i) Filtration machine, measuring equipment and other related machinery

Similar documents
Method statement for. The installation of. Precast Concrete Piles. (Site Name).

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

ACS.TPCP1A SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS TESTING AND PURGING

HOT WORK SAFETY 29 CFR WELDING & CUTTING SAFETY (HOT WORK)

ACS.TPCP1 SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS; LPG; OTHER GASES TESTING AND PURGING

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

Power Transformer Maintenance. Maintenance Practices & Procedures for Substation Class Distribution Power Transformers

Operating Engineers Agreement

Title: NFPA 70E Effective Date: 12/8/2014 Control Number: THG_0053 Revision Number: 1 Date: 10/26/2015 Annual Review Completed: 5/13/2015 NFPA 70E

Project: Consultant : MEP Contractor: PREPARED BY: DORMAN SMITH SWITCHGEAR - DUBAI REVIEWED BY CONSULTANT : Page 1 of 15

Installation and maintenance instructions for liquid-filled distribution transformers

MANUAL GAS MANIFOLDS

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

Permit To Work. A permit to work system is designed to ensure that all necessary actions are taken before,during,and after most of task on plant.

Manual Actuated Boiler Blowdown Valves

Arab Fertilizers Association Knowledge Sharing Template

Safety Powder Spray Systems

Title: Control of Hazardous Energy Lockout / Tagout Program

SCOPE OF WORK. The Repair of the Mobile Harbour Crane leaking Luffing Cylinder

ACS.CoNGLP1 SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC NATURAL GAS TO LPG GENERIC

BOTTOM HINGED FLOOD BARRIER

30T A/Manual Hydraulic Shop Press

Contractor handbook. Purpose

LOCKOUT/TAGOUT PROGRAM

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

INTENDED USE TECHNICAL SPECIFICATIONS

TP1 and TP2 Temporary Cone Shaped Strainers

THE HF-210 SERIES. Operating and Service Manual. Series includes all variants of HF-210/211. Issue A October 2014 *Section 6.

DEH Instructions. Three-Phase, Platform-Mounted Distribution Transformers

ASSESSING COMPETENCE OF AERODROME RESCUE AND FIRE FIGHTING PERSONNEL AND TRAINING FACILITIES/INSTITUTIONS

Electrical Safety Work Practices

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

INSTRUCTION BOOK CARE AND MAINTENANCE OF OIL-IMMERSED (R-TEMP-OR SILICONE IMMERSED) TRANSFORMERS

FINAL FACILITY STUDY. KV1C Transformer Addition at Badwater Substation 2009-T1. November 17, 2009

ACS.CoNGLP1 SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC NATURAL GAS TO LPG GENERIC

THE MF-400 SERIES. Operating and Service Manual. Series includes all variants of MF-400/401

2 GALLON TWIN STACK AIR COMPRESSOR W/ HOSE REEL

TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3

AIR COMPRESSOR. Failure to follow all instructions as listed below may result in electrical shock, fire, and/or serious personal injury.

Control of Energy - Isolation Process

BUTTERFLY VALVES Series 800

HEALTH AND SAFETY METHOD STATEMENT AIR CONDITIONING/REFRIGERATION MAINTENANCE/SERVICE. 2. Clean filters and screens when necessary

Sample Sailing Instructions for Sanctitoned Lightning Class Championship Regattas

PRESSURE TEST PUMP OPERATING & MAINTENANCE INSTRUCTIONS. Model No: PTP100. Part No: GC01/09

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Isolation and Lockout

TOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors

Perform Pressure & Leak Test, Tubing & Piping. Module 12306

Personal Protective Equipment Policy & Procedure

FLANGED MULTI-PORT BALL VALVES

COOPER POWER SERIES. Manual or Hostick Operable, Padlockable 150 A Tap-Changer Switch Installation Instructions. Tap-Changer Switch MN800015EN

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

Hazardous Energy Control

Dri-Line Mk2 Spirax-Monnier Compressed Air Drain Trap

RULES PUBLICATION NO. 119/P

1. Preface Important Safety Notes Brief Product Information Product Working Principle Installation Guidelines...

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

Distribution Transformer. Instruction Manual. For Domestic Use

GAS CYLINDERS RULES, 2004

AUTOMATIC HOSE TEST UNIT, TYPE SPU

General maintenance engineering applications

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

PDY TON HYDRAULIC CRIMPING TOOL WARNING

Government of Bermuda Department of Maritime Administration BERMUDA SHIPPING NOTICE

REL-46 WARNING NOTICE 15 TON SINGLE ACTING REMOTE HYDRAULIC CRIMPING HEAD. Compatible with RELIABLE R15 and P Style dies. REL-46 Manual

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

LUBRICATOR ASSEMBLY AND OPERATING INSTRUCTIONS

Contractor / Exhibitor Handbook

CHAPTER 1 INTRODUCTION TO RELIABILITY

SWMS No 007 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

Technical Specifications of Hydrogen Isotope Handling and Recovery System

REL-510H WARNING NOTICE 12 TON SINGLE ACTING REMOTE HYDRAULIC CRIMPING HEAD

SOUTH LYON FIRE DEPARTMENT Manual of Procedures 403

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

Adjustable. Unloader Valve. O&M Manual. Part #

Operation Instruction Manual

Safety at Work. Rules for Staying Alive

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE

INTERPLANT STANDARD - STEEL INDUSTRY

LESS LETHAL, FLASH SOUND DIVERSIONARY DEVICE, CHEMICAL AGENTS INSTRUCTOR CERTIFICATION COURSE OVERVIEW AND INSTRUCTIONAL GOALS COURSE OVERVIEW

QUALITY ASSURANCE SPECIFICATION NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7

Spirax Compact FREME Flash Recovery Energy Management Equipment

CLUB RISK ASSESSMENT TEMPLATE

Compact Ball Valves ASAHI AV VALVES. Contents. User s Manual. (Page) (1) Be sure to read the following warranty clauses of our product 1

GEMS SENSORS & CONTROLS

PKP Prozessmesstechnik GmbH. Borsigstrasse 24. D Wiesbaden-Nordenstadt. Tel: / Fax: / Operating Instructions

Record of Assessment OFFICER IN CHARGE OF AN ENGINEERING WATCH

AREA VALVE SERVICE UNITS

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

QPEO2/037N Credit Value: 15 QCF Level: 2 GLH: 68 Maintaining electrical equipment/systems

Gas Welding Hoses and connections, the weak link

SA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Dial Adjustment)

THE BP-690 SERIES. Operating and Service Manual. Series includes all variants of BP-LF/MF-690/691

PRESSURE SYSTEMS POLICY

KMU SUBSTATION WORKSHOP

LOCK-OUT / TAG-OUT SYSTEM & PROCEDURE

Magnetic level switch type MR783 Instruction Manual

Transcription:

5 MVA TRANSFORMER SERVICE AND MAINTENANCE FOR TATA CHEMICALS MAGADI. SAFETY MEASURES AND REQUIREMENTS i) A thorough site risk assessment to be done before commencement of work. ii) All personnel involved in the job to be safety inducted for familiarization with the scope of work and the risks involved. iii) A risk assessment board to be availed on site furnished with the permit to work, risk assessment form, hot work permit and job procedure. iv) Ensure all electrical connections have been isolated and lock out, try out and tag out procedures have to be followed before taking over the plant for the job. v) A tool box talk to he held before commencement of every shift to highlight on the new risks encountered or expected and how to mitigate them. vi) A person in charge of safety to be identified and be known to all the personnel during every shift. vii) A first aid kit to be availed on site at all times and a shift first aider identified. viii) All oxy-acetylene sets to be inspected and tested for leakages before use and hoses to be clear of falling hot material, sharp edges and dropping debris. ix) All personnel shall wear the mandatory PPE at all times and ensure use of other relevant PPE depending on the nature of work and condition of the work site. x) Housekeeping to be done at every stage of work and thoroughly at every close of shift. TOOLS REQUIRED FOR SERVICE N/B: Vendor to provide. i) Spanners ii) Pipe wrenches iii) Crimping tool iv) Ladders among others. EQUIPMENTS N/B Vendor to provide i) Filtration machine, measuring equipment and other related machinery

CONSUMABLES REQUIRED (TATA TO PROVIDE) i) Cotton rags ii) Transformer oil iii) Silica gel iv) Kerosene v) Petrol TRANSFORMER LOCATION-POWER STATION TRANSFORMER CAPACITY (MVA/ KVA) Total cost (ksh) Total Number Amount in Location Capacity in Litres/Kgs MVA/KVA 1 7100Kgs Powerhouse 5mva Cost of service (Ksh) The following are the tasks that need to be carried out during the service. DESCRIPTION Cooling system Bushings Transformer oil SCOPE Inspect and clean cooling fins and seal leakages if any. Also clean the entire transformer Inspect and clean bushings and repair where defective. Seal any leaks which may be noticed coming from the bushes Test dielectric strength and dissolved gasses in the transformer oil then perform filtration of 130kg oil in the transformer tank online to required di-electric strength then perform final test the oil Di-electric strength and moisture AMOUNT IN KSH

content & dissolved gases and issue certificate. Buchholz Relay Insulation & leak current test Conservator Tank Silica gel Gauges Marshalling boxes Do mechanical inspection, service and test the operation of the buchholz relays. Service and test for correct functionality of all protection system of the transformer carry out insulation resistance, dielectric absorption ration and polarization index using HV insulation resistance tester Inspect and service conservator tank. Seal any leakage if any in all the flanges Change silica gel Service the oil temperature gauges and oil level gauges and change oil if necessary Check all controls and relay terminations and tighten where necessary Check remote tap changer control panel, clean and tighten terminals where necessary Current Transformers Voltage Transformers On-Load tap Changer Power Cables Inspect and service the CTs in the substation for proper functionality Inspect and service all the VTs in the substation Service tap Changer and replace Oil Inspect power cables terminations to the copper tubes, clean and make proper tightening

Transformer Cover and Joints Inspect for any oil leak in the flanges and where necessary replace the gasket to seal all the leaks Inspect and arrest any oil leak at the conservator tank. Conservator tank Replace silica gel MINIMUM REQUIREMENTS/ GENERAL TERMS AND CONDITIONS I. Site visit is a must to familiarize with the area and establish special requirement to execute the task provision of convenient means of mobilization of machine and personnel to site and to different areas where transformers are located II. III. IV. Provision of correctly rated generator to run oil filtration machine and any other powered equipment Provision of own assorted fittings to be used on various transformers oil filtration Provision of own testing equipment V. Provision of own oil filtration equipment VI. VII. VIII. IX. Gasket will be provided by Tata where need be Silica gel will be provided by Tata where need be Provision of own working tools Transformer Oil for top up will be provided by Tata X. Class A registration certificate by ERC XI. XII. XIII. Previous experience in Transformer service and switch gear service The contractor shall deploy sufficient man power tools and tackles, measuring instrument, etc. as required for the work The contractor shall remove the respective equipment, controls, & instruments the contractor will ensure that no damage is done to any other equipment /instruments / item

of the nearby area. Any loss of damage done to aforesaid items shall be recovered from contractor. XIV. XV. XVI. XVII. XVIII. XIX. XX. XXI. XXII. The contractor shall take measurement and record operating values before stopping auxiliaries and start of dissembling such as winding resistance, insulation resistance, etc. Detailed and recorded. Matching, etc. including required consumables shall be done by contractor. All parts shall be cleaned by using proper type of cleaner (kerosene, petrol) etc. Assembling should be started only after obtaining clearance/permission from site engineer in charge. All fitting and operating values/clearances/gaps must be achieved/maintained as per the recommendations should be done carefully/counter checked by the engineer in charge. Assembling should be done carefully and without damaging of parts. Contractor shall take measurement, set correctly as per recommendations and record final set values i.e. electrical parameters etc. All safety, measures shall be taken during execution of work. TCML will be not be responsible for any accident occurs during the execution of work. All the work related to installation of C&I item and electric cable Re-termination shall be done and after completion of work trial taken in presence of Engineer-In-charge. After completion of work equipment trail satisfactory work equipment and surrounding area shall be cleaned properly. Inspect and identify all the required spares and consumables in store in readiness for the service. Testing and Commissioning-Transformer should be left in its normal working condition.

TECHNICAL ANALYSIS Quantitative Technical Criteria Tender Returnable Proof Criteria Criteria Sub Description Format Weighting Weighting 1 TECHNICAL CRITERIA 80% 1 The company MUST be certified and registered with class A certificate by ERC. Attach current Certificate 20% The bidder shall submit 2 copy of completion The vendor MUST have done certificates/ un-priced similar jobs (Installation and P.O. copies in support of servicing of transformers of the above. If required same class) purchaser may visit the client 30% 3 Site visit by vendor Site visit is mandatory 10% Attach a detailed work 4 Show detailed preparation and execution work plan schedule for the activities in scope with manning 20% levels. SAFETY CRITERIA 10% 5 Does your company have competent, trained, safety conscious, and insured personnel Attach a valid WIBA for your staff 20% TOTAL 100% A minimum overall score of 70% will be used to deem the renderer technically acceptable and anything below 70% will deem the renderer technically unacceptable

FINANCIAL EVALUATION DESCRIPTION QTY UNIT PRICE (KES)@ Scope for 5mva Power House Transformer Mobilization and demobilization charges 1 LUMP SUM 1 LUMPSUM SUB TOTALS VAT TOTAL Payment Terms Mandatory Site Visit on 19 th July, 2017