CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP December 29, 2014 Volume 2, Issue 102 DOUG s CORNER COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE Doug s Corner.1 3 Traffic/Active Work 4-6 Construction Notices.7-13 Project App.. 14
CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP DOUG s CORNER MY WEEK IN PICTURES
CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP DOUG s CORNER MY WEEK IN PICTURES Doug St. Stevens
CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP WORK ACTIVITIES AND TRAFFIC CONTROL WEEK OF 12.29.2014 Dunlap / 19th Intersection Track, irrigation, structural soil, set steel columns Two (2) lanes both east and westbound, left turn lanes will be maintained Dunlap to Butler Form/pour devil strip, sig-comm One (1) lane both north and southbound will be maintained NORTH DUNLAP ORANGEWOOD Butler to Northern Traffic signals, road widening, sidewalk, curb, gutter, driveways, wall One (1) lane both north and southbound will be maintained Turns at the signalized intersections will be maintained Northern / 19th Intersection Clear for the Holidays Northern to Orangewood Curb, gutter, sidewalk, driveways, traffic signals, water removals One (1) lane both north and south bound will be maintained Turn lanes at the signalized intersections will be maintained Augusta, Frier, Morten closures thru January 31, 2015 Orangewood closed December 18, 2014 thru January 4, 2015 Orangewood closed January 9. 2015 thru 11, 2015 Orangewood daytime closures January 12, 2015 thru January 16, 2015
WORK ACTIVITIES AND TRAFFIC CONTROL Orangewood to Glendale Curb, gutter, sidewalk, driveways, traffic signals One (1) lane both north and south bound will be maintained Turn lanes at the signalized intersections will be maintained State and Myrtle closures thru January 31, 2015 Glendale / 19th Intersection Clear for the Holidays Beginning January 5, 2015 1 lane east and westbound left turns maintained Glendale to Maryland Form/pour track, sig-comm, place station footings One (1) lane both north and south bound will be maintained Turn lanes at the signalized intersections will be maintained Maryland closed January 5, 2014 thru January 14, 2014 Maryland to Bethany Home Road Curb, gutter, sidewalk, driveways, roadway, traffic signals, ductbank, OCS One (1) lane both north and south bound will be maintained Turn lanes at the signalized intersections will be maintained Rose to Rovey alternating closures thru January 31, 2015 Bethany Home / 19th Intersection CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP WEEK OF 12.29.2014 SOUTH ORANGEWOOD -MONTEBELLO Clear for the Holidays Bethany Home Road to Montebello Curb, gutter, sidewalk, driveways and ductbank installation One (1) lane both north and south bound will be maintained Turn lanes at signalized intersections will be maintained Mall entrance closure thru December 31, 2014
CONSTRUCTION NOTICE SSWJV-Superintendent 24-Hour Project Hotline 602-254-RAIL (7245) Augusta, Frier, and Morten Roadway Widening Paving Through January 31, 2015 Pipe removal, roadway widening, and paving on the East side of 19th Ave Intermittent road closure will take place for Augusta, Frier and Morten Frier will remain open if Augusta or Morten are closed Augusta and Morten can close at the same time. Use 18th Ave as alternate access to Augusta, Frier, and Morten
19th AVE CONSTRUCTION NOTICE SSWJV Superintendent Orangewood East Side Closure Roadway Widening December 18, 2014 to January 4, 2015 Roadway widening. No east bound traffic from 19th Ave. Morten Ave detour State and Myrtle will alternate closures during this time frame and serve as the south detour W MORTEN AVE 24-Hour Project Hotline 602-254-RAIL (7245) W ORANGEWOOD AVE Work W STATE AVE W MYRTLE AVE
19th AVE CONSTRUCTION NOTICE SSWJV Superintendent Orangewood East Side Closure Roadway Widening January 9, 2015 7pm to January 11, 2015 10pm Roadway widening. No east bound traffic from 19th Ave. Morten Ave detour State and Myrtle will alternate closures during this time frame and serve as the south detour W MORTEN AVE 24-Hour Project Hotline 602-254-RAIL (7245) W ORANGEWOOD AVE Work W STATE AVE W MYRTLE AVE
19th AVE CONSTRUCTION NOTICE SSWJV Superintendent Orangewood East Side Closure Roadway Paving January 12, 2015 to January 16, 2015 Asphalt Paving Orangewood will close 9 AM to 2 PM & 4 PM to 7 PM Monday, Tuesday, Thursday, and Friday Orangewood will close 9 AM to 1 PM & 4 PM to 7 PM on Wednesday No east bound traffic from 19th Ave Morten Ave Detour State Ave Detour W MORTEN AVE 24-Hour Project Hotline 602-254-RAIL (7245) W ORANGEWOOD AVE Work W STATE AVE W MYRTLE AVE
CONSTRUCTION NOTICE SSWJV Superintendent State Ave. & Myrtle Ave. Civil-Demo-Replace October 13, 2014 to January 31, 2015 Demo and replace curb, gutter, sidewalk, roadway Intermittent road closure will take place between State Ave. & Myrtle Ave. State and Myrtle will not close simultaneously. Use Orangewood or Myrtle to 17th Ave. as alternate access to State. Use Orangewood or State to 17th Ave. as alternate access to State and Northview
19th Ave N 17th Ave CONSTRUCTION NOTICE SSWJV Superintendent Maryland & 19th Ave - Track Guideway Track Guideway Construction January 5, 2015 to January 14, 2015 Constructing track and pouring concrete. No left turns from 19th Ave (Northbound) No left turns from 19th Ave (Southbound) Right only from Maryland (Eastbound) Right only from Maryland (Westbound) Tuckey Lane Maryland Ave 24-Hour Project Hotline 602-254-RAIL (7245) Work Zone Rose Lane
19th 19th Ave 19th 19th Ave N 18th Dr N 18th Dr CONSTRUCTION NOTICE SSWJV Superintendent 24-Hour Project Hotline 602-254-RAIL (7245) Rose Rd Closure and Rovey Rd Closure Roadway Paving November 12, 2014 to January 31, 2015 Roadway widening, and paving. Intermittent road closure between Rose, and Rovey. Rose and Rovey will not close simultaneously. restrictions may change, due to weather or unforeseen conditions. Rose Rose Work Rovey N 18th Ave Bethany Home Road Rovey N 18th Ave Bethany Home Road
CONSTRUCTION NOTICE Christown Spectrum Mall Entrance Waterline Roadway Widening October 8, 2014 to December 31, 2014 Extended SSWJV Superintendent Waterline tie-ins, roadway widening, and paving Christown Spectrum Mall Entrance will be closed Use Bethany Home Rd. or Montebello to access mall 24-Hour Project Hotline 602-254-RAIL (7245)
CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP PROJECT APP City of Phoenix