CPE562 Chemical Process Control HOMEWORK #1 PROCESS & INSTRUMENTATION DIAGRAM

Similar documents
Process & Instrumentation Diagram (P&ID) Purpose. Howitisdone? Methodology?

Manual for continuous distillation

Operating Instructions

1. Study the performance of a binary distillation column operated in batch mode.

Armfield Distillation Column Operation Guidelines

Operating Instructions

Chapter 3 EXPERIMENTAL: EQUIPMENT, SET-UP, AND PROCEDURE

EXPERIMENT 2 LEVEL CONTROL SYSTEM

Vortex Separation Technologies. Engineered Solutions to Separation Problems

PETROLEUM & GAS PROCESSING TECHNOLOGY (PTT 365) SEPARATION OF PRODUCED FLUID

MEMORIAL UNIVERSITY OF NEWFOUNDLAND Faculty of Engineering and Applied Science FLUID MECHANICS LABORATORY PIPE FRICTION

PROCESS GAS SAMPLING SYSTEMS

Relief Systems. 11/6/ Fall

From the Choke KO drum, the gas passes through another gas/gas exchanger - the 'LTS Pre-cooler'.

The Discussion of this exercise covers the following points:

Exercise 4-2. Centrifugal Pumps EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Pumps

Heat Pump Connections and Interior Piping

Air Eliminators and Combination Air Eliminators Strainers

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

Radar, Ultrasonic and RF Level Transmitters

Another convenient term is gauge pressure, which is a pressure measured above barometric pressure.

The Discussion of this exercise covers the following points: Pumps Basic operation of a liquid pump Types of liquid pumps The centrifugal pump.

then the work done is, if the force and the displacement are in opposite directions, then the work done is.

NEW PROGRAM! OIL AND GAS TECHNOLOGY PROGRAM

The Discussion of this exercise covers the following points: Range with an elevated or suppressed zero Suppressed-zero range Elevated-zero range

Gas Absorption Draft Standard Operating Procedure

OIL AND GAS SEPARATION DESIGN MANUAL

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Yutaek Seo. Subsea Engineering

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35

TABLE OF CONTENT

Bulletin TCR-104 & 109 Filling and adding to the Glycol pressure system

White Paper. Electrical control valve actuators on oil and gas production separators

Fundamentals of NGL Sampling Systems. By Dominic Giametta & Jim Klentzman

GAS DEHYDRATION SYSTEM

Unit 24: Applications of Pneumatics and Hydraulics

The Discussion of this exercise covers the following points:

PHYS 101 Previous Exam Problems

PROCESS MONITORING AND CONTROL

Transient Analyses In Relief Systems

CRYOGENIC EXPERTS, INC. World Wide Web Toll Free FOR CEXI Phone (805) Facsimile (805)

Measurement of Low GAS & Liquid Flows

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module:

FOAM TANK (1/2) DATA SHEET

Hazard Operability Analysis

2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate.

DECLARATION OF INCORPORATION

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

Subparts AA and BB - The Other RCRA Air Rules. Beginners aabb

TABLE OF CONTENT

SHOP WELDED TANKS STANDARD CONNECTIONS

NGP-250/500 Nitrogen Generator Quick Start Guide

Tube rupture in a natural gas heater

ASSIGNMENT 2 CHE 3473

1. General safety information. 2. General product information. 3. Installation. 4. Commissioning. 5. Operation. 6. Maintenance. 7.

Steam generator tube rupture analysis using dynamic simulation

TEST BENCH FOR SAFETY VALVES

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

Training Title IDENTIFY OPERATIONAL UPSETS, REVIEW & VALIDATE IN OIL & CHEMICAL PLANTS

ASSIGNMENT 2 CHE 3473

PRODUCTION EQUIPMENT EFFECTS ON ORIFICE MEASUREMENT STORMY PHILLIPS J-W MEASUREMENT 9726 E. 42 ND STREET, STE. 229 TULSA, OK 74146

Free Surface Flow Simulation with ACUSIM in the Water Industry

Optimizing Effective Absorption during Wet Natural Gas Dehydration by Tri Ethylene Glycol

L21S/SR/ST Glass Level Gauges

PRODUCTION EQUIPMENT EFFECTS ON ORIFICE MEASUREMENT. Stormy Phillips

Best Practices for Installation of Gaseous Sample Pumps

Peerless TECH SPEC FOR HIGH-EFFICIENCY, HIGH-CAPACITY, AND LOW-COST GAS AND LIQUID SEPARATION

FOAM TANK (1/2) DATA SHEET

Operating Instructions

PART 1.2 HARDWARE SYSTEM. Dr. AA, Process Control & Safety

LPG DRIVER ATTENDED TRANSPORT LOADING

DA-SAFE/17/ Nov 2017

UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER

Institute For Thermal Processing Specialists

Installation and operation Manual. Bermad Surge Anticipation Valve. Model No 435

THERMODYNAMICS, HEAT AND MASS TRANSFER TUTORIAL NO: 1 (SPECIFIC VOLUME, PRESSURE AND TEMPERATURE)

Start up XXX from normal shutdown Introduction

Introduction. Part one: Identify the Hydraulic Trainer Components

Fundamentals Of Petroleum Engineering PRODUCTION

EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM

Understanding Net Positive Suction Head

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION

THE INNER WORKINGS OF A SIPHON Jacques Chaurette p. eng. January 2003

BioAerosol Nebulizing Generator. Operation and Maintenance User Manual

AE50S Automatic Air and Gas Vent for Liquid Systems Installation and Maintenance Instructions

OPERATING INSTRUCTIONS

API th Edition Ballot Item 7.8 Work Item 4 Gas Breakthrough

LAKOS Waterworks. PWC Series Sand Separators. Installation & Operation Manual LS-829 (10/12)

E X T E R I O R L I V E P R O P A N E F I R E P R O P P R O C E D U R E S F O R U S I N G T H E P R O P A N E P R O P

Thermocirc Installation and Maintenance Instructions

ENSURING AN ACCURATE RESULT IN AN ANALYTICAL INSTRUMENTATION SYSTEM PART 1: UNDERSTANDING AND MEASURING TIME DELAY

INSTALLATION INSTRUCTIONS FOR FUME SCRUBBERS

Hydraulics of Kettle-Reboiler Circuit on Distillation Columns

PREVIEW COPY. Level Measurement. Table of Contents. Principles of Level Measurement...3. Electrical Instruments Pressure Head Instruments...

CHEMICAL ENGINEERING LABORATORY CHEG 239W. Control of a Steam-Heated Mixing Tank with a Pneumatic Process Controller

APPS-160 Gen 2 User Manual

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

Dynamics and Control of Chemical Processes Solution to Lab #8 Shutdown of C4-C5 separation section

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

Third measurement MEASUREMENT OF PRESSURE

Transcription:

Faculty of Chemical Engineering CPE562 Chemical Process Control HOMEWORK #1 PROCESS & INSTRUMENTATION DIAGRAM SUBMISSION DATE: 1 OCT. 2012

Question 1 Name the following equipments based on standard P&ID symbols and notations. PG FE PI FI PT FT PAH FAH TT LC TAL LS TR TA H L LC LS Question 2 What are the differences between these devices? a) PG vs. PI b) vs. c) LS vs. LS d) vs.

Question 3 Vertical longitudinal flow separator must perform four distinct functions: inlet momentum control, vapor demisting, liquid retention, and liquid outlet control. The inlet is on one end of the horizontal separator, and the gas and liquid outlets are on the opposite end. As fluid enters, bulk separation occurs at the inlet device. The phases separate within the liquid retention section and flow to their respective outlets. Demisting and coalescing devices assist in the phase separation, and vortex breakers prevent the re-entrainment of phases. (http://www.pipingguide.net/2009/04/flowseparator.html) Figure 1 Draw the following devices to the vessel and respective pipings by using standard P&ID notations and symbols. a. Pressure gauges to gas pipings (inlet and outlet). b. Pressure gauge between coalescer and impingement baffle. c. Pressure relief valve between coalescer and impingement baffle. d. Liquid level gauge (sight-glass type). e. Pressure alarm high below coalescer but above maximum allowableliquid level level. f. High and low liquid level alarm. g. Flow gauges to gas piping (inlet and outlet).

Question 4 Reboiler is used in the petroleum industry to vaporize a fraction of the bottom product from a distillation column. Liquid flows from the column into a shell in which there is a horizontal tube bundle, boiling taking place from the outside this bundle. The vapor passes back to the column as shown. (http://www.thermopedia.com/content/1078/) (a) Figure 2 (b) Draw the following devices to the vessel and respective pipings (Fig. 2b) by using standard P&ID notations and symbols. a. Pressure gauges to steam inlet piping and reboiler vapor piping. b. Temperature gauges to all inlet and outlet pipings. c. Temperature gauge at heated liquid compartment. d. Liquid level gauges at heated liquid compartment and over flow liquid compartment. e. Pressure relief valve on top of vessel. f. Pressure relief valve to steam inlet piping. g. Liquid level alarm high at over flow liquid compartment. h. Liquid level alarm low at heated liquid compartment. i. Flow indicators for liquid from tower bottom and reboiler vapor to tower.

Question 5 The influent flow enters the tank at the bottom and exits the tank, through a distant port at the top. The objective with port placement is to create the longest possible path between the inlet and discharge ports. In this system the treatment tank remains full all of time. Therefore one gallon entering the influent port displaces one gallon through the discharge port. As the influent flow enters the treatment tank it is thoroughly mixed with the tank contents. If the ph of the influent varies from the tank contents then the influent flow will be ph adjusted through the resultant chemical reaction that occurs as the influent mixes with the contents. There will obviously be an equal and opposite reaction within the tank contents. This opposite reaction is sensed by the ph probe which provides a continuous ph signal to the ph controller. The controller then paces the appropriate metering pump to bring the body of water within the tank back into range. If the influent flow was alkaline, for example, the result would be a steady rise in the ph of the tank contents as measured by the ph probe at the discharge port. The ph controller would then pace the acid metering pump at an appropriate rate to bring the ph back down into range. (http://www.phadjustment.com/ph.htm) Figure 3 Draw the following devices to the vessel and respective pipings by using standard P&ID notations and symbols. a. Flow indicating transmitters for each stream (inlet and outlet). b. ph recorder c. Liquid level gauge d. Liquid level switch is connected to a normally open solenoid valve at untreated influent stream. e. ph transmitter is connected to a ph controller which connected to caustic pump.

Question 6 Figure 4 show a P&ID obtained from a website (http://www.vantran3d.com/html%20image%20gallery/14p&id.html). Analyze and comment on the P&ID drawn according to the standard. Make correction to the drawing. Figure 4

Question 7 Figure 5 show a P&ID obtained from a website (http://3.bp.blogspot.com/ JIJ9jlRvgM/TBsq3d6Am7I/AAAAAAAAAFI/ Cfl2EkihDW8/s1600/cats1.jpg). Analyze and comment on the P&ID drawn according to the standard. Make correction to the drawing. Figure 5