On the occasion of the Athens 2004 Olympic Games event presented

Similar documents
H. General Director of the Secretariat General of Sports

6 JUNE TILL 9 JUNE PROGRAM

6 JUNE TILL 9 JUNE PROGRAM

Photo by John Todd

The 2nd European Games 2019

NON-RIGHTS HOLDING BROADCASTERS: ENR ACCREDITED PRESS CATEGORY. Non-rights holding broadcasters should remember five key points:

الاسكندريه مصر Tel Fax: (+2) Mob: (+2)

THE PENETRON SYSTEM P R RESS ELEASE PENETRON WATERPROOFS THE 2014 WINTER OLYMPICS

Camp Nou Stadium, home of FC Barcelona, to be remodelled

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

European Athletics COMMUNICATIONS MEETING

Media Operations. Media Operations Scope 7/11/2011. Maria Spalaraki, Effie Zikouli

London 2012 Olympics The Green Build. Rachel Krzeminski Aggregate Industries UK Ltd

Photo by John Todd

BROADCASTING THE OLYMPIC GAMES

Thank for your cooperation to the award of TOKYO

MEGA EVENTS: DRIVERS OF CHANGE?

Content. Transport 7/11/2011. Implementation Recommend ations. Overview. John Stavropoulos. ATHENS 2011 Observer s Program

CYCLING MOUNTAIN BIKE The name Napa Valley evokes images of one of the great winegrowing regions in the world, of rolling hills and lush vineyards.

Ketchikan Harbors Thomas Basin and Bar Point Harbor

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

The Role of Hellenic Navy Hydrographic Service in Preparing for the Olympic Games. Contents

Past World-Class Events: Reflections on Network Reliability Issues

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

Grays Harbor O&M and Deepening Dredging

Grays Harbor Federal Project

London March Donna Taylor Head of Accommodation. 13th

PROJECT FACT SHEET March 21, 2018

RECOMMENDATION: 1) that the existing Traffic Bridge be replaced with a modern steel truss bridge as outlined in this report;

The list of events is detailed in Table a Daily Schedule.

PART 1: INFRASTRUCTURE OPPORTUNITIES

Prepare 2008 Olympic Sailing Events. Sailing Sub-committee of BOCOG Qingdao

A complete listing of all events for all disciplines is presented in Table a Daily Schedule.

m.l. tigue moore FielD

TR A N S P O R TAT I O N READY TO GO

Right Sizing VE Studies CSVA Conference. Markham, ON October 27, BRIAN RUCK, P. Eng., C.V.S. AECOM Canada

Audi Dome, Munich. Progress is built on ideas.

POPULOUS DELIVERS NEW WARNER STAND AT THE HOME OF CRICKET

Application of Value Engineering The Crosstown Project

A complete listing of all events for all disciplines is presented in Table a Daily Schedule.

PROJECT FACT SHEET May 25, 2018

Host Town Initiative

WINTER CYCLING: THE EXAMPLE OF MONTREAL

Eilat 's artificial lagoons project on the Red Sea - Israel R. Raviv Ir. R. Raviv, Coastal Engineering Ltd., P.O. Box 7322, z/b 37072,

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

HARBOR INFRASTRUCTURE INVENTORIES Oak Orchard Harbor, New York

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

Road safety at road and rail interface

Canadian Gymnaestrada

Nome Harbor Page 2 of 12

Port Infrastructure to Support Floating Offshore Wind West Coast USA

Case Studies. NEXEDGE Digital Communications System for the National Stadium in Poland

The Olympic Games: Ancient and Modern

A detailed list of events for Shooting is presented in Table a Daily Schedule.

A complete list of events for Weightlifting is provided in Table a Daily Schedule.

REVISED SILT CURTAIN DEPLOYMENT PLAN

Use case Behind the scenes Holland Heineken House during the Olympic Winter Games PyeongChang 2018

Planning of Major Recreational Boating Facilities at Shell Cove Boat Harbour

Terwillegar Drive Expressway Draft Concept Plan

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

BUILDING PROJECTS. respond online... search our information archive at

CALIFORNIA Golden Bears

1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787)

SPORT PARIS 2024 KEY INFO IN POINTS

London Media fact pack. - Games by numbers - Key moments forward look - Myth-buster

Gas Transportation Planning System in the Department of Economy of Gazprom

THE 2012 LONDON GAMES

HARBOR INFRASTRUCTURE INVENTORIES Port Sanilac Harbor, Michigan

THE TARRAGONA TRADE FAIR AND CONFERENCE CENTRE, THE VENUE FOR THE SEMINAR OF THE HEADS OF MISSION AND THE GENERAL ASSEMBLY OF THE ICMG

Faster, higher, stronger greener

Main Building and raft building viewed from the south side of the Oklahoma River. The white water Main Building anchors the development.

POOLS HOT TUBS SWIMSPAS SPA EXPERIENCE WATER FEATURES Viaduct Rd. Stamford, CT (855)

STEPHEN F. AUSTIN STATE UNIVERSITY WOMEN S SOCCER CAPITAL IMPROVEMENT PLAN -SPRING 2013-

Easington Sports and Social Club, Addison Road, Banbury, OXON OX169DH

Redondo Beach Boat Launch Ramp Facility

Introduction. The Back Story. Participating Countries. Sports. The Brand and Mascot

Lighting to rely on for safety and speed. Our stories. See how lighting created the perfect environment to help athletes perform at their peak.

season ticket holder s guide to UEFA EUROPA ROUND OF 32 HOME MATCH

Photo by Robert Stiles

INTERNATIONAL SKATING UNION

ARENA SYSTEMS TO SUIT YOUR SPORT

Elite Canada in Men s & Women s Artistic Gymnastics

BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI. Capt. MVR MURTHY ABSTRACT

Welcome! Sherbrooke Neighbourhood Renewal Open House. Sherbrooke Open House February 3, Capital Construction

section 4 Existing Conditions, Issues, and Options

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

Superyacht Seattle. Moorage Options

Port of Zeebrugge: Upgrading the Brittannia Dock

2018 ICF CANOE SLALOM WORLD CHAMPIONSHIPS. Rio de Janeiro - Brazil

The Failure of the Kamaishi Tsunami Protection Breakwater

New Orleans Municipal Yacht Harbor

Success Factors for Olympic Games in Hamburg as Beacon Project of European Urban Development

UCI PARA-CYCLING ROAD WORLD CHAMPIONSHIPS INFORMATION FOR ORGANISERS

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Lithuanian Roads. LITHUANIA in Europe. Territory km 2 Population LITHUANIAN ROAD ADMINISTRATION

Pierce O Callaghan (IRL) European Games Senior Consultant Director of Sport, Baku 2015 European Games Member of IAAF & EA Competition Commissions

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

PART III SECTION 5C OLYMPIC GAMES STATEMENT OF BADMINTON S REQUIREMENT

SGDC Logo+ Title. A Leaf of Grass on the Golf Course is no less than the journey work of the stars...

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Transcription:

On the occasion of the Athens 2004 Olympic Games event presented herebelow are certain structures for which ATHENA S.A. is very proud for the timely completion and quality achieved. ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olympic Stadium, the Palais de Sports, the roof cover of Olympic Velodrome and Agora, the International Broadcasting Complex (IBC), the Olympic Main Press Centre (MPC), the Olympic Sailing Centre of Ag. Kosmas, the Journalist Accommodation Village Maroussi 2004, the Zea Marina, the Rion Antirion bridge, as well as the world renowned Olympic Stadium Roof Cover designed by the famous Spanish Architect Calatrava. 1

2

3

Palaisde Sports, Athens Sports Center Client: General Secretariat of Sports 15,000 seat Stadium, complete with installations & facilities for large domestic and international athletic & social events, 120 m roof span, 32 pylons, 17m to 32m high, 600 ton/each on a 42.000 m2 area. 4

Palaisde Sports, Athens Sports Center 5

Aesthetic Unification of the Olympic Athletic Centre of Athens : Special Constructions 6

Aesthetic Unification of the Olympic Athletic Centre of Athens : Special Constructions Client: General Secretariat of Sports Consists of the special constructions of Olympic Stadium (2 nd Construction Period), Olympic Velodrome and the Agora. 7

Olympic Stadium (1 st Construction Period 1980 1982) 1982) Client: General Secretariat of Sports 75,000 seat Olympic Stadium, with in situ fabrication, casting and installation of 2,4 m high, 600 ton twin pylons, specially designed by Athena S.A. to reduce construction time. Twin level stands, 34 twin pylons, 45,000 m3 concrete, 52,000 m3 prefabricated concrete elements. Complete services and utilities of all the athletic & supporting facilities & installations, including landscaping. 8

Olympic Stadium (2 nd Construction ti Period d2002 2004) 2004) Client: General Secretariat of Sports Upgrade of Stadium using innovative and creative ways, including the new roof structure designed by the Spanish Architect Santiago Calatrava. 9

Olympic Stadium (2 nd Construction ti Period d2002 2004) 2004) 10

Olympic Stadium (2 nd Construction ti Period d2002 2004) 2004) 11

Olympic Stadium (2 nd Construction ti Period d2002 2004) 2004) 12

Olympic Velodrome Client: General Secretariat of Sports The Olympic Velodrome, at the Athens Olympic Sports Complex (OAKA), is the venue where the Track Cycling discipline took place. It hosted 5,250 spectators, who had the opportunity to view the fast paced sport in the modern Velodrome venue. The field of play is a wooden track made by afzelia hard wood of 250 m. length and 720 m. width. The banking at the two bends is 42 and at the two straights is 12. Part of it included its roof, designed by the famous Spanish architect Santiago Calatrava. 13

Olympic Velodrome 14

Agora 15

Agora 16

International Broadcasting Center Client: General Secretariat of Sports Construction ti of the 115,000 m2 broadcasting facilities, two underground garages of 38,500 m2 each, adjoining 38,500 m2 of broadcasting studios, all required facilities dedicated to the radio and television coverage of the Athens 2004 Olympic Games. 17

International Broadcasting Center 18

Olympic Main Press Center Client: General Secretariat of Sports The firm implemented the design and construction of the Olympic Main Press Center. Works include the construction of two steel buildings, of seven and eight stories respectively, along with all the electromechanical installations, to serve the press media during the Athens 2004 Olympic Games. 19

Olympic Main Press Center 20

Olympic Sailing Centre Ag. Kosmas 21

Olympic Sailing Centre Ag. Kosmas Client: Hellenic Ministry of Public Works Construction of an outer 1 km breakwater, protected with rock armor and acropods. The inner harbor includes basin dredging, construction of quay wall of 1.13 km at 4m depth, buildings of 25,000 m2, and landscaping and surrounding works. 22

Journalist Accommodation Village Maroussi 2004 Client: Lamda Olympia Village S.A. Construction of nine 4 storey residential buildings in 108 apartments with basements totaling 27,800 m2 to accommodate the visiting journalists attending the Athens 2004 Olympic Games, building maintenance and phase adaptation required for final after Olympic residential use. 23

Zea Marina Client: Marina Zeas S.A. Reconstruction and repairs to existing piers and quays, sea bottom dredging, repairs on breakwater, buildings for new installations and landscaping works. 24

Rio Antirio Bridge Construction Client: Hellenic Ministry of Public Works A BOT project, 7 year design / construction contract, 35 year concession for the construction of 2.29 km bridge which forms an integral part of the Trans European Network. The works comprise two access bridges of 378 m & 252 m respectively, and 5 cable stayed bridge spans of 2.24 km of total length. In addition, four concrete pylons are placed at 45 m & 62 m sea depth to support the main bridge. 25

Rio Antirio Bridge Construction 26