Contents. 1. Non Destructive Testing Requirements. 2. Non Destructive Testing Methods Magnetic Particle Examination

Similar documents
Use of Underwater Dry Welding for In Situ Repair to Offshore Structures. Sabine Powell 02/12/2016

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints

Liquefied gas cargo tanks and process pressure vessels

Technical Standard. API6D Ball & Plug Valve. Inspection & Test Procedure

Testing Procedures of Watertight Compartments

Annex G (normative) Requirements for Nondestructive Examination

DIFFERENT SOLUTIONS TO INSPECT PLATFORM RISERS. By R van Agthoven and H Quakkelsteijn, ApplusRTD, Rotterdam, The Netherlands

Enbridge Pipelines Inc. PIPELINE INTEGRITY AXIAL CRACK THREAT ASSESSMENT

RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS

Survey of Underwater NDT Technologies for Offshore Assets

NONDESTRUCTIVE INSPECTION OF HULL WELDS

The Use of Ultrasonic Inspections at Elevated Temperature

In-Service Inspection of Ammonia Storage Tanks

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

OMS WeldChecker WeldChecker inspection tool Features that can be inspected include: 2007 & 2014 The camera will identify: WELD

Flaw Detection Capabilities with Eddy Current Array Technology

APPENDIX 1. PART 10: Leak Detection Inspector, Level 1, 2 and 3 CERTIFICATION SCHEME FOR PERSONNEL. 3 rd Edition, February 2016

MIL-STD-883H METHOD EXTERNAL VISUAL

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

UKOPA Dent Management Strategy

TECH TIPS: ROPE DEFECTS

DETERMINATION OF THE DEPTH OF CLOSED BLIND CRACKS IN NON-METAL CHECK SAMPLES AND TEST PANELS FOR PENETRANT TESTING

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

SHELL FLAGS INSPECTION CASE STUDY

SLUG CATCHER INSPECTION USING THE LARGE STRUCTURE INSPECTION AUTOMATED CORROSION MAPPING SYSTEM IN LNG INDUSTRY

Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland

Preparing and using manual gas welding equipment

GUIDELINES. Systems. Pressure. Guidelines for Competent Person In-service examination of pressure systems pipework

Notice for Pressure Special Equipment Manufacture Licensing

Wire ropes condition monitoring: conception and embodiment

Smart Water Application Technologies (SWAT) TM

Suspension Ropes. Suspension Rope

Outline for Safety Performance Supervisory Inspection of Boiler and Pressure Vessel Products

High Pressure Iron (HPI) Recertification Guidelines & Procedures

DNVGL-CP-0187 Edition March 2016

B-05 SEAMLESS STEEL GAS CYLINDERS

UNPIGGABLE NO MORE! PRACTICAL SOLUTIONS FOR CHALLENGING PIPELINES

Pipeline Systems PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING

THE MISSING LINK - INSPECTING THE FINAL CRITICAL SECTION OF A LARGE CRUDE TRANSMISSION AND EXPORT SYSTEM

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

Journal of Applied Fluid Transients, Vol 1-1, April 2014 (3-1)

EXPERIMENTAL RESULTS OF GUIDED WAVE TRAVEL TIME TOMOGRAPHY

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives)

Engineering Data Sheet

User Information Sheet 013

Combined NDT advanced techniques as an alternative to radiography for NDT of primary component circumferential welds. Ready for industrialization.

6-way characterised control valves DN15 and DN 20

With a team of highly qualified divers Vision offers a wide range of services including;

INSPECTION & NON-DESTRUCTIVE TESTING

Standard Practice for Eddy-Current Examination of Steel Tubular Products Using Magnetic Saturation 1

Other Si min/max. Cr min/max. 0.4/ / / / Bal.

Rubber Dock Hose care, Use & Maintenance

Testing Procedures of Watertight Compartments

DR.ING. CARLO AVANZINI PROFESSIONAL ENGINEER GRIP TEST REPORT NOVA SIRIA, ROLETTO, Premise

TECHNICAL REPORT ON CAPACITY BUILDING IN USE OF EDDY CURRENT TESTING EQUIPMENT

Employer s Unit of Competence Magnetic particle testing of materials, products and plant

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Hose Management Inspection Guidelines for HP Drilling and Production Hoses

PRESSURE RETEST. 49 CFR, (g) Co#: Vin#: DOT Spec: MAWP:

HYDROSTATIC LEAK TEST PROCEDURE

Slug Catchers Engineered Solutions to Separation Problems

OCTOBER 2017 ISSUE Page 1 of 7

Installation Instructions and User Guide 15mm & 22mm Thermostatic Mixing Valve

Analysis A1 and B2 Methods of Hydrostatic Testing Applied at Gas Pipeline; Cause Study A1-Method

Item 404 Driving Piling

Guided Wave Testing (GWT)

Procedures for Inspection Bodies Testing and Inspection of UK Tanks

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

Amador Circle Tank. City of Rio Vista. Report of Findings From the Diving Operations Conducted on. March 28, 2011

Elcometer Viscosity Cup. Operating Instructions

SECTION PRESSURE TESTING OF PIPING

A1.1.5 It is assumed that under normal circumstances a ship uses only one bow anchor and chain cable at a time.

PIP PNE00012 Piping Examination and Leak Test Guide

Industry Guidelines POLYETHYLENE (PE) PIPES AND FITTINGS FOR COMPRESSED AIR ISSUE 6.8

Flange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing

CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT

MSC Guidelines for Independent Fuel Tanks

The purpose of this task is to prevent damage from occurring to the pipe or it s coating when backfilling an exposed pipeline.

Welding Contest. The contestant may provide the following: Welding gloves. Ironworkers International Welding Contest (February 2016) Page 1

M-06 Nitrogen Generator (Nitrogen Making Machine)

BVM CORPORATION TYPE AAX TONG 55,000 FT/LBS. TORQUE Part number: Serial Number:

APPLICATION OF ACOUSTIC EMISSION DETECTION TECHNOLOGY ON MULTILAYER BINDING HIGH PRESSURE VESSEL

Translation of the original Operating Instructions for HKS rubber compensators

Internal riser inspections on FPSO storage & production facilities

Gas Pressure Regulator HON 200

Steam Trap BK 15 (DN40, DN 50) Original Installation Instructions English

Title: Non-Destructive Inspection

EKC International FZE. Safety Instructions For Handling & Inspection Manual For Refillable Seamless Steel Gas Cylinders

RELIABILITY ASSESSMENT, STATIC AND DYNAMIC RESPONSE OF TRANSMISSION LINE TOWER: A COMPARATIVE STUDY

CAST IRON SAFETY VALVE TYPE 6301

Defence Standard Part 5. Issue 3 Date: 21 June Requirements for Non-Destructive Examination Methods Part 5: Ultrasonic

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

CRANE WITH WINCH USE AND MAINTENANCE MANUAL. Code Rev. Release MD /03

INTERNAL AXIAL CORROSION IN OFFSHORE PIPELINES: INSPECTION AND ASSESSMENT. By: Dr. Christoph Jäger, Abdullahi Atto, NDT Global, Germany

IGEM/TD/1. Background, Development, Changes J V Haswell

Veriforce TG CCT 661OP. Training Guide

Abdelhamid Bedjou, Magister of Hydraulic Dr.-Ing. Sissis Kamarianakis

Transcription:

1

Contents 1. Non Destructive Testing Requirements 2. Non Destructive Testing Methods Magnetic Particle Examination 3. Non Destructive Testing Methods Dye Penetrant Examination 4. Non Destructive Testing Methods Ultrasonic Examination 5. Non Destructive Testing Methods Radiographic Examination 6. Pressure Testing Procedure 2

1. NON DESTRUCTIVE TESTING REQUIREMENTS As it has already been mentioned welding requirements including NDT extent and welding defects acceptance limits are covered in EN 12732 Gas Supply Systems Welding Steel Pipework Functional Requirements Initially the standard allocates quality requirements categories: 3

4

5

6

7

The pipeline operator shall specify the acceptance criteria. The acceptance criteria given in Table G.1 for radiographic findings and in Table G.3 for ultrasonic findings are based on workmanship criteria. The pipeline operator may use EPRG guidelines (Tables G.2) or alternative acceptance criteria based on fracture mechanics analysis and fitness-for-purpose criteria, provided they are fully documented and based on a proven safe approach. Weld defects detected by means of ultrasonic examination shall be evaluated in accordance with the requirements of Table G.3. The acceptance requirements for alternative examination methods shall be determined from case to case. 8

9

10

11

The EPRG (European Pipeline Research Group) guidelines on the assessment of defects in transmission pipeline girth welds are based on literature reviews, an extensive laboratory test program, published experimental data and accepted fitness for purpose methodologies. The guidelines are structured in three tiers and specify defect acceptance levels intier 1 (good workmanship) and defect limits in Tiers 2 and 3 (fitness-for-purpose). The application of current welding standards can lead to quite different defect limits. but the EPRG guidelines provide uniform acceptance levels and defect limits, with a comprehensive technical justification 12

13

14

15

16

17

18

19

20

2. NON DESTRUCTIVE TESTING METHODS MAGNETIC PARTICLE EXAMINATION 21

3. NON DESTRUCTIVE TESTING METHODS DYE PENETRANT EXAMINATION 22

23

4. NON DESTRUCTIVE TESTING METHODS ULTRASONIC EXAMINATION 24

During the initial creation and transmission of ultrasounds a near field area is created which makes difficult the detection of defects 25

26

In the last years automatic ultrasonic test systems have been developed which make use of phased array Ultrasonic Heads and Time of Flight Diffraction (TOFD) techniques for improved detection and sizing of the indications. Such systems provide very fast examination of a production field weld without having also the safety risks associated with radiographic testing. As a drawback automatic UT systems requires a dedicated calibration block for each weld configuration with the same diameter, thickness, and material as the pipes to be used on site. Additionally defect criteria and acceptance levels cannot be taken from existing standards and need to be set by the system manufacturer. 27

28

5. NON DESTRUCTIVE TESTING METHODS RADIOGRAPHIC EXAMINATION 29

Factors affecting the radiographic technique: Material thickness Geometric Unsharpness Ug = s*b/a where: S = source size b = material thickness a = distance of the source from the material surface Sensitivity (diameter of the smaller visible wire / material thickness) x 100 %. 30

MISALIGNMENT 31

EXCESSIVE ROOT PENETRATION 32

UNDERCUT 33

ROOT CONCAVITY 34

INCOMPLETE PENETRATION 35

CLUSTER POROSITY 36

TRANSVERSE CRACKS 37

TUNGSTEN INCLUSIONS 38

6. PRESSURE TESTING PROCEDURE Basic pressure testing requirements are described in EN 1594 Gas supply systems pipelines for maximum operating pressure over 16 bar functional requirements. Based on these requirements a pipeline pressure test comprises of the following stages: - Definition of pipeline test sections and test planning - Pipeline cleaning and gauging - Water filling and test preparation - Pressure test (including strength and tightness test) - Dewatering - Final pigging and acceptance 39

TEST PLANNING Initially the pipeline section needs to be broken down to sections which shall be agreed with the Owner based on the criteria given by EN 1594 and other project requirements i.e. level between lowest and highest point in each section to be less than 300m for mountainous areas and 60m for areas with low elevations. Prior to the initiation of the pressure test the following need to submitted to the Owner for approval: - Detailed pressure test program and method statements for all scheduled activities - Approvals from local authorities according to regulatory requirements - Submission to the Owner for review of all relevant technical documentation including detailed pipeline section profile, Weld log book covering all weld seams within the test section, layout plans for the designated launching and receiving stations and water analysis report. 40

41

CLEANING AND GAUGING Prior to water filling cleaning and gauging of the pipeline shall be conducted for the whole pipeline test section. The purpose of cleaning is to remove any debris existing in the pipeline from the construction period. Gauging verifies the internal roundness of the pipeline and the absence of any unacceptable deformation. Cleaning is performed using a train of high seal bidirectional cleaning pigs which travel through the test section by the application of a suitable back pressure using water or air. Wire brushing pigs may be used but when the pipeline is internally lined the use of such pigs may damage the internal coating of the pipeline. Passage of the cleaning pig train shall be performed as many times as necessary for all debris to be removed from the pipeline. Line valves hall not be installed during cleaning operations to avoid valve damages caused by debris and other foreign bodies. 42

43

CLEANING AND GAUGING Following successful cleaning of the pipeline an aluminum gauging plate is attached to a gauging pig and a gauging run is performed to verify the internal diameter of the pipeline and the absence of unacceptable deformations. The gauging plate diameter is 95% - 10 mm of the pipe internal diameter The gauging run is considered acceptable if the aluminum plate shows no signs of damage to the outer edges thereby revealing that contact was made to the internal pipe wall during passing through the section. 44

45

WATER FILLING AND EQUALIZATION Suitable properties for the water to be used during pressure testing include a ph of 6-8 and a low salt content. In case the water does not fulfill the chemical requirements or if it is going to stay in the pipeline for a period of over 1 month then corrosion inhibitors and/or biocides need to be added. Selection of the suitable additives must be agreed with the Owner and all environmental effects of these chemicals must be taken into consideration prior to disposal. During water filling it is critical that large quantities of air are not trapped into the pipeline. To achieve this, multiple sealing pigs suitable for expulsion of air from the pipeline are used in front of the main water volume. During water filling the time of departure and arrival of pigs, the volume of water used and its temperature are recorded in the relevant form. 46

47

WATER FILLING AND EQUALIZATION On completion of the water filling procedure the equalization period begins. The pressure during this period is held between 1/8 and 1/4 of the strength test pressure. During the equalization period, the pressure is continuously monitored, while also the pipe temperature is measured at least every six hours by suitably located thermometers. At least three measuring points shall be used. Thermometers must be placed o.5 km from each end of the test section and not further than 2.5 km from each other. The equalization is considered complete when the temperature difference of the thermometers does not change more than 0.5 C between two consecutive measurements. 48

49

STRENGTH TEST The strength test pressure (Ps) is calculated based on the requirements of EN 1594. Typical strength test stages include the following: - Pressurizing of the test section at a maximum rate of 2 bars/min - When Ps is reached the pressure is maintained for 6o min (1 st hold time) - Air inclusion test is performed by dropping the pressure 1 bar and comparing the water volume needed for this drop to the one theoretically calculated. - After inclusion test the pressure is reduced at a minimum of 2 bar at the highest pipeline point and hold for 30 min (2 nd hold time) - Pressure is increased at Ps and maintained there for 10 min (3 rd hold time) - Pressure is reduced at the tightness test ressure (Pt) 50

51

TIGHTNESS TEST The tightness test pressure (Pt) is defined prior to the pressure test and shall not be less than the pipeline design pressure (DP). Tightness tests have a duration of at least 8 hours but a duration of 24 hours is the usual practice. During the whole tightness test duration corresponding values of time, pressure and pipeline temperature are recorded every hour. Evaluation of the tightness test is performed through specific calculations which verify any observed change in the Pt. 52

53

54

55

56

57

DEWATERING On completion of the test the pipeline shall be emptied of water using swabbing pigs driven by compressed air. The disposal of water shall be done under an approved and in areas where no environmental problems will be created. Special care shall be taken when chemical additives have been used in the water. 58