Rigging Safety. 1 Copyright 2014 by PEC Safety Management, Inc. PPT-SM-RIGGING 2014

Similar documents
Managing Mobile Crane Hazards. Paul Satti Construction Safety Council. Hazards of Working Around Cranes. Key Concepts:

OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part , , , , , & ANSI B30.5, ANSI B30.

"RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS"

PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to ensure that material handling devices are used correctly and safely.

1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment

Section 15 TABLE OF CONTENTS Rigging. 15.A General B Personnel Qualifications

Premium PowerPoint Presentation. Rigging Review

GENERAL GUIDELINES FOR PROPER RIGGING PRACTICES AND INSPECTION & REMOVAL CRITERIA FOR SLINGS PER OSHA

References: EM Section 15 OSHA UFGS

Care, Use and Inspection

USER S GUIDE LIFTING TERMINOLOGY

SECTION 15 RIGGING. b. Defective rigging shall be removed from service.

Slings Steel Chain, Wire Rope and Metal Mesh

Worker s Safety Handbook for Rigger and Signalman

Proof load is the load applied in performance of a proof test. Proof test is a nondestructive tension test performed by the sling manufacturer or an

Session Objectives. Business & Legal Reports, Inc. 1011

For Review Only No Copying No Saving No Lending No Posting Online

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

operation WARNING! Operator must read and understand instructions here and on sling prior to use.

HOW TO PREPARE FOR THE LEVEL A CRANESAFE CERTIFICATION ASSESSMENT

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

Health & Safety Policy and Procedures Manual SECTION 25 RIGGING AND HOISTING EQUIPMENT

This training session focuses on safe rigging for crane and derrick operations at construction sites. A critical job for the safety of any crane or

Lift-All Wire Rope & Slings

Basic Rigging And Wire Rope

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS PART 49. SLINGS

TULSA CHAIN.COM, LLC.

USER S INSTRUCTION MANUAL FOR THE INSTALLATION, OPERATION & MAINTENANCE OF THE GUARDIAN TEMPORARY HORIZONTAL LIFELINE SYSTEM

WIRE ROPE AND SLING BASICS. Total. of Wires WIRE ROPE SLINGS. Use of EIP, IWRC rope gives 15% greater capacity than IP, IWRC ropes.

Sling Safety. Construction Safety and Health Outreach Program. U.S. Department of Labor OSHA Office of Training and Education May 1996 INTRODUCTION

CORPORATE SAFETY MANUAL

Lifting Slings. Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Crane & Rigging Brain Teasers

September 27, DOE-RL-92-36, Hanford Site Hoisting and Rigging Manual. Wire Rope. Page 1 CONTENTS

BANKSMAN / SLINGER. 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline?

Rigging Safety 16 Hour (API RP 2D 7 th Edition) Course Outline

Slings Natural Rope, Synthetic Rope and Synthetic Web

Heavy Equipment & Rigging Specialist Training

Warning CABLE REPLACEMENT INSTRUCTIONS. Questions? - Call Telpro Inc. Customer Service at or

British Columbia Carpenter Apprenticeship Program

POWER DELIVERY. Contractor Health & Safety General Terms and Conditions. Appendix B Personal Protective Equipment

Care and inspection of wire rope

HEALTH AND SAFETY MANUAL

Fall Protection Checklist. Guardrail System

Rigging. Student Booklet

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

Hand Safety. 1 Copyright 2014 by PEC Safety Management, Inc. PPT-SM-HNDSFTY 2014

PROCEDURES Power Lines

M S I C R A N E S C A L E

FALL PROTECTION / ELEVATED WORK

Heavy Equipment Technician Rigging

Roughneck TM Mesh Slings

Fall Protection. Fall Speed vs. Reaction Time. Good body reaction time = 0.5 seconds Travel distance in 0.5 seconds = 4 feet (1.21mts.

Fall Speed vs. Reaction Time

SERVING MANUFACTURERS, DISTRIBUTORS & RELATED SERVICE PROVIDERS FOR THE MATERIAL HANDLING INDUSTRY SINCE

HOW TO USE THIS CATALOG

THE TUFLEX DIFFERENCE. All Lift-All slings meet or exceed OSHA and ASME B30.9 standards and regulations. What is a Tuflex Roundsling?

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

Section 16B. Fall Protection. Falls are the second leading cause of death in the workplace. Factors contributing to falling incidents:

See the most up to date version of our catalog by visiting our web site:

Fall Protection PPE Inspection

Fall Protection STANDARD PROCEDURE INSTRUCTION. Fall Protection. Title SPI. Department. Supersedes SPI Dated. Jan 19, 2016.

Synthetic Rope Installation Guide Premium, Ultra Performance & Zeon Winch Lines

Once the job has been planned and the site has been inspected according to WHS and site requirements it is important to follow work procedure and

SLINGS, HOISTING & RIGGING

Electrical Safety PPT-SM-ELECTSFTY V.A.0.0

SAMPLE PAGE. Section 2... Wire Rope

Inspection & Maintenance

product use, care, & inspection Document Released: January, 10, 2012 Approved By: Bryce Merrick

Product Inspection Guide

SOP GEN-007X Crane and Winch Operations

BC Shackle. Made in the China. Alloy Steel Anchor Shackle. Instructions for handling and use - Please read in full before using this device

Tu fl e x TM Roundslings

Serial Number: Lot Number: Purchase Date: General Factors Accepted / Rejected Supportive Details or Comments. Accepted Rejected.

Introduction: Materials needed to conduct this training: White board, black board or presentation tablets. Projector

Figure 1 - Parts Identification. Copyright 2002, DB Industries, Inc.

fall arrest. Contact your distributor or Guardian about policies regarding replacement of Guardian components involved in a fall.

Winchline n a box WINCH LINE SELECTION GUIDE. Wire Rope Winchlines are superior to most other winchlines found in the market place due to the

SYNTHETIC, CHAIN & WIRE ROPE SLINGS

steel wire rope slings and fittings

Definitions found in several locations:

"PERSONAL PROTECTIVE EQUIPMENT"

MoBiLe CrAnes. surelift. B y W i r e r o p e i n d u s t r i e s. tower CrAnes. port CrAnes

University of Vermont Department of Physical Plant Personal Protective Equipment Program

DLH online. Important factors in the selection of lifting slings

Rescue ladder System. User Instruction Manual

CAROLINA S RIGGING & CRANE 1219 Bluff Road, Columbia, SC (803) Toll Free: (800) Fax: (803)

GEMTOR. ... when your life is on the line OWNER'S MANUAL. FLW Series Self-Retracting Lanyard/Fall Limiter

Distribution. Experience Matters.

PFI Fall Protection Best Practice

MARCH CORE REFRESHER HSE TOOL BOX

E3939 Rigging Safety in Construction Environments. Leader s Guide

USER S GUIDE LIFTING

Big Ox Energy - Siouxland LLC. Safety Management System. Authority: President

Fall Protection Program

Summary Report for Individual Task Perform field maintenance on lifting devices Status: Approved

CRANE WITH WINCH USE AND MAINTENANCE MANUAL. Code Rev. Release MD /03

Guide to Documentation and Marking Part 5 Lifting Accessories, Slings

SELF-RETRACTING LIFELINES - INSTRUCTION MANUAL

VL SHEAVES/CABLE UPGRADE KIT INSTRUCTIONS

Transcription:

Rigging Safety 1 Copyright by PEC Safety Management, Inc.

Rigger Role Assist the crane operator by properly attaching and detaching loads the crane Know how to safely connect and disconnect loads Discuss any potentially unsafe lifts with your supervisor Do not make the lift if the hazardous situation cannot be resolved Note unsafe weather High sea conditions, high wind conditions, etc. These conditions make the lift unsafe

Rigger Role Use proper hand signals at all times Know the working load limit (WLL) of sling chains, wire rope, etc., to avoid overloading the equipment Understand how to incorporate features such as unbalanced center of gravity (CG), sling angles, and hitch configurations Inspect all equipment for damage and defects before use Do not use knots; they weaken rope, sling, or line Double check the connection prior to making the lift

Pre-lift JSA Anytime an overhead lift is made, workers must perform a JSA Discuss potential hazards Discuss any required specialized rigging techniques Communicate the weight of objects to be lifted Identify the CG for unusually shaped objects Verify the capacity of all rigging involved Discuss any unusual conditions that can affect the safety of the lift Verify that all equipment has passed inspection

Body Positioning Stay out from under loads Avoid turning your back to a moving load or block Have someone spot the block Keep the crane operator s line of sight clear Keep hands, feet, and body clear of pinch points Make sure the equipment is free to be lifted before attempting to move the equipment Make sure you are away from the swing path of the binder when it is released

Electrical Lines Electricity can arc to a metal boom or wire without actual contact Assume all overhead electric lines are energized Never bring any conductive object within 10 feet of an unguarded line with a current of 50 kv Crane booms Slings Wires Taglines

Electrical Lines As a best practice, stay at least 20 feet away from any unguarded, energized overhead powerlines.

Personal Protective Equipment PPE that must be worn around rigging operations Hard hats Safety glasses Foot protection Steel toe boots Metatarsal protection Hand protection Wear cotton dot or multi-purpose gloves for rigging Wear leather gloves to inspect wire ropes

Slings A sling is a device that attaches the load to the crane block hook Attach all loads to the crane with a set of slings Do not attach loads directly to the crane hook

Types of Slings Fiber Rope Synthetic Web Wire Rope Chain 10

Sling Inspection Carefully inspect slings for use Take slings out of service if they are damaged in any way If the sling does not have a legible tag, do not use it Proof test slings once per year Replace any damaged slings

Replacement of Wire Rope Slings Replace if any of the following conditions occur Broken wire 10 randomly distributed broken wires in a lay length 5 broken wires in one strand of one lay length 1 or more broken wires within lay length to an end fitting Kinking 12

Replacement of Wire Rope Slings Replace if any of the following conditions occur Crushed or flattened wire rope Broken core Bird cages Tension breaks from overloading Corrosion Heat damage Abrasion

Replacement of Chain Slings Replace if any of the following conditions occur The chain is not grade 8 or 10 alloy More than 10% wear Nicks, cracks, breaks Stretching or bending Extreme temperatures Improper functioning of hardware Missing or illegible tag

Replacement of synthetic slings Replace if any of the following conditions occur Significant cuts, tears, and abrasions Red core fiber is exposed Heat damage Busted stitches Illegible identification Chemical or UV exposure Knots of any kind

Replacement of Polyester Slings Replace if any of the following conditions occur Missing or illegible tag Melting, charring, or weld splatter Holes, tears, cuts, abrasion, or broken stitches Embedded particles Knots

End Attachments and Fittings Make sure end attachments are the right size and capacity for the rope and load Inspect each end attachment before use Corrosion, broken parts, cracks, nicks, distortion, stretching, heat damage, malfunction

End Attachments and Fittings Make sure end attachments are the right size and capacity for the rope and load Never saddle a dead horse Never put the saddle of the wire rope clip on the dead end of the wire rope Always put the saddle on the live side of the wire rope that has the pull on it

Hand Signals When verbal communication with the crane operator is not possible, hand signals must be used Use only the ASME standardized hand signals If the crane operator does not understand the signals, stop the lift Review each hand signal on the accompanying handout

20

Taglines A rope attached to the load to offer the rigger control of the load without putting the rigger in a position to be injured Attach before load is lifted Should be long enough to protect the riggers When lifting a heavy or wide load, use two taglines Should be strong enough to control the load but be able to break if they get caught on an object

Taglines No knots should be on the tagline Taglines must be made with nonconductive material Watch for pinch points or entrapment and use taglines to stay out of these danger zones Preplan the escape route Never wrap taglines around any part of your body

Weight Always determine the exact weight of the load, never estimate The weight should be marked on the load The boat should have a bill of lading stating the weights of equipment Consult the manufacturer to determine weight Use rigging books and calculators as a last resort Never guess or estimate the weight of a load Knowing the weight of an object is critical to using a lift chart and making a safe lift.

Center of Gravity Lifts must be made with the block directly over the CG or balance point To determine the CG of asymmetrical objects Slowly lift the asymmetrical object a few feet off the ground If the load shifts more than 5 it should be landed and re-rigged Most loads that are transported offshore will be pre-slung from the dock with the CG determined since this cannot be done on a boat in rough seas

25