Chinook s Edge School Division Capital Plan

Similar documents
Overview Introduc on Project Process Key Issue:

Dra Design and Land Use Op ons Booklet

Executive Summary #GPC IV-18 Safe Routes to School Plans 2011

2014 REPORT CARD 2014 STRATEGIC ACTION PLAN REPORT CARD

2014 STATE OF THE SYSTEM REPORT

INFRASTRUCTURE & AMENITIES. Bicycle Parking. Chapter 3 Design Elements INFRASTRUCTURE & AMENITIES BICYCLE PARKING

Public Engagement Session

More than a Membership...

Chicago Cubs Senior Coordinator Events and Space Optimization

The City of Garden City, Kansas invites your interest in the position of Golf Professional at Buffalo Dunes Golf Course

STMA Baseball Newsletter

THE I-81 CHALLENGE THE I-81 CHALLENGE. Highlights from Technical Memo #1: Physical Conditions Analysis. Physical Conditions Analysis Highlights

Creating Healthy Communities Coalition

Intersec ons. Alignment. Chapter 3 Design Elements. Standards AASHTO & PennDOT: As close to 90 as possible, but a minimum of 60.

Shared Use Facili es. Mul -Use Trails. Chapter 3 Design Elements BICYCLE/PEDESTRIAN MULTI USE TRAILS

ROANOKE PARKS AND RECREATION

Cutting Edge of Fitness - Indian Ridge!

Air Eliminators and Combination Air Eliminators Strainers

Fly Ball Communica on Dominant Player Chart

Delhi. Safe Routes to School Action Plan 0

Springhead Park Golf Club Newsle er

SILENT CAPTURED SPRING SELECTION GUIDE

KASB 2017 Superintendents Survey Annual Report Ted Carter, Research Specialist December, 2017

SILENT CAPTURED SPRING SELECTION GUIDE

Welcome. Harley O. Weatherly PRESENTED BY CRAIN AUTOMOTIVE MAY

Steering group. Research group

Mayor Kenneth Malone Vice-Mayor Robert Hile Commissioner Jon Good. Commissioner Karl Littman Commissioner Rob Sisson Commissioner Ina Taulbee

WALKER RESEARCH GROUP Research Consulting Data Management

How To Troubleshoot Low Pressure On Well Systems Page 1

Coaches Corner. Falcon Fastbreak

Public Facilities & Services

VIRGINIA BEACH CITY PUBLIC SCHOOLS

STAFF REPORT. MEETING DATE: November 20, 2014 AGENDA ITEM: 10

BACKGROUND INFORMATION DOCUMENT

Napa County Fairgrounds Opportunity Analysis. RCH Group A. Plescia & Co. Fair & Exposition Planning Consultants. September 8, 2016.

Bonita Beach Road Visioning Study

Superintendent s Proposed Capital Improvements Program. Fiscal Years (Revised January 14, 2019)

ASSESSMENT METHODOLOGY

Trinity County Fire Safe Council 20 Years of Advocacy

Na onal Study of Hispanics on Environmental Issues. Bendixen & Amandi Interna onal. Date: June 14, Introduc on

JUNE 1 JULY 1, 2017 IMPORTANT DATES. Purdue Extension DeKalb County June, 2017

A Few Swim Lesson Reminders

THE TRANSIENT GAS LIFT SIMULATOR IN PROSPER (IPM10.0)

World Championship Overview University of Texas - Austin, TX June 22 July 13, 2012

Tuesday, July 4, 2017

Which Type of Age 5-12 Playground Style?

Private-Public Partnership. Presentation to Metropolitan Council October 2, 2017

Westbury Bap st Church Recrea on Ministry

Rail Sta ons. Transporta on Centers. Chapter 3 Design Elements PUBLIC TRANSPORTATION

BRITISH CANOEING OLYMPIC & PARALYMPIC PROGRAMMES World Class Programme Qualifica on Policy (1 January Dec 2019)

Low Carbon Cities. Principles and Practices for China s Next Generation of Growth

2016 MASTER CATALOGUE

msc SPRING 2014 TERM TIME COURSES THE SPORTS ACADEMY FOR CHILDREN AGED 3-15 YEARS Mallinson Sports Centre Bishopswood Road Highgate London N6 4NY

WEDNESDAY 7 MARCH am PANCAKE MORNING & ASSEMBLY

RE: National Bike to Work Day in Bloomington and Monroe County, May 18, 2012

Morgan Hill Safe Routes to School Action Plan

SUMMER 2016 YOUTH BASKETBALL

WPGA JUNIOR FOUNDATION, INC SCHOLARSHIP APPLICATION

7th Edi on, Update 6 November 2017 Roadway Conges on & System Reliability

2017 Bond Election Facts. Election Date November 7, 2017

March Rebel Na onals Sailing Instruc ons July 14-16, 2017 Clark Lake Yacht Club Clark Lake, MI Sailing Instruc ons

International Non-Tumbling Divisions Score Sheets Levels 2-6

1.0 Introduction Existing Conditions Description Site Visits Data Sources Pedestrian Pathfinding...

Roadway Design Standards

ALL Birthday Party Reserva ons must be made AT LEAST 14 days in advance of the event

Pedestrian Facili es. Sidewalks. Chapter 3 Design Elements BICYCLE/PEDESTRIAN

Bond Steering Committee Recommendation. Monday, July 17, 2017

Transportation Assessment

Existing Pedestrian Conditions. PSAC February 8, 2011

Greenway Golf Lease Amendment. City Council February 20, 2018

Declining Deer Hunters

Anime Los Angeles Masquerade Official Rules

SPONSORSHIP OPPORTUNITIES AND AN OVERVIEW OF THE MARKETING WORLD OF SHOW JUMPING

Club Kawana. Catch-Up June 2016

Texas Sec on Society for Rangeland Management. Outstanding Rangeland Management Award

Student Reassignment. Presentation to the Board of Education August 11, 2018

Issue #

Clark County Extension Office 111 E. Court St. Suite 10 Kahoka, MO Swine/Sheep /Goat Weigh-in.

Menu: Chicken Fajita, Steamed Carrots, Lettuce, Fresh Oranges, Pears; Hamburger on Bun

Horse Keeping in Low Rainfall Areas

San Diego Ice Arena Presents 2015 Fun in The Sun Hockey Tournament

Automated External Defibrillator Program

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

2012 Mixed League. Section Championships. Players s Packet. September 14-16, 16, 2012 Albuquerque, NM

Department C Dairy Ca le Kim Walker Estep, Superintendent, Lewisburg, West Virginia Sandy Davis, Assistant Superintendent, Mar nsburg, West Virginia

Crossroads Clover. September News and Announcements. Tuesday, September 8th at 6:00 p.m. at the 4-H Activity Center.

WATERSPORTS ACTIVITIES

CATCH IT IF YOU CAN! Equipment An open playing area, beanbags (one per pupil)

NORTH SHORE WINTER CLUB Kids Camp Guide Summer 2017

tattersall park RBY EBSCO RETAIL PROPERTIES

Rural West Waterloo School Closure Review ARC Meeting #1 October 21, 2013

NZRB Submission - Review of the New Zealand Racing Industry

GREENWAYS AND TRAILS PLAN UPDATE APRIL 22, 2016 DRAFT

Anne Arundel County Public Schools * Planning Office * 2017 Educational Facilities Master Plan * Page 235

Indian Ridge Gets Better Every Year!

CEPS Dean s Office shows panther pride for EIU Homecoming 2014

The Osceola School District was awarded a competitive grant of $2.2 million from the Florida DOE to improve STEM teaching and learning in 2014.

NORTHWEST GEORGIA REGIONAL FAIR LIVESTOCK RULES AND GUIDELINES

Nuneaton Volleyball Club

ALPINE LEVEL I SKIING

Transcription:

Chinook s Edge Division Capital Plan 2018-2021 Ranking Annually applied for Project ID Project Key Drivers In 1999, Alberta Infrastructure audited all schools for condition and awarded them a score to assist them in prioritizing condition. 11454 Olds Koinonia Lease Support # 1 1219 Carstairs Addi on # 2 12720 Jessie Duncan Addi on # 3 13151 École HJ Cody Moderniza on # 4 13506 ÉcoleOlds Moderniza on # 5 13700 Penhold # 6 13505 Carstairs New Lease Support Demographics Economic Growth Demographics Economic Growth Demographics, Program Changes, Economic Growth Demographics Economic Growth Health and Safety Program Growth Demographics Economic Growth Olds Koinonia (private) has come under Chinook s Edge as an alternate program and we are applying for lease support. 3873 @ $70.60 m² x 1.6% $4,374.94 = $277,808.74 250 student classroom addi on and expansion of exis ng gym for Carstairs With the growth in Penhold, Jessie Duncan would require addi onal capacity of four classrooms based on enrolment pressures. With the growth in Sylvan Lake, pressure is expected at the high school level. École HJ Cody wasn t originally designed as a high school (K-12) and moderniza on is required to support Inspiring Educa on. The moderniza on would accommodate projected growth increases and required program offerings. This school is now fed by three elementary schools into one middle school into the high school. An expansion / moderniza on of École Olds of five or six classrooms, one classroom per grade, based on u liza on. A 500 capacity replacement school is requested. New 500 capacity grades Pre K - 4 school. The original request was for a 350 capacity grade 3-5 school. Addi onal background informa on on each of the requests and long term planning for those communi es is presented below.

Town of Carstairs Carstairs Expansion and New s The Town of Carstairs has experienced major growth over the past several years. The community has consistently seen over 50 residen al building permits each year for the past 5 years. The popula on of Carstairs has increased by 18.4% to 4077 based on 2016 census data as compared to 2011 census data. Chinook s Edge Division has two schools in the Town of Carstairs. Carstairs with a K-2 school configura on and Hugh Sutherland with a 3-12 grade configura on. Carstairs was opened as a K-4 school. However, to increase u liza on rates in the Town of Carstairs and to accommodate the space needed for the grade levels at Carstairs, the school was reconfigured to a K-2 school. In September of 2013 the grade 4 students were relocated to Hugh Sutherland and in September of 2015 the grade 3 students were relocated to Hugh Sutherland. Chinook s Edge Division has used IMR funds to repurpose space at Hugh Sutherland to accommodate the increasing student enrollment at Hugh Sutherland. Chinook s Edge Division believes we have reached the point where addi onal space is needed immediately to address the lack of instruc onal space and the high u liza on rates in the Town of Carstairs. 10 year enrollment numbers are provided below along with u liza on rates for each school over the 10 year period. Grade 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 23-24 24-25 K 101 90 97 95 96 97 98 99 100 101 102 1 91 96 95 88 96 98 99 100 101 102 103 2 81 86 105 98 90 98 100 101 102 103 104 3 68 77 87 109 100 92 100 102 103 104 105 4 70 63 81 91 111 102 94 102 104 105 106 5 50 69 69 88 93 113 104 96 104 106 107 6 69 49 73 73 89 95 115 106 98 106 108 7 65 69 47 76 76 91 97 117 108 100 108 8 57 66 70 51 76 78 93 99 119 110 102 9 52 55 66 68 51 78 80 95 101 121 112 10 45 52 58 67 69 53 80 82 97 103 123 11 51 48 49 61 71 71 55 82 84 99 105 12 47 47 51 53 62 73 73 57 84 86 101 K-12 Total 847 867 948 1018 1080 1139 1188 1238 1305 1346 1386 U liza on Rate 83% 85% 92% 96% 102% 107% 111% 116% 122% 125% 129% Immediate Need Phase 1 CESD is in immediate need of addi onal classroom space for Carstairs. An addi on of 10 classrooms spaces and an expansion / addi on to the Carstairs gym are needed to address the immediate u liza on concerns in the Town of Carstairs. CESD recognizes the importance of this immediate need and have place it as the number one priority on the 2018/2021 Capital Plan. Based on current conserva ve growth plans illustrated in the chart above this would lower the u liza on rate in

the Town of Carstairs to 105% in 2024/2025. This would allow the grade configura ons to change to K-4 at Carstairs and 5-12 at Hugh Sutherland. Phase 2 As the chart indicates above, the projected conserva ve growth rate will s ll see the uni za on rate in Carstairs at 107% by 2024/2025. A new 500 capacity school will be needed in Carstairs prior to the 2024/2025 school year. The long term plan is to have this as a second K-4 school. However, if the numbers are needed Carstairs and the new school could become K-6 schools to reduce the u liza on pressures at Hugh Sutherland. CESD currently has this listed as #6 on the 2018/2021 Capital Plan. Phase 3 With the con nued growth in the Town of Carstairs an addi onal 500 capacity new high school will be needed. The current Hugh Sutherland would transi on to a 5-8 middle school and the new high school would have a grade 9-12 configura on. Based on current projec ons, CESD believes the need for the new high school will be on or before the 2027/2028 school year. This is not yet listed on the CESD Capital Plan but will become an increasing priority over the next several years.

Town of Penhold Jessie Duncan Expansion and Replacement The Town of Penhold has experienced major growth over the past several years. The community has consistently seen a high number of residen al building permits each year for the past 5 years. The popula on of Penhold has increased by 32% to 3277 based on 2016 census data as compared to 2011 census data. Chinook s Edge Division currently has three schools within the Town of Penhold: Jessie Duncan (K-2), Penhold (3-5) and Penhold Crossing Secondary (6-12). Over the past couple of years Chinook s Edge Division has reconfigured the grade levels in the schools to fully u lize the capacity of the schools within the Town of Penhold. This has seen grade configura ons changes at Jessie Duncan from a K-3 to a K-1, Penhold from a 4-9 to a 2-5 and Penhold Crossing to a 6-12. These changes were made to avoid the need to apply for relocatable classrooms and addi onal capital projects within the Town of Penhold. However, with the con nued growth in the Town of Penhold, CESD was awarded 4 relocatables for the 2017-2018 school year which now has the school grade configura ons as Jessie Duncan K-2, Penhold 3-5 and Penhold Crossing 6-12. The current u liza on rates are as follows: Jessie Duncan 95%, Penhold 94% and Penhold Crossing 97%. The total u liza on rate for the three schools in the community is 95%. However, because of the low number of grade 12 students leaving the school and the much higher numbers at the lower grades replacing these gradua ng students the community u liza on rate will be at 104% at the start of the 18-19 school year. Immediate Need Phase 1 CESD appreciates that it would make the most sense to Alberta Infrastructure that we apply for relocatable classrooms for Penhold Crossing given that its u liza on rate is the highest at 97%. Jessie Duncan was constructed with core infrastructure like a gymnasium to accommodate expansion. Adding relocatable classrooms to Jessie Duncan would allow Chinook s Edge Division to avoid making a capital request for a larger gymnasium and library at Penhold or Penhold Crossing. In addi on, Penhold Crossing was constructed with relocatable classrooms on it and there is no space on the site for addi onal relocatable classrooms because of the connected to the Penhold Mul plex. Space concerns within the Town of Penhold would be addressed by the addi on of these 4 relocatable classrooms. Adding the relocatable classrooms to Jessie Duncan would allow Chinook s Edge Division to reconfigure the schools back to K-3, 4-6 and 7-12 at the three schools which was the configura on prior to the need to make changes due to enrollment. CESD s goal is to add one grade level back to Jessie Duncan which would require 4 addi onal classroom spaces.

Enrollment numbers and projec ons along with charts illustra ng how the addi on of one grade level impact the u liza on rates at all the schools within the Town of Penhold have been included. This would leave us space at Penhold Crossing that will see a steady increase in u liza on rates for the next several years as the larger numbers enter the school and the lower numbers graduate. Enrollment Data Enrollment Data Based on Current Community Capacity Based on Adjusted Enrollments Year Pre- K K 1 2 3 4 5 6 7 8 9 10 11 12 Total U liz a on % 15-16 20 64 71 56 68 68 58 40 69 48 50 34 35 23 704 101% 16-17 21 83 65 73 59 74 70 62 41 70 52 43 27 32 772 109% 17-18 19 78 74 65 68 58 71 68 57 41 53 46 36 29 763 95% 18-19 20 80 80 76 67 70 60 73 70 59 43 55 48 38 839 104% 19-20 20 81 82 82 76 69 72 62 75 72 61 45 57 50 904 112% Capacity Data If 4 Relocatable Classrooms were approved and Jessie Duncan became K-3, Penhold became 4-6 and Penhold Crossing became 7-12 - Based on adjusted enrollment numbers. Jessie 15-16 16-17 17-18 18-19 19-20 Duncan Pre K 20 21 19 20 20 K 64 83 78 80 81 Grade 1 71 65 74 80 82 Grade 2 65 76 82 Grade 3 67 78 Ui lize % 90% 103% 95% 92% 98%

Penhold 15-16 16-17 17-18 18-19 19-20 Grade 2 56 73 Grade 3 68 59 68 Grade 4 68 74 58 70 69 Grade 5 58 70 71 60 72 Grade 6 73 62 U lize % 121% 134% 93.5% 96% 96% Penhold 15-16 16-17 17-18 18-19 19-20 Crossing Grade 6 40 62 68 Grade 7 69 41 57 70 75 Grade 8 48 70 41 59 72 Grade 9 50 52 53 43 61 Grade 10 34 43 46 55 45 Grade 11 35 27 36 48 57 Grade 12 23 32 29 38 50 U lize % 99% 108% 97% 92% 105% With the addi on of the requested 4 relocatable classrooms CESD projects that the Penhold Community would be at 100% u liza on rate in 2019-2020 as a result of 38 grade 12 students leaving the school and 75 grade 7 students entering the school. Phase 2 As the popula on in the Town of Penhold con nues to grow and the u liza on con nues to increase. There will be a need for addi onal classroom space. There is no room for adding addi onal classroom spaces to the exis ng three schools. Penhold is in need of a complete renova on. Penhold was constructed in 1961 and only has the capacity for 230 students. CESD has listed a 500 student capacity replacement school for Penhold as # 5 on the 2018-2021 Capital Plan. Once the replacement school is constructed the exis ng Penhold would be demolished or sold. The replacement school would increase the capacity of the schools by 270 students which would address the u liza on needs and the need to renovate the exis ng Penhold building.

Town Of Sylvan Lake École H.J. Cody Modernization The Town of Sylvan Lake is one of the fasted growing towns in Alberta. Over the past number of years grade configura ons changes, relocatable addi ons to C.P. Blakely and a new K-6 school have been needed to address the growth in Sylvan Lake. École H.J. Cody is the only high school in the Town of Sylvan Lake and is in need of a complete moderniza on. Minor renova ons occurred in 1997 but the original building was constructed in 1957. CESD recognizes the need for a complete moderniza on of École H.J. Cody school to bring the only high school in a town of over 15,000 people to a level appropriate for high school educa on in Alberta today. The enrollment projec ons below are based on the current enrollment of the feeder schools for École H.J. Cody. Year 9 10 11 12 Total U liza on Rate 15-16 170 174 170 172 686 87% 16-17 155 160 162 174 651 83% 17-18 171 145 152 168 636 82% 18-19 176 172 148 159 655 84% 19-20 203 179 175 151 708 90% 20-21 131 206 182 178 697 89% 21-22 164 134 209 185 692 88% 22-23 185 167 137 212 701 89% 23-24 176 188 170 140 674 86% 24-25 168 179 191 173 711 90%

Through the lens of student learning, why is modernization needed at École H.J. Cody? The lack of facility at the school, in specific areas, is impeding the educa onal quality of our students. With having nearly 100 students in a Phys Ed block, there cannot be adequate space to design learning and lessons. Further, when the climate of Sylvan Lake has undesirable condi ons outside for several months of the year, there is not a reasonable ability to have physical educa on. outside for many months. Moderniza on would allow for the crea ng and building of space that reflects the needs of our students. A further gym, workout area, classroom and break out space, all would contribute to a be er environment. There are few spaces for students to work independently or in small groups, and with our high school redesign plans to increase student responsibility and ownership, it is impossible to do so without spaces that support this philosophy... for example, it would make sense to re-structure the spaces in the learning commons. Larger class sizes could be be er accommodated with larger func onal classroom spaces. More whiteboard space for student to be able to brainstorm in groups and be er present findings Alterna ve ligh ng through light fixtures with mul ple se ngs or more adjustable screens/window coverings - can adjust brightness for students when needed - o en extremes of too much blinding ar ficial light or darkness. Added flexible learning areas. Many classrooms and hallways were originally designed for elementary sizes and are too crowded for 30 plus to learn. Addi onal space must be considered for our growing popula on. In mes of extreme heat or cold, the building does not compensate to the appropriate temperature. As a result, learning is affected. There are no breakout spaces or variety of spaces to enhance student learning.

Through the lens of the physical building, why is modernization needed at École H.J. Cody? This building has been built in phases over 60 years. These phases have not been considerate of the expanding popula on of Sylvan Lake or the unique func onality of a high school popula on. Without an adequate shop, lab space, gym space, wellness areas or classroom space to accommodate the growing class sizes we are facing each day. In order to remain compe ve and a posi ve part of the ever expanding community, we need to move towards learning areas that allow for further crea vity. We need to create spaces that are sufficient to serve the needs of a growing community in the decades to come. Thin wooden walls between rooms makes sound travel very easily. Larger hallways for be er movement throughout school, especially if crowded during an emergency. Lack of sufficient washroom facili es for staff. Temperature control in gymnasium is non-existent, as well as in some classrooms. Electrical system is insufficient for demand of projectors opera ng, lab equipment in use, chromebook carts charging, etc. (breakers have blown). Storage spaces in the school (drama, janitors, stairwell, phys.ed., shop, etc.) are make-shi and poten ally unsanitary and dysfunc onal. Classrooms do not match students' size (because this school began as a k-12 school, many elementary size rooms are now being used for high school students). Not sufficient science lab space given number of students that access these courses. There are blocks in the day where 100 students are in the gym for phys. ed class. That number of students is far too many for the current space. Bigger Lockers so that kids can easily keep all of their books and learning items at school. The school has one hallway, there are no alterna ve routes to get to the other side of the school. For example, to get to the drama room from home ec, the only choice is up the senior hallway, through the common area and up the junior hallway. The band room is very small. The ceiling is below a standard considera on. The space cannot hold the whole band comfortably. Storage is very limited and underdeveloped. A larger cafeteria style ea ng area is needed.

Town of Olds École Olds Modernization and Expansion The Town of Olds con nues to see steady popula on growth. The popula on has increased by 11.5% to 9184 since the 2011 Census. With the con nued growth, CESD is in need of addi onal classroom space in École Olds. École Olds was constructed in 1960 and is also in need of a complete moderniza on. CESD has listed the renova on and addi on of 6 classroom spaces of #4 on the 2018/2021 Capital Plan. The current and project enrollment and u liza on rates are provided as support for this request. Year Pre- K K 1 2 3 4 Total U liza on Rate 15-16 35 80 101 128 106 92 542 101% 16-17 33 112 91 106 127 103 572 104% 17-18 30 104 116 89 107 126 572 104% 18-19 29 107 108 115 90 111 559 102% 19-20 30 108 109 110 117 92 556 103% 20-21 31 109 110 111 112 119 592 108% 21-22 32 110 111 112 113 114 592 108% 22-23 33 111 112 113 114 115 598 109% 23-24 34 112 113 114 115 116 604 109% 24-25 35 113 114 115 116 117 610 110%