ETMS ADVISORY BOOKLET 1 GUIDANCE NOTES FOR ROAD CLOSURES AND DIVERSIONS

Similar documents
M6 J7 Rushall Canal: Essential Repair Work Briefing

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

Proposed: Temporary Traffic Management Design Guidance

Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs.

ASSOCIATION OF RUNNING CLUBS EVENT PLANNING AND RISK ASSESSMENT

Smart motorways: all lane running on the M25. Guidance for EEAST crews

72 Crossrail Amendment of Provisions

Kent Police - Traffic management guidance for event organisers

Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

Traffic Control Inspection Checklist Segment:

Traffic Control: An Overview. May 2016

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

Resident s Toolkit Traffic Control Device Local Area Traffic Management

STATE OF MARYLAND FLAGGER EXAM

Parade & Traffic Management Plan

SECTION TRAFFIC REGULATIONS

Welcome. Smart motorway M1 junctions 13 to 16 public information exhibition. Highways England Creative [XXXXX_XXXX_XXX]

Appendix A Type of Traffic Calming Measures Engineering Solutions

Chapter 8 (2009) - Summary of key changes

EXHIBIT R1. Neighborhood Cul-de-Sac Implementation

Collision Site Investigation - Bodenham By-Pass Background

Traffic Sensitive Streets. Guidance Notes. GeoPlace Streets Team. Traffic Sensitive Streets. Guidance Note Page 1 of 7.

Beginning School Bus Driver Curriculum UNIT IX. FIELD TRIPS and TRAFFIC CONTROL DEVICES. Revised 09/2011 Revised 10/2013 (Instructional Content)

Introduction Methodology Study area and data collection Results and recommendation Conclusion References

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

FAQ s Walsh Road / Ferguson Road Pilot Scheme

INTERIM ADVICE NOTE 188/16

The Delivery Hub health, safety and environment Raising the bar 19 Noise The Delivery hub health, safety and Version environment

Extending 200m either side of the intersection Te Mata Mangateretere/ Waimarama/ Te Mata/River Rd

LET US KNOW WHAT YOU THINK

The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass).

Speed Limit Policy Isle of Wight Council

Wanaka Community Board 16 November Report for Agenda Item: 1. Temporary Road Closure - Challenge Wanaka Triathlon Event 2017

Sevenways Roundabout, and the need for a Road Safety Scheme:

Temporary Vehicle Restraint System Policy

// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015

The procedures to be followed in undertaking Non-Emergency work depend on the degree of traffic disruption caused by the work.

How To Read Road Signs - Roundabouts

Marcus Jones, TRL. Presented by Name Here Job Title - Date

SH3 Waitara to Bell Block

MEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR

Residential Traffic Calming Handbook

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Understanding the highway and traffic system to drive safely. Gopinath Menon Vice-Chairman, Singapore Road Safety Council

Issue 4. Module TS10. ERTMS level 2 train signalling regulations. GERT8000-TS10 Rule Book

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

Guidelines from the Manual on Uniform Traffic Control Devices for Streets and Highways Pertaining to Violation

Traffic Signs and Markings. Instructor: Dr. Yahya Sarraj Associate Prof. Of Transportation

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS

OPERATIONS CONTRACT MANAGEMENT MEMO CMM xx/16

SARF Engineering for Road Safety

DRAFT INTERIM ADVICE NOTE 150/17

COUNCIL POLICY. Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction

Traffic Control & Road Closures for Special Events

MUTCD, 2003 Edition. FHWA, US DOT March R

McHenry Avenue / River Road Temporary Roundabout San Joaquin County & Stanislaus County

M1 Smart Motorways Junctions 32 to 35a

Bicyclist Signing Guidelines

Welcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport

Accident Case Studies

Cyclists at road narrowings

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

PROJECT FACT SHEET May 25, 2018

INTERIM ADVICE NOTE 150/12. Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways.

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

91

CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings

RAA Member Panel. Roundabout Road Rules

Traffic Management Guidelines for Structure Rehabilitation Projects

MINNESOTA FLAGGING HANDBOOK

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

MINNESOTA COMMITTEE ON UNIFORM TRAFFIC CONTROL DEVICES SEPT 20, 2017 MEETING MINUTES WATERS EDGE ROOM 403. Old Business

You can download the latest version of this Traffic Signs Manual chapter and all other Traffic Signs Manual chapters from:

Closing statement. I have chosen not to object in principle to the proposal to close S08.

QLDC Council 29 October Report for Agenda Item: 3

GUIDELINES FOR EMERGENCY TRAFFIC CONTROL

Local Highway Panels Members Guide. 4 Signs & Road Markings

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

WORKSITE TRAFFIC MANAGEMENT

Our Approach to Managing Level Crossing Safety Our Policy

MINUTES OF THE POOLE HARBOUR BRIDGES OPERATING BOARD HELD AT COOBS QUAY ON 15 JANUARY DRAFT

Maynooth Cycling Submission on North South Corridor

Traffic Calming Policy

Roundabouts vs. All- Way Stop-Controlled Intersections

Economic and Social Council

Chicane Schemes. Traffic Advisory Leaflet 12/97 December Introduction

A partnership of Christchurch City Council, New Zealand Transport Agency and Environment Canterbury Keeping Christchurch Moving

What if there were no signs, signals or markings?? Throughout Ch 2 you will learn how signs, signals, and markings help regulate traffic flow.

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

Audit No. RSA Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

Local Highway Panels Members Guide. 2 Speed and Traffic Management

Appendix V1c - Bute Park Access Bridge Bollard Control Guidance for Event Traffic

M20. Upgrade to smart motorway Junctions 3 to 5

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

Auckland Transport Code of Practice 2013

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

Safety at Street Works and Road Works

Emergency Detour Route Guideline and Best Practices

Transcription:

ETMS ADVISORY BOOKLET 1 GUIDANCE NOTES FOR ROAD CLOSURES AND DIVERSIONS Version 1.0

Road Closure with Diversion ROAD CLOSURE SIGNING In Advance of the Closure At the Point of Closure STANDARD DIVERSION SIGNS Start of Diversion Route In Advance of a Junction At a Junction In Advance of a Fork End of Diversion Route

Example Closure with Diversion Signing Proposed Working Space A B

Guidelines for Installation and Removal BACKGROUND INFORMATION Although closing a stretch of road while works are carried out is often the safest option, other factors such as inconvenience to residents and businesses along with the confusion and congestion caused often mean that the closure of roads is only undertaken where other Traffic Management methods cannot be safely employed. When a stretch of road is to be closed, road users must be provided with an alternative route so a suitable Diversion Route along with appropriate signing must first be agreed with the relevant Highway Authority. A Temporary Traffic Regulation Order (TTRO) must then be obtained from the Highway Authority prior to the closure taking place. This will ensure such things as notification of emergency services. While Diversion signing is in place, it may be necessary to mask off any conflicting permanent signs in order that road users aren t confused. Before masking any permanent sign, permission must be obtained from the Highway Authority. Information Boards are required to be erected prior to closing any stretch of public road. These give notice to those using the road regularly as to where and when the closure will take place and for how long. INSTALLATION Diversion Routes only become active when the Road Ahead Closed, Road Closed and Diversion signs are erected at each end of the stretch of road to be closed. Diversion Ends signs are required at each end of any diversion route to inform road users that having passed these signs, they are no longer required to follow any Diversion signing. Intermediate Diversion Signs are those signs positioned between the Diversion and Diversion Ends signs in each direction. The Golden Rule when installing any Diversion Route is to ensure that the Road Works Ahead, Intermediate and Diversion Ends signs are erected BEFORE the Road Ahead Closed, Road Closed and Diversion signs are erected at the start of the Diversion Route in each direction. Failure to do this will result in motorists being diverted from their intended route without any further instruction and can result in motorists mistakenly travelling many miles in the wrong direction.

Guidelines for Installation and Removal INSTALLATION (continued) To differentiate between each end of the closure, in the following text and the example layout (see previous page), these are referred to as A and B. Having first erected the Road Works Ahead, all Intermediate Diversion Signs and Diversion Ends signs proceed to position A at one end of the proposed closure. Erect the Road Ahead Closed sign in the correct position then, after positioning your vehicle just inside the proposed closure, erect the Road Closed and Diversion signs and cones so that they prevent any further vehicles entering the closure but allow any vehicles within the closure travelling from B to A to exit. The TM vehicle should now be the last vehicle able to travel through the closure from A to B. Having arrived at position B the Road Ahead Closed sign should be erected in the correct position before erecting the Road Closed and Diversion signs along with coning to completely close the road at point B. Completely closing the road at point B, will ensure that the TM vehicle will now be the last vehicle able to travel from B to A. Having driven back through the closure to point A the Road Closed, Diversion and coning should be adjusted to completely close the road at point A. The stretch of road between A and B is now effectively closed and can be handed over to the contractor. MAINTENANCE Guidance for maintenance of Temporary Traffic Management arrangements is provided in the Safe Systems of Work booklet, Working Safely, Section 16.

Guidelines for Installation and Removal REMOVAL Prior to removal of any closure, it is essential to confirm with the contractor that it is safe to do so. Remember that Local Authorities may take advantage of the road being closed to carry out additional work such as litter picking and maintenance, TM companies are not always informed of these activities, so prior to removal check the closed area so that no one is put at risk. While driving through the closure prior to reopening the road, checks should be carried out to ensure that all work-related debris and equipment has been removed. Remember that it is an offence to leave debris on the highway and this includes both the carriageway and the footway. To remove the closure, drive to point A and readjust the Road Closed, Diversion and coning so that access is still prevented but traffic is able to exit the closed area. Drive to point B and remove the Road Closed, Diversion and Road Ahead Closed signing along with any coning. Drive back to point A and remove the Road Closed, Diversion and Road Ahead Closed signs along with any coning. Remember that once the signing and coning are removed from points A and B, there is no diverted traffic so the Intermediate and Diversion Ends signs will be ignored. The road is now open to traffic from both directions and normal service should be resumed while the Intermediate, Diversion Ends and Road Works Ahead signs are removed. A final check should be carried out to ensure that ALL items have been removed. NOTES Remember that even when the road is closed, emergency vehicles may require access to deal with accidents, fires and emergencies.

Diversion Signs for Roundabouts