BRT Corridor Shastri Park Karawal Nagar Yamuna Vihar Mori Gate Gandhi Nagar

Similar documents
Decongestion Strategies for Delhi Roads

Equitable Road Space : Case study Vikas Marg, New Delhi

Low Carbon Mobility Plan For Indian Cities

Cycling Inclusive Transport Planning

Scope of the Transit Priority Project

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

URBAN AGE CONFERENCE GOVERNING URBAN FUTURES

No.TR/Sch/(00)/3/2014/4949 Dated:

EFFECTS OF TRANSIT SIGNAL PRIORITY ON BUS RAPID TRANSIT SYSTEM. Sahil Chawla, Shalini Sinha and Khelan Modi

Welcome. The Brooklin Secondary Plan and Transportation Master Plan are collectively referred to as the Brooklin Study.

Integrated Corridor Approach to Urban Transport. O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012

NEWMARKET CENTRE Mobility Hub Profile

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

BURGAS INTEGRATED PUBLIC TRANSPORT PROJECT. Information day, 5 th July 2011, Burgas

Integrated Mobility Plan for Gurgaon Manesar Urban Complex

DON MILLS-EGLINTON Mobility Hub Profile

INTEGRATED MULTI-MODAL TRANSPORTATION IN INDIA

The City. Population of BH. Population of RMBH. 2.4 million inhabitants. 5.7 million inhabitants. 6.3 million trips a day

FIRST DELHI BRT CORRIDOR A DESIGN SUMMARY AMBEDKAR NAGAR TO DELHI GATE

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Traffic and Transport Safety TABLE 9.5.7: LOCATION OF MAJOR PARKING PLACES IN UDAIPUR CITY TABLE 9.5.8: MODE WISE ACCIDENT TREND IN UDAIPUR

Clackamas County Comprehensive Plan

DUNDAS WEST-BLOOR Mobility Hub Profile

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

2. Context. Existing framework. The context. The challenge. Transport Strategy

Urban Transport Service Level Benchmarking in Urban Transport for Indian Cities

Preliminary Transportation Analysis

Urban Street Design and Development

Roadways. Roadways III.

Analysis of Unsignalized Intersection

guide to a phased approach TRIPP

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues

Copenhagen Cycling Map. Red Lines Cycling facilities

Signal Optimization using PTV Vistro for a Major BRTS Corridor in Pimpri Chinchwad, Maharashtra

PESHAWAR Bus Rapid TRANSIT. By Engr. Haroon Rashid Ph. D Scholar, MS in Transportation Planning and B.Sc Civil Engineering

DON MILLS-SHEPPARD Mobility Hub Profile

Konstantin Glukhenkiy Economic Affairs Officer

Bus Rapid Transit: How Delhi Compares

David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

NORTH YORK CENTRE Mobility Hub Profile

BELFAST ON THE MOVE Transport Masterplan for Belfast City Centre

Contents. Champaign-Urbana Mass Transit District Stop Placement Guidelines

Better Market Street Project. Project Update January 15, 2015

Role of Non-motorized Transport in Million plus Cities

VOLUME 5 Technology and Option Evaluation

UNIT V 1. What are the traffic management measures? [N/D-13] 2. What is Transportation System Management (TSM)? [N/D-14]

PLANNING FOR SUSTAINABLE PEDESTRIAN INFRASTRUCTURE NALIN SINHA INITIATIVE FOR TRANSPORTATION & DEVELOPMENT PROG. (ITD), DELHI

Sixth Line Development - Transit Facilities Plan

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

Frequently Asked Questions (FAQ)

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS

Arterial Transitway Corridors Study. Ave

1. Introduction. 2. Survey Method. Volume 6 Issue 5, May Licensed Under Creative Commons Attribution CC BY

Development of Saturation Flow Rate Model for Heterogeneous Traffic at Urban Signalized Intersection

Bicycle Sharing in Delhi - Users Evaluation Report

Chapter 2 Current and Future Conditions

PLANNING FOR FIRST &LAST MILE CONNECTIVITY FOR MASS TRANSIT USERS

Peterborough Council on Aging

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Classification Criteria

PBS CITY SPECIFIC PLAN VADODARA. Stakeholder Workshop

Wellington Public Transport Spine Study

Multimodal Analysis in the 2010 Highway Capacity Manual

Community Task Force March 14, 2018

Intersection Improvement in Udaipur: A Demonstration of Passive Junction Design Solutions

Bus Rapid Transit Plans

Markham Sports, Entertainment and Cultural Centre Transportation Overview

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

Scheduling 101 Calculating Running Time Metropolitan Atlanta Rapid Transit Authority Multimodal Operations Workshop Houston, TX

CPC Parking Lot Riverside Drive. Transportation Rationale

MOBILITY CHALLENGES IN HILL CITIES

Central Jersey Transportation Forum. March 2007

Regional Bus Priority

Arterial Transitway Corridors Study. Sept. 26, 2011

STATION #3 INITIAL ALTERNATIVES

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

Priced Managed Lanes in America. October 2013

Eliminate on-street parking where it will allow for a dedicated bus only lane %

5. RUNNINGWAY GUIDELINES

Traditional Public Transport Priority. Priority/Traffic Management? What is Integrated Public Transport Priority/Traffic management? Why? How?

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Public Event 1 Community Workshops

95 th Street Corridor Transportation Plan. Steering Committee Meeting

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

122 Avenue: 107 Street to Fort Road

METRO RTA TRANSIT MASTER PLAN. May 25-26, 2011

2019 Development Charge Study: Historical Service Standards. Development Charges Stakeholders Sub-Committee City of Hamilton September 13, 2018

Performance Criteria for 2035 Long Range Transportation Plan

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

Presentation on INTEGRATION OF FEEDER SERVICES WITH BRTS CORRIDOR- MUMBAI-PUNE ROAD 5th Dec UMI, New Delhi Mr. S. S. Savane and Mr. D. R.

Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

1. Provide a dedicated westbound approach bus lane at the intersection;

Introduction: Janmarg also known as Ahmadabad

28th Nov 2014 Chandramauli Shukla CEO, BCLL, Bhopal

A MULTI-MODAL PUBLIC TRANSPORT SOLUTION FOR MALE, MALDIVES

BICYCLE SHARING SYSTEM: A PROPOSAL FOR SURAT CITY

Delhi BRT System Lessons Learnt

Transcription:

Delhi Integrated Multi Modal Transit System Ltd. BRT Corridor Shastri Park Karawal Nagar Yamuna Vihar Mori Gate Gandhi Nagar Presentation to Governing Body UTTIPEC DDA March,2011

NARELA BRT PHASE II PUTHKHURD BAKHTAWARPUR BRT PHASE III BAWANA BRT PHASE IV IBRAHIMPUR SG TPT NAGAR MUKUNDPUR KARAWAL NAGAR Project Corridor KANJHAWALA JAHANGIRPURI MADHUBAN CHOWK AZADPUR GOKALPURI DELHI BORDER NAJAFGARH MUNDKA DABRI MOD PUNJAB I BAGH TILAK NAGAR SHAKUR BASTI KIRBI PLACE GULABIBAGH NEW PATEL NAGAR DHAULAKUAN ISBT KASHMERE GATE AZAD MARKET SHAHI IDGAH DELHI GATE CONNAUGH T PLACE IG CENTRA L SECTT STADIUM NAT. STADIUM GANDHI NAGAR KARKARI MOR DILSHAD GARDEN ISBT ANAND VIHAR (TATA TELCO) GAZIPUR KONDALI GOPALNAGAR PALAM MOR JOR BAGH S KALE KHAN CHILLA TO NOIDA AIRPORT MOOLCHAND SUKHDEV VIHAR KHAIRA IIT OKHLA PH II CHHAWLA KAPASHERA VASANT KUNJ RAJOKARI AMBEDKAR NAGAR SULTANPUR BADARPUR PHASING OF FUTURE BRT CORRIDORS IN DELHI

Corridor Location Map (On Road Map) N 3 0.72 2. 05 8. 46 1. 62 8. 96 1. 47 8. 17 N 29.58 54.31 5 3.91 1. 19 10.65 1. 12 4. 05 10.85 6. 13 N N 4 3.83 11.12 2. 07 10.24 1.5 2. 21 11.64 8. 46 4. 57 N 5 6.93 1. 22 1. 21 8. 81 1. 74 8. 69 1. 62 7. 55 5.1 9. 66 N N N N Karawal Nagar Khajuri Khas Junction Yamuna Vihar Mori Gate Shastri Park Junction Located in East Delhi Total Corridor Length is 14.50 Kms Shastri Park Metro Stn. Gandhi Nagar The corridor connects ISBT, Gandhi Nagar (cloth market) and Metro stations.

Mukundpur Wazirabad FUTURE BRT CORRIDORS IN THE VICINITY OF PROPOSED CORRIDOR Karawal Nagar Khajuri Khas Yamuna Vihar Proposed Corridor, i.e. Karawal Nagar to Gandhi Nagar and Bhajanpura to Mori Gate would created integrated network by connecting future links Bhajanpur a 4 2 Mori Gate Shastri Park Gandhi Nagar 3 Dilshad Garden 1. BRT from Gandhi Nagar to Chilla 2. BRT from Mukundpur to Kondli 3. BRT form Shastri Park to Dilshad Garden 1 4. Yamuna Vihar Metro Station of Phase-III metro system Kondli Chilla

Influence Area Characteristics: BRT Vehicle Types Distribution 30000 15000 7500 Car Two-Whlr Cycle Others 0.75 1.5 Kilometers Corridor will Service Large Population of Influence Area. About 7.8 lac. Serves Low and low middle class household income areas having high dependence on public transport. Area has High private vehicle (2 wheeler) ownership. Important to reverse this trend by improving public transport.

Road Network Inventory of the corridor Length (km) Road class Lane configuration Main Corridor 8.7 Urban Highway 4 lane Link Road-1 3.2 Urban Highway 6 lane Link Road-2 2.0 Urban Highway 4 lane with Service Roads alongwith BRT lanes Link Road-3 1.7 Urban Highway 4 lane with Service Roads alongwith BRT lanes LINK-2 Link Road-4 0.34 Urban Collector BRT 2 lane (Proposed) Available Right of Ways provide opportunity to have Bus Lane Segregation without major impact on MV Lanes LINK-1 LINK-4 LINK-3

Vehicle composition and speed in the corridor Intersection # 1 2 3 Ghandi Nagar Rd & Yamuna Marginal BM & Yamuna Marginal BM & GT Road Shastri Park - ISTB Rd Wazirabad Rd Mode Veh % Veh % Veh % 272 270 269 253 254 271 267 266 268 256 261 Motorized 46,907 46.2% 127,907 64.7% 99,415 76.8% Motorcycle 22,150 21.8% 67,752 34.3% 54,967 42.5% Car 12,989 12.8% 28,075 14.2% 21,792 16.8% Auto rickshaw 7,510 7.4% 20,145 10.2% 10,737 8.3% Truck 3,349 3.3% 8,979 4.5% 7,933 6.1% LCV Pass 749 0.74% 1,575 0.80% 1,115 0.862% LCV Freight 2,063 2.03% 5,036 2.55% 5,007 3.868% 2 Axles 482 0.47% 2,017 1.02% 1,531 1.183% 3 Axles 51 0.05% 315 0.16% 228 0.176% SemiArticulat ed 3 0.00% 33 0.02% 34 0.026% Articulated 1 0.00% 3 0.00% 18 0.014% Bus 915 0.9% 2,955 1.5% 3,977 3.1% Non- Mortorized 54,624 53.8% 69,907 35.3% 30,015 23.2% Cycle 25,329 24.9% 44,307 22.4% 22,331 17.3% Cycle rickshaw 22,625 22.3% 22,182 11.2% 7,204 5.6% Others 6,670 6.6% 3,418 1.7% 480 0.4% 77 360 251 234 233 230 229 Total vehicles 101,531 100.0% 197,814 100.0% 129,430 100.0% AVERAGE SPEED IN PEAK HOUR Modal Distribution 300000 150000 75000 Public Transport Auto Rickshaw Car 2 Weels 0 1 2 Karawal Nagar to Shastri park- 12-18 KMPH High NMV Share Opportunity to create space for Safe Movement for NMV Kilometers Current Situation

Finalization of BRT Elements Running ways Terminal Vehicles Bus Rapid Transit Fare Collection Service & Operation Plan ITS ELEMENTS DESIGN TO REDUCE DELAY AND INCREASE EFFICIENCY OF BUS SYSTEM

DATA BASE DEVELOPMENT PRIMARY SURVEYS SECONDARY DATA Speed and Delay Surveys Boarding / Alighting Survey Origin / Destination cum Opinion Survey Turning Movement Surveys Direction-wise Classified Traffic Volume Survey Traffic Signal Time and Saturation Flow Survey Parking Survey (on-street and off-street) Pedestrian Survey Data for Strip Plan 1. Traffic Demand Forecast Study 2. BRT Guidelines Reconnaissance Survey identification of specific / typical problem areas. Secondary data Relevant secondary data regarding, development plans, road development plans, signal phasing, ownership of land parking provision bus stop location and bus routing

Passenger Demand Forecast: BRT Line 1 and Line 2 Demand model for the current and the horizon years Line 1 (pass/day) Line 2 (pass/day) Total (pass/day) 2012 69,862 78,024 147,886 2022 85,358 90,806 176,164 2032 118,155 125,696 243,851

Estimated required fleet and headways 80-85 buses will be required to serve both lines For Route 1-33 standard buses For Route 2-42 standard buses q To meet demand for critical section in peak hour-line 1- Average headway of 2 min q For Line 2, average headway of 1.8 min.

Karawal Nagar Proposed Corridor Plan Corridor Sections Length (Km) Bus Lane Placement Khajuri Khas Yamuna Vihar Main Corridor 8.7 Both Bus Lane on River side Link 1 3.2 Central Lane Link 2 2.0 Kerb Side Lane Link 3 1.7 Central Lane Kashmere Gate Metro Station Shastri Park Jn. Link 4 0.35 Both Bus Lane RHS Foot Over Bridge Mori Gate Shastri Park Metro Stn. Gandhi Nagar Ped. Subway Signature Bridge Metro Station

Proposed Cross sections

Karaw al Nagar TYPICAL CROSS SECTION FOR NORMAL ROAD SECTION Khaju ri Khas Juncti on Yamun a Vihar Mor i Gat e Shast ri Park Metr o Stn. Shast ri Park Juncti on Gandh i Nagar Main Corridor Between Shastri Park Junction and Khajuri Junction

The corridor will have central platforms Wide NMV lane on both sides. Wide Bus queue shelters Holding area for buses Table top pedestrian crossings Two MV lanes on both sides (main corridor)

HORN PLEASE 1725 14400 2000 14400 1400 33925 EXISTING ROAD SECTION WITH MIX TRAFFIC CONDITION (GT ROAD) HORN PLEASE 1800 2687 300 10000 300 3300 750 33925 3300 300 10000 300 2688 1800 Karaw al Nagar 37525 PROPOSED ROAD SECTION IN SEGREGATED TRAFFIC CONDITION (GT ROAD) - Optional Khajuri Khas Junction Yamun a Vihar Mori Gate Shastri Park Junction Shastri Park Metro Stn. Gandh i Nagar GT ROAD

21200 2000 3200 450 3200 300 6750 300 3000 2000 TYPICAL CROSS SECTION FOR NORMAL ROAD SECTION Karaw al Nagar Khaju ri Khas Juncti on Yamun a Vihar Mor i Gat e Shast ri Park Metr o Stn. Shast ri Park Juncti on Gandh i Nagar Main Corridor Near Shastri Park Metro Station Buland Maszid Area

1800 4000 300 7000 300 3100 450 3100 300 7000 300 4000 1800 TYPICAL CROSS SECTION FOR CENTRAL BUS LANE Karaw al Nagar Khaju ri Khas Juncti on Yamun a Vihar Mor i Gat e Shast ri Park Metr o Stn. Shast ri Park Juncti on Gandh i Nagar Near Gandhi Nagar

2500 2000 31150 300 3100 300 7000 750 7300 300 2800 300 2000 2500 TYPICAL CROSS SECTION FOR CURB SIDE BUS LANE Karawal Nagar Khajuri Khas Junctio n Yamuna Vihar Mori Gate Shastri Park Junctio n Shastri Park Metro Stn. Gandhi Nagar

Depot 1 3 2 Karawal Nagar Terminal Proposed Corridor Features Bus Stops Id Station Name 4 5 Khajuri Khas 16 15 14 Yamuna Vihar 1 Karawal Nagar Terminal 2 Police Training Center 3 Tukmerpur 4 Rajiv Nagar 5 Kartar Nagar Transfer Station 6 Ghonda Patti 6 7 Jagjeet Nagar 8 New Usmanpura 7 9 Shastri Park 10 Buland Masjid 8 Shastri Park Jn. 11 Metro station 12 Kailash Nagar 20 19 18 17 11 10 9 13 Gandhi Nagar 14 Yamuna Vihar 15 Brij Puri Mori Gate Terminal Shastri Park Metro Stn. 12 13 Gandhi Nagar 16 Bhajanpura 17 IT Park 18 Shastri Park Depot 19 Kashmere Gate ISBT 20 Mori Gate Terminal

Modern Bus shelters and FOB

Karawal Nagar Proposed Corridor Features FOBs & Cycle Parking Khajuri Khas Yamuna Vihar Proposed FOB Cycle parking Shastri Park Jn. Mori Gate Shastri Park Metro Stn. Gandhi Nagar

Junction Improvements

Khajuri Khas junction Existing Condition Proposed Improvement

Existing Condition Shastri Park Junction Proposed Improvement

Existing Situation at Shastri Park-Old GT Road Crossing(Buland Masjid) Existing Condition Proposed Improvement

Proposals at Buland Masjid Area

Existing Situation Old G.T. Road Roundabout Existing Condition Proposed Improvement In critical areas BRT will run in mix traffic

Application of Intelligent Transport System Automatic Vehicle Location Transit Priority at Intersection ITS for Passenger Information & Fare Collection Initially. Signal Priority & AVL

Stakeholders Consultation Several Consultations and Joint Site Visits to Finalize and Refine Plan UTTIPEC Traffic Police

Thank You