Geary Corridor Bus Rapid Transit: Staff-Recommended Alternative

Similar documents
Geary Bus Rapid Transit Project

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

Public Comment Meeting Geary BRT Project Draft Environmental Impact Statement/Report

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

Geary Bus Rapid Transit Project

Van Ness Avenue Bus Rapid Transit (BRT) San Francisco Environment Commission Policy Committee

Geary Corridor Bus Rapid Transit

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Memorandum. M:\Board\Board Meetings\2015\Memos\09 Sep\BRT Reports\Geary Report\Geary BRT Sep2015 Board Update

SFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

Polk Streetscape Project

ALTERNATIVES SCREENING REPORT

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

March 24, Date: To: From: Through: Subject: Summary BACKGROUND. along the. facility. bus lanes. The Geary. the 6.5- mile Geary current

122 Avenue: 107 Street to Fort Road

Pedestrian and Bicycle Conditions

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Community Task Force July 25, 2017

Date: Plans and. Committee. To: From: Through: Subject: the San (BRT) Summary BACKGROUND. Avenue. action by work to support the and an

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

WELCOME WIGGLE NEIGHBORHOOD GREEN CORRIDOR COMMUNITY OPEN HOUSE

FOLSOM-HOWARD STREETSCAPE OVERVIEW

ALTERNATIVES SCREENING REPORT

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

Vision Zero Priority Projects (March 2017)

Appendix A-2: Screen 1 Alternatives Report

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Freeway ramp intersection study

Item Description: Presentation and Discussion: Berkeley Rapid Transit Locally Preferred Alternative

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

3.5 Pedestrian and Bicycle Transportation

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

El Camino Real Bus Rapid Transit Conceptual Engineering. Los Altos Council Workshop January 24, 2012

42nd Ave N Reconstruction

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Environment and Public Works Committee Presentation

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

North Shore Transportation Improvement Strategy

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

Chapter 3 BUS IMPROVEMENT CONCEPTS

Eliminate on-street parking where it will allow for a dedicated bus only lane %

FINAL REPORT DECEMBER 2011

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Geary Community Advisory Committee Tuesday, March 20, :00 pm One South Van Ness, 7 th floor, Union Square Conference Room

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Pedestrian Safety Workshop SAN FRANCISCO, CALIFORNIA

Omaha s Complete Streets Policy

San Jose Transportation Policy

Geary COrrIDOr Bus rapid TransIT (BrT) study san FranCIsCO COunTy TranspOrTaTIOn authority DRAFT - ApRil 12, 2007

Geary COrrIDOr Bus rapid TransIT (BrT) study san FranCIsCO COunTy TranspOrTaTIOn authority June 18, 2007

Central Jersey Transportation Forum. March 2007

Public Information Meeting

Building Great Neighbourhoods STRATHEARN

Central Freeway and Octavia Circulation Study

District 6 & Citywide Non-Transit Project Delivery Status Report

Appendix A-K Public Information Centre 2 Materials

RED COLORED TRANSIT-ONLY LANES REQUEST TO EXPERIMENT

MUNI FORWARD Proposed Changes: Stanyan

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010

Better Market Street Project Update. Urban Forestry Council September 17, 2014

SFMTA s Services for Seniors and People with Disabilities. San Francisco Municipal Transportation Board July 17, 2018

Presentation Starts at 5:30 PM

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Geary Bus Rapid Transit (BRT) CITIZENS ADVISORY COMMITTEE (GCAC) Meeting Five

From Disarray to Complete Street:

South King County High-Capacity Transit Corridor Study

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Options. Agenda. Program

Community Task Force November 15, 2017

Building Great Neighbourhoods LANSDOWNE

Technical Working Group November 15, 2017

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

CURBSIDE ACTIVITY DESIGN

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

OneBayArea Grant Application

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

TransferNo. 23, RESCUE MUNI. Transfer. Rescue Muni's 2005 Riders' Survey Results. Survey Results. Winter Riders' Fall 2005

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

North Avenue Corridor Study

DRAFT MINUTES. CITIZENS ADVISORY COMMITTEE June 25, 2014 MEETING

Transcription:

Geary Corridor Bus Rapid Transit: Staff-Recommended Alternative Urban Forestry Council January 24, 2014 SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Today s Presentation Staff-Recommended Alternative Tree and landscaping plan Mayor Christopher tree GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 2

Background: SFCTA and SFMTA Agency Role in Project Environmental lead agency After this phase, project to be transferred to SFMTA Will prepare Conceptual Engineering Report, final engineering design, construct, and operate BRT 3

Staff-Recommended Alternative: Consolidated Center-to-Side Masonic Fillmore Side lanes Center lanes, Consolidated local/brt stops Side lanes GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 4

Staff-Recommended Alternative: Highlights Strong bus benefits where BRT treatments applied: Travel time: 25% savings Reliability: 20% reduction in travel time variability Ridership: 10%+ gains forecasted strong cost effectiveness Lower travel times = more service, more riders at lower operating cost Pedestrian benefits GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 5

Inner Geary Recommendation: Enhance Existing Lanes Colorize existing lanes and remaining gap (O Farrell, Powell to Market) Bus bulbs at highridership stops Spot improvements at congested intersections Corner bulbs at strategic locations Curbside loading access preserved GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 6

Fillmore-Area Recommendation: Side Bus Lanes Surface station with new amenities, good connection to 22-Fillmore Underpass retained, with fewer lanes Pedestrian crossing improvements at Steiner, Webster GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 7

Masonic-Area Recommendation: Side Bus Lanes Surface stop provides strong access, security and safety, transfer to 43-Masonic Smooth multimodal interactions Responds to community feedback GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 8

Richmond-Area Recommendation: Center Bus Lanes, Consolidated Stops Preserves most of on-street parking New landscaped medians Complete Streets New median stations Pedestrian safety improvements GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 9

Conceptual Landscape Design: Corridor Level Richmond Masonic Fillmore Inner Geary Side lanes Center lanes, Consolidated local/brt stops Side lanes New trees on blocks with bus stops New trees in new dual medians, all blocks New trees on blocks with bus stops NOTE: all concepts are prototypical GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 10

Trees and Landscaping: Conceptual Design Existing trees removed: 155 Trees in proposed conceptual landscape plan: ~300 ~2/3 in median (8-9 feet wide) ~1/3 in sidewalks (sidewalks extended) In sidewalk, at median stations: narrow-crown trees In median between stations: wider-canopy trees GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 11

Conceptual Design: Inner Geary GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 12

Conceptual Design: Van Ness to Palm Side Lanes GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 13

Conceptual Design: Palm to 27 th Center Lanes, at Stations GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 14

Conceptual Design: Palm to 27 th Center Lanes, Between Stations GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 15

Landscaping Considerations: Discussions Ahead Utility constraints (SFDPW, SFPUC) Use of tree-supportive infrastructure, e.g., structural soils, Silva Cells (SFDPW, SFPUC) Tree species selection (SFDPW) Maintenance (SFDPW) GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 16

Mayor Christopher Tree Tree #173 in survey Species: New Zealand Christmas Tree Trunk Diameter: 20 Age: Mature Health Condition: 4 out of 5 (good) GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 17

Mayor Christopher Tree: BRT Project Design, Constraints Bus lanes Bus stop locations, including connection to 28-19 th Ave Pedestrian access Left turn locations Sewer lines On-street parking GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 18

Options and Constraints Preserve in place challenges: Bus lane alignment Bus stop location On-street parking Sewer constraints Relocation - challenges: Large root ball 8-10 radius Surrounded by utilities and pavement Likelihood of surviving transplant low Other ways to commemorate Mayor Christopher s efforts? GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 19

Recommended Alternative: Cost and Funding Funding $M Total Cost: $225M-$260M Source Funds Prop K Sales Tax $38 Federal discretionary $75M Land development contribution (CPMC) Other funding to be determined $2.5M $110-$145M 20

Schedule Schedule Winter 2013/14 Summer 2014 Fall 2014 Winter 2014/15 Outreach Activity/Milestone Draft Environmental Document w/ preferred alternative Public comment Action to endorse preferred alternative Final Environmental Document GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE 21

For More Information: www.gearybrt.org GEARY CORRIDOR BUS RAPID TRANSIT PROJECT UPDATE