number Prefix Program Award Date Project Description NW Caldwell County B BRO 2/7/2017 Bridge Replacement NW City

FDOT Broward County Traffic Report March 2 through March 9, 2018

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Technical Advisory Committee (TAC)

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

MISSOURI DEPARTMENT OF TRANSPORTATION NOTICE OF BID OPENING FOR PROPOSED STATE ROAD WORK BIDS TO BE RECEIVED -- January 19, 2018

Parks Highway: MP Lucus Road to Big Lake Road

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Palm Beach County Traffic Report November 16 through November 23, 2018

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

BIG STONE GAP RANSPORTATION

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

CITY OF SPOKANE VALLEY Request for Council Action

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

. Study Overview. . Study Background

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

FDOT Broward County Traffic Report April 20 through April 27, 2018

The Year Ahead: Virginia Department of Transportation Northern Virginia District

Project Name Project Description Authorized Amount

Roadway Design Manual

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

IDOT Highway District 2:

Truck Climbing Lane Traffic Justification Report

City Avenue Projects

Mobility Plan Status Report 2012 Average Annual Daily Traffic

ENERGY SECTOR COORDINATION

INTERSECTION CONTROL NOVEMBER 2018

Roadway Project Recommendations:

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

FDOT Broward County Traffic Report April 27 through May 4, 2018

News Release Eastern Oregon Region 5

GDOT Fiscal 2015 Year 2017 GDOT PowerPoint. Title Page

Please find below the Town staff s responses to NCDOT s recommended roadway stipulations listed in a letter dated May 25, 2015.

CITY OF SPOKANE VALLEY Request for Council Action

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

444 North Capitol Street NW, Suite 249, Washington, DC (202) Fax: (202) ERRATA

Transportation Corridor Studies: Summary of Recommendations

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

City Council Work Session

Roadway Design Manual

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

3.0 PROJECT DESCRIPTION

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

CTH M HIGHWAY PROJECT CTH Q to STH 113

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

ARRENTON RANSPORTATION

State Route 160 (Blue Diamond Highway)

5. RUNNINGWAY GUIDELINES

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

T10:2012 Site Category 1a) T10:2012 Site Category 1b) Railway Level Crossing Approach Traffic Signal Approach Event Code F Event Code E

Transcription:

NW Dekalb US 36 1P3237 Scoping for pavement and shoulder improvements in the westbound lanes from east of Rte. 31 (north) to Rte. C. Project includes eastbound lanes shoulder improvements from Rte. 33 to Grindstone River. $8 $2 $0 To add scoping project to improve pavement. $5 $5 now $5) now $5) NW Sullivan MO 6 1P3239 Scoping for ADA Transition Plan improvements within city limits of Green Castle. $40 $10 $0 $25 $25 now $25) now $25) Macon MO 149 2S3223 Scoping for ADA Transition Plan improvements from Trailer Court Lane to Delmar Place in New Cambria. $20 $5 $0 $20 $5 now $20) now $5) Macon RT M 2S3221 Scoping for ADA Transition Plan improvements from Aaron Street to Orchard Street in Atlanta. $20 $5 $0 $20 $5 now $20) now $5) Schuyler US 136 2P3222 Scoping for ADA Transition Plan improvements from Seventh Street to First Street and various locations on Rtes. C, D and U in Lancaster. $24 $6 $0 $20 $10 now $20) now $10) Schuyler US 136 2P3224 Scoping for ADA Transition Plan improvements from Cemetery Street to Angus Drive and on Rte. A from Rte. 136 to Bondurant Street in Downing. $24 $6 $0 $20 $10 now $20) now $10) STIP Section 3, Administrative Amendment 1 of 3

CD Osage MO 100 5S3306 Scoping for slide repair 0.4 mile east of Rte. 89 at Chamois. To add scoping project to repair slide. $30 $7 $0 $20 $17 now $20) now $17) RT MM 6S3368 Scoping for pavement resurfacing, guardrail upgrades, curve correction, and replace box culvert from Rte. T to Rte. 100. To add scoping project to improve roadway. $220 $55 $0 $100 $175 now $100) now $175) RT OO 6S3370 Scoping for pavement resurfacing and guardrail upgrades from Rte. 100 to First St. in Pacific. $200 $50 $0 $150 $100 now $150) now $100) RT YY 6S3369 Scoping for pavement repair and guardrail upgrades from Rte. Y to Rte. 185 near Lyon. $200 $50 $0 $50 $200 now $50) now $200) Jefferson US 61 6P3371 Scoping for pavement repair and guardrail upgrades from I-55 to the St. Genevieve County line. $140 $35 $0 $100 $75 now $100) now $75) St. Charles MO 364 6P3373 Scoping for ramp additions and striping modifications from Jungs Station Road to Missouri River. To add scoping project to improve corridor. $16 $4 $0 $10 $10 now $10) now $10) STIP Section 3, Administrative Amendment 2 of 3

St. Charles US 67 6P3372 Scoping to raise southbound lanes and add signalized intersection from the Mississippi River to north of Machens Club Drive. To add scoping project to improve roadway. $216 $54 $0 $20 $250 now $20) now $250) SE St. Francois US 67 9P3505 Scoping for upgrade of existing median crossover to J-turn design at intersection of Rte. 67 and New Perrine Road. To add scoping project to improve safety. Fed: State: Local: $92 $10 $0 $102 $0 now $102) now $0) Fed: State: Local: $1,250 $299 $0 District Engineering: $662 $887 STIP Section 3, Administrative Amendment 3 of 3

District KC SW County Route Job No. Tentative Award State Fiscal Year and Change by Type 2018-2022 STIP Highway and Bridge Construction Schedule Funding Source: 4S3151 Description of Location / Improvement / Funding To modify project funding and to split from 4S3151 (see November Amendment). Construction and Right of Way Funds Engineering Funds Various Various 0S3018E 2018 CN ADA Transition Plan improvements at various locations in the urban $142 $0 Kansas City District. $512,000 from Statewide Transportation Alternatives funds. (was $370 (was $0 now $512) now $0) St. Charles MO 94 6S3328 2019 CN Pavement resurfacing and adding shoulders from Rte. 370 to BNSF $0 $0 2018 RW Railroad crossing in Orchard Farm. $652,000 Open Container funds. (was $3,293 (was $438 To purchase right of way on an existing project. now $3,293) now $438) Funding Source: Available SFY 2018 STIP funds. Various Various 8P3088 2019 CN Intersection improvements at various locations in the urban Southwest -$1,438 -$2 2018 RW District. (was $2,180 (was $32 To split out project 8P3015 (November amendment). now $742) now $30) Funding Source: NA. Total: -$1,296 -$2 STIP Section 4, Administrative Amendment 1 of 1 October, 20, 2017

District KC SW County Route Job No. Tentative Award State Fiscal Year and Change by Type 2018-2022 STIP Highway and Bridge Construction Schedule Funding Source: 4S3151 Description of Location / Improvement / Funding To modify project funding and to split from 4S3151 (see November Amendment). Construction and Right of Way Funds Engineering Funds Various Various 0S3018E 2018 CN ADA Transition Plan improvements at various locations in the urban $142 $0 Kansas City District. $512,000 from Statewide Transportation Alternatives funds. (was $370 (was $0 now $512) now $0) St. Charles MO 94 6S3328 2019 CN Pavement resurfacing and adding shoulders from Rte. 370 to BNSF $0 $0 2018 RW Railroad crossing in Orchard Farm. $652,000 Open Container funds. (was $3,293 (was $438 To purchase right of way on an existing project. now $3,293) now $438) Funding Source: Available SFY 2018 STIP funds. Various Various 8P3088 2019 CN Intersection improvements at various locations in the urban Southwest -$1,438 -$2 2018 RW District. (was $2,180 (was $32 To split out project 8P3015 (November amendment). now $742) now $30) Funding Source: NA. Total: -$1,296 -$2 STIP Section 4, Administrative Amendment 1 of 1 October, 20, 2017