POST OAK BOULEVARD DEDICATED BUS LANES PROJECT

Similar documents
Uptown Houston November 2014

Ujari Mohite. Vijay Mahal and Vincent Sanders. Revised Ridership Forecasts for the Uptown DBL project. Date: August 17, 2015 INTRODUCTION/SUMMARY:

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

Bus Rapid Transit Plans

Frequently Asked Questions (FAQ)

SANTA MONICA BOULEVARD CORRIDOR

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

Regional Transportation Needs Within Southeastern Wisconsin

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

METRO RTA TRANSIT MASTER PLAN. May 25-26, 2011

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

Transportation Master Plan Advisory Task Force

100 Most Congested Roadways in Texas

Arterial Transitway Corridors Study. Ave

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

I-35W Solutions Alliance Project Update July 13, 2017

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Arnold Hinojosa

100 Most Congested Roadways in Texas

North Coast Corridor:

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

ENERGY CORRIDOR DISTRICT UNIFIED TRANSPORTATION PLAN ACHIEVE MOBILITY THROUGH ENERGY

Highway 217 Corridor Study. Phase I Overview Report

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Traffic Congestion in Houston. Presented by Bill King

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

South King County High-Capacity Transit Corridor Study

395 Express Lanes Extension

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

METRO Now. Transit Leader. One of only four urban. gain bus ridership in Purple and Green Lines. Red Line is one

Durham Region Long Term Transit Strategy

Chapter 3 BUS IMPROVEMENT CONCEPTS

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Performance Measure Summary - San Jose CA. Performance Measures and Definition of Terms

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

TRAFFIC IMPACT ANALYSIS

Highway 17 Transportation Improvement Study

Performance Criteria for 2035 Long Range Transportation Plan


BRT for Berkeley A Proposal for Consideration

Key objectives of the survey were to gain a better understanding of:

CHAPTER 1 INTRODUCTION

Arterial Transitway Corridors Study

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

summary of issues and opportunities

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

Defining Purpose and Need

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Focused Traffic Analysis for the 200 Nellen Avenue Project

Project Narrative. Albuquerque, NM. July 31, 2015

Pocatello Regional Transit Master Transit Plan Draft Recommendations

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

Feasibility Study for Intermodal Facility in Anchorage, Alaska

Contents. Champaign-Urbana Mass Transit District Stop Placement Guidelines

Washington DC Section of ITE Project Briefing

CHAPTER 7.0 IMPLEMENTATION

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

3.0 Future Conditions

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT

Clackamas County Comprehensive Plan

1 PROJECT DESCRIPTION PROBLEM STATEMENT PROJECT PURPOSE AND NEED Study Purpose Study Need... 4

A Selection Approach for BRT Parking Lots Nicolls Road Corridor Parking Study

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

Preview. Second midterm Tables in your paper Mass Transit as alternative to auto California s problems in urban transportation

Community Task Force July 25, 2017

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

SMART 1 Public Meeting #1. February 24, 2016

Notes to Benefit-Cost Analysis

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

City of Davenport CitiBus Public Transportation Study. April 2015

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

WHAT CAN WE DO? SECTION 6

SECTION 1 - TRAFFIC PLANNING

Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher

I-105 Corridor Sustainability Study (CSS)

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Westside Transportation Access Needs Assessment - Short and Long Term Improvements

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

Public Transport and Development: Making It Work

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

City of Novi Non-Motorized Master Plan 2011 Executive Summary

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

TRANSPORTATION NEEDS ASSESSMENT

Ann Arbor Downtown Street Plan

Project Update May 2018

Transcription:

POST OAK BOULEVARD DEDICATED BUS LANES PROJECT January 2015

Uptown Dedicated Bus Lanes project Post Oak Boulevard Uptown Employees by Zip Code Number of Employees by Zip Code 750 to 999 500 to 749 300 to 499 200 to 299 100 to 199 99 or less Park & Ride Corridors Park and Ride Lots The challenge Uptown Houston is a leading economic driver of the City of Houston and the largest business center in the nation outside of a traditional downtown. The greatest challenge facing Uptown is the lack of effective commuter transit service. Uptown s 80,000 employees simply have no commuter transit options, and the lack of service is a detriment to the growth of this highly successful area. Houston has an excellent commuter bus service on its comprehensive HOV network. This network effectively penetrates the heart of the suburban communities in which most of Uptown s employees live. The plan Uptown Houston has a plan, the Uptown Dedicated Bus Lanes Project, which is designed to get these employees to and from work using Houston s highly successful busway system. Uptown Houston proposes to rebuild Post Oak Boulevard into an exquisitely designed Grand Boulevard while preserving existing automobile access, substantially improving transit service and creating a beautifully landscaped pedestrian environment.

Bus Shelter Post Oak Boulevard KATY Uptown Dedicated Bus Lanes Project NORTHWEST TRANSIT CENTER 10 PROPOSED WEST LOOP (I-610) ELEVATED DEDICATED BUS LANES Connection to katy/us 290 Park and Ride Lots The Project taps into the existing US 290 and IH-10 Katy Freeway HOV lanes, allowing employees to use Park and Ride lots along these corridors. Post Oak Boulevard Dedicated bus lanes Uptown Houston will build Dedicated Bus Lanes in the median of a newly expanded and reconstructed Post Oak Boulevard from IH 610 to Richmond. 610 UPTOWN HOUSTON POST OAK BOULEVARD DEDICATED BUS LANES 59 BELLAIRE/ UPTOWN TRANSIT CENTER Connection to US59/westpark By constructing the Bellaire / Uptown Transit Center, the Project will tap into the existing Westpark Tollway and Southwest Freeway HOV lanes, allowing employees to use Park and Ride lots along these corridors. The plan Would For more information on the Uptown Dedicated Bus Lanes Project, visit www.uptown-houston.com, like us on Facebook and follow us on Twitter. @UptownHouston /UptownHoustonTX 1. Preserve 6 existing auto traffic lanes 2. Preserve all signalized left turn lanes 3. Maintain existing signal operations 4. Add Dedicated Bus Lanes 5. Remove buses from general traffic lanes 6. Enhance pedestrian access 7. Preserve Boulevard s oak trees

Post Oak Boulevard Dedicated Bus Lanes Project Post Oak Boulevard Traffic Study Third Party Review By Walter P. Moore and Associates, Inc. Walter P. Moore has completed an independent review of the analysis of the proposed Post Oak Boulevard Improvements included in the Uptown Houston Transportation Plan prepared by Gunda Corporation and has conducted a study of three improvement scenarios for Post Oak Boulevard. Based on their review and analysis, Walter P. Moore concluded that the proposed Dedicated Bus Lane option provides the best long term solution for reducing traffic congestion in the Uptown Houston area. This conclusion was based upon their findings that a major transportation issue in the area is congestion along IH-610. No matter the number of improvements made within Uptown Houston on Post Oak Boulevard or east / west thoroughfares, vehicles will still be caught in long queues along the IH-610 frontage roads and main lanes trying to reach their ultimate destinations. The only effective solution is to provide an alternative to individuals driving alone by creating a transit system that is attractive (proving reliable, frequent service) to residents, employees, and visitors of Uptown Houston, as proven in Downtown Houston where approximately 32% of commuters use transit. Review of Retail Impact Report Jose Luis Nueno produced a report which opined that the proposed Post Oak Boulevard Dedicated Bus Lanes Project would negatively impact retail activities in the area. In response, Uptown commissioned William Whitney, Ph.D. to conduct an in-depth review of the assumptions, analysis and conclusions of Mr. Nueno s report. Dr. Whitney received his Ph.D. from the Graduate School of Management, University of California Los Angeles in Urban Land Economics (1975). He served as a Principal with Arthur Andersen for nine years, the last three years headquartered in their London office. His duties with Andersen included the establishment of Andersen s real estate consulting practices in Southern California and the Asia Pacific Region, then re-locating to England and serving as a resource to Andersen s European and Middle East Real Estate and Hospitality consulting practices. He is also a contributing author to ULI s recent publication, Retail Development, 4th Edition. Dr. Whitney concluded, A comparison with other existing and proposed DBL / BRT programs suggests that the Uptown DBL / BRT is perhaps the most responsive yet in terms of taking steps in its design and execution that should minimize negative impacts on the local retail community during the development period. John Fransen, Vice President, The Hahn Company, and active with the International Conference of Shopping Centers, the Urban Land Institute and a consultant focused on improving retail in Houston s downtown stated, In his executive summary, Professor Luis Nueno issues sweeping, definitive predictions resulting in a drop in sales of 50% to 60% that will force closure of most retailers. He would like the reader of his report to buy into his extreme argument either no construction and status quo (his position) versus a straw man

argument he has created a worst case construction nightmare scenario where most retailers are forced to close. This is just not a believable position. Alexander Garvin, M. Arch., M.U.S, Adjunct Professor, Yale, Vice President, Lower Manhattan Development, Corporate Deputy Commissioner, New York City and author of the book, The American City: What Works, What Doesn't, concludes, The planned investments in Post Oak Boulevard will increase the street s carrying capacity and, with the increase in the number of people on the street, increase property values and generate further private investment far in excess of what will be spent on improvements to the public realm. In addition to these international experts, local retailers who have successfully served the Houston retail market for decades support the Dedicated Bus Lanes Project, including: Ed Wulfe with BLVD Place; The Galleria; Kendall Miller with Tanglewood Corporation s Post Oak Shopping Center; Weingarten s Centre at Post Oak and Richmond Square; and AmREIT s Uptown Park. Harris County Appraisal District Property Values for Properties to be Acquired In order to understand the cost of acquiring properties along Post Oak Boulevard for the proposed Dedicated Bus Lanes Project, the Harris County Appraisal District (HCAD) valuations were compiled as follows: 2014 Average Total Est. HCAD Values Sq. Ft. to Total Values Per Sq. Ft. Be Acquired Values Preliminary Noticed $ 133 per sq. ft. 152,000 sq. ft. $ 20.50 M Protested $ 127 per sq. ft. 152,000 sq. ft. $ 20.10 M Transit Demand Forecast Transit ridership forecasts were developed using a set of computer models developed over a 40 year history by H-GAC / TxDOT / METRO, which have been continually updated, calibrated and refined. The population, employment and land use forecasts were based on H-GAC data sets. The forecasting effort combined a multi-agency task force, including H- GAC, TxDOT, TTI, METRO and Uptown. METRO s modeling consultant performed the detailed analysis. The information was accepted by HGAC s Transportation Planning Committee, Federal Transit Administration and Federal Highway Administration. Projected ridership will range from 15,000 20,000 in 2018 and 20,000 to 28,000 in 2035. Overall, ridership estimates were conservative with only 8 10% of the employees using transit, but even at this level of ridership, the Dedicated Bus Lanes Project will carry the equivalent of 3 4 additional lanes of automobile traffic. Land Owner Support for Dedicated Bus Lanes Project Land owners representing more than 70% of the retail linear footage along Post Oak Boulevard support the Dedicated Bus Lanes Project. Land owners of all land uses representing approximately 60% of the linear feet along Post Oak Boulevard support the Project.

Post Oak Boulevard Dedicated Bus Lanes Project Construction Phasing Effectively managing the construction of the Post Oak Boulevard Dedicated Bus Lanes Project is the primary and perhaps most important near term objective to the ongoing operations of Uptown private sector businesses. TIRZ #16 (Uptown Houston) has a long and successful history of constructing projects in the area in a manner that successfully maintains a vibrant business environment and the timely completion of projects. When work begins on Post Oak Boulevard, active construction segments will maintain a minimum of two lanes of traffic in each direction and all turning movements at intersections during peak periods on weekdays. Non active construction segments will maintain the current three lanes in each direction including all turning movements at intersections. Driveway access will be maintained at all times with the cooperation of the property owners. Uptown Houston plans to construct the project in manageable segments as follows: North: West Loop to San Felipe Middle: San Felipe to Westheimer South: Westheimer to Richmond Project construction will be appropriately phased to ensure acceptable traffic operations, business access and prudent and timely completion of the project. Typical Construction Phasing

TABLE OF CONTENTS I. Post Oak Boulevard Traffic Study Third Party Review by Walter P. Moore and Associates, Inc... Tab 1 II. Analysis of Nueno Retail Report by William H. Whitney, Ph.D.... Tab 2 Analysis of Nueno Retail Report William H. Whitney, Ph.D. Bio Summary Analysis of Nueno Retail Report Executive Summary / Full Report III. Harris County Appraisal District Property Values for Property to be Acquired for Dedicated Bus Lanes Project... Tab 3 Summary Property Values Memorandum Deal Sikes and Associates Uptown Post Oak Boulevard HCAD Tax Values Chart IV. Demand Forecasts... Tab 4 V. Post Oak Boulevard Project Land Owner Support... Tab 5 VI. Real Estate Acquisition... Tab 6 Summary Real Estate Acquisition Guidelines Real Estate Acquisition Guidelines