National Transport Awards Cambridge Park & Ride

Similar documents
9. Parking Supporting Statement

Bristol City Council has produced a draft Bristol Transport Strategy document.

Part 3: Active travel and public transport planning in new housing developments

London Cycle Network Annual Report 2000

Final Plan 20 December 2016

Nottingham Cycle City Frequently Asked Questions

Technical note. 1. Introduction

EUROPEAN MOBILITY WEEK September 2015

Report to Cabinet. 18 May 2016

MILTON ROAD LLF PROJECT UPDATE

HISTON ROAD Have your say on better public transport, cycling and walking journeys

Loughborough University Travel Planning

ENFIELD TOWN THE REVISED DESIGN

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

North West Non-Technical Summary of the Transport Assessment September 2011

Greater Cambridge City Deal Executive Board & Joint Assembly

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details

2. Context. Existing framework. The context. The challenge. Transport Strategy

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

City Deal: Call for Evidence

Wayfinding and Walking in London. Lilli Matson Transport for London May 2013

Municipality of Sofia Traffic Master Plan. Intelligent Transport Systems Strategy Andrew Walsh

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

Traditional Public Transport Priority. Priority/Traffic Management? What is Integrated Public Transport Priority/Traffic management? Why? How?

1.0 FOREWORD EXECUTIVE SUMMARY INTRODUCTION CURRENT TRENDS IN TRAVEL FUTURE TRENDS IN TRAVEL...

CAMBRIDGE SOUTH WEST PARK & RIDE

Sandwell General Hospital Travel Plan 2014

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

Konstantin Glukhenkiy Economic Affairs Officer

GETTING WHERE WE WANT TO BE

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

Transportation Master Plan Advisory Task Force

A bicycle map depicts the local bicycle lane network. It also gives recommendations for routes,

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

Launceston's Transport Futures. Greater travel options for the people of Launceston

Capital Beltway HOT Lanes - Frequently Asked Questions

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

4. Guided Bus Explained

Design Workshops Summary of all Feedback January 2017

Initial ideas for bus and cycle links

Park & Ride Implications for TRICS Users. TRICS UGM, June 2009

Active Travel Strategy Dumfries and Galloway

Tackling Peak-time Congestion in Cambridge

Central London Bus Services Review

AGENDA. Stakeholder Workshop

Cambridge Past, Present & Future Wandlebury Ring, Gog Magog Hills Babraham, Cambridge CB22 3AE Phone

Cambridgeshire Local Transport Plan Policies and Strategy

ABERDEEN: CITY OF THE FUTURE

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Thursday 18 th January Cambridgeshire Travel Survey Presentation to the Greater Cambridge Partnership Joint Assembly

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

University of Leeds Travel Plan

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes

Cambridge Access and Capacity Study

LEEDS BECKETT UNIVERSITY. Transport Strategy

UNIT V 1. What are the traffic management measures? [N/D-13] 2. What is Transportation System Management (TSM)? [N/D-14]

WEST YORKSHIRE LTP CYCLE PROSPECTUS

ASIA PACIFIC RAIL 2006

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

York Scarborough Bridge Economic Appraisal Update Technical Note

Sustainable Transport Blueprint for Canterbury. Lynn Sloman

CITY PLANNING ADMINISTRATION. The walkable city. Michael Erman, City of Stockholm Vienna/CORP 2012, 15 May 2012

Green Travel Strategy & Action Plan

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts

MARKHOUSE ROAD IMPROVEMENTS

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

Integrated Corridor Approach to Urban Transport. O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012

BELFAST ON THE MOVE Transport Masterplan for Belfast City Centre

CUERDEN TRANSPORT PROPOSALS

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives

GD 0043/18 ACTIVE TRAVEL STRATEGY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Public Bicycle Sharing Scheme

Devonport City Cycling Network Strategy

Dear City Council Members,

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Auckland Transport Monthly Indicators Report 2018/19

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Potential for a Public Bikes Scheme in Waterford Gerry Murphy

Integrated Urban Mobility

Living Streets response to the Draft London Plan

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

Satisfaction with getting to work 54% 14% 6% 5% Total distance travelled. miles per week

TRANSPORT PUBLIC SAFETY SERVICES THAT SUPPORT COMMUNITIES. Provide access to, from and for emergency services

St Peter s Catholic Primary School ACTIVE TRAVEL POLICY

Cambridge Parking Strategy Review

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

A Strategy for Increasing Walking and Cycling

Green Mobility. Emani Kumar. Coordinator, ICLEI Asia & Executive Director, ICLEI South Asia.

Green Travel Strategy & Action Plan

Public Consultation Centre For. Transportation Master Plan Update. Information Package

Healthy and Environmental Friendly Transport in the City Region

How To Encourage More Efficient Transportation in Brazilian Cities

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

Living Streets Policy

Determining bicycle infrastructure preferences A case study of Dublin

Transcription:

National Transport Awards Cambridge Park & Ride What Cambridgeshire has achieved q An award winning scheme focussed on quality. q Four sites, with a fifth site due to be built later this year. q 950,000 passenger journeys in 2000: up 50% since 1998 q Very high levels of satisfaction recorded through the Citizens Panel q 3,200 parking spaces increasing to 4,200 this autumn q Fully integrated with Cambridge city centre car restraint measures q Modern high quality buses q 78% of users would otherwise have used the car Park & Ride represents probably the greatest transport achievement in Cambridgeshire over the past few years. Starting from a low base, the County Council has set up a comprehensive ring of state of the art Park & Ride sites around Cambridge. This, combined with a Quality Partnership agreement with Stagecoach, has brought about a step change in the quality of alternative, sustainable transport provision. Park & Ride lies at the heart of the Council's transport policies. These aim to develop integrated and sustainable transport. Park and Ride is closely integrated with other initiatives aimed at reducing city centre congestion, as well as bus priority measures, cycleway improvements and pedestrian zones. The success of Park & Ride derives from three key attributes: quality, customer focus and integration with other transport modes. Quality The Council's philosophy for Park & Ride is to ensure a quality experience for all users a prerequisite if car drivers are to be persuaded to use the service. The Cambridge scheme meets this need in all respects: Park & Ride new build and enhancements since 1998

All sites are carefully designed to minimise walking distances to the central facilities and bus stops. Sites are built using high quality materials and high standards of landscaping. Each site has dedicated site attendants who are highly regarded by customers. All sites are equipped with CCTV. Fast, frequent, high quality services operate from all sites, two of which now operate with low floor buses. The sites have won an Institute of Civil Engineers Merit Award for their appearance and the scheme has won a bus industry award. Customer focus Layout of the Madingley Road site Park & Ride in Cambridge is run as a business, focusing at all times on the customer. High levels of quality, convenience and reliability have raised the profile of the service and persuaded car users to switch. This in turn has played a major role in achieving a modal shift away from car use and has led to a demand for more sites, achieving the key aim of making the provision of high quality alternatives to car use popular and easier to implement. Key elements of this customer focus, which are co-ordinated by the Park & Ride manager, include: Provision of a comprehensive range of site facilities including: q Tourist information and general Park & Ride information q Toilets including facilities for the disabled and for babies q Disabled and parent and child parking spaces q Comfortable and attractive waiting areas q A high standard of site maintenance Monitoring of services and a continuous improvement programme, including q Regular customer surveys and market research programmes q A How to complain leaflet that is widely available. q A passenger charter q Extended hours of operation. q Customer care training for bus drivers. Integration Cambridge Park & Ride is fully integrated with other transport initiatives.

The Babraham Road site was opened on "Integration Day" the same date as the second stage of the Cambridge Core Traffic scheme and the introduction of additional bus priorities along the route. The sites can be used by cyclists in addition to car users. Bus priority measures from the outset ensure that the road space created by the Park & Ride is used to the benefit of public transport. Park & Ride has led the way, showing the bus companies that high quality, frequent services can lead to increased bus patronage. On- and off-street parking charges in Cambridge are linked to Park & Ride fares to encourage longer stay customers to use Park & Ride. Surplus revenue from on-street parking charges is used to support site running costs and maintenance. Targets In 1996, the Council set an ambitious target of 1 million P&R users per annum by 2004. This target will now be exceeded in 2001. Resources The capital costs of Park & Ride improvements since 1998 are 4.35 million, with a further 4.5 million identified for a new site at Trumpington. Developers of a major retail scheme in Cambridge will be making significant contributions to this site. Park & Ride bus services in Cambridge have always been operated without public subsidy and this emphasises the business approach we adopt. Target Groups All people who travel to Cambridge are within our target group - shoppers, commuters and visitors. The latest major survey has indicated that Park & Ride is successful in attracting all of these groups with 35% of passengers being commuters, 55% shoppers and 10% visitors.

Partners Park & Ride is the result of a successful public-private partnership involving Cambridgeshire County Council, Cambridge City Council and Stagecoach. Bus services are run on the basis of a Quality Partnership between the County Council and Stagecoach. This makes requirements on both parties to ensure that Park and Ride is continouously improving. It thus provides a springboard for the future to ensure that Park and Ride can increase its share of trips made into Cambridge. Results and Impacts The success of any scheme should be measured by its results. Park & Ride has exceeded our most optimistic expectations. The scheme has experienced over 50% growth since 1998 as the benefits have become more widely appreciated. The opening of the Trumpington Park & Ride later this year is expected to push usage well above 1.2 million per annum. Our success is highlighted by the number of other authorities who have visited our sites to learn from them and emulate our success. The County Council is also leading on benchmarking of sites to compare with other authorities. Numbers of Park and Ride Passengers Passengers 1,000,000 950,000 900,000 850,000 800,000 750,000 700,000 650,000 600,000 05/09/98 05/11/98 05/01/99 05/03/99 05/05/99 05/07/99 05/09/99 05/11/99 05/01/00 05/03/00 05/05/00 05/07/00 05/09/00 05/11/00 05/01/01 With over 75% of users of the service stating that they would otherwise have used the car to get into Cambridge, Park and Ride can be seen as having made a real contribution to easing congestion. Figures for 1999 indicate that 2.1% of vehicles entering Cambridge were intercepted by Park and Ride.

H o w jo u r n e y s w o u ld h a v e b e e n c o m p le te d w ith o u t P a r k & R id e C a r 7 8.7 % T ra in 2.7 % B u s 9.3 % W a lk 1.3 % M o to rb ik e 0.2 % N o trip 6.1 % C y c le 1.7 % Building on success the way forward The Cambridge Park and Ride system is widely regarded for its excellence, both by its users and other authorities. For the future, we will strive for continuous improvement and ensure that Park and Ride is developed alongside other initiatives to promote sustainable travel. Some of the key next steps include: An extended network of sites, including rural transport interchanges, linked to existing bus services Real Time information at the sites Variable message information signs on major roads approaching the sites to ensure drivers make informed decisions. Supporting documents attached: - Cambridge Park and Ride How to comment on our service - What is cambridge Park and Ride? - Cambridge Park and Ride - Charter mark Application