FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Similar documents
"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

"Mobility 2040" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015

Alamo RMA VRF Project Update June 2016

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018

P E D E S T R I A N M O B I L I T Y A D V I S O R Y C O M M I T T E E

APPENDIX D COST SUMMARY TABLES

Bluffdale/ UDOT South High-T Intersection Project Type Operations

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

Short and Long Term Needs

Greater Harmony Hills Neighborhood Association Walkable Community Workshop Report June 30, 2012

2012 PRIORITY TRANSPORTATION PROJECTS

Ave C to Ave J Repair and installation of sidewalks along eastern side of Main St

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. February 11, :00 AM to Noon

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,

DEKALB COUNTY. 22. Priority Projects for DeKalb County

Hennepin County Transportation Department

Factors that Affect Fixed-Route Ridership Frequency Connections and accessibility Travel time Travel cost Service area coverage Reliability

WALKABLE + BIKEABLE REGIONS TxAPA Conference Alex Carroll Andrew Pompei, AICP Kelly Porter, AICP

Welcome to the Quebec Alternatives Analysis Public Meeting

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

I-10 AT SCENIC LOOP RD. Open House

Chapter 5 Future Transportation

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

FDOT Treasure Coast Traffic Report

Bicycling in the Alamo Region

DRAFT INVESTMENT CORRIDORS

Welcome to the Sellwood Bridge Project Open House!

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Enhancing Downtown

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FDOT Treasure Coast Traffic Report

Applications for Funding

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

FDOT Treasure Coast Traffic Impact Report

Safe Streets. City of Lake Forest Park. March 21, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Chapter 4: Funding and Implementation

Prepared for. Volume 2: Developing Vision Prepared by. Phase 2 Stakeholder Involvement Summary. with RJ RIVERA Associates, Inc.

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Application of a Complete Street

Culpeper District. Albemarle County Monthly Report October, 2011

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

I-40 Maumelle New Interchange and new 2-lane facility 48 $10.4 $29.8 Highest. Full ITS Implementation 55 $63.3 $144.5 Highest

STATION #3 INITIAL ALTERNATIVES

Welcome to Laredo Metropolitan Transportation Plan First Public Meeting. February 27 th, :30 PM to 7:30 PM. We value your opinion!

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

2040 Long Range Plan Projects Draft October 2011

Appendix B. Summary of Public Comments Tri County Health Department Comments

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE

Basalt Creek Transportation Refinement Plan Recommendations

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

TRANSPORTATION COMMISSION Agenda Staff Report

Preliminary Engineering Study

CITY OF PORTSMOUTH PLANNING DEPARTMENT

FM 471. Open House Public Meeting FM 471

MPO PROPOSITION 1/CATEGORY 2 PROJECTS (METROPOLITAN CORRIDORS)

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Project Fact Sheet. August 1,

2017 General Obligation Bond

FDOT Treasure Coast Traffic Impact Report

Proposed Action, Purpose and Need Technical Memorandum

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

TRANSPORTATION TRAINING TOPICS. April 6, 2010

A: PLANNED P ROJECTS PROJECTS

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

FDOT Treasure Coast Traffic Impact Report

C C C

Performance-Based Planning for Safety in a Vision Zero World. AMPO September 27, 2018

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

Building Great Neighbourhoods QUEEN ALEXANDRA

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Fairfax County Parkway Widening Fairfax County

Elon Bicycle, Pedestrian and Lighting Plan. Pedestrian Rail Crossings Study

CITY OF LANCASTER PROPOSED NEW PROJECTS

2019 Federal Transportation Improvement Program

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

San Jose Transportation Policy

CHAPTER 1 INTRODUCTION

Transcription:

-2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo Area Commute Solutions Pgm - 5103.0 0915-12-546 AACOG Alamo Area Commute Solutions Pgm - 5301.0 0915-00-195 AACOG Alamo Area Commute Solutions Pgm - 5302.0 0915-00-196 AACOG Alamo Area Commute Solutions Pgm - 5303.0 0915-00-197 AACOG Alazan Creek Hike and Bike Lombrano Street Laredo Street $6,000,000 Trail Extend the Alazan Creek section of the Greenway Trail System 4977.0 0915-12-595 SARA Blanco Road West Oak Estates Borgfeld Rd $14,661,235 Expand from a 2 to 4 lane divided roadway with raised median, bike lanes, sidewalks, 5317.0 0915-12-585 curbs and drainage Broadway Burr Road IH 35 $14,000,000 Roadway rehabilitation and complete streets improvements 5313.0 0016-08-034 Bulverde Road Marshall Road Wilderness Oak $8,097,480 Reconstruct and widen to 4 lanes with shoulder, pedestrian ramps, curb, bridge 3988.0 0915-12-509 construction and drainage improvements ARMA Converse Greenway Park Converse Park North FM 78 $1,382,725 Construct multi use path 4972.0 0915-12-594 Converse Crestway Road Kitty Hawk Rd FM 1976 $7,791,571 Widen to provide operational improvements including bike lanes; construct 6 ft. sidewalk 5318.0 0915-12-584 E. Aviation Blvd. Houston Drive Aztec Way $8,632,561 Widen to provide operational improvements, bike lanes, sidewalks and drainage 5325.0 0915-12-578 UC FM 1103 IH 35 Guadalupe County Line $1,500,000 Expand to 4 lanes with medians, turn lanes, sidewalk and bike lanes 4970.0 1268-01-013 1

-2022 Transportation Improvement Program - DRAFT Project Number FM 1103 Comal C/L Rodeo Way $22,500,000 Expand to 4 lanes with medians, turn lanes, sidewalk and bike lanes 4971.0 1268-02-027 FM 1516 FM 78 IH 10 $23,500,000 Expand 2 to 4 lane divided with bike lanes and sidewalks 5379.0 1477-01-043 FM 1518 FM 78 IH 10 $19,500,000 Intersection and operational improvements 5309.0 0465-02-027 FM 1560 Galm/Schaenfield FM 471 $12,100,000 Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and 5311.0 2230-01-020 sidewalks FM 2252 at Evans Road. $4,200,000 Construct intersection operational improvements, including widening of Cibolo Creek 5324.0 1433-01-029 bridge FM 2252 Bexar/Comal County Line FM 3009 $19,000,000 Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes 9115.0 1433-02-044 and sidewalk FM 2252 Evans Road Comal/Bexar County Line $6,000,000 Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes 5329.0 1433-01-028 and sidewalk FM 471 Old FM 471 Medina County Line $21,000,000 Expand 2 to 4 lane divided with bike lanes and sidewalks 5377.0 0849-01-055 FM 725 Comal/Guadalupe County Line Zipp Rd $10,600,000 Expand from 2 to 4 lanes with median, sidewalks and bike lanes 5308.0 0215-09-029 Galm Road Ph III Culebra Road Government Canyon State Park $7,323,351 Expand from 2 to 4 lanes, including drainage improvements, bike and pedestrian 5105.0 0915-12-544 amenities Harry Wurzbach at Austin Highway. $17,177,000 Construct entrance and exit ramps between Harry Wurzbach and Austin Highway 5110.0 0915-12-550 CoSA Huebner Creek Hike/Bike Trail SH 16 (Bandera Road) bridge Crystal Hills Park $933,000 Construction of a hike and bike trail along Huebner Creek 3992.0 0915-12-514 LV IH 10 Loop 1604 Guadalupe/Bexar County Line $171,000,000 Expand from 4 lane to 6 lane expressway 5396.0 0025-02-215 2/2018 IH 35 Guadalupe River Hays/Comal County Line $75,000,000 Operational improvements including ramp revisions and intersection improvements - 5375.0 0016-04-112 convert frontage road to one way 2/2018 2

-2022 Transportation Improvement Program - DRAFT Project Number IH 35 Hays County Line 0.5 Mi S. of Hays County Line $1,200,000 Revise ramps and convert frontage roads from two way to one way operation 5339.0 0016-04-113 IH 37 LP 13 IH 410 $2,900,000 Construction of a partial frontage road, ramps, and intersection improvements 4969.0 0073-08-183 IH 410 at US 281/San Pedro. $20,000,000 Interchange improvements 5376.0 0521-04-285 Judson Road Independence IH 35 $1,000,000 Construct sidewalk along west side of Judson Road 5428.0 0915-12-603 CoSA Loop 1604 IH 35 S 0.7 Mi North of FM 2536 $14,000,000 Expand from 2 lanes to 4 lane divided 9110.1 2020-02-031 Loop 1604 0.7 Mi North of FM 2536 US 90 W $26,000,000 Expand from 2 lanes to 4 lane divided 9110.2 2452-01-066 Loop 1604 US 281 Redland Road $47,808,839 Expand to 8 lane expressway - construct 4 new managed lanes 3786.0 2452-03-113 Loop 1604 SH 16 US 281 $507,705,768 Expand to 8 lane expressway - construct 4 new managed lanes; including managed lane 3913.0 2452-02-083 direct connectors at IH 10 ARMA Loop 1604 at FM 2696 - Blanco Road. $30,000,000 Intersection operational improvements 5332.0 2452-02-117 Loop 410 at IH 10 E. $100,000,000 Construct direct connectors: Phase 1 - Priority Connectors 5371.0 0521-06-138 Loop 410 SH 151 US 90 $10,000,000 Expand from 6 lane to 8 lane expressway 5374.0 0521-04-279 Loop 410 Ingram Rd SH 151 $50,000,000 Expand from 8 to 10 lane expressway 5372.0 0521-04-204 Loop 410 at SH 151 Interchange $40,000,000 Reconstruct interchange - Phase 2 5373.0 0521-04-275 New Braunfels Pedestrian On San Antonio Street, Walnut Avenue, and McQueeney Road and Seele Elementary $1,516,711 Connectivity Construct sidewalks, ramps & other pedestrian related infrastructure 4973.0 0915-17-066 New Braunfels 8/2017 3

-2022 Transportation Improvement Program - DRAFT Project Number NW Military Highway Lp 1604 Huebner $6,500,000 Construct 2 way left turn lane, bike lanes and sidewalks 5323.0 0658-01-045 NW Military Highway Lp 1604 Huebner $6,500,000 Construct 2 way left turn lane, bike lanes and sidewalks 5323.0 0658-01-045 NW Military Highway 1.0 Miles North of Lp 1604 Lp 1604 $7,500,000 Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and 5310.0 0658-01-044 sidewalks NW Military Highway 1.0 Miles North of Lp 1604 Lp 1604 $7,500,000 Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and 5310.0 0658-01-044 sidewalks Presa Street West Boyer Street SE Military Drive (Loop 13) $10,000,000 Bike and Pedestrian Corridor enhancements to create Complete Streets 5434.0 0915-12-604 CoSA Quintana Road Harmon Avenue McKenna Avenue $7,800,000 Rehab and realign roadway, intersection and flood control improvements 4005.0 0915-12-520 Port SA Rocket Lane E. Norris Drive Loop 1604 $5,430,481 Expand from 2 to 4 lane roadway with continuous center turn lane, sidewalks and bike 5319.0 0915-12-582 lanes Converse Rudeloff Road SH 46 Huber Road $6,316,658 Expand from 2 to 4 lanes with center turn lane, bicycle and pedestian facilities 5322.0 0915-46-045 Seguin Schertz Pedestrian and Bike Woodland Oaks Drive, Savannah Drive, a Live Oak Road and off road trail $1,158,266 Improvements Construct sidewalks, bike lanes and off-road trail 4975.0 0915-17-065 Schertz SH 211 (TX Research Pkwy) Bexar C/L, 2.9 MI N of FM 1957, N Bexar C/L, 4.5 MI N of FM 1957 $4,100,000 3155.0 3544-06-001 SH 211 (TX Research Pkwy) Bexar CL, 2.0 MI S of FM 471, N FM 471 (Culebra Rd) $4,400,000 3152.0 3544-03-002 SH 211 (TX Research Pkwy) Medina Co. Line, 4.5 Mi N of FM 1957, N Medina Co. Line, 2.0 Mi S of FM 471 $2,600,000 3154.0 3544-05-001 SH 211 (TX Research Pkwy) FM 1957 (Potranco Rd), N 2.9 Mi Medina County Line $7,000,000 3153.0 3544-04-002 SH 46 US 281 Bentwood Dr $14,000,000 9114.2 0215-01-044 4

-2022 Transportation Improvement Program - DRAFT Project Number SH 46 US 281 Bentwood Dr $14,000,000 9114.2 0215-01-044 SH 46 Farhills Dr US 281 $26,000,000 9114.1 0215-07-027 SH 46 Farhills Dr US 281 $26,000,000 9114.1 0215-07-027 Talley Road Wiseman Blvd. Tamaron Pass $10,931,172 Widen to provide operational improvements including a continuous left turn lane; 5304.0 0915-12-581 construct 10 ft. shared use path VA In City of San Antonio. $2,000,000 Construct citywide pedestrian and bicycle improvements 5305.0 0915-12-579 CoSA VA Various locations on the state roadway s. $4,000,000 Construct curb ramps, sidewalks and other pedestrian related infrastructure 5316.1 0915-12-574 2/2017 VA Various locations on the state roadway s. $4,000,000 Construct curb ramps, sidewalks and other pedestrian related infrastructure 5316.2 0915-12-575 VA Various locations on the state roadway s. $8,000,000 Construct curb ramps, sidewalks and other pedestrian related infrastructure 5316.3 0915-12-576 VA In City of San Antonio. $1,500,000 Intelligent Transportation System - Enhancements 5306.0 0915-12-580 CoSA VA In City of San Antonio. $1,500,000 Intelligent Transportation Systems - Enhancements - Upgrade Traffic Signal Controllers 5425.0 0915-12-601 CoSA VA Austin-San Antonio Regional Corridor Project $4,000,000 Studies, plans and projects associated with multimodal transportation solutions 3768.1 0915-00-172 AAMPO VA Austin-San Antonio Regional Corridor Project $16,000,000 Studies, plans and projects associated with multimodal transportation solutions 3768.2 0915-00-173 AAMPO 2/2017 VA In San Antonio at TransGuide Center $4,000,000 Upgrade TransGuide Facility 5426.0 0915-12-602 Walnut Springs Trail Extension Project 4976.0 8/2017 Vaughan Bridge Max Starcke Park East $2,801,246 Extend Walnut Springs multi use trail, including retaining walls, hand and guard rails and 0915-46-046 below grade crossing Seguin 5

-2022 Transportation Improvement Program - DRAFT Project Number Watson Road FM 2790 (Somerset Road) 0.8 Miles East to Watson Road $4,886,116 Expand from 2 to 4 lanes, including drainage improvements, bike and pedestrian 5106.0 0915-12-562 amenities Wurzbach Parkway Lockhill Selma Road FM 1535 $30,000,000 Intersection and operational improvements 5315.3 1502-03-003 Wurzbach Parkway Lockhill Selma Road FM 1535 $30,000,000 Intersection and operational improvements 5315.3 7774-01-001 Zarzamora Street Fredericksburg Road Loop 13 $5,000,000 Construct sidewalks, remove unused utility poles, and implement pedestian detection ITS 4974.0 0915-12-596 CoSA 8/2017 6