Prof. B.S. Thandaveswara. The Beas Sutlej link project links two rivers viz: Beas and Sutlej through a system of

Similar documents
MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK)

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM

NUMERICAL AND PHYSICAL MODELING

Structural design and motion analysis of Hexapod Bionic walking. device. Zhu Zhifang12

(304) WVPEBD (304) Manor Group (267)

JENN-AIR DETAILED PLANNING DIMENSIONS 1 of 5

PROJECT DIRECTORY CG - GENERAL COMMERCIAL / AREA DISTRICT 1 34,067 SF - (E) BUILDING (89%) 14,280 SF - (N) ADDITION (92%)

Bow Tie Wedding SVG Set.

Uniform illumination for slim, shallow box signs

Hydraulic modeling summary for Sodom Dam Alternatives Feasibility Study

2 019 STAND UP PADDLE.

FLY ASH GENERATION AND UTILIZATION DURING

- FRAME ONLY - PANEL RAILS NOT INCLUDED

19.1 Problem: Maximum Discharge

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

5th International Symposium on RCC Dams General Introduction

STUDY ON ANCHOR BEHAVIOR OF CFRP PLATE TO CONCRETE

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

Journal of Energy Technologies and Policy ISSN (Paper) ISSN (Online) Vol.4, No.6, 2014

LIST OF STANDARD ABBREVIATIONS

NOVEL AIRFOIL DESIGN FOR SMALL HORIZONTAL AXIS WIND TURBINE: A PRELIMINARY RESULT

tapper+ Concrete Screw Anchor

JENN-AIR DETAILED PLANNING DIMENSIONS 1 of 5

On the decomposition of life expectancy and limits to life

WIND SPEED LENGTH OF TIME WIND BLOWS (Duration) DISTANCE OVER WHICH IT BLOWS (Fetch)

Power Supply in Package (PSiP) Power Supply on Chip (PwrSoC) Update 2010

IMPROVING THE SAFETY OF AN OLD AUSTRIAN DAM ABSTRACT

NH00-Fuse switch disconnector

PART IV - Technical Reference

Follow this and additional works at:

BLDG-2 STE- STE- STE- A3-1.0 PFLUGERVILLE RETAIL CENTER. Tchen Architects 1300 WEST PFLUGERVILLE PARKWAY BUILDING-3 SHELL FLOOR PLAN

More than half the world lives on less than $2 a day

Inland waters, rivers

16th Australasian Fluid Mechanics Conference: An Evaluation of Computational Fluid Dynamics for Spillway Modelling

OFFSHORE WIND ENERGY POTENTIAL ALONG INDIAN COAST

Tidal Energy from the Severn Estuary: Opportunities and Challenges

On the decomposition of life expectancy and limits to life

Hydraulic Modeling to Aid TDG Abatement at Boundary and Cabinet Gorge Dams

T o validate the proposed design of

Preventing unstable operation of a synthesis compressor using Dynamic System Simulation

Evaluating Surge Potential in CSO Tunnels

ACCEPTED VERSION.

INTER-STATE BASIN MANAGEMENT IN FEDERAL COUNTRIES- INDIAN SCENARIO. By Radha Singh Additional Secretary GOVERNMENT OF INDIA

NAGASE KENKO CORPORATION. the name you know, the name you trust

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN

RESCUE TRAINING and SERVICES CONFINED SPACE HIGH ANGLE SURFACE MINES EXCAVATION/TRENCH ADVANCED RIGGING. Winter, D2000 Safety: Key Facts

[RR , XXXR0680R1, RR.R0336A1R.7WRMP0032] Notice of Availability of a Draft Environmental Impact Statement and Notice of

The transition to sustainable energy

Immediately after its establishment, within

Course Teacher: Prof. Dr. M. R. Kabir SPILLWAY & IRRIGATION PUMPS. Spillway:

2018 FIFA WORLD CUP RUSSIA

Dr S.Gomathinayagam Executive Director CWET, Chennai, India. web: cwet.res.in

New spillway at the Esch-sur-Sûre Dam Luxembourg

COIN TELEPHONE STATIONS BACKBOARDS

Product Reliability Qualification Report

Hydraulic Evaluation of the Flow over Polyhedral Morning Glory Spillways

STRUCTURAL STABILITY ASSESSMENT

Lecture 10 : Sewer Appurtenances

Appendix FRANCE Lyon Croix-Rousse Tunnel

The Masterplan Coastal Safety: a wave of opportunities

UNIT 15 WATER HAMMER AND SURGE TANKS

Health Advice on Eating Fish You Catch

Wind Forced Motion. Equation of motion a=σf/ρ 12/09/11. What forces might cause a parcel of water to accelerate?

GETTING STARTED INSTALLATION GUIDE HID CONVERSION KIT. Please make sure all parts are included in your HID kit.

Exercise (3): Open Channel Flow Rapidly Varied Flow

AIRFLOW GENERATION IN A TUNNEL USING A SACCARDO VENTILATION SYSTEM AGAINST THE BUOYANCY EFFECT PRODUCED BY A FIRE

GETTING STARTED HID CONVERSION KIT INSTALLATION GUIDE. Please make sure all parts are included in your HID kit.

Design and Installation of two Permanent Booms at La Romaine-2 to resist Ice, retain Debris and serve as Safety Booms.

AN ISOLATED SMALL WIND TURBINE EMULATOR

Wave Energy. ME922/927 Wave energy

La Rance tidal power plant in La Rance, France. Tidal and Wave Energy

Yacyretá Hydroelectric Project Argentina and Paraguay

Interlake Tunnel WRA Board Workshop. August 25, 2014

Summer 2016 Commercial Fatalities

Developments in Netherlands. Example of old levelling system 1. Lock levelling in The Netherlands. Example of old levelling system 2

COST AND AVAILABILITY OF FISHING HOOKS IN INDIA

Experience with the design, manufacture, test and commercialisation of the REpower 6M turbine

Other nature information

V MW Offshore leadership

LifeJacket saves lives when hydraulic pressure fails

CAISSON SHAFT SYSTEM

Stability of Pipeline and details of Anchor blocks

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018

ø40, ø50, ø63, ø80, ø100 How to Order 40 mm 50 mm 63 mm 80 mm 100 mm Port thread type Rc NPT G

Wind Blow-out Hollow Generated in Fukiage Dune Field, Kagoshima Prefecture, Japan

Selection Protocol BC Snowboard Provincial Freestyle Team July 15, 2015

2 Contnts Throughout history, popl hav movd goods from on plac to anothr. Ths txts ar about popl who travl as part of thir jobs. On th Road 3 Sharon B

(056Sform.lf. A.>wy»A 3..2 No *61 0 C B 1 SINGLE HUNG - LARGE MISSILE IMPACT 31* 8100 PVC SINGLE HUNG IMPACT

Proceedings of the 7 th International Conference on HydroScience and Engineering Philadelphia, USA September 10-13, 2006 (ICHE 2006) ISBN:

Ennore Coal Port Project: Port Basin and Entrance Channel

take a deep breath... Dependable high quality breathing air compressors

Yellowknife Area Wind Potential

Japan s Floating Offshore Wind Projects

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

SUPERMETRO - Super-High-Speed-Train in Low Pressure Tunnel

BALEEN WHALE REPORTS FROM THE EASTERN ARABIAN SEA BASED ON INTERVIEW SURVEYS AND STRANDING REPORTS - UPDATE FROM INDIA

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010.

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Investigation of Cavitation Damage Levels on Spillways

Site C Clean Energy Project

Transcription:

Prof. B.S. Thandavswara Tunnl Th Bas Sutlj link projct links two rivrs viz: Bas and Sutlj through a systm of tunnls and a high contour opn channl. This link is dsignd to carry a discharg of 255 m 3 s -1. Pandoh Baggi tunnl 250 mm lining, Q = 255 m3s -1, 7.62 m dia, 13.17 km long, So 1 in 22.2 first 457 m, 1 in 670 rmaining part. Sundrnagar Hydl Channl Sundrnagar Sutlj Tunnl 12.31 km long, 8.33 m dia, lind / R.C. for som rach links forbay and surg shaft. Surg shaft 22.6 m dia, 125.3 m high, Diffrntial typ 3 pnstocks 22.86 m dia, 7.62 m dia risr. Chut spillway in a 6.71 m dia Tunnl fittd to surg shaft. Powr gnratd 1000 MW. Dhar Powr plant Pandoh Dam Spillway with flip buckt. Bas dam is fittd with spillway of 213.4 m with a discharg of 12374 m 3 s -1. Stilling basin 99 m long and 213.4 m wid. Indian Institut of Tchnology Madras

Prof. B.S. Thandavswara Muchkund Projct, Tunnl linking th watr conductor systm (channl) to th forbay Indian Institut of Tchnology Madras

Prof. B.S. Thandavswara Som Tunnl profils 55.5 o 0.854 m 0.64 m 1.96 m 2.54 m 3.55 m 2.80 m 2.175 m 59 o 3.0 1.275 m 0.825 m 1.70 m 1.47 m 4.9804 m Hors sho tunnl Hors sho tunnls ar vry convnint to construct Low prssur Tunnls < 10 m, Mdium had Tunnls (10-100 m) and High had Tunnls (> 100 m) Nam Ara (Sq.m) Discharg, Q Vlocity (m/s) (m 3 /s) Sabarigiri 16.4 53.5 3.32 Sharavathy 35.36 147.2 4 to 4.5 Yamuna Hydl II stag 44.15 234 5.32 Pandoh - Baggi Bas projct 45.58 255.0 5.59 Vlocity in prssur shafts 6 to 8 m/s. Valu of Manning n for Tunnls Vry rough 0.04 to 0.06 Surfac trimmd 0.025 to 0.035 Surfac trimmd and invrts d 0.020 to 0.030 Indian Institut of Tchnology Madras

Prof. B.S. Thandavswara Hydraulic Data for Had Rac Tunnl - Indian Projcts Sl. No Nam of th Projct 1 Baira Siul. H.E. projct (H.P) (a) Baira Tunnl (b) Bhaldh Tunnl 2 Yamuna Hydl Schm Stag II 3 Lngth of Tunnl Diamtr of Tunnl Ara (Sq.m) Disch arg (m 3 /s) Vlocit y (m/s) 7700 5.0 20.7 88.0 4.25 7910 1.83 * 2.74 4.66 19.8 4.25 (a) Part I 6200 7.0 38.4 235 6.1 (b) Part II 5700 7.5 44.15 234 5.32 Giri H.E. Projct 4 Loktak Hydro Elctric Projct 5 Bas Sutlj Link (a) Pandoh - Baggi 6 Srisailam Hydro Elctric Projct 7 Uppr sindh Hydro Elctric 7200 1250 3.66 3.36 10.51 8.83 46.68 46.68 4.45 5.29 6510 3.81 12.05 42.3 3.51 13110 7.62 45.58 255 5.59 12350 8.53 57.15 403.5 7.06 Typ of Lining R.C.C R.C.C has bn provid d whr th covr is lss 736 15.0 176.8 980 5.54 R.C.C. 396 3.14 * 2.59 5.63 12 2.13 R.C.C. nar Indian Institut of Tchnology Madras

Prof. B.S. Thandavswara 8 Projct Manri Bhali Hydro Elctric Projct 9 Kadampari Hydro Elctric Projct 10 Chukha Hydro Elctric Projct 11 12 13 Sharavathi (Karnataka) Kundah (Tamil Nadu) Koyna (Maharashtra) 8532 4.75 17.71 70 3.95 1035 7.0 38.46 150 3.9 6406 4.9 18.85 95.2 5.05 2073 8.69 55.73 198.4 3.56 4553.4 2.52 4.96 19.81 4.0 3256 7.32 42.06 - - portal / R.C.C HYDRAULIC DATA FOR HEAD RACE TUNNELS-FOREIGN PROJECTS Sl. No. 1 2 3 4 5 6 7 Nam of Projct Ala, Italy 1953 Valtllina, Italy 1959 Eucumbn, Tumut Australia 1959 Tooma Tumut Australia 1961 Tumut 2 Australia 1962 La Bathi, Franc 1960 Innrtkirchn, Switzrland Lngth of th Tunnl Dia of Tunnl Ara in m 2 Discharg Q m 3 /s Vlocity m /s Typ of lining 9,236-67 200 2.99 Concrt 22600 4.94 20.24 62 3.31 22315 6.4 32.2 142 4.40 14330 3.8 * 3.7 hors sho3.43 circular 12.81 9.24 100 100 7.81 10.82 6.5 km 4,938 6.4 32.2 125 3.88 12528 4.2 * 4.4 14-15.2 50 3.33 9,968 3.4 9 54 6.0, stl for 100m Asbstos Plat Indian Institut of Tchnology Madras

Prof. B.S. Thandavswara 8 9 1942 Brsimis I, Canada 1955 Kurob, Japan 1961 12230 9.45 70 425 6.07 10,400 4.80 18.1 72 3.98 - Manning roughnss n = 0.013 pr. Muchkund Hydro Elctric Schm / watr conductor systm Location: Jalapat across Muchkund Rivr. Gross Had: 266.39 m nar Dudh Falls. Flum opn = 1250 m. Tunnl = 1219.2 m. Prssur tunnls 914.4 m. Piplins 2 numbrs 3.05 m diamtr. Stl pip of 34.75 m. Pnstocks 6 numbrs 1.6 m diamtr and 1.45 m diamtr. Vrtical Francis Turbin. d 0 Hors sho tunnl Indian Institut of Tchnology Madras

Prof. B.S. Thandavswara 1 0.8 Circular Hors sho Ara y d 0 0.6 0.4 Hydraulic Man Radius 0.2 0 0 0.2 0.4 0.6 0.8 1 1.2 1.4 Normalisd Ara ( A ) and Hydraulic Man Radius ( R 2 ) π d 0 0 d 4 4 for Hors Sho Conduits RCC with 1% Rinforcmnt Minimum Excavation Lin (Pay Lin) Innr Formd surfac of lining RCC with 1.5 to 2 % Rinforcmnt Typical Cross sction in soft strata Typical Cross sction of Tunnl in soft soils Indian Institut of Tchnology Madras