-2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo Area Commute Solutions Pgm - 5103.0 0915-12-546 AACOG Alamo Area Commute Solutions Pgm - 5301.0 0915-00-195 AACOG Alamo Area Commute Solutions Pgm - 5302.0 0915-00-196 AACOG Alamo Area Commute Solutions Pgm - 5303.0 0915-00-197 AACOG Alazan Creek Hike and Bike Lombrano Street Laredo Street $6,000,000 Trail Extend the Alazan Creek section of the Greenway Trail System 4977.0 0915-12-595 SARA Blanco Road West Oak Estates Borgfeld Rd $14,661,235 Expand from a 2 to 4 lane divided roadway with raised median, bike lanes, sidewalks, 5317.0 0915-12-585 curbs and drainage Broadway Burr Road IH 35 $14,000,000 Roadway rehabilitation and complete streets improvements 5313.0 0016-08-034 Bulverde Road Marshall Road Wilderness Oak $8,097,480 Reconstruct and widen to 4 lanes with shoulder, pedestrian ramps, curb, bridge 3988.0 0915-12-509 construction and drainage improvements ARMA Converse Greenway Park Converse Park North FM 78 $1,382,725 Construct multi use path 4972.0 0915-12-594 Converse Crestway Road Kitty Hawk Rd FM 1976 $7,791,571 Widen to provide operational improvements including bike lanes; construct 6 ft. sidewalk 5318.0 0915-12-584 E. Aviation Blvd. Houston Drive Aztec Way $8,632,561 Widen to provide operational improvements, bike lanes, sidewalks and drainage 5325.0 0915-12-578 UC FM 1103 IH 35 Guadalupe County Line $1,500,000 Expand to 4 lanes with medians, turn lanes, sidewalk and bike lanes 4970.0 1268-01-013 1
-2022 Transportation Improvement Program - DRAFT Project Number FM 1103 Comal C/L Rodeo Way $22,500,000 Expand to 4 lanes with medians, turn lanes, sidewalk and bike lanes 4971.0 1268-02-027 FM 1516 FM 78 IH 10 $23,500,000 Expand 2 to 4 lane divided with bike lanes and sidewalks 5379.0 1477-01-043 FM 1518 FM 78 IH 10 $19,500,000 Intersection and operational improvements 5309.0 0465-02-027 FM 1560 Galm/Schaenfield FM 471 $12,100,000 Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and 5311.0 2230-01-020 sidewalks FM 2252 at Evans Road. $4,200,000 Construct intersection operational improvements, including widening of Cibolo Creek 5324.0 1433-01-029 bridge FM 2252 Bexar/Comal County Line FM 3009 $19,000,000 Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes 9115.0 1433-02-044 and sidewalk FM 2252 Evans Road Comal/Bexar County Line $6,000,000 Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes 5329.0 1433-01-028 and sidewalk FM 471 Old FM 471 Medina County Line $21,000,000 Expand 2 to 4 lane divided with bike lanes and sidewalks 5377.0 0849-01-055 FM 725 Comal/Guadalupe County Line Zipp Rd $10,600,000 Expand from 2 to 4 lanes with median, sidewalks and bike lanes 5308.0 0215-09-029 Galm Road Ph III Culebra Road Government Canyon State Park $7,323,351 Expand from 2 to 4 lanes, including drainage improvements, bike and pedestrian 5105.0 0915-12-544 amenities Harry Wurzbach at Austin Highway. $17,177,000 Construct entrance and exit ramps between Harry Wurzbach and Austin Highway 5110.0 0915-12-550 CoSA Huebner Creek Hike/Bike Trail SH 16 (Bandera Road) bridge Crystal Hills Park $933,000 Construction of a hike and bike trail along Huebner Creek 3992.0 0915-12-514 LV IH 10 Loop 1604 Guadalupe/Bexar County Line $171,000,000 Expand from 4 lane to 6 lane expressway 5396.0 0025-02-215 2/2018 IH 35 Guadalupe River Hays/Comal County Line $75,000,000 Operational improvements including ramp revisions and intersection improvements - 5375.0 0016-04-112 convert frontage road to one way 2/2018 2
-2022 Transportation Improvement Program - DRAFT Project Number IH 35 Hays County Line 0.5 Mi S. of Hays County Line $1,200,000 Revise ramps and convert frontage roads from two way to one way operation 5339.0 0016-04-113 IH 37 LP 13 IH 410 $2,900,000 Construction of a partial frontage road, ramps, and intersection improvements 4969.0 0073-08-183 IH 410 at US 281/San Pedro. $20,000,000 Interchange improvements 5376.0 0521-04-285 Judson Road Independence IH 35 $1,000,000 Construct sidewalk along west side of Judson Road 5428.0 0915-12-603 CoSA Loop 1604 IH 35 S 0.7 Mi North of FM 2536 $14,000,000 Expand from 2 lanes to 4 lane divided 9110.1 2020-02-031 Loop 1604 0.7 Mi North of FM 2536 US 90 W $26,000,000 Expand from 2 lanes to 4 lane divided 9110.2 2452-01-066 Loop 1604 US 281 Redland Road $47,808,839 Expand to 8 lane expressway - construct 4 new managed lanes 3786.0 2452-03-113 Loop 1604 SH 16 US 281 $507,705,768 Expand to 8 lane expressway - construct 4 new managed lanes; including managed lane 3913.0 2452-02-083 direct connectors at IH 10 ARMA Loop 1604 at FM 2696 - Blanco Road. $30,000,000 Intersection operational improvements 5332.0 2452-02-117 Loop 410 at IH 10 E. $100,000,000 Construct direct connectors: Phase 1 - Priority Connectors 5371.0 0521-06-138 Loop 410 SH 151 US 90 $10,000,000 Expand from 6 lane to 8 lane expressway 5374.0 0521-04-279 Loop 410 Ingram Rd SH 151 $50,000,000 Expand from 8 to 10 lane expressway 5372.0 0521-04-204 Loop 410 at SH 151 Interchange $40,000,000 Reconstruct interchange - Phase 2 5373.0 0521-04-275 New Braunfels Pedestrian On San Antonio Street, Walnut Avenue, and McQueeney Road and Seele Elementary $1,516,711 Connectivity Construct sidewalks, ramps & other pedestrian related infrastructure 4973.0 0915-17-066 New Braunfels 8/2017 3
-2022 Transportation Improvement Program - DRAFT Project Number NW Military Highway Lp 1604 Huebner $6,500,000 Construct 2 way left turn lane, bike lanes and sidewalks 5323.0 0658-01-045 NW Military Highway Lp 1604 Huebner $6,500,000 Construct 2 way left turn lane, bike lanes and sidewalks 5323.0 0658-01-045 NW Military Highway 1.0 Miles North of Lp 1604 Lp 1604 $7,500,000 Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and 5310.0 0658-01-044 sidewalks NW Military Highway 1.0 Miles North of Lp 1604 Lp 1604 $7,500,000 Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and 5310.0 0658-01-044 sidewalks Presa Street West Boyer Street SE Military Drive (Loop 13) $10,000,000 Bike and Pedestrian Corridor enhancements to create Complete Streets 5434.0 0915-12-604 CoSA Quintana Road Harmon Avenue McKenna Avenue $7,800,000 Rehab and realign roadway, intersection and flood control improvements 4005.0 0915-12-520 Port SA Rocket Lane E. Norris Drive Loop 1604 $5,430,481 Expand from 2 to 4 lane roadway with continuous center turn lane, sidewalks and bike 5319.0 0915-12-582 lanes Converse Rudeloff Road SH 46 Huber Road $6,316,658 Expand from 2 to 4 lanes with center turn lane, bicycle and pedestian facilities 5322.0 0915-46-045 Seguin Schertz Pedestrian and Bike Woodland Oaks Drive, Savannah Drive, a Live Oak Road and off road trail $1,158,266 Improvements Construct sidewalks, bike lanes and off-road trail 4975.0 0915-17-065 Schertz SH 211 (TX Research Pkwy) Bexar C/L, 2.9 MI N of FM 1957, N Bexar C/L, 4.5 MI N of FM 1957 $4,100,000 3155.0 3544-06-001 SH 211 (TX Research Pkwy) Bexar CL, 2.0 MI S of FM 471, N FM 471 (Culebra Rd) $4,400,000 3152.0 3544-03-002 SH 211 (TX Research Pkwy) Medina Co. Line, 4.5 Mi N of FM 1957, N Medina Co. Line, 2.0 Mi S of FM 471 $2,600,000 3154.0 3544-05-001 SH 211 (TX Research Pkwy) FM 1957 (Potranco Rd), N 2.9 Mi Medina County Line $7,000,000 3153.0 3544-04-002 SH 46 US 281 Bentwood Dr $14,000,000 9114.2 0215-01-044 4
-2022 Transportation Improvement Program - DRAFT Project Number SH 46 US 281 Bentwood Dr $14,000,000 9114.2 0215-01-044 SH 46 Farhills Dr US 281 $26,000,000 9114.1 0215-07-027 SH 46 Farhills Dr US 281 $26,000,000 9114.1 0215-07-027 Talley Road Wiseman Blvd. Tamaron Pass $10,931,172 Widen to provide operational improvements including a continuous left turn lane; 5304.0 0915-12-581 construct 10 ft. shared use path VA In City of San Antonio. $2,000,000 Construct citywide pedestrian and bicycle improvements 5305.0 0915-12-579 CoSA VA Various locations on the state roadway s. $4,000,000 Construct curb ramps, sidewalks and other pedestrian related infrastructure 5316.1 0915-12-574 2/2017 VA Various locations on the state roadway s. $4,000,000 Construct curb ramps, sidewalks and other pedestrian related infrastructure 5316.2 0915-12-575 VA Various locations on the state roadway s. $8,000,000 Construct curb ramps, sidewalks and other pedestrian related infrastructure 5316.3 0915-12-576 VA In City of San Antonio. $1,500,000 Intelligent Transportation System - Enhancements 5306.0 0915-12-580 CoSA VA In City of San Antonio. $1,500,000 Intelligent Transportation Systems - Enhancements - Upgrade Traffic Signal Controllers 5425.0 0915-12-601 CoSA VA Austin-San Antonio Regional Corridor Project $4,000,000 Studies, plans and projects associated with multimodal transportation solutions 3768.1 0915-00-172 AAMPO VA Austin-San Antonio Regional Corridor Project $16,000,000 Studies, plans and projects associated with multimodal transportation solutions 3768.2 0915-00-173 AAMPO 2/2017 VA In San Antonio at TransGuide Center $4,000,000 Upgrade TransGuide Facility 5426.0 0915-12-602 Walnut Springs Trail Extension Project 4976.0 8/2017 Vaughan Bridge Max Starcke Park East $2,801,246 Extend Walnut Springs multi use trail, including retaining walls, hand and guard rails and 0915-46-046 below grade crossing Seguin 5
-2022 Transportation Improvement Program - DRAFT Project Number Watson Road FM 2790 (Somerset Road) 0.8 Miles East to Watson Road $4,886,116 Expand from 2 to 4 lanes, including drainage improvements, bike and pedestrian 5106.0 0915-12-562 amenities Wurzbach Parkway Lockhill Selma Road FM 1535 $30,000,000 Intersection and operational improvements 5315.3 1502-03-003 Wurzbach Parkway Lockhill Selma Road FM 1535 $30,000,000 Intersection and operational improvements 5315.3 7774-01-001 Zarzamora Street Fredericksburg Road Loop 13 $5,000,000 Construct sidewalks, remove unused utility poles, and implement pedestian detection ITS 4974.0 0915-12-596 CoSA 8/2017 6