PALLADIAN EXPOSED TUB SET WITH HANDSHOWER AKIT1901LM (Metal levers) AKIT1901XM (Cross Handles) COLORS/FINISHES WARRANTY FEATURES Palladian metal levers or cross handles Floor mounted exposed two handle tub filler with cradle and single-function brass handshower with metal insert 1/4 turn ceramic disc valve 5 29/32 center to center Fixed center to center measurements Maximum male stub out 9 16 floor legs Floor legs cannot be cut down 10 GPM at 60 PSI For wall or deck applications, call ROHL 39 3/8 length hose Decorative shut offs available (order two for a set) -ZA10384021-APC -ZA1038402B-PN -ZA1038402Z-IB -ZA1038402A-STN -ZA1038402V-TCB 2 C7205EXT Straight union extension available Kit includes: -A1901 -C5574EXT -ZA383 HOT XM option COLD 44 Polished Chrome Polished Nickel Inca Brass Satin Nickel Tuscan Brass* Ø1" 12 1/4 4 17/32 8 7/8 4 5/8 30 3/8 Limited Lifetime* * No warranty on Tuscan Brass finish (TCB) 5 29/32" 1 31/32 3 7/8 Ø3 7/8" G1/2" FEMALE NPT Ø3 7/8" 1
A1901 Spare parts C5574EXT For wall instalation only. Use C5574EXT for the kit. 2
Installation and care & maintenance guide Installation guide Please note, you may have to install an inline anti-scald device. Check your local code requirements. 3
ZA383 Spare parts 4
ASSEMBLY INSTRUCTIONS FOR ART. ZA10383 Fig.1 Fig.2 Fig.3 Fig.4 1"7/16 max.19/32" 5 " 2 9 / 3 2 G.1/2"NPT G.1/2"NPT max.19/32" 5 " 2 9 / 3 2 G.1/2"NPT G.1/2"NPT WARNING DO NOT OVER TIGHTEN 5/32" 2 PARTS ENSURING 4 MECHANICAL FIXING 1 Ø13/32" 5 3 Fig.5 7 9 Fig.6 10 10 3/32" 3/32" 8 1"3/16 6 3/32" 1"3/16 Installation requirements: 2 x1/2 NPT male stub outs at 5 29/32 centers Please note: if installing with an Italian Country Bath exposed tub filler you must install a set of adaptors, C5574EXT Fig.1 Apply Teflon tape to the male connection. Fig.2 Fig.3 Hand tighten, then turn with a strap wrench 1/2 to ¾ turn to make a seal. WARNING: Do not over tighten. Over tightening could cause the brass to crack. Test for leaks before installing floor escutcheons. Please note that the threaded connection only ensures hydraulic water tightness, please note that mechanical fixing of floor legs is ensured by the whole part assembly of components listed as 1-2-3-4-5 in Picture4. Slide on base escutcheons (1) and the cut bushings (2). Mark the screw holes for drilling. Fig.4 Fig.5 Fig.6 Drill a hole using a 13/32 drill and install floor anchors (3). Slide the base escutcheons (1) to the floor, align with holes and tighten allen screws (4) using a 5/32 wrench. Insert the cut bushings (2) into the base escutcheons (1) and slide on the threaded ring (5). tighten using a 1 7/16 wrench. Install waste tube connection rings (6) into the horizontal sleeve (7) and slide onto pillar legs Screw the clamp (8) to the rod (9) and install the clamp with the rod (8 & 9) onto the horizontal sleeve (7) Use the clamp to anchor the frame to the overflow pipe of the tub drain Square off the installation and tighten allen screws using a 3/32 wrench. Install elbow unions (10) to pillar legs, using a 1 3/16 wrench, ensuring that all washers create a seal. Install tub faucet to elbow unions using a 1 3/16 wrench, ensuring all washers create a seal Cod. 0101034000 Ed.08.14 5
SPARE PARTS FOR ZA 383 FLOOR LEGS 1-1 1 1-1 4 2 2-1 5-1 5 5-2 3 POS. DESCRIPTION CODE 1 9 0 u n i o n p i l l a r l e g Z Z 9 3 7 5 0 0 1-1 G a s k e t N B R 9 0 S H. 2 4 x 1 6 x 2, 7 Z Z 9 2 6 8 9 0 2 W a s t e t u b e c o n n e c t i o n Z Z 9 4 0 8 3 0 2-1 W a s t e t u b e c o n n e c t i o n Z Z 9 4 1 2 7 0 3 I n s t a l l a t i o n s e t Z Z 9 4 3 4 3 0 4 G 1 / 2 " N P T f l o o r p i l l a r l e g Z Z 9 4 3 5 5 0 5 B a s e f o r f l o o r p i l l a r l e g Z Z 9 4 3 5 6 0 5-1 F i x i n g r i n g Z Z 9 4 3 5 7 0 5-2 C u t b u s h Z Z 9 4 3 5 8 0 6
7
8