This report includes:

Similar documents
Reliability Engineering. Module 3. Proactive Techniques - Definitions

TAMPERS WARNING NOTICE. Reliable s REL-TMP Series makes quick work of setting poles, asphalt patch and general construction backfill compacting.

Carter Option X Valve connector assembly. Maintenance manual

(DD/MMM/YYYY): 10/01/2013 IP

BUTTERFLY VALVES Series 800

Installation & Operation Manual Proven Quality since 1892

35 TON HYDRAULIC PUNCH WARNING

4 IN. BALL LAUNCHER Engine Mounted / PTO Driven

HIGH RATE BASKET STRAINER

LECTURE 3 MAINTENANCE DECISION MAKING STRATEGIES (RELIABILITY CENTERED MAINTENANCE)

TOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING

MUELLER. Xp, & Lineseal 350 Butterfly Valves

MECHANICAL EQUIPMENTS: COMPRESSORS, PUMPS, SEALS, SPEED DRIVES, CONTROL VALVES & ACTUATORS & SAFETY RELIEF VALVES

OPERATORS GUIDE REL-SP SERIES NOTICE WARNING HYDRAULIC SUBMERSIBLE PUMP

PDY TON HYDRAULIC CRIMPING TOOL WARNING

RESULTS SUMMARY. APU risk reduction post STS-9 (re-design) Orbiter flight software using OI-7

MECHANIC QUALIFICATION

HYDRAULIC INTENSIFIER Max. Pressure: See Intensifier Data Plate Weight: 16 Lbs. (7.26 kg)

API Piping Plan 62: A Reliable Quench System

DEVELOPING YOUR PREVENTIVE MAINTENANCE PROGRAM

Installation Instructions

N2 Blanketing Valve DST100 / DST200 TYPE INSTRUCTION MANUAL CONTENTS K.S.P.C. General Description Operation. Installation Maintenance

Operation Manual Guillotine Cutter RC-5

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Installation Instructions

WARNING. RELIABLE EQUIPMENT & SERVICE CO., INC. 301 Ivyland Road Warminster, PA USA Phone: Fax:

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

Installation Instructions

Goulds 3296 EZMAG. Chemical Process Pump


Operating Procedures for GripTight 15.5 SDR & IPS Test Plugs

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

Manual Actuated Boiler Blowdown Valves

Binks SG-2 Plus TM Rotary 2 QT. PRESSURE CUP

Operating Instructions Model and Hydrostatic Test Pump

Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

Using Reliability Centred Maintenance (RCM) to determine which automated monitoring systems to install to new and existing equipment

PROCEDURE. April 20, TOP dated 11/1/88

REL-46 WARNING NOTICE 15 TON SINGLE ACTING REMOTE HYDRAULIC CRIMPING HEAD. Compatible with RELIABLE R15 and P Style dies. REL-46 Manual

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

The Criticality of Cooling

Ins$tu$onalize Reliability Improvement

Installation Instructions, Pressure Regulator Series

Pressure Relief Valve Instruction Manual

Dean Pump Self-Priming Chemical Process Pumps

Instructions for Installation, Operating and Maintenance

INSTALLATION & MAINTENANCE INSTRUCTION

REL-510H WARNING NOTICE 12 TON SINGLE ACTING REMOTE HYDRAULIC CRIMPING HEAD

Operating instructions Way valve DR4

MUELLER. Mega-Lite Drilling Machine. Reliable Connections. table of contents PAGE. Equipment 2. Operating Instructions 3-4. Parts Information 5

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

641/01 AVK SWING CHECK VALVE OPERATION & MAINTENANCE MANUAL. AVK UK Limited OM270710

KECKLEY INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS TYPE NO. 7 FLOAT VALVE

INSTALLATION, OPERATION & MAINTENANCE MANUAL

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

CRP INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SAMPLING VALVES

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

TECH TIPS: ROPE DEFECTS

Mooney * Noise Controller Installation, Operation, and Maintenance Manual

Instructions. Control Solution ICF 20-4, ICF 25-4, ICF ICF 40-4, ICF 20-6, ICF 25-6, ICF 32-6, ICF 40-6, Direction and position.

KECKLEY. Installation, Operation, and Maintenance Manual. Style KGV - Knife Gate Valve

UNDERSTANDING MECHANICAL SEALS

Hydraulic Punch Drivers

BS Series Basket Strainer

UTEX INDUSTRIES, INC.

Hydro Plant Risk Assessment Guide

MDEP Common Position No AP

Identification and Screening of Scenarios for LOPA. Ken First Dow Chemical Company Midland, MI

HPB25 Hydraulic Paving Breaker

TactAir PCP Fill Kit/Adapter. Operation Manual

SERVICE INSTRUCTIONS P-A OR P-B ELECTRONIC PRESSURE COMPENSATOR, SERIES F1U CONTROLS

5/2014 Supersedes None SPLIT-COUPLED INLINE PUMP WITH INTEGRATED VARIABLE FREQUENCY DRIVE REPLACEMENT PARTS GUIDE TYPE VLSE

Parts: Included in the parts box: Inner Rear Tire Tray. Inner Front Tire Tray. Trail Doc Clamp. Pivot Assembly. Trail Doc Post.

APCO ASU-SCAV & ASU-CAV SINGLE BODY COMBINATION AIR VALVES

A hose layline contains important information for specifying the replacement assembly: manufacturer, hose trade name, working pressure and hose ID.

SERVICE INSTRUCTIONS PVWJ A-FRAME PUMPS -011/-014/-022 FOR TYPE P-C AND P-K SOFT START PRESSURE COMPENSATING CONTROLS

Booster Pump PB4-60 Replacement Kits

SERVICE INSTRUCTIONS PVWJ A-FRAME PUMPS -011/-014/-022 FOR TYPE P-1NN AND P-LNN PRESSURE COMPENSATING CONTROLS

INSTALLATION GUIDELINES

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Structural Design and Analysis of the New Mobile Refuge Chamber

Choosing the Right Pump for Your Project

WKM Model 320F Floating Ball Valve

TITAN FLOW CONTROL, INC.

MU043D: Mechanical Seals

4400 TwinHybrid Gas Seal

Valve Station ICF 15, 20 and 25

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

Gas Compressor Operation and Control

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart

REV0709. Parts List. Hydraulic Cylinder Model MODEL C SINGLE-ACTING, SPRING RETURN HYDRAULIC CYLINDER. Max. Capacity: 55.2 Tons at 10,000 PSI

MU102: Mechanical Seals Applications for Rotating Machinery

PV4 and PV6 Piston Valves

Health and Safety Executive. Key aspects of HS(G) 253. Andrew Hall HID CI 1G. HM Specialist Inspector (Mechanical)

Installation Operation Maintenance

Engineering Data Sheet

Pressure Dump Valve Service Kit for Series 2300 Units

Roller Chain and Sprocket Troubleshooting Guide

Transcription:

REPORT SUMMARY Page 1 of 15 In addition to this summary, this report includes the following forms: Report Summary al Failure Analysis Failure Categorization (One per ) Maintenance Task Selection (One per Cause) Tasks RCM++ Report Sample This report was generated with ReliaSoft RCM++ by HBM Prenscia software in Microsoft Word. Similar reports can also be generated in Microsoft Excel. You can easily replace the RCM++ logo graphic with your own company logo. Within Word and Excel, reports can be edited/annotated, if necessary, and generated in PDF and/or HTML format for easy distribution. This report includes: The functional failure analysis spreadsheet report. The full details of the failure effect categorization () values identified during the analysis. The full maintenance task selection details for each failure mode identified during the analysis. A summary of the maintenance tasks created during the analysis. The analysis shown in the report is based on the SAE JA1012 A Guide to the Reliability-Centered (RCM) Standard guidelines.

al Failure Analysis Pump_Centrifugal_Motor Drive Page 2 of 15 # Failure # al Failure # Cause # 1 Move a given fluid while maintaining an acceptable leak rate at the Shaft 1 al Failure: External leak rate at the Shaft is above the acceptable rate : Packing worn 2 al Failure: Leak rate at the Shaft is below the acceptable rate : Packing mis-adjusted (too tight) 1 Loss of fluid to the ground / sewer Packing Gland too tight or loss of lubrication Incorrect installation Wear Out - Normal wear 1 Packing prematurely worn Packing bolts over tightened 3 al Failure: Catastrophic failure of the Shaft Seal : Seal/Packing blowout 1 Process impact and Loss of fluid to the ground / sewer Induced - Gland Follower corrosion / failure Induced - Gland Follower stress / failure Impeller and shaft sub-assembly 1 Induce fluid movement at xx gallons per minute and xx lbs force with yy head pressure.... 1 Low output volume less than xx gpm 1 Loss of production. Vane wear due to fluid dynamics Broken / damaged impeller vane due to age, fatigue, debris in fluid

FAILURE EFT CATEGORIZATION Page 3 of 15 al Failure 1 - al Failure: External leak rate at the Shaft is above the acceptable rate : Packing worn 1 - Loss of fluid to the ground / sewer Failure Categorization Answers and Explanations 1 - (A) Will the loss of function caused by this failure mode on its own become evident to the operating crew under normal circumstances? 1 Yes Yes No 2 - (B and C) Is there an intolerable risk that the effects of this failure mode could injure or kill someone OR Is there an intolerable risk that the effects of this failure mode could 3 - (E and F) Is there an intolerable risk that the effects of the multiple failure could injure or kill someone OR Is there an intolerable risk that the effects of the multiple failure could 2 No Yes No Yes No 3 Category Remarks - 2 - Will affect the production line and may affect output. - 1 - Evident Safety and - 2 - - 3 - Hidden Safety and - 4 - Hidden Economic

FAILURE EFT CATEGORIZATION Page 4 of 15 al Failure 2 - al Failure: Leak rate at the Shaft is below the acceptable rate : Packing mis-adjusted (too tight) 1 - Packing prematurely worn Failure Categorization Answers and Explanations 1 - (A) Will the loss of function caused by this failure mode on its own become evident to the operating crew under normal circumstances? 1 No Yes No 2 - (B and C) Is there an intolerable risk that the effects of this failure mode could injure or kill someone OR Is there an intolerable risk that the effects of this failure mode could 3 - (E and F) Is there an intolerable risk that the effects of the multiple failure could injure or kill someone OR Is there an intolerable risk that the effects of the multiple failure could 2 Yes No Yes No 3 No Category Remarks - 4 - Hidden Economic - 1 - Evident Safety and - 2 - - 3 - Hidden Safety and - 4 - Hidden Economic

FAILURE EFT CATEGORIZATION Page 5 of 15 al Failure 3 - al Failure: Catastrophic failure of the Shaft Seal : Seal/Packing blowout 1 - Process impact and Loss of fluid to the ground / sewer Failure Categorization Answers and Explanations 1 - (A) Will the loss of function caused by this failure mode on its own become evident to the operating crew under normal circumstances? 1 Yes Yes No 2 - (B and C) Is there an intolerable risk that the effects of this failure mode could injure or kill someone OR Is there an intolerable risk that the effects of this failure mode could 3 - (E and F) Is there an intolerable risk that the effects of the multiple failure could injure or kill someone OR Is there an intolerable risk that the effects of the multiple failure could 2 No Yes No Yes No 3 Category Remarks - 2 - - 1 - Evident Safety and - 2 - - 3 - Hidden Safety and - 4 - Hidden Economic

FAILURE EFT CATEGORIZATION Page 6 of 15 1.1 - Impeller and shaft sub-assembly 1 - Induce fluid movement at xx gallons per minute and xx lbs force with yy head pressure.... al Failure 1 - Low output volume less than xx gpm 1 - Loss of production. Failure Categorization Answers and Explanations 1 - (A) Will the loss of function caused by this failure mode on its own become evident to the operating crew under normal circumstances? 1 No Yes No 2 - (B and C) Is there an intolerable risk that the effects of this failure mode could injure or kill someone OR Is there an intolerable risk that the effects of this failure mode could 3 - (E and F) Is there an intolerable risk that the effects of the multiple failure could injure or kill someone OR Is there an intolerable risk that the effects of the multiple failure could 2 Yes No Yes No 3 No Category Remarks - 4 - Hidden Economic - 1 - Evident Safety and - 2 - - 3 - Hidden Safety and - 4 - Hidden Economic

Page 7 of 15 al Failure 1 - al Failure: External leak rate at the Shaft is above the acceptable rate : Packing worn 1 - Loss of fluid to the ground / sewer -2-1 - Packing Gland too tight or loss of lubrication 4: Is a scheduled on-condition task technically feasible and worth doing? X 5A: Is a scheduled restoration task technically feasible and worth doing? X 5B: Is a scheduled discard task technically feasible and worth doing? X # Task Status Task Type Assigned interval Crew Task Duration 1 Training; Maintenance - Proper Packing Tra 1 Year PM Crew $180/Hr 40.0000 Hour 2 IN - Inspection for leaks OC 6 Week Pump Crew - Inspection 0.2500 Hour

Page 8 of 15 al Failure 1 - al Failure: External leak rate at the Shaft is above the acceptable rate : Packing worn 1 - Loss of fluid to the ground / sewer -2-2 - Incorrect installation 4: Is a scheduled on-condition task technically feasible and worth doing? X 5A: Is a scheduled restoration task technically feasible and worth doing? X 5B: Is a scheduled discard task technically feasible and worth doing? X # Task Status Task Type Assigned interval Crew Task Duration 1 Training; Maintenance - Proper Packing Tra 1 Year PM Crew $180/Hr 40.0000 Hour

Page 9 of 15 al Failure 1 - al Failure: External leak rate at the Shaft is above the acceptable rate : Packing worn 1 - Loss of fluid to the ground / sewer -2-3 - Wear Out - Normal wear 4: Is a scheduled on-condition task technically feasible and worth doing? X 5A: Is a scheduled restoration task technically feasible and worth doing? X 5B: Is a scheduled discard task technically feasible and worth doing? X # Task Status Task Type Assigned interval Crew Task Duration 1 PM - RR - planned pump RR 7116 Hour PM Crew $180/Hr 1.5000 Hour

Page 10 of 15 al Failure 2 - al Failure: Leak rate at the Shaft is below the acceptable rate : Packing mis-adjusted (too tight) 1 - Packing prematurely worn -4- Hidden Economic 1 - Packing bolts over tightened 9: Is a scheduled on-condition task technically feasible and worth doing? X 10A: Is a scheduled restoration task technically feasible and worth doing? X 10B: Is a scheduled discard task technically feasible and worth doing? X 11: Is a scheduled failure-finding task technically feasible and worth doing? X # Task Status Task Type Assigned interval Crew Task Duration 1 Training; Maintenance - Proper Packing Tra 1 Year PM Crew $180/Hr 40.0000 Hour

Page 11 of 15 al Failure 3 - al Failure: Catastrophic failure of the Shaft Seal : Seal/Packing blowout 1 - Process impact and Loss of fluid to the ground / sewer -2-1 - Induced - Gland Follower corrosion / failure 4: Is a scheduled on-condition task technically feasible and worth doing? X 5A: Is a scheduled restoration task technically feasible and worth doing? X 5B: Is a scheduled discard task technically feasible and worth doing? X # Task Status Task Type Assigned interval Crew Task Duration 1 OC- Inspection for corrosion OC 12650 Hour Pump Crew - Inspection 0.5000 Hour

Page 12 of 15 al Failure 3 - al Failure: Catastrophic failure of the Shaft Seal : Seal/Packing blowout 1 - Process impact and Loss of fluid to the ground / sewer -2-2 - Induced - Gland Follower stress / failure 4: Is a scheduled on-condition task technically feasible and worth doing? X 5A: Is a scheduled restoration task technically feasible and worth doing? X 5B: Is a scheduled discard task technically feasible and worth doing? X # Task Status Task Type Assigned interval Crew Task Duration 1 PM - Gland Follower RR 330000 Hour PM Crew $180/Hr 3.0000 Hour

Page 13 of 15 1.1 - Impeller and shaft sub-assembly 1 - Induce fluid movement at xx gallons per minute and xx lbs force with yy head pressure.... al Failure 1 - Low output volume less than xx gpm 1 - Loss of production. -4- Hidden Economic 1 - Vane wear due to fluid dynamics 9: Is a scheduled on-condition task technically feasible and worth doing? X 10A: Is a scheduled restoration task technically feasible and worth doing? X 10B: Is a scheduled discard task technically feasible and worth doing? X 11: Is a scheduled failure-finding task technically feasible and worth doing? X # Task Status Task Type Assigned interval Crew Task Duration 1 PdM - Track Flow Rate OLM 1 Month Pump Crew - Inspection 0.2500 Hour

Page 14 of 15 1.1 - Impeller and shaft sub-assembly 1 - Induce fluid movement at xx gallons per minute and xx lbs force with yy head pressure.... al Failure 1 - Low output volume less than xx gpm 1 - Loss of production. -4- Hidden Economic 2 - Broken / damaged impeller vane due to age, fatigue, debris in fluid 9: Is a scheduled on-condition task technically feasible and worth doing? X 10A: Is a scheduled restoration task technically feasible and worth doing? X 10B: Is a scheduled discard task technically feasible and worth doing? X 11: Is a scheduled failure-finding task technically feasible and worth doing? X # Task Status Task Type Assigned interval Crew Task Duration 1 Inspect for broken / damaged impeller vane IN 3 Month PM Crew $180/Hr 0.5000 Hour

TASKS Page 15 of 15 Task ID Task Task Type Status Reference Document Proposed Interval Assigned interval Condition Comments Zone Access Last Updated By Last Updated 32 Training; Tra 1 Year 4/9/2013 10:53 AM Pump_Centrifugal_Motor Packing bolts Maintenance - Proper Packing Drive over tightened 35 PM - Gland Follower RR 330000 Hour 4/9/2013 10:53 AM Pump_Centrifugal_Motor Induced - Drive Gland Follower stress / failure 34 OC- Inspection for corrosion 32 Training; Maintenance - Proper Packing 36 IN - Inspection for leaks 32 Training; Maintenance - Proper Packing 37 PM - RR - planned pump OC 12650 Hour 4/9/2013 10:53 AM Pump_Centrifugal_Motor Induced - Drive Gland Follower corrosion / failure Tra 1 Year 4/9/2013 10:53 AM Pump_Centrifugal_Motor Packing Gland Drive too tight or loss of lubrication OC 6 Week 4/9/2013 10:53 AM Pump_Centrifugal_Motor Packing Gland Drive too tight or loss of lubrication Tra 1 Year 4/9/2013 10:53 AM Pump_Centrifugal_Motor Incorrect Drive installation RR 7116 Hour HBM Prenscia 11/10/2017 3:31 PM Pump_Centrifugal_Motor Wear Out - Drive Normal wear 31 Inspect for broken / damaged impeller vane 33 PdM - Track Flow Rate IN 3 Month 4/19/2013 11:53 AM Impeller and shaft subassembly OLM 1 Month 4/9/2013 10:53 AM Impeller and shaft subassembly Broken / damaged impeller vane due to age, fatigue, debris in fluid Vane wear due to fluid dynamics