Planning for the future: Whitehorse Corridor Alaska Highway

Similar documents
Highway 56 Traffic Study Rymal Road to Cemetery Road

Transportation Master Plan Advisory Task Force

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

Access Management Regulations and Standards

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

TRANSPORTATION NEEDS ASSESSMENT

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Kelowna On the Move. Pedestrian and Bicycle Master Plan

Highway 1 Kamloops to Alberta Four-Laning Program

Welcome. If you have any questions or comments on the project, please contact:

Regional Transportation Needs Within Southeastern Wisconsin

Access Management Regulations and Standards

Route 29 Solutions Projects

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Route 7 Corridor Study

122 Avenue: 107 Street to Fort Road

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Public Works and Infrastructure Committee. General Manager, Transportation Services. P:\2016\Cluster B\TRA\TIM\pw16009tim.docx

York Region Population and Employment Growth

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

TRASBURG RANSPORTATION

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

LOOP 360 IMPROVEMENT STUDY

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Durham Region Long Term Transit Strategy

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Pennsylvania Avenue (CR 484) Design Alternatives Study

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Terwillegar Drive Expressway Draft Concept Plan

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

Congestion Management Report

Tonight is for you. Learn everything you can. Share all your ideas.

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

3.0 Future Conditions

5.0 Roadway System Plan

Welcome! San Jose Avenue Open House August 25, 2015

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Highway 111 Corridor Study

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Executive Summary Route 30 Corridor Master Plan

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

TRAFFIC IMPACT STUDY CRITERIA

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

DUNBOW ROAD FUNCTIONAL PLANNING

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018

Highway 217 Corridor Study. Phase I Overview Report

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

NOTES OF MEETING AIRPORT ROAD (KING STREET TO HUNTSMILL DRIVE) ENVIRONMENTAL ASSESSMENT (EA) COMMUNITY WORKING GROUP (CWG) ORIENTATION SESSION

This page intentionally left blank.

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).

Welcome. The Brooklin Secondary Plan and Transportation Master Plan are collectively referred to as the Brooklin Study.

Providing an Efficient and Multi-modal Transportation System

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

City of Charlottesville Bicycle and Pedestrian Master Plan Update

North Shore Transportation Improvement Strategy

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

PROJECT FACT SHEET May 25, 2018

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

CHAPTER 4: IDENTIFICATION OF ROAD SYSTEM DEFICIENCIES: TRANSPORTATION PLANNING MODEL

Legislative Update Williamsburg Residency

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

CITY MANUALS AND STANDARDS REVIEW

Governance and Priorities Committee Report For the July 2, 2015 Meeting

TABLE OF CONTENTS. Executive Summary

Clackamas County Comprehensive Plan

4. Action Plan & Projects

I-35W Solutions Alliance Project Update July 13, 2017

PROJECT FACT SHEET March 21, 2018

Charlotte Region Fast Lanes Study Phase III

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

New Seward and 36 th Avenue Intersection Conceptual Design

Frome Street Bicycle Route

MnPASS System Today and the Future

2. Context. Existing framework. The context. The challenge. Transport Strategy

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

Welcome to the Open House

Project Description Form 6V

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

THE CORPORATION OF THE DISTRICT OF CENTRAL SAANICH. COMMITTEES - 7:00 PM Monday, April 27, 2015 Council Chambers AGENDA

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

PEDESTRIAN ACTION PLAN

Transcription:

Planning for the future: Whitehorse Corridor Alaska way The Government of Yukon commissioned a professional engineering firm to draft the Functional Plan for the Whitehorse Corridor - Alaska way. The draft plan sets out recommended improvements along the 40 km stretch of the highway from just south of the Klondike way turnoff to Carcross, to just north of the turnoff to Dawson. The draft functional plan provides a long-term solution for highway improvements, setting out in detail the proposed projects to be undertaken in the immediate term (over the next five years), the medium term (to 2031), and the longer term. The proposals are designed to improve safety and travel times for all highway users and to enable more efficient goods movement to support the local and regional economy. Why are way Improvements Required? The Alaska way provides an essential link in the daily commute of many Whitehorse residents and serves a growing population who travel into Whitehorse from surrounding subdivisions and communities. It plays a critical role in transporting goods and supplies needed by Yukon s population, provides an important transportation route for the territory s resource industry, and also supports tourism. Over the past 10 years the population of Whitehorse has grown by over 24% reaching 28,000 in 2014. Population growth is expected to continue, reaching 35,000 by 2031 and 47,000 in the longer term. Improvements are required to address existing and anticipated safety and congestion concerns, and to meet recommended transportation engineering guidelines and standards. The draft functional plan also provides the opportunity to accommodate pedestrians and cyclists and to enhance the multi-modal trail system that parallels portions of the highway. The Purpose of this brochure The purpose of this brochure is to promote awareness about the project and its core components. The brochure provides a high level overview of the proposed improvements to the Whitehorse corridor. The specific details of the proposed improvements are complex and too numerous to display in the brochure. To obtain a better understanding of how the proposed changes may affect you, please visit the project website (www.placespeak.com/whitehorsecorridor). Yukon government would like to hear your views on whether the draft functional plan addresses your concerns about safety and traffic flow, as well as your opinion on the schedule and timing of the proposed upgrades. You are encouraged to complete the feedback form enclosed with this brochure, or to provide feedback online via the project website. The feedback you provide will be used to confirm and/or refine the functional plan, prior to the commencement of detailed design later in 2015. Further information about the project will be provided at Open Houses, scheduled for the week of April 20, 2015. Une version de cette brochure est située au site web (www.placespeak.com/whitehorsecorridor). Aussi, vous pouvez téléphone le 1-866-692-4484 pour demander la version française de la brochure. 1

We Are Here Review Stakeholder Consultation Design Criteria Traffic and Safety Analysis Required Improvements Conceptual Options Development Planning Level Cost Estimates Option Evaluation Construction Sequencing Steps in Plan Development 2011: YG commissions road safety, environmental, and highway capacity studies 2012: YG prepares a concept plan to compare high-level development options 2013-14: YG commissions preparation of a functional plan. Key steps in the development of the functional plan include: Reviewed previous work. Engaged key stakeholders (including the City of Whitehorse, Kwanlin Dün First Nation, Ta an Kwäch än Council, utilities and Whitehorse Airport) to understand their future plans. Developed design criteria for the corridor, based on recognized engineering design guidelines and transportation engineering standards relating to levels of service and safety. Analyzed existing and forecast levels of service and traffic, based on modelled traffic volumes. Identified required improvements considering safety, operations, environmental impacts and costs. Developed and analyzed conceptual options including provision of additional highway lanes, access management/closure, frontage road provision, intersection improvements, provision of a central traffic barrier in the highway median. Prepared cost estimates taking into account infrastructure improvement costs and potential property impacts. Evaluated options for 10 individual segments based on construction costs, travel time savings, accident reduction, environmental impacts. Determined prioritization and staging of construction through systematic assessment and evaluation of construction costs, travel time savings, accident reduction, and environmental impacts. Spring 2015: Public engagement to refine the functional plan Summer 2015: Report back on what we heard and resulting changes to the draft plan Later in 2015: YG finalizes functional plans and undertakes Environmental Assessments (YESAA) 2016: Commencement of initial construction, upon approval Understanding Plan Components 1. way widening Parts of the highway may be widened to 4 lanes, with an extra lane provided in each direction. Equal widening on both sides with a paved centre median is the preferred solution based on costs, consistency and impacts. Cyclists would be accommodated within the shoulder which would be widened to 2.5m 3m. IMPROVED LIGHTING CYCLING ACCOMMODATED IN WIDENED SHOULDER 2. Passing Lanes 2 LANES OF TRAFFIC PAVED CENTRE MEDIAN 2 LANES OF TRAFFIC IMPROVED LIGHTING CYCLING ACCOMMODATED IN WIDENED SHOULDER The provision of an additional lane along certain sections of the highway would enable faster moving traffic to pass in the left lane, adding highway capacity, improving safety and enabling highway speeds to be maintained. Before VEHICLES BACK UP BEHIND SLOWER MOVING TRAFFIC After FASTER MOVING TRAFFIC MAY PASS IN THE LEFT LANE 3. Access consolidation Access consolidation involves reducing the number of properties with direct access to the highway by providing a frontage road (typically within the highway right of way) which serves several properties and provides a single point of access to the highway. Access consolidation may also include combining collector roads into new and improved intersections. Reducing the number of accesses to the highway would enable highway speeds to be maintained, and improve safety through the provision of fewer access points which comply with highway design guidelines and standards for separation distances and capacity. Details of access consolidation are not shown in this brochure. If you currently access the highway directly from your property, you are encouraged to visit the project website to find out how your access may be affected. Before After PROPERTIES ACCESS THE HIGHWAY DIRECTLY A FRONTAGE ROAD PROVIDES A SINGLE, CONSOLIDATED POINT OF ACCESS TO THE HIGHWAY NEW ACCESS COMPLIANT WITH DESIGN GUIDELINES 4. Intersection Improvements Reducing access points between intersections allows intersection design improvements to be constructed. Improvements at intersections that serve high traffic volumes may include the addition of turning lanes, and signals. These improvements would have safety benefits and reduce delays from turning movements. Safer pedestrian crossing of the highway would be enabled through improved highway lighting and pedestrian-activated signalized crosswalks. 5. SPEEDS The proposed improvements include posted speed zones intended to reduce speeding, improve safety and simplify signage. A typical posted speed of 80kph is proposed along the length of the corridor, although lower speed zones may apply in the urban sections between Hillcrest Drive and just north of Two Mile Hill Rd, while higher posted speeds would apply at each of the corridor ends. 6. MULTI-USE TRAIL Turning Lane Example Intersection Improvement Improvements are proposed to the multi-use trail network which parallels portions of the highway. The proposed improvements suggest a continuous trail connection along the length of the corridor to facilitate better connectivity with the City of Whitehorse trail network, improve movement across existing barriers (such as creeks), enable safer crossing of the highway, and provide better connectivity between areas of high trail-user demand. The proposed multi-use trail would be paved from MacRae to Crestview, but would be gravel on either end. In general, a multi-use trail would be supported on both sides of the highway corridor. However, owing to constraints, in some locations the multi-use trail may be provided on one side of the highway only. The type and usage of the trail segments will be considered in future phases of the project, as will the design of cycling and pedestrian facilities. 2 3

Alaska way Whitehorse Corridor: Long Term Vision Cronkhite Rd Moraine Dr (Please note this figure only shows proposed details of lane and signalized intersection upgrade locations. For complete details of road/access closures, and specific intersection improvements, please visit the project website.) Dawson Rd WOLF CREEK Blaker Pl MT SIMA Esker Dr Mt. Sima Ski Hill Rd South Klondike Hwy COWLEY CREEK Fireweed Dr MARY LAKE Spruce Hill Pineridge Wolf Creek Campground Segment 2 Nansen Dr Castle Dr Alusru Way FOX HAVEN Fox Farm Rd MACRAE Fraser Rd Segment 3 Pioneer RV Park Canyon Cres Miles Canyon Rd LOBIRD Hamilton Blvd extension Salmon Trail Southern Project Limits Venus Pl Gentian Lane Empress Rd Segment 1 GOLDEN HORN Duncan Dr SEGMENT 1: Length: 3,450m Priority #8 Start / End: Southern Project Limits to Spruce Hill Add northbound passing lane; upgrade intersections at Gentian Lane, Venus Pl, Empress Rd, South Klondike Hwy, Duncan Dr, Salmon Trail, and Spruce Hill/Fireweed Dr; and add 3 new SEGMENT 2: Length: 5,100m Priority #9 Start / End: Spruce Hill to Esker Dr Add northbound and southbound passing lanes; upgrade intersections at Wolf Creek Campground, Dawson Rd / Castle Dr, Cronkhite Rd / Nansen Dr, Blaker Pl / Alusru Way, Moraine Dr, and Fox Farm Rd; and add 3 new SEGMENT 3: Length: 6,400m Priority #7 Start / End: Esker Dr to Esker Dr, Fraser Rd, Pioneer RV Park, Mt Sima Ski Hill Rd, Miles Canyon Rd, and Canyon Cres; add a new intersection; and add 4 new Robert Service Way SEGMENT 4: Length: 2,700m Priority #3 WEIGH STATION Segment 4 Start / End: to Radar Rd / Widen to four lanes; upgrade intersection at Robert Service Way; and improve entrance /exit to the rest area and Whitehorse weigh station Downtow Radar Rd Hillcrest Dr Norseman Rd DOWNTOWN HILLCREST Segment 5 Burns Rd Salvation Army Range Rd SEGMENT 5: Length: 1,300m Priority #2 Sumanik Dr Forestry-Bethany Tabernacle access Hamilton Blvd Segment 6 Start / End: Radar Rd / to north of Sumanik Dr Radar Rd /, Hillcrest Dr, Burns Rd / Norseman Rd, Sumanik Dr / Range Rd; provide a new intersection at Salvation Army North Access; and add 3 new SEGMENT 7: Length: 1,500m Priority #4 Start / End: to Copper Belt Rd Widen to four lanes; new intersection at Prospector Rd; and add 1 new frontage road VALLEYVIEW TAKHINI Prospector Rd KOPPER KING War Eagle Way Copper Belt Rd Segment 7 SEGMENT 6: Length: 1,200m Priority #1 SEGMENT 8: Length: 2,200m Priority #6 Segment 8 Start / End: Sumanik Dr to north of Widen to four lanes; intersection improvement at Hamilton Blvd / Two Mile Hill Rd; new intersection at Forestry- Bethany Tabernacle access (north of Two Mile Hill Rd); and add 2 new Start / End: Copper Belt Rd to south of Centennial St Widen to four lanes and/ or widen shoulders; upgrade intersections at War Eagle Way /Copper Belt Rd, Fish Lake Rd, and the Waste Management Facility Access Rd Fish Lake Rd Centennial St Waste Management Facility Access Rd 15th Ave Pedestrian Activated PORTER CREEK Wann Rd KULAN MacDonald Rd Laberge Rd Segment 9 SEGMENT 9: Length: 4,000m Priority #5 Start / End: South of Centennial St to north of Kathleen Rd Widen to four lanes; upgrade intersections at Centennial St, 15th Ave, Wann Rd, Laberge Rd / MacDonald Rd, and Kathleen Rd; and add 2 new CRESTVIEW Kathleen Rd Cousins Airstrip Rd SEGMENT 10: Length: 3,420m Priority #10 Start / End: Kathleen Rd to Northern Project Limits Upgrade intersections at Cousins Airstrip Rd and North Klondike Hwy; upgrade rest area entrance/exit; add southbound passing lane; and add 1 new frontage road Rest Area Segment 10 CITY OF WHITEHORSE BOUNDARY MACPHERSON Northern Project Limits LEGEND Immediate term priorities Medium term priorities Longer term improvements FN Settlement Land 2 Lane Existing Proposed Passing Lane 4 Lane Upgrade Signalized Intersection (Vehicle and / or pedestrian activated) City of Whitehorse Boundary (See page 7 for prioritization details) 0 200 1000m 2000m North Klondike Hwy HIDDEN VALLEY

Determining Improvement Priorities The Whitehorse corridor - Alaska way was divided into 10 defined segments that can be readily analyzed and constructed as complete sections. Improvements to individual segments were prioritized, based on evaluation of: Construction Costs Travel Time Savings Safety and Accident Reduction Environmental Impacts Evaluation Outcomes Through the evaluation process, segments 4, 5 and 6, were identified as high priorities. These segments correspond with the parts of the corridor that run through the central area of the City of Whitehorse and experience the highest vehicle volumes and turning movements. Improvements to these segments provide the greatest improvements to travel time, and the greatest safety benefits. Improvements to segments 7, 8 and 9, located north of the central area, are required in the medium term. These segments experience lower vehicle volumes than the central part of the corridor. In the medium term, as the population grows and traffic increases, widening of the highway through this section will result in more reliable travel times and safety benefits. In the longer term, as the population grows, segments 1, 2, 3 and 10 may be considered for improvement. Segment 1 2 3 4 5 6 7 8 9 10 Summary of Proposed Improvements Evaluation Summary Table Construction Costs Travel Time Savings Safety and Environmental Accident Impacts Reduction Relative Priority access management Medium Intersection upgrades, access management Medium Medium LEGEND No Impact Marginal Impact Some Impact Significant Impact Very Significant Impact where GREEN = Benefit RED = Cost Phasing of Improvements Order of Priority IMMEDIATE PRIORITY (within 5 years) MEDIUM TERM IMPROVEMENTS (by 2031 or when population reaches 35,000) LONGER TERM IMPROVEMENTS (when the population reaches 47,000) way Segment Approximate Start 1 6 Sumanik Dr 2 5 3 4 4 7 Radar Rd / Lodestar Lane Two Mile Hill Rd 5 9 South of Centennial St 6 8 Copper Belt Rd 7 3 Esker Dr 8 1 Southern Project Limits Approximate End Sumanik Dr Radar Rd / Length (m) 1,200 4 1,300 4 2, 700 4 Copper Belt Rd 1,500 4 Kathleen Rd South of Centennial St 4,000 4 2,200 2-4 6,400 4 Spruce Hill 3,450 2-3 9 2 Spruce Hill Esker Dr 5,100 2-3 10 10 Kathleen Road Northern Project Limits 3,420 2-3 No. of way Description Lanes Widen to four lanes; intersection improvement at Hamilton Blvd / ; new intersection at Forestry-Bethany Tabernacle access (north of ); and add 2 new Radar Rd /, Hillcrest Dr, Burns Rd / Norseman Rd, Sumanik Dr / Range Rd; provide a new intersection at Salvation Army North Access; and add 3 new Widen to four lanes; upgrade intersection at Robert Service Way; and improve entrance / exit to the rest area and Whitehorse weigh station Widen to four lanes; new intersection at Prospector Rd; and add 1 new frontage road Widen to four lanes; upgrade intersections at Centennial St, 15th Ave, Wann Rd, Laberge Rd / MacDonald Rd, and Kathleen Rd; and add 2 new Widen to four lanes and / or widen shoulders; upgrade intersections at War Eagle Way / Copper Belt Rd, Fish Lake Rd, and the Waste Management Facility Access Rd Esker Dr, Fraser Rd, Pioneer RV Park, Mt Sima Ski Hill Rd, Miles Canyon Rd, and Canyon Crescent; add a new intersection; and add 4 new Add northbound passing lane; upgrade intersections at Gentian Lane, Venus Pl, Empress Rd, South Klondike Hwy, Duncan Dr, Salmon Trail, and Spruce Hill / Fireweed Dr; and add 3 new Add northbound and southbound passing lanes; upgrade intersections at Wolf Creek Campground, Dawson Rd / Castle Dr, Cronkhite Rd / Nansen Dr, Blaker Pl / Alusru Way, Moraine Dr, and Fox Farm Rd; and add 3 new Upgrade intersections at Cousins Airstrip Rd and North Klondike Hwy; upgrade rest area entrance / exit; add southbound passing lane; and add 1 new frontage road 6 7

Costs and Funding Various funding scenarios are being considered. The preferred scenario will depend on Yukon government s budgetary limits, public feedback, and future population growth in Whitehorse. The project program could be accelerated, extended or deferred as needs change. Please note: The costs and timelines identified in this brochure represent the analysis and estimates provided by the consultants commissioned to prepare the draft functional plan. The estimates are a reflection of their comprehensive analysis and projections, and do not represent a fiscal commitment from Yukon government. The costs and timelines are provided to illustrate the scope and scale of the Whitehorse corridor project, and to put into context why the proposed plan recommendations are broken into segments and their associated timelines. Implementation of immediate term improvements: construction costs (roadway and trail) of required improvements to segments 4, 5, and 6, are estimated at $52 million, requiring funding of approximately $10 million per year over a 5 year period. Implementation of medium term improvements: construction costs (roadway and trail) for improvements to segments 7, 8, and 9 are estimated at $50 million. These improvements are required by the time the population reaches 35,000 (based on an average annual population growth rate of 2 percent that may occur by 2031). Implementation of longer term improvements: construction costs (roadway and trail) for improvements to segments 1, 2, 3, and 10 are estimated at $100 million. These improvements are required by the time the population reaches 47,000. The timing for the longer term improvements will be considered as the population approaches this parameter. Opportunities to Voice Your Opinion This is your chance to have a say in the future of the Whitehorse corridor. Please review details of the proposed changes online and complete the enclosed feedback form. You may also provide feedback online at www.placespeak.com/whitehorsecorridor. More detailed information will be available at Public Open Houses scheduled for the week of April 20 2015, where you will also have opportunity to ask questions and to provide further feedback. The feedback you provide will be used to confirm and/ or refine the functional plan, prior to the finalization of the plan and commencement of detailed design later in 2015. Should you have questions about the planned improvements to the Whitehorse corridor, please call the toll-free project inquiry line on 1.866.692.4484 or email us at whitehorsecorridorinfo@ch2m.com. 8 TBG042414173021VBC