GUIDELINES ON HEATING, VENTILATION AND AIR-CONDITIONING SYSTEMS FOR NON-STERILE PHARMACEUTICAL PRODUCTS

Annex 8. Guidelines on heating, ventilation and air-conditioning systems for non-sterile pharmaceutical products. Background. Summary of main changes

Air Handling Unit (AHU) Air handling unit which serves to condition the air and provide the required air movement within a facility.

Guideline to the Inspection of Hormone Product Manufacturing Facilities QAS/08.256, February 2008

Regulatory Basics for Facility Design (WHO GMP): Current GMP Requirements

The routine maintenance and inspection of local exhaust ventilation (LEV)

CTG Certification Protocol -- Version 3.0 SUMMARY

LABORATORY FUME HOOD SPECIFICATION AND MAINTENANCE PROGRAM

VENTILATION DURING TUNNEL CONSTRUCTION INDUSTRY CONSIDERATIONS

The primary purpose of laboratory fume hoods is to keep toxic or irritating vapors out of the general laboratory working area.

Space Pressurization: Concept and Practice ASHRAE Distinguished Lecture Series

GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS)

IC Sentinel Applications Guide for Healthcare Environmental Air Quality Monitoring

SKAC25 Operate plant to maintain the quality of pool water

ISO INTERNATIONAL STANDARD. Breathing system filters for anaesthetic and respiratory use Part 2: Non-filtration aspects

LEV GUIDANCE FOR SAFE USAGE, TESTING AND MAINTENANCE OF LOCAL EXHAUST VENTILATION SYSTEMS WITHIN ANGLIA RUSKIN UNIVERSITY RISK MANAGEMENT

ARCHIVED. Compliance Document for New Zealand Building Code Clause G11 Gas as an Energy Source. Prepared by the Department of Building and Housing

H 2 O 2 Bio-Decontamination and Aseptic Transfer of Heat Sensitive Materials Sergio Mauri, Director, Global Marketing and Business Intelligence

Proficiency Module Syllabus. P601 - Thorough Examination and Testing of Local Exhaust Ventilation Systems

Vertebrate Animal Biosafety Level 1 Criteria

Work Equipment: LOCAL EXHAUST VENTILATION

ISO INTERNATIONAL STANDARD. Hydraulic fluid power Filter elements Determination of resistance to flow fatigue using high viscosity fluid

TExT Thorough Examination & Test of LEV Local Exhaust Ventilation Systems

Hazard and risk analysis in pharmaceutical products 1

MANAGEMENT PROCEDURE FOR LABORATORY VENTILATION

Kansas State University Fume Hood Operation

Whitepaper Technical Opinion: Grade A - Air Supply and Local Protection

THE UNIVERSITY OF WESTERN ONTARIO DIVISION OF HUMAN RESOURCES OCCUPATIONAL HEATH & SAFETY

LEV Issues. Local Exhaust Ventilation. A Salesman Approaches! Why is LEV important? What is it supposed to do? What comprises an LEV system?


Walk in Modular Material Transfer Chamber Including Integration of a Bioquell Clarus L2 hydrogen peroxide vapour (HPV) generator

THE UNIVERSITY OF WESTERN ONTARIO OCCUPATIONAL HEATH & SAFETY

Title: INSTRUMENT AND EQUIPMENT DOCUMENTATION AND RECORDS

IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL

ISO 6570 INTERNATIONAL STANDARD. Natural gas Determination of potential hydrocarbon liquid content Gravimetric methods

STANDARDS FOR COMPRESSED GAS TESTING

Developing a HACCP plan

OPERATOR, PRODUCT AND ENVIRONMENTAL PROTECTION

OPERATOR, PRODUCT AND ENVIRONMENTAL PROTECTION

ESTATES OFFICE OPERATIONS WORKS INSTRUCTIONS WI 6. Fume Cupboards, Ventilated Cabinets, Local Exhaust Ventilation

Ventam 85 Installation & Commissioning Instructions

Sole reliance for sterility or other quality aspects must not be placed on finished product test.

CASE STUDY ON RISK ASSESSMENTS FOR CROSS CONTAMINATION. Stephanie Wilkins, PE EMA Workshop June 2017

INSPECTION OF MEDICINAL GASES

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

Toolkit for safe Use of Microbiological Safety Cabinets(MSC s)

APPENDIX A SAMPLE FHT SPECIFICATION (This recommended FHT specification is available from

Annex 6 Good manufacturing practices for sterile pharmaceutical products

ISO Vacuum gauges Calibration by direct comparison with a reference gauge

NZQA unit standard version 3 Page 1 of 8. Manage the mine ventilation system at an extractive site

Specific Accreditation Criteria Calibration ISO IEC Annex. Mass and related quantities

PERFORM Operating Document

Laboratory Ventilation. Environmental, Health, and Safety

M-06 Nitrogen Generator (Nitrogen Making Machine)

Pressure Systems Safety Regulation

SECTION TESTING ADJUSTING AND BALANCING FOR HVAC

Field Evaluation of ASTM E in Relation to Control Room Habitability Testing and Boundary Maintenance in Nuclear Power Plants.

New Thinking in Control Reliability

Title: Standard Operating Procedure for R&R Environmental Devices Model MFC201 Gas Dilution Calibrator

American National Standard

Vision Painting Inc Safety Management System

Installation and operating manual. Pneumatic control station LK product no: PCS 1-10

Draft. Equipment/Instrument

Ad Hoc GMP Inspections Services Group EC GUIDE TO GOOD MANUFACTURING PRACTICE REVISION TO ANNEX 1

Validation of a Neutral Pressure Isolation Room

Guidance on room integrity testing and its interpretation

ProSys Laboratory Analytical Isolators

Control of Nuclear Gloveboxes and Enclosures Using the No- Moving-Part Vortex Amplifier (VXA)

INOGATE Technical Secretariat UK Experience European Standards Implementation Key Expert Phil Winnard Session 2 Georgia, October 2015

Facility design for containment. Gordon Farquharson, July 2016

Opening and closing force guidelines

In summary, the ISPE comments suggest the following additional improvements to the modified Annex 1 document:

CORESTA RECOMMENDED METHOD N 6

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

General Accreditation Guidance. User checks and maintenance of laboratory balances

This document is a preview generated by EVS

R2S Standard Sampling Assembly OPERATION PROCEDURE

NZQA unit standard New US 1Non-coal of 7145 version 1 Page 1 of 5

ASSESSMENT OF BIOAEROSOL REDUCTION METHODS IN STEM CELL TRANSPLANT UNITS AT A UNIVERSITY HOSPITAL

1. The laboratory supervisor must enforce the institutional policies that control access to the laboratory.

Enzyme Safety Management. A series of web based training and Information Sessions developed and presented by the AISE Enzyme Safety Task Force

Pressure Automated Calibration Equipment

IP DEFINITIONS. Technical Notes. Definitions. IPXX Code

92831 TEL: (714) FAX:

EtO Micro-Dose Sterilization

INTERNATIONAL STANDARD

LABORATORY SAFETY SERIES: Laboratory Hoods

RULES FOR CLASSIFICATION Naval vessels. Part 1 Classification and surveys Chapter 5 Surveys for submarines. Edition January 2016 DNV GL AS

92831 TEL: (714) FAX:

Class 2 Gases Learning Tool

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

Outside Air Nonresidential HVAC Stakeholder Meeting #2 California Statewide Utility Codes and Standards Program

ISO INTERNATIONAL STANDARD. Natural gas Measurement of properties Volumetric properties: density, pressure, temperature and compression factor

Instrument Craftsman Receives Caustic Burn to Ear

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

VDMA VDMA-Einheitsblatt December 2014 VDMA 15390: Continued page 2 to 31. Verband Deutscher Maschinen- und Anlagenbau e.v.

"LABORATORY SAFETY SERIES"

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

New Licensed Asbestos Operative Training

Biography. Abstract. Keywords. Body box, garments, validation, calibration, clean garments, IEST-RP-CC003.3, garment. Introduction and Scope

Transcription:

February 2018 Draft document for comment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 GOOD MANUFACTURING PRACTICES FOR HEATING, VENTILATION AND AIR-CONDITIONING SYSTEMS FOR NON-STERILE PHARMACEUTICAL DOSAGE FORMS: PART 2 INTERPRETATION OF PART 1 GMP FOR HVAC SYSTEMS World Health Organization 2018 All rights reserved. (February 2018) DRAFT FOR COMMENT Should you have any comments on the attached text, please send these to Dr S. Kopp, Group Lead, Medicines Quality Assurance, Technologies Standards and Norms (kopps@who.int) with a copy to Mrs Xenia Finnerty (finnertyk@who.int) by 26 April 2018. Medicines Quality Assurance working documents will be sent out electronically only and will also be placed on the Medicines website for comment under Current projects. If you do not already receive our draft working documents please let us have your email address (to bonnyw@who.int) and we will add it to our electronic mailing list. This draft is intended for a restricted audience only, i.e. the individuals and organizations having received this draft. The draft may not be reviewed, abstracted, quoted, reproduced, transmitted, distributed, translated or adapted, in part or in whole, in any form or by any means outside these individuals and organizations (including the organizations' concerned staff and member organizations) without the permission of the World Health Organization. The draft should not be displayed on any website. Please send any request for permission to: Dr Sabine Kopp, Group Lead, Medicines Quality Assurance, Technologies Standards and Norms, Department of Essential Medicines and Health Products, World Health Organization, CH-1211 Geneva 27, Switzerland. Fax: (41-22) 791 4730; email: kopps@who.int The designations employed and the presentation of the material in this draft do not imply the expression of any opinion whatsoever on the part of the World Health Organization concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. Dotted lines on maps represent approximate border lines for which there may not yet be full agreement. The mention of specific companies or of certain manufacturers products does not imply that they are endorsed or recommended by the World Health Organization in preference to others of a similar nature that are not mentioned. Errors and omissions excepted, the names of proprietary products are distinguished by initial capital letters. All reasonable precautions have been taken by the World Health Organization to verify the information contained in this draft. However, the printed material is being distributed without warranty of any kind, either expressed or implied. The responsibility for the interpretation and use of the material lies with the reader. In no event shall the World Health Organization be liable for damages arising from its use. This draft does not necessarily represent the decisions or the stated policy of the World Health Organization.

page 2 41 42 43 44 45 46 47 48 SCHEDULE FOR THE PROPOSED ADOPTION PROCESS OF DOCUMENT QAS/18.757: GOOD MANUFACTURING PRACTICES FOR HEATING, VENTILATION AND AIR- CONDITIONING SYSTEMS FOR NON-STERILE PHARMACEUTICAL DOSAGE FORMS: PART 2 INTERPRETATION OF PART 1 GMP FOR HVAC SYSTEMS Preparation of document by Dr A. J. van Zyl, consultant Circulation of working document for public consultation Consolidation of comments received and review of feedback Discussion during the informal consultation on GXPs for medicines and inspection tools Circulation of working document for public consultation Consolidation of comments received and review of feedback Presentation to the 53rd meeting of the WHO Expert Committee on Specifications for Pharmaceutical Preparations Any further action January February 2018 February 2018 May 2018 July 2018 August 2018 49 September 2018 22 26 October 2018

page 3 50 51 52 53 54 55 56 57 58 59 60 61 62 63 BACKGROUND The World Health Organization (WHO) published the first edition of the WHO Guidelines on good manufacturing practices for heating, ventilation and air-conditioning systems for nonsterile pharmaceutical dosage forms in WHO Technical Report Series, No. 937, in 2006. Having considered various comments and the recommendations through public consultation over several years, the WHO Expert Committee on Specifications for Pharmaceutical Preparations (ECSPP) agreed during its 51st meeting held in October 2017, that the Good manufacturing practices for heating, ventilation and air-conditioning systems for non-sterile pharmaceutical dosage forms guidelines, as amended, be adopted as Part 1. It was agreed that Part 1 consists of guidelines that contain good manufacturing practices (GMP) recommendations for heating, ventilation and air-conditioning (HVAC) systems for non-sterile products, and further agreed that Part 1 be supported by an additional document that reflects the interpretation of the recommendations in Part 1. This document is Part 2 and will be considered for adoption as such after consultation. 64

page 4 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 Contents Section 1 and 2. Introduction and Scope 3. Glossary 4. Premises 5. Design of HVAC systems and components 6. Full fresh air and recirculation systems 7. Air filtration, airflow direction and pressure differentials 8. Temperature and relative humidity 9. Dust, vapour and fume control 10. Protection of the environment 11. Commissioning 12. Qualification 13. Maintenance page

page 5 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 Section 1 and 2 : Introduction and Scope This document represents Part 2 of the HVAC systems guidelines. It contains non-binding examples, drawings, technical representations and interpretation in support of Part 1 of the HVAC systems guidelines. It is intended to be a basic and explanatory guide for use by pharmaceutical manufacturers and GMP inspectors. It is not intended to be prescriptive in specifying requirements and design parameters but it attempts to facilitate a harmonized understanding of expectations for HVAC systems for manufacturers of non-sterile products. Part 1 and Part 2 focus on good practices for HVAC systems for non-sterile products. Where applicable, some of the principles referred to may be considered in the HVAC design and approach for other dosage forms. These two documents are, however, not intended to be used as enforceable criteria for the design or review of HVAC systems for, e.g. APIs or sterile products. Other relevant national and international standards, as applicable, should be considered when Part 1 and Part 2 are used. These include, but are not limited to, the current publications such as ISO 14644 and ASHRAE standards. In general, HVAC systems can play an important role in facilitating a suitable environment for the manufacture of quality pharmaceutical products. Therefore careful consideration should be given to the design of the HVAC system. When designing an HVAC system, careful consideration should also be given to the building design and layout of areas as these may influence the decision and design relating to, for example, the number of air handling units (AHUs), components in AHUs, room pressure, pressure differentials, pressure cascades, levels of filtration, humidification, dehumidification, heating and cooling of air. These may in turn have an impact on the quality of materials and products as well as the functioning of equipment and instruments. The conditions of areas should be defined and should be appropriate for the storage, manufacturing and use, as appropriate, for equipment, instruments, materials and products. It should further ensure that comfortable conditions are maintained for operators. Risk assessment In line with the current approach in GMP, risk identification should be done for utilities such as HVAC systems. A science-based, comprehensive exercise of risk assessment should be used to determine risks related to possible failure of the HVAC system and AHUs (including their components and subcomponents). An appropriate risk assessment tool such as failure modes and effects analysis (FMEA) or fault tree analysis (FTA) should be selected. Controls should be identified to eliminate the risks, or minimize the risk to an acceptable level. For example, the effect of the failure of one or more AHUs in the HVAC system; the failure of

page 6 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 dust extraction systems; the failure of AHU components such as filters, heating coils, cooling coils and fans should be assessed and appropriate controls should be identified and implemented. For more information on risk assessment, refer the current WHO guidelines on Quality risk management. Design parameters Manufacturers should define the design parameters of the HVAC system to ensure appropriate operation and functioning of the system that is needed for all the areas. Special consideration should be given to the required conditions for storage and handling of materials and products, equipment and instrument functioning, personnel requirements and contamination control. Section 3. Glossary For definitions and abbreviations, see Part 1.

page 7 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 Section 4. Premises Premises design Both the architectural design of the building and that of the HVAC system should be carefully considered when attempting to achieve the general objectives of preventing contamination, cross-contamination and ensuring an appropriate environment for the production and control of pharmaceutical products. The layout of the premises should facilitate unidirectional flow of material and personnel; building finishes should not result in contamination (e.g. through shedding of particles) and should ensure that the required environmental conditions, cleanliness and containment are achieved and maintained. Air infiltration of unfiltered air into production areas should be prevented. Manufacturing facilities should normally be maintained at a positive pressure relative to the outside, to limit the ingress of contaminants. Where facilities are to be maintained at negative pressures relative to the ambient pressure, special precautions should be taken. Where necessary, air locks, change rooms and pass-through hatches may be considered and provided with effective ventilation and filtered air. Special attention should be given to door design as gaps between doors and floors, doors opening into low pressure areas and sliding doors can result in changes in pressure differential between areas. An interlocking system and a visual and/or audible warning system may be used to prevent the opening of more than one door at a time where required. In addition to the design of the premises, general controls should be in place to ensure protection of materials, products and personnel. The HVAC system can play a role in achieving this objective. Where identified, areas should be maintained within defined limits for temperature, relative humidity, viable and non-viable particles. In such cases, the areas are considered to be clean areas (also referred to as zones, rooms, etc.). To ensure that the clean area is maintained at the defined limits, areas are normally classified. When classifying the area, the manufacturer should state whether the classification is for the as built, at rest or in operation condition. For details including definitions, see ISO 14644. The following describes approaches (and illustrations by means of diagrams) of different room arrangements and room pressures. Weighing/dispensing and sampling areas A room for weighing (e.g. dispensing of materials), should be of appropriate design. It is often advantageous to have several rooms associated with the weighing activity. These may include a pre-weighing staging area, personnel airlock, material airlock, weighing area with a containment booth, post-weighing staging area, washing area and provision for waste removal. The HVAC system for such areas should ensure that the areas have at least the same area classification as other production areas where materials and products are exposed to the environment, logical flow of material and personnel, appropriate number of AHUs, pressure

page 8 186 187 188 189 190 191 192 193 194 195 196 differentials, containment, dust control, and air exchange rate. The objective of having a booth in a weighing room is to provide dust containment and operator protection. For example, the dust generated at the weighing location should be extracted through a perforated worktop, thus protecting the operator from dust inhalation, but at the same time protecting the product from contamination by the operator by means of the vertical airflow stream. The airflow velocity should be such that it does not disrupt the sensitivity of balances. The operator should neither obstruct the airflow nor become a source of contamination of the materials or products.

page 9 197 198 Figure 1. Example of a weighing area Change Room SOB 35 Pa Dispensary Post-Staging Room 35 Pa Wash Bay 35 Pa Pallet BIN BIN BIN BIN BIN Dispensary Pre-Staging Room Perforated Worktop Weigh Booth 25 Pa Airflow Protection Plenum Material Flow Material Flow Table Scale BIN Floor Scale BIN Return Air Shaft 199 200 201 Figure 2. Example of a weighing area Production Passage Dispensary Post-Staging Room MAL Change Room MAL Change Room Weigh Booth 1 Airflow Protection Plenum Return Air Shaft Weigh Booth 2 Airflow Protection Plenum Return Air Shaft Brocken Bulk Store MAL Wash Bay MAL Wash Bay Dispensary Pre-Staging Room MAL 202 203 204 205 206 207 208 Material Flow MAL Warehouse Area Similar aspects may be considered when designing a sampling area, as materials and primary components may be exposed to the environment during sampling. Sampling of materials such as starting materials, primary packaging materials and products, should be carried out in the same environmental conditions that are required for the further processing of the product

page 10 209 Figure 3. Example of a sampling area Warehouse Area 25 Pa SOB Change Room 30 Pa Wash Bay 5 Pa 210 211 212 Material Flow PTH Material Flow Sampling Booth Perforated Worktop Airflow Protection Booth Plenum Figure 4. Example of a sampling area Return Air Shaft Write-up Worktop Return Air Plenum Change Room Warehouse Area 5 Pa SOB 25 Pa APB (Airflow Protection Booth) Sampling Booth Wash Bay 30 Pa 213 Material Flow 25 Pa Entry MAL 25 Pa Exit MAL Material Flow 214 215 216 217 218 219 220 221 222 223 224 225 226 227 A clean corridor concept is usually recommended for non-sterile oral solid dosage form production areas where there is then a higher pressure in the corridor compared to airlocks or production rooms. This is to facilitate containment of dust and contaminants that may have been generated in production rooms (see also the principles mentioned in the section on sampling and dispensing). To further support containment, consideration may also be given to have material airlocks (MAL) and personnel airlocks (PAL), where needed, for entry and exiting processing areas. Appropriately designed airlocks can assist in ensuring containment. Additional controls such as pressure differentials between areas, an appropriate number of air changes in an area and sufficient filtration of air should be in place.

page 11 228 Figure 5. Example of a change room and some production areas SOB Female Ablution Production Passage Female Change Room -10 Pa 30 Pa Lobby 0 Pa SOB Male Change Room -10 Pa Male Ablution 229 230 231 Un-classified Zone Figure 6. Example of a compression cubicle with MAL and PAL (also used as an area to change garments) Low Level Return Air SOB Change Room 25 Pa Compression Cubicle Supply Air Grille 35 Pa Passage MAL Low Level Return Air 25 Pa 232 233

page 12 234 235 236 237 238 239 Washing areas should be designed and used in such a manner that equipment and components will not be re-contaminated after cleaning. The system supplying and extracting air from the area(s) should be suitably designed to ensure that this objective is achieved. Principles that may be considered include (but are not limited to) filtration of air, pressure differentials between areas and airflow directions. Figure 7. Example of a washing area Material Flow Material Flow Wash Bay 25 Pa Dirty Equipment Store 30 Pa Passage Material Flow Clean Equipment Store Equipment Drying 45 Pa 35 Pa Material Flow Material Flow 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 Section 5. Design of HVAC systems and components The HVAC system should be appropriately designed, taking into consideration the design of the facility with various rooms or areas for the storage of materials and in-process materials or products, processing, movement of materials, products and personnel. The required cleanliness classification should be achieved, as well as other parameters such as airflow direction, air filtration, air exchange rate, airflow velocity, air volumes, pressure differentials, temperature and relative humidity, viable and non-viable particle counts and containment. Conditions and limits should be specified based on need. Manufacturers should determine and define limits for these. These should be realistic, appropriate and scientifically justifiable. In determining these, relevant factors and risks should be considered including but not limited to possible failures of AHUs, seasonal variations, properties and types of materials and products, number of personnel and risks of cross-contamination. Other aspects such as the number of AHUs, dust collecting or dust extraction systems, the need for recirculation of air, percentage of fresh air (in the case of recirculated air) and the level of filtration of air should be defined by the manufacturer when considering the design of the facility and activities in different areas and rooms. Manufacturers should maintain schematic drawings of the HVAC system, AHUs and components. These should reflect the initial design and installation, as well as the current situation. Changes made during the life cycle of the system should be reflected in change

page 13 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 control records and qualification protocols and reports as appropriate. The components selected in an HVAC system should be of sufficient capacity to ensure that the design objectives are met (e.g. for heating, cooling, humidification, dehumidification, air flow volumes), taking impacting factors into consideration such as loss of air due to leakage and seasonal variations. Materials of construction for components and their placement should be such that these do not become the source of contamination. For example, components should not shed particles and the sequence of components should be logical, e.g. filters should be placed in such a manner that any possible contaminants generated in the system can be retained by filters and not be introduced into the production area. To prevent contamination of areas, access to components such as ventilation dampers, filters and other services should be accessible from outside the manufacturing areas (such as service corridors). The overall design should be such that there is no possibility of undesired, unfiltered air or contaminants entering into manufacturing areas. Containment Manufacturers should ensure that appropriate measures are taken to contain product dust in a manufacturing area, thus preventing or minimizing the risk of contamination of other areas and possible cross-contamination. In some cases, it may be advisable to have airlocks or pass through hatches between rooms or areas. In addition, sufficient dilution, pressure differentials (recommended minimum values of 5 to ) and airflow directions can further support containment in an area. Cleanliness Areas should be maintained at the defined levels of cleanliness and classifications. The HVAC system can support this through, e.g. appropriate levels of filtration of air, airflow directions, dilution, dust removal and air exchange rate. Equipment, containers, personnel and other related components should be appropriately located or placed in areas so as not to obstruct airflow and effectiveness of the HVAC system. Recontamination should be prevented by ensuring that material and personnel movement is within the same area classification and not back and forth between areas of different classification. Where such back-and-forth movement is unavoidable, appropriate controls should be identified and implemented to ensure that moving from a higher class to a lower classified area and back to a higher classified area will not result in contaminants being brought into the cleaner classified area. Automated monitoring systems

page 14 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 The performance of the HVAC system achieving and maintaining the desired results for parameters such as temperature, relative humidity, airflow and pressure differential should be carefully controlled and monitored. This is to ensure that there is no departure from these limits during manufacturing. Monitoring systems should be in place to ensure that the system operates within its design limits. Manual or automated (computerized) systems may be used. Manual systems of monitoring may not always provide sufficient proof that the system is able to maintain all conditions throughout the manufacturing period. Automated monitoring systems may provide ongoing monitoring possibilities with better assurance of compliance with the defined limits. Where these automated systems are considered to be GXP systems, these should be appropriately validated. The scope and extent of validation of the computerized system should be determined, be justifiable and appropriately executed. This includes, but is not limited to, access and privileges to the software, setting of limits, monitoring and acknowledging alarms, audit trails, controls, monitoring and reporting. Switching off of AHUs It is recommended that the HVAC system be operational on an ongoing basis. Where a manufacturer decides to use energy saving modes or switch some selected AHUs off at specified intervals such as overnight, weekends or extended periods of time, care should be taken to ensure that materials and products are not affected. In such cases, the decision, procedures and records should be sufficiently documented and should include risk assessment, standard operating procedures (SOPs), records and validation. This includes procedures and records for the start-up and shut-down sequence of air handling units. Section 6. Full fresh air and recirculation systems Manufacturers may select to have full fresh air systems or recirculate treated air supplied to production areas (In a full fresh air system, no air is recirculated. In recirculation systems, a defined percentage of the air is recirculated.). In both cases, the air supplied to the production areas should be appropriately treated to ensure that the environmental conditions specified are met and that the risks for contamination and cross-contamination are controlled. Manufacturers using recirculation systems should determine the percentage of fresh air to be supplied to the relevant manufacturing areas, as required by national and international standards. This volume of air should be verified during qualification. In both scenarios, appropriate levels of filtration should be applied to prevent contamination and cross-contamination. Manufacturers should ensure that when HEPA filters are used that these are appropriately installed, not damaged and thus suitable for the intended use (see tests described below under the section of qualification).

page 15 351 352 Figure 8. Example of a full fresh-air system F Fresh Air Primary Filter - Cooling Coil AIR HANDLING UNIT Supply Air Fan Secondary Filter HEPA Filter S = Supply Air R = Return Air F = Fresh Air E = Exhaust Air S + S PRODUCTION FACILITY EXHAUST AIR HANDLING UNIT E Exhaust Air Fan HEPA Filter Secondary Filter Primary Filter E E Exhaust Air 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 Degree of filtration required depends on exhaust air contaminants Section 7. Air filtration, airflow direction and pressure differentials Effective ventilation and appropriate levels of filtration are recommended in basic GMP guidelines. Manufacturers should determine which classes of filters should be used in ensuring that contaminants from outside are not introduced into manufacturing areas and that where recirculation systems are used, filtration of recirculated air should be effectively treated to ensure that there is no risk of cross-contamination. Where different products are manufactured in different rooms in the same facility at the same time, appropriate controls should be in place to ensure containment and the prevention of contamination and crosscontamination. Filters selected for air filtration, air changes and airflow direction should be determined and specified. When a manufacturer chooses to install high efficiency particulate air (HEPA) filters to achieve the desired degree of filtration of air, these filters may be placed in the AHU or may be installed terminally near the supply grille. The number of air changes or air exchange rates should be sufficient. A guidance value is between 6 and 20 air changes per hour. Manufacturers should also establish how much time it takes for a room, which is out of its classification, to return within the specified class. This is often referred to as clean-up or recovery time. A guidance time period for clean-up or recovery is about 15 to 20 minutes Airflow directions should be specified and proven to promote containment and not be adversely affected or obstructed by equipment, utilities, containers or personnel. The location of supply and return or exhaust air grilles should facilitate appropriate airflow directions in an area. Figure 9 is a schematic diagram of air-handling system serving rooms with horizontal directional flow, vertical directional flow and turbulent flow, for rooms 3, 4 and 5, respectively. In these room, the HEPA filters are indicate to have been placed terminally

page 16 385 386 387 388 389 mounted at the rooms and not in the AHU. Terminally-mounted HEPA filters can assist with preventing cross-contamination from room to room in the event of a fan failure condition. Figure 9. Example of horizontal airflow, vertical flow and turbulent flow AIR HANDLING UNIT F Primary Filter - Cooling Coil Supply Air Fan Secondary Filter S S = Supply Air R = Return Air F = Fresh Air R S R + + + S S R S HEPA Filters S Room with low level return air S R Room with Horizontal UDAF HEPA Filters S R Room with Vertical UDAF R R 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 ROOM 4 ROOM 5 ROOM 3 The pressure differential should be of sufficient magnitude to ensure containment and prevention of flow reversal, but should not be so high as to create turbulence problems. It is suggested that pressure differentials of between 5 Pa and 20 Pa be considered. Where the design pressure differential is too low and tolerances are at opposite extremities a flow reversal can take place. There should be no risk of overlap in the acceptable operating range, e.g. 5 Pa to in one room and to 30 Pa in an adjacent room, resulting in the failure of the pressure cascade. The upper and lower limits for pressure differentials between areas in a facility should be defined by the manufacturer. Where there are interleading rooms the limits should be appropriate to ensure that there is no overlap in actual values as this may result in loss in pressure differential between areas and even reversal of air flow. The pressure control and monitoring devices used should be calibrated and where possible, be linked to an alarm system set according to the determined levels. Figure 10: Examples of pressure cascades

page 17 Tablet Compression Tablet Compression Encapsulation ± 3 Pa ± 3 Pa ± 3 Pa Airlock Production Corridor 30 Pa ± 3 Pa Design Condition ( Pressure Differential) ± 3 Pa Image of room pressure gauge indicating colour coded normal, alert & action parameters Tablet Compression Tablet Compression Encapsulation Tablet Compression Tablet Compression Encapsulation 12 Pa 12 Pa 12 Pa 18 Pa 18 Pa 18 Pa Airlock Airlock Production Corridor 33 Pa 12 Pa Production Corridor 27 Pa 18 Pa 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 Maximum Differential (21 Pa Pressure Differential) Minimum Differential (9 Pa Pressure Differential) Airlocks Airlocks with different pressure cascade regimes include the cascade airlock, sink airlock and bubble airlock: cascade airlock: higher pressure on one side of the airlock and lower pressure on the other; sink airlock: lower pressure inside the airlock and higher pressure on both outer sides; bubble airlock: higher pressure inside the airlock and lower pressure on both outer sides. Figure 11: Example of cascade airlock (In most cases the internal pressure of the airlock is not critical. The pressure differential between the two outer sides is the important criteria.) Material Airlock 22.5 Pa 30 Pa 425 426 Cascade Airlock 427

page 18 428 429 Figure 12: Example of sink airlock 30 Pa Material Airlock 30 Pa 430 431 432 433 434 Sink Airlock Figure 13: Example of bubble airlock Material Airlock 30 Pa 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 Bubble Airlock Note: The diagrams above and the differential pressures shown here are for illustration purposes only. Pressures indicated in these examples are absolute pressures, whereas the local pressure indication would most likely be pressure differential from room to room. Additional controls should be identified through risk identification and risk assessment. For example, where possible, personnel should not move between different areas during production (such as compression rooms and in process control laboratories) unless there is no risk of contamination of other areas. Personnel often become sources of contamination as they may carry dust from one area to another. Controls may include airlocks or gowning procedures. Section 8: Temperature and relative humidity Manufacturers should set appropriate upper and lower limits for temperature and relative humidity for different areas. The required storage conditions specified for the materials and products should be considered when the limits are defined. The HVAC system should be designed in such a manner that these limits can be achieved and be maintained through all seasons.

page 19 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 Systems for dehumidification or humidification require special considerations due to their contamination risk (e.g. condensate formation, bacterial and fungal contamination, contaminated steam and risks when using mobile systems between different areas). Chemicals such as corrosion inhibitors or chelating agents, which could have a detrimental effect on the product, should not be added to the boiler system. Humidification systems should be well drained. No condensate should accumulate in air-handling systems. Other humidification appliances such as evaporative systems, atomizers and water mist sprays, should not be used because of the potential risk of microbial contamination. Air filters should not be installed immediately downstream of humidifiers as moisture on the filters could lead to bacterial growth. Cold surfaces should be insulated to prevent condensation within the clean area or on air-handling components. Chemical driers using silica gel or lithium chloride are acceptable provided that they do not become sources of contamination. Section 9. Dust, vapour and fume control Manufacturers should ensure that dust-generated vapours and fumes are effectively removed from the manufacturing areas. Extraction or collecting systems should be designed and qualified to demonstrate this. Sufficient air velocity should be maintained in such systems to effectively remove dust and vapours. A dust extractor should normally not serve different rooms where different products can be processed at the same time due to the risks such as backflow or flow from room to room resulting in possible contamination and cross-contamination. Wherever possible, dust or vapour contamination should be removed at source, i.e. as close as possible to the point where the dust is generated. Dust extraction ducting should be designed with sufficient transfer velocity (determined by the manufacturer depending on materials and products processed) to ensure that dust is carried away, and does not settle in the ducting (a guidance value is 15 20 m/s). As vapours can be problematic, extraction may be supported by directional airflow to assist in the removal. The density of the vapour should be taken into consideration with extract grilles at a high level or possibly at both high and low levels. Section 10. Protection of the environment Manufacturers should have controls in place to ensure that air from production areas, including contaminated air from equipment such as fluid bed driers, is passed through appropriate levels of filtration to ensure that the environment is not polluted. Manufacturers should consult national and international environmental legislation. Section 11. Commissioning Where manufacturers perform commissioning, this should be clearly documented. Section 12. Qualification

page 20 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 Manufacturers should consider all stages of qualification for their HVAC systems. This includes, where appropriate, user requirement specification, design qualification, factory acceptance test, site acceptance test, installation qualification, operational qualification and performance qualification. Qualification to be done over the life cycle of the HVAC system should be described and executed including, e.g. when changes are made to the system. Validation master plan(s), protocols, reports and source data for tests should be available. The scope and extent of qualification should be determined based on risk assessment. Parameters with limits included in qualification (such as temperature test, airflow direction, viable and non-viable particle counts) should be justified by manufacturers. The procedures followed for the performance of the tests should generally be in line with the standard as described in ISO 14644 Some of the typical HVAC system parameters that should be included in the tests during qualification are listed below. It is recommended that the tests be done at defined intervals. The tests typically cover: temperature; relative humidity; supply air quantities; return air or exhaust air quantities; room air-change rates; pressure differentials; airflow direction test; installed filter leakage tests; particle counts; clean-up or recovery rates; microbiological counts; warning/alarm systems. Table 1. Considerations in testing Test parameter Test procedure Note Temperature Relative humidity ISO 14644 and WHO Technical Report Series, No. 961 ISO 14644 and WHO Technical Report Series, No. 961 Consider the temperature mapping test as described in WHO Technical Report Series See Temperature mapping test for principles

page 21 Pressure differential ISO 14644 Airflow volumes ISO 14644 Installed filter leakage ISO 14644 Particle counts ISO 14644 Airflow direction ISO 14644 or company procedure (smoke test) Air flow velocity ISO 14644 Recovery Where a smoke test is performed, ensure a continuous capture of the process, e.g. video, with correct angles to demonstrate flow direction and identification of date, time and area filmed and recorded in a traceable manner 533 534 535 536 537 538 539 540 541 542 543 544 545 546 Section 13. Maintenance Manufacturers should maintain current documentation for HVAC systems which include operation and maintenance manuals, schematic drawings, procedures and records. Repairs, maintenance and preventive maintenance (including cleaning, replacement of components, changes, qualification) should be executed in accordance with procedures. Records for these should be maintained for an appropriate time. ***