Advisory Group Meeting #5. Potential Near-Term Mobility Strategies January 26, Ruth Fisher Board Room, Union Station. 6:00-8:00 pm.

Similar documents
ONE CENTER CITY SEATTLE'S NEAR-TERM ACTION PLAN EXECUTIVE SUMMARY. Office of Planning and Community Development

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

C C C

Arterial Transitway Corridors Study. Ave

Seattle Transit Master Plan

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Interim Transit Ridership Forecast Results Technical Memorandum

Bellevue Downtown Association Downtown Bike Series

Aurora Corridor to E Line

South King County High-Capacity Transit Corridor Study

Appendix A-K Public Information Centre 2 Materials

Technical Working Group November 15, 2017

Metropolitan Council Transportation Committee

Community Task Force November 15, 2017

Public Event 1 Community Workshops

Community Task Force July 25, 2017

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Environment and Public Works Committee Presentation

Standing Committee on Policy and Strategic Priorities

Arterial Transitway Corridors Study

PROJECT OVERVIEW. Auburn Station Access Improvements Project

Washington DC Section of ITE Project Briefing

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Standing Committee on Policy and Strategic Priorities. Potential Granville Bridge Connector Public Engagement

Strategies to keep people and goods moving in and through Seattle

SOUND TRANSIT AT A GLANCE

Bus Rapid Transit Plans

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Kennedy Plaza and Providence Downtown Transit Connector PUBLIC MEETING. Stakeholder Meeting #1 October 24, 2016

Seattle Bicycle Master Plan

Transportation Master Plan Advisory Task Force

Transportation Technical Report

Frequently Asked Questions (FAQ)

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Alaskan Way, Promenade, and Overlook Walk Final EIS

Community Task Force March 14, 2018

Governance and Priorities Committee Report For the July 2, 2015 Meeting

M14A/D Select Bus Service

Transportation Assessment

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

Roadways. Roadways III.

122 Avenue: 107 Street to Fort Road

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Hennepin/First Transportation Study

Kansas City Area Transportation Authority. Downtown Transit Improvement Vision 2/11/15

CURRENT AND VOTER APPROVED SOUND TRANSIT SERVICE

Sacramento Grid 2.0. The Downtown Transportation Study

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

CENTRAL AND EAST CORRIDORS

ABOUT THE PROJECT. DOWNTOWN WEST Transportation Planning Study. Pennsylvania Ave. NW: H Street NW: Farragut. K St. NW. North. I St.

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

KING STREET TRANSIT PILOT

Advisory Group 5 th Avenue Workshop Summary (DRAFT) May 16, 2017./. 5:00 7:00 PM Seattle Municipal Tower Room 3832

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Welcome. If you have any questions or comments on the project, please contact:

West Seattle and Ballard Link Extensions

Chapter 3 BUS IMPROVEMENT CONCEPTS

Seattle Bicycle Advisory Board August 3, 2011

Polk Streetscape Project

Living Streets Policy

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

FINAL REPORT DECEMBER 2011

Employment 8,881 17,975 9,094. Households 18,990 31,936 12,946

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Transportation, Parking & Roads

NACTO Designing Cities 2014 Dongho Chang, City Traffic Engineer October 23, 2014

TRANSPORTATION MANAGEMENT PLAN MAY 2018 DRAFT

Welcome. Background. Goals. Vision

Memorandum. Sunday, July 13, Saturday, July 19, 2014

North Shore Transportation Improvement Strategy

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Dear Mayor Murray, Top SR-520 Design Innovations and Remaining Opportunities

Ann Arbor Downtown Street Plan

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Executive Summary Route 30 Corridor Master Plan

Traffic Engineering for Transit Operations

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

Hennepin County Bicycle and Pedestrian Planning

Capital Metro Downtown Multimodal Station

Preliminary Transportation Analysis

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Decision on North Waterloo Routing

Feasibility Study. Expo-Downtown Bicycle Connector

About the Wilmington Downtown Circulation Study

Transit Planning at 3 Scales: the Network, Corridor, and Station Levels

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

the Story of the 30s & 70s Bus Lines James Hamre - WMATA

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Highway 217 Corridor Study. Phase I Overview Report

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

PROJECT OVERVIEW. Auburn Station Access Improvements Project

Welcome. Welcome to the second open house on the Downtown Transportation Study.

Tonight is for you. Learn everything you can. Share all your ideas.

Transcription:

move connect experience Advisory Group Meeting #5. Near-Term Mobility Strategies January 26, 2017. Ruth Fisher Board Room, Union Station. 6:00-8:00 pm. TABLE OF CONTENTS 1-2 Advisory Group: Near-Term Strategies Input 3-9 Surface Street Options: North-South Travel 10 Draft Guiding Principles 11-12 Surface Street Scenario Evaluation 13 for On-Time Delivery 14-15 Bus Service Restructuring Options 16-24 Transit Service Concepts 25-30 Surface Street Options: Union, Pike, & Pine Streets

ADVISORY GROUP Near-Term Strategies Input Helping Address Near-Term Mobility Challenges Seattle faces an enviable challenge - managing growth spurred by one of the nation s strongest economies and the draw of a vibrant city located in a spectacular region of the world. Growth is driving increased demand for access and mobility in a time when construction projects seem omnipresent. Sound Transit light rail will be extended to Northgate by 2021 and Lynnwood and the Eastside (East Link) by 2023, providing important new access to the Center City. Seattle residents and regional commuters need safe, affordable, comfortable, reliable and convenient transportation options to, through, and within Center City. One Center City will identify a set of recommended strategies to address near-term mobility challenges and prioritize public realm investments, providing safe and reliable options for all users. JAN 12 JAN 26 F 9 Near-Term Opportunities and Challenges Presentation on Strategies Discussion of Strategies MARCH Recommended Strategies For Further Evaluation and Outreach APRIL Public and Stakeholder Outreach Council and Board Decision Processes 1

Key Roles of the Advisory Group Focus on alignment with adopted One Center City Draft Guiding Principles. Consider the balance of bus service restructuring and surface street capital projects to guide the technical team in developing a draft preferred set of strategies. Share feedback on specific proposals to help refine the concepts. This input will be considered before proposals move into a broader public involvement process. Members are not asked to be technical experts. Final recommendations will require approval from the Seattle City Council, the Metropolitan King County Council, and the Sound Transit Board of Directors. In the coming months King County Metro Transit and Sound Transit will seek customer comments on potential changes to bus routes. In reviewing various projects and service options, we need your input on: Values How various service proposals, capital projects, and operations strategies align with the One Center City Draft Guiding Principles. See One Center City Draft Guiding Principles sheet. Balance How should we prioritize limited rights-of-way? (Transit, SOVs, pedestrian, parking etc.) How should we invest in operating bus routes differently vs. operating streets differently? How can we accomodate mobility and access needs while creating vibrant, functional public spaces? What issues are your communities going to be most interested in or most concerned about? Are there other strategies that need to be on the table? Stakeholder Interests and Communication 2 Changes to streets and public spaces affect many stakeholder groups. Options and tradeoffs will be communicated more broadly over the coming months. JOIN THE CONVERSATION AND LEARN MORE AT: onecentercity.org

SURFACE STREET OPTIONS North-South Travel What is the Challenge and the Opportunity? Center City mobility and access demands are growing rapidly; there is very limited additional public right-of-way on surface streets to accommodate travel growth. Center City streets, particularly north-south avenues in downtown, have many mobility and access priorities to balance, including:» Safe facilities for people walking and on bicycles» Curb uses, including commercial loading, passenger loading, and short-term parking» Transit operations and passenger facilities» General purpose traffic» Freight and commercial vehicle movements» Active uses of the public realm. Local and regional bus services provide critical access to Center City jobs and services. Major changes in Center City, including the end of bus operations in the Downtown Seattle Transit Tunnel, opening of the Center City Streetcar, closure of the Alaskan Way Viaduct, and other regional projects, will put pressure on already strained surface streets. If Downtown Seattle Transit Tunnel buses are moved on to surface streets in conjunction with the Viaduct coming down and reduced capacity on 1st Avenue, projections show regional buses on 2nd and 4th Avenues will slow to speeds of just 3 to 4 miles per hour during the afternoon peak period without capital investments to improve surface operations. 3 What Options Will You Review? Four scenarios for 2019: A. Baseline, representing 2019 conditions with no One Center City actions or investments ( Do Nothing ) B. Operational Enhancements on 2nd, 3rd, and 4th Avenues C. 2019 4th Avenue & 5th Avenue Transit Couplet D. 5th Avenue Transit Spine

What Do the Draft Options Include? These options are packages of surface street projects representing different approaches to addressing near-term access and mobility challenges. Options for improving transit, bicycle facilities, pedestrian and public realm, and general purpose traffic operations were considered for each major corridor and the system as a whole. Options emphasize solutions for transit following the end of bus operations in the Downtown Transit Tunnel (as early as Fall 2018) and before future light rail extensions, which will reduce downtown bus volumes (2021/2023). Options assume all tunnel buses move to surface street pathways. Certain corridor projects can be implemented independently; others rely on other capital improvements or service adjustments. The Dashboard provides a comparison of each scenario to existing (2016) conditions. What Happens Next with the Draft Options? One Center City Interagency Team members will review Advisory Group input and consider it along with technical analysis, additional stakeholder feedback, and public comment to develop a draft set of preferred near-term projects and strategies. Draft Recommended Strategies will be presented for Advisory Group review at the March meeting. Before any decisions are made, surface street options identified in the One Center City planning effort will go through a separate public involvement process. 4 JOIN THE CONVERSATION AND LEARN MORE AT: onecentercity.org 1

OPTION A: Existing Option A Concept What is Changing? BASELINE OR DO NOTHING (2019) Streetcar = Northbound = Southbound Downtown Seattle 1st Ave 2nd Ave 3rd Ave Transit Tunnel 4th Ave 5th Ave 6th Ave * Typical cross sections between Spring St and Madison St looking north. Curb parking/loading not shown except where subject to change. Streetcar Center City Connector Streetcar One lane each direction repurposed for transit lane KEY TAKEAWAYS: DRAFT 2-way Parking / & Left-Turn Protected 2-way Parking / & Left-Turn Protected Downtown Seattle Transit Tunnel bus routes operate southbound on 2nd Ave Existing 2-Way protected bike lane is extended north to Denny and south to Jackson (current SDOT project) Traffic volumes increase 10-15% due to temporary Alaskan Way closure and lane repurposing on 1st Ave Same as today / Bus / Bus Light rail only Light rail headway same as today Downtown Seattle Transit Tunnel bus routes operate northbound on 4th Ave Traffic volumes increase 10-15% due to temporary Alaskan Way closure and lane repurposing on 1st Ave Bus trips are longer and less reliable for transit customers on 2nd, 4th, and 5th Avenues Transit agencies pay more to maintain current service levels Several key bus stops are overcrowded during the PM peak, affecting pedestrian movements Light rail reliability improves in Downtown Seattle Transit Tunnel Drivers have longer peak trips due to traffic shifting from Alaskan Way and 1st Avenue and increased bus volumes Challenging to implement northbound and southbound protected bike lane east of 3rd Ave Same as today Same as today 5

OPTION B: Existing Option B Concept What is Changing? OPERATIONAL ENHANCEMENTS ON 2ND, 3RD, 4TH, & 5TH AVENUES (2019) Streetcar = Northbound = Southbound Downtown Seattle 1st Ave 2nd Ave 3rd Ave Transit Tunnel 4th Ave 5th Ave 6th Ave * Typical cross sections between Spring St and Madison St looking north. Curb parking/loading not shown except where subject to change. Streetcar Same as Baseline KEY TAKEAWAYS: 2-way Parking / & Left-Turn Protected / Bus / Bus DRAFT Protected/ permissive right-turn phasing 2-way Parking / & Left-Turn Protected Intersection improvements at westbound cross streets (i.e., Madison & Columbia) Signal phasing that allows transit lane to clear of right turning vehicles Opportunities to speed boarding at bus stops are pursued Allows some buses to relocate from 2nd & 4th Aves Improvements to passenger environment & organization at crowded bus stops Same as Baseline Protected Protected/ permissive right-turn phasing Intersection improvements at eastbound cross streets (i.e., Cherry, Marion, Spring, Pike) Signal phasing that allows transit lane to clear of right turning vehicles Northbound protected bike lane (assume paired with southbound lane on 5th Ave) Protected Protected With sidewalk reduction With lane reduction Southbound protected bike lane would require repurposing a travel lane or moving curbs and possibly removing trees Reduction to two travel lanes would require additional investment in two-way 6th Ave Modest operational improvements for transit on 2nd and 4th Avenues, but potential improvements to speed boarding allow some regional routes to relocate to 3rd Avenue Opportunity to implement 4th and 5th Avenue protected bike lane couplet Low capital investment allows easier implementation before Fall 2018 Same as Baseline 6

OPTION C: Existing Option C Concept What is Changing? 4TH & 5TH AVENUE TRANSIT COUPLET (2019) = Northbound = Southbound Downtown Seattle 1st Ave 2nd Ave 3rd Ave Transit Tunnel 4th Ave 5th Ave 6th Ave * Typical cross sections between Spring St and Madison St looking north. Curb parking/loading not shown except where subject to change. Streetcar Streetcar Same as Baseline KEY TAKEAWAYS: 2-way Parking / & Left-Turn Protected / Bus / Bus DRAFT Protected/ permissive right-turn phasing 2-way Parking / & Left-Turn Protected Intersection improvements at westbound cross streets (i.e., Madison, Columbia) Signal phasing that allows transit lane to clear of right turning vehicles Same as Baseline Same as Baseline Protected/ permissive right-turn phasing Second northbound transit lane added Dual transit lane adds capacity for buses Current skip stop pattern retained Signal phasing that allows transit lane to clear of right turning vehicles Does not allow room for bike lane One lane repurposed to create southbound transit lane More bus service moved to 5th Avenue to take advantage of transit lane One travel lanes north of Madison, three south of Madison Does not allow room for bike lane Adds one full lane of transit capacity northbound and southbound Repurposing lane for transit on 5th Avenue necessitates new southbound lane on 6th Avenue; important for access to I-5 South Very difficult to implement northbound or southbound protected bike lane east of 3rd Avenue Sidewalk crowding is an issue on 2nd, 4th, and 5th Avenues Bus passengers may have to walk further uphill/downhill to access transit Has the most significant reduction in on-street parking and loading during the peak period More intensive capital projects such as two-way 6th Avenue will require expedited process to implement by Fall 2018 5 Spring to University To I-5 Converted to two-way street between Stewart and Marion Southbound travel lane provides additional capacity for I-5 access from North Downtown, Denny Triangle, Belltown, and South Lake Union 5th Ave transit lane is dependent on two-way 6th Ave 7

OPTION D: Existing Option D Concept What is Changing? 5TH AVENUE TWO-WAY TRANSIT SPINE (2019) = Northbound = Southbound Downtown Seattle 1st Ave 2nd Ave 3rd Ave Transit Tunnel 4th Ave 5th Ave 6th Ave * Typical cross sections between Spring St and Madison St looking north. Curb parking/loading not shown except where subject to change. Streetcar Streetcar Same as Baseline KEY TAKEAWAYS: Peak GP / Off-Peak Parking 2-way Parking / & Left-Turn Protected 2-way Parking / & Left-Turn Protected / Bus / Bus DRAFT Southbound transit lane removed West curb lane used for general traffic during peak and parking/loading during off peak Most transit service relocated to 5th Ave Same as Baseline Same as Baseline 2-way Protected Peak GP / Off-Peak Parking Northbound transit lane removed East curb lane used for general traffic during peak and parking/ loading during off peak Most transit service relocated to 5th Ave Concentrates transit service on 1st, 3rd, and 5th Avenues During peak, most surface transit is operating in a transit-only lane Simplifies street operation as there are very limited turn movements from 5th Avenue during peak periods Simplified traffic operations reduce driver delay, but would change access to some buildings & garages Bus passengers may have to walk further uphill/downhill to access transit Introducing new bus stops on 5th Avenue would require impact streetscape and require some tree removal 5th and 6th Avenue project elements are capital intensive; design/outreach would make Fall 2018 completion challenging Bus Stop Note: Center lane alternates between and to allow buses to pass at stops. Transit only during peak periods from Stewart to Jackson Operates similar to 3rd Ave Transit Spine; transit only at peaks with limited access and delivery Most bus services using 2nd & 4th Aves consolidate to 5th Ave Signficantly alters the existing 5th Ave streetscape and tree line 5 Spring to University Converted to two-way street between Stewart and Marion Southbound travel lane provides additional capacity for I-5 access from North Downtown, Denny Triangle, Belltown, and South Lake Union 5th Ave peak transit only operation is dependent on two-way 6th Ave 8

NORTH/SOUTH SURFACE STREET OPTIONS OVERVIEW Change from Today Change in Transit Travel Time & Reliability (Downtown Bus Riders) Additional Downtown Transit Operating Costs (Bus Only) General Purpose Traffic Travel Time Change in On-Street Spaces Pedestrian Experience at Hubs and Major Bus Zones Surface Street Project Capital Cost Opportunity to Implement Northbound and Southbound Protected (East of 3rd Ave) for On-Time Delivery Option A: 2019 Baseline Option B: Operational Enhancements to 2nd, 3rd, 4th, & 5th Option C: 4th & 5th Avenue Transit Couplet Option D: 5th Avenue Two-Way Transit Spine Travel Time: +3.5 min. per rider during peak period Reliability: LOW Travel Time: +1.9 min. per rider during peak period Reliability: MED Travel Time: +1.7 min. per rider during peak period Reliability: MED Travel Time: No Change per rider during peak period Reliability: HIGH +$7-$8M annually annually Northbound: +0.3 min. average of 4th & 6th Ave Southbound: +3.0 min. average of 2nd, 5th, & 6th Ave Northbound: No Change average of 4th & 6th Ave Southbound: +2.8 min. No Change 2ND 3RD 4TH 5TH 2ND 3RD 4TH N/A $11-$14M LOW DRAFT +$1.5- $2.5M +$0.5- $1M annually +/-$0M annually average of 2nd, 5th, & 6th Ave Northbound: +1.2 min. average of 4th & 6th Ave Southbound: +3.4 min. average of 2nd, 5th, & 6th Ave Northbound: +0.7 min. average of 4th & 6th Ave Southbound: No Change average of 2nd, 5th, & 6th Ave Commercial Load Zones: -1 Passenger Load Zones: -4 Parking Stalls: -25 during PM peak period Commercial Load Zones: -6 Passenger Load Zones: -19 Parking Stalls: -45 during PM peak period Commercial Load Zones: -3 Passenger Load Zones: -4 Parking Stalls: -36 during PM peak period 5TH 2ND 3RD 4TH 5TH 2ND 3RD 4TH 5TH $14-$17M $22-$28M MED LOW MED N/A HIGH MED LOW 9

The draft guiding principles below were developed based upon feedback received at the November 10 Advisory Group meeting as well as a follow-up meeting between agency staff and several Advisory Group member volunteers held on November 22. These include refinements from the January 12 meeting. Draft Guiding Principles Equity: Design for the health, safety and well-being of all who live in our community using established race and social justice guidelines. Flexibility: Create flexible systems that can evolve over time by taking a system-wide view and challenging long-held assumptions. Optimization: Optimize use of limited street and sidewalk space for people and goods. Public space: Design the street experience and public realm so that they are inviting, engaging, safe and supportive of social connections and community-building. Stewardship: Reduce vehicles and emissions and use sustainable building practices. Transportation: Provide safe, affordable, comfortable, reliable and convenient transportation options for all users of all abilities daytime and nighttime, commuters and non-commuters, and those needing timely multiple connections. User experience: Create an easy to use and intuitive system by prioritizing accessibility, pedestrian mobility, wayfinding, and multimodal connectivity. Well-being: Support social sustainability and economic prosperity for all. 10

SURFACE STREET SCENARIO EVALUATION Preliminary Measures used for Surface Street Dashboard The following can be used as a reference sheet for reviewing potential Surface Street Options and the preliminary measures that were used to assess them. Measure Guiding Principles Supported What Are We Measuring? How Was the Rating Calculated? Key Assumptions or Qualifier Change in Transit Travel Time and Reliability: Downtown Bus Riders User experience Transportation Equity Change in travel time and reliability for bus riders traveling to and through downtown. Calculated using traffic and bus stop operations model, includes travel time and reliability on 2nd, 4th, and 5th Ave. Bus riders on transit tunnel routes currently experience higher travel speeds and better reliability through downtown, and will experience a greater degradation than bus riders using current surface street routes. Stewardship Additional Downtown Transit Operating Costs Well-being Change in annual bus transit operating costs resulting from increased travel times for buses operating on surface streets Additional transit delay compared to existing conditions. Calculated using a bus stop operations model that evaluates: Delay because buses are backed up at bus stops Additional dwell time due to increased passenger volumes Additional time to reach layover Does not account for other changes in downtown traffic or transit operations such as changes related to East Link construction and waterfront construction. All costs in 2016 dollars, does not include Light Rail operating costs. General Purpose Traffic Travel Time Transportation Equity Average amount of additional time auto drivers and passengers spend traveling through downtown during afternoon peak period. Modeled using traffic operations models that simulate traffic operations including general purpose traffic, buses, bicycles, and pedestrians. Traffic pattern changes resulting from lane changes on 1st Avenue due to Center City Connector streetcar and temporary closure of Alaskan Way taken into account. Stewardship Includes travel north or south on 2nd, 4th, 5th, and 6th Aves, or east or west on Pike and Pine Streets. 11

Measure Guiding Principles Supported What Are We Measuring? How Was the Rating Calculated? Key Assumptions or Qualifier Opportunity to Implement Protected User experience Optimization Flexibility Opportunity to implement a new protected bike lane in both the northbound and southbound directions east of 3rd Ave, and in both directions on the Pike-Pine Corridor. Evaluated performance of general purpose auto and transit with inclusion of protected bike lane using Vissim traffic operations model. HIGH has limited impact on travel times for transit and auto travelers MED has some impact, but impact may be reduced if combined with other strategies (surface street or service intervention) LOW has significant impact on travel times for transit and auto Pedestrian Experience at Transportation Hubs and Major Bus Stops User experience Optimization The degree to which waiting bus passengers impede pedestrian movement on sidewalks where bus stops are located. Estimated density of waiting bus passengers, pedestrian volumes, and other physical impediments from street furniture, etc. HIGH sidewalks operate well for pedestrians passing bus stop MED pedestrian movements are constrained during peak periods Public space LOW waiting bus passengers regularly block pedestrian movement Surface Street Capital Project Costs Well-being The total capital cost of all surface street improvements included in the scenario. Calculated using SDOT capital costing tools and unit costs from recent projects. All costs in 2016 dollars. Optimization Change in On Street Parking and Spaces User experience Transportation The change in number of on-street parking and loading stops resulting from scenario projects and number of driveways that have access patterns affected (not required to close). Counted number of on-street parking, and commercial and passenger loading areas displaced by capital project options. Public space Flexibility for On Time Delivery Well-being Flexibility Likelihood to design, receive environmental clearances, contract, and construct the set of projects within the fall 2018 timeline Detailed schedule assessment using SDOT s capital project assessment tool. Schedule assessment considered a number of possible options for expedited design and delivery. LOW significant risk construction will not be complete by fall 2018 MED moderate risk construction will not be complete by fall 2018 HIGH very low risk construction will not be complete by fall 2018 12

POTENTIAL FOR ON-TIME DELIVERY Implementation Timeline And Risks The surface street capital projects listed below are those considered in developing the rating shown on the Surface Street Options (N-S Avenues) sheets. They are rated High to Low, with High meaning the project has a high potential for on-time delivery and Low meaning the project has low potential for on-time delivery. Improvement Strategy 2nd Ave Spot Improvements + P/P Right Turn Phasing Construction Timeline HIGH Standard schedule HIGH Public, Customer, Stakeholder Minimal change to street operations Other Capital Projects Conflict HIGH None 4th Ave Spot Improvements + P/P Right Turn Phasing HIGH Standard schedule HIGH Minimal change to street operations HIGH None 4th Ave Dual Transit Lane MED Need expedited schedule MED Moderate change to street operations HIGH None 5th Ave Transit Lane MED Need expedited schedule MED Moderate change to street operations MED Denny Substation & UW Tower Project 5th Ave Two-Way Transit Spine LOW Need expedited schedule, environmental determination of non-significance and streamlined public process LOW Major change to transit routings, street operations, driveway access and parking facilities LOW Denny Substation, UW Tower Project 6th Ave Two-Way Operations LOW Need expedited schedule, environmental determination of non-significance and streamlined public process MED Major change to street operations, driveway access and parking facilities MED Denny Substation 13

BUS SERVICE RESTRUCTURING OPTIONS What is the Challenge and the Opportunity? Current planning is for buses to stop using the Downtown Seattle Transit Tunnel as early as Fall of 2018. This will provide more frequent and reliable train service, as planned when the tunnel was built. There is limited capacity on Center City surface streets to carry the additional buses that will move out of the tunnel without capital investment to improve surface street operations.. Light rail trains provide substantial capacity to move people reliably into and out of Center City neighborhoods. With buses no longer in the tunnel, Sound Transit Link efficiency will improve. Why Restructure Bus Services? Increase mobility for bus operations and transit customers on Center City surface streets during busy commute hours. Increase travel reliability by removing buses from congested corridors, and having more people use light rail. Move bus stop activity to transportation hubs designed to handle higher volumes of waiting and transferring passengers and improve loading time at existing busy bus stops. Make the best use of light rail capacity and increase service reliability. How Were Draft Bus Service Restructuring Options Identified? King County Metro, Sound Transit, Community Transit and SDOT staff worked together to develop a long list of service restructuring options that met some or all of the following objectives:» Maintained or improved customer experience and reliability.» Consideration of any adverse impacts on minority or low-income populations.» Reduced bus volumes on Center City surface streets, particularly regional bus pathways such as 2nd and 4th Avenues. The long list of over 30 options was refined and reduced based on technical analysis that reviewed:» of the proposal with long-term transit network plans.» How the proposal affected travel time and service reliability for transit customers» The number of peak period buses removed from congested Center City surface streets and key choke points.» The ability for sidewalks and bus stops to accommodate waiting bus passengers. 14

What Options Will You Review? Based on the detailed technical analysis, the agencies identified seven (7) options for bus service restructuring, which are described in the one-page sheets that accompany this summary. Some options align with restructuring strategies that Sound Transit and King County will seek public input on beginning in spring 2017. What Happens Next with the Draft Service Proposals? King County Metro, Sound Transit, and Community Transit all have well established and comprehensive public involvement processes that allow community members and stakeholders to review and provide input on proposed changes to bus service. Before any decisions are made, service restructuring recommendations identified in the One Center City planning effort will go through a more detailed analysis and separate public involvement process that may include:» Citizen advisory panels»»»» Community stakeholder outreach Public meetings Surveys Targeted outreach to underrepresented populations Final decision on any service restructuring proposal will be made by King County Council the Sound Transit Board, or the Community Transit Board JOIN THE CONVERSATION AND LEARN MORE AT: onecentercity.org 15

SR 520 Routes Service to University of Washington Station DRAFT FOR DISCUSSION ONLY 15TH AVE 0 0.25 0.5 Miles Montlake Current Rt 545 Current King County Metro University of Washington Station Link Light Rail NICKERSON ST MERCER ST DENNY WAY Puget Sound 34TH ST U99 V AL AS K AN WAY WESTL AKE 2ND AVE Benefit to Regional Mobility High Service Reliability Improves for all riders by avoiding I-5 and downtown congestion AVE Lake Union U99 V PACIFIC S T!"# 5 545!"# 5 KCM LINK MADISON ST Destination U513 V 24TH AVE University of Washington Station ST Route: 545 POTENTIAL SERVICE CONCEPT UV 520 KCM Routes: 252 255 257 268 311 Lake Washington Sources: King County Metro, Sound Transit Rider Travel Time (Change from Today) 2019 Baseline 2019 with Restructure Westlake Station 3+ Minutes No Change International District/ Chinatown Station Key Details 5+ Minutes No Change ly reorient four peak-only routes and two all-day routes to serve University of Washington Station at Montlake Hub and the University District Permanent change with high benefit for downtown mobility, minimal travel time impact, and improved reliability for riders Limits transit travel time and reliability impacts of major construction projects such as Portage Bay Bridge reconstruction (2020-2026), Washington State Convention Center Addition (2018-2020), and others A Sound Transit internal analysis underway will identify any opportunities to increase capacity within the Downtown Seattle Transit Tunnel $2 $3 M capital investment required at Montlake Hub to accommodate more buses and provide improved passenger experience Considered for Sound Transit and King County Metro evaluation and comprehensive public involvement process on potential 2018 service changes 16

23RD AVE ST Route 550 (Bellevue - Seattle) Service to International District/Chinatown Station DRAFT FOR DISCUSSION ONLY EL L IOTT AVE 1ST AVE MERCER ST 5TH AVE 2ND AVE AL ASK AN WAY 9TH AVE PINE ST E ASTL AK E AVE LINK MADISON ST POTENTIAL SERVICE CONCEPT!"# 5 0 0.25 0.5 Miles 550 Existing 550 International District Station Link Light Rail Puget Sound UV 99 International District Station UV 519 U JACKSON ST 550 BOREN AVE!"# 90 RAINIER AVE To Bellevue Sources: Sound Transit Lake Washington Benefit to Regional Mobility Medium Service Reliability Rider Travel Time (Change from Today) Destination 2019 Baseline 2019 with Restructure Westlake Station 3+ Minutes No Change Improves for Westlake Station riders International District/ Chinatown Station Key Details No Change No Change ly reorient one all-day route that currently operates in the tunnel to International District/Chinatown Station A Sound Transit internal analysis underway will identify any opportunities to increase capacity within the Downtown Seattle Transit Tunnel Temporary change until East Link extension opens in 2023 $1.5 $2.5 M capital investment required at International District/Chinatown Station to accommodate more buses and provide improved passenger experience Considered for Sound Transit evaluation and comprehensive public involvement process on potential 2018 service changes 17

West Seattle/Burien/Vashon Peak Routes Service to First Hill DRAFT FOR DISCUSSION ONLY Lake Union EL L IOTT AVE ROY ST 0 0.25 0.5 Miles Transit Current Transit Pioneer Square Station Link Light Rail 1ST AVE Burien Peak Routes: 113 121 122 123 Puget Sound ALASKAN WAY 9TH AVE Pioneer Square Station UV 99 UV 519 West Seattle Peak Routes: 3RD AVE PINE ST!"# 5 E AS T 37 55 56 57 4TH AVE S LINK MADISON ST JAMES ST BOREN AVE JACKSON ST!"# 90 Vashon Island Peak Routes: 116 118 119 CHERRY ST YESLER WAY RAINIER AVE 23RD AVE POTENTIAL SERVICE CONCEPT Sources: King County Metro Benefit to Regional Mobility High Service Reliability Rider Travel Time (Change from Today) Destination 2019 Baseline 2019 with Restructure First Hill No Change -5 Minutes Improves for Westlake Station riders by avoiding downtown congestion Westlake Station 2+ Minutes 2+ Minutes International District/ Chinatown Station Key Details No Change No Change ly reorient 11 peak-only routes from the communities of West Seattle, Burien, and Vashon Island to First Hill Permanent change that will free up capacity on 3rd Avenue during the busiest commute times while providing more service to First Hill No additional capital improvements needed to implement change Considered for King County Metro evaluation and comprehensive public involvement process on potential 2018 service changes 18

Route 41 Service to Westlake Station DRAFT FOR DISCUSSION ONLY ELLIOTT AVE MERCER ST BROAD ST 9TH AVE FAIRVIEW AVE!"# 5 41 To Northgtate POTENTIAL SERVICE CONCEPT Puget Sound 0 0.25 0.5 Miles 41 Current 41 (when DSTT is closed) Link Transfer Stations Link Light Rail 2ND AVE Westlake Station ALASKAN WAY 6TH AVE University Street Station UV 519 UV 99 PIKE ST!"# 5 UNION ST 7TH AVE LINK JACKSON ST BOREN AVE MADISON ST 23RD AVE Sources: King County Metro, Sound Transit Benefit to Regional Mobility Medium Service Reliability Improves for International District/ Chinatown Station riders by avoiding downtown congestion Destination Rider Travel Time (Change from Today) 2019 Baseline 2019 with Restructure Westlake Station No Change No Change International District/ Chinatown Station Key Details 5+ Minutes 3+ Minutes ly end one all-day route in Westlake Station that currently operates in the tunnel Being evaluated concurrent with Pike/Pine protected bike lane options Temporary change until Northgate Link extension opens in 2021 $1.5 $2.5 M capital investment needed to accommodate additional buses and passengers Considered for King County Metro evaluation and comprehensive public involvement process on potential 2018 service changes 19

ST Pierce County Routes Service to International District/ Chinatown Station or South Lake Union DRAFT FOR DISCUSSION ONLY Puget Sound EL L IOTT AVE 1ST AVE MERCER ST ST Routes to SLU: 577 578 592 5TH AVE 2ND AVE AL ASK AN WAY 9TH AVE PINE ST Westlake Station LINK MADISON ST POTENTIAL SERVICE CONCEPT 0 0.25 0.5 Miles International District Station South Lake Union Current ST Pierce County Link Transfer Stations Link Light Rail ST Routes to IDS: 590 594 595 UV 99!"# 5 UV 519 U BOREN AVE JACKSON ST International District Station RAINIER AVE 23RD AVE!"# 90 Lake Washington Sources: Sound Transit Benefit to Regional Mobility High Service Reliability Rider Travel Time for SLU Routes (Change from Today) Destination 2019 Baseline 2019 with Restructure Westlake Station 3+ Minutes No Change No significant change International District/ Chinatown Station Key Details No Change 5+ Minutes ly reorient Sound Transit peak and all-day services from Pierce County to International District/ Chinatown Station or South Lake Union Service to South Lake Union would use 6th Ave and Westlake, providing direct access to Westlake Station and South Lake Union while service to International District/Chinatown Station would use SODO Busway $1.5 $2.5 M capital investment required at International District Station to accommodate more buses and passengers Considered for Sound Transit evaluation and comprehensive public involvement process beyond 2018 service changes due to technical constraints. 20

Community Transit Service to International District/ Chinatown Station DRAFT FOR DISCUSSION ONLY ELLIOTT AVE MERCER ST 0 0.25 0.5 Miles Transit Current Transit International District Station Link Light Rail BROAD ST 2ND AVE ALASKAN WAY Benefit to Regional Mobility High Service Reliability No significant change 9TH AVE 6TH AVE 4TH AVE Puget Sound UV 99 STEWART ST!"# 5 International District Station EASTLAKE AVE 5TH AVE Destination LINK CT Routes: 412 413 416 421 425 435 BOREN AVE JACKSON ST MADISON ST!"# 90 POTENTIAL SERVICE CONCEPT Rider Travel Time (Change from Today) 2019 Baseline 23R D AVE Sources: Community Transit 2019 with Restructure South Lake Union 5+ Minutes 5+ Minutes Westlake Station 3+ Minutes 3+ Minutes International District/ Chinatown Station Key Details No Change No Change ly reorient six peak-only routes to International District/Chinatown Station via the Cherry St I-5 Express ramps Temporary change until Lynnwood Link extension opens in 2023 No additional capital improvements needed to implement change Considered for Community Transit evaluation and comprehensive public involvement process beyond 2018 service changes due to technical constraints. 21

Snohomish County Routes Service to South Lake Union & Westlake DRAFT FOR DISCUSSION ONLY MERCER ST ELLIOTT AVE 0 0.25 0.5 Miles ST & CT Current ST Current CT Westlake Station Link Light Rail CT Routes: 402 405 410 415 417 422 424 Puget Sound BROAD ST 4TH AVE 2ND AVE ALASKAN WAY 9TH AVE 6TH AVE UV 519 UV 99 FAIRVIEW AVE PINE ST OL 5TH AVE!"# POTENTIAL 5 SERVICE CONCEPT IVE WAY Westlake Station 7TH AVE LINK BOREN AVE JACKSON ST ST Routes: 510 511 513 MADISON ST 23RD AVE Sources: Community Transit Benefit to Regional Mobility High Service Reliability Rider Travel Time (Change from Today) Destination 2019 Baseline 2019 with Restructure South Lake Union No Change -5 Minutes No significant change Westlake Station No Change No Change International District/ Chinatown Station Key Details 5+ Minutes 3+ Minutes ly reorient ten peak-only routes operated by Sound Transit and Community Transit to South Lake Union and Westlake Hub Improves South Lake Union access from Snohomish County $1.0 $1.5 M capital investment required at Westlake Hub to accommodate more buses and passengers Temporary change until Lynnwood Link extension opens in 2023 Considered for Sound Transit and Community Transit evaluation and comprehensive public involvement process beyond 2018 service changes due to technical constraints. 22

Conceptual International District/Chinatown Station Hub Improvements OCCIDENTAL AVE S ST AVE YESLER WAY 2ND EXT AVE S 2ND AVE S 3RD AVE S Sound Transit Pierce County service via 4th/5th Ave and SODO Busway Weller St Pedestrian Bridge to King Street Station 0 250 500 Feet Bellevue Service 1 4TH AVE S ** 2 * * 5TH AVE S 3 4 INTERNATIONAL DISTRICT STATION PLAZA Snohomish County service via I-5 Cherry St Express Ramp S WASHINGTON ST S MAIN ST S JACKSON ST S KING ST S WELLER ST M Concept Details International District/Chinatown Station currently serves as a transfer hub for Sound Transit buses from Bellevue and Pierce County, and Community Transit buses from Snohomish County Riders can connect to Link Light Rail, frequent bus service, Sounder, and shared mobility options Key Improvements BUS DEDICATED BUS LANES Bus-only lanes separate transit from traffic ENHANCED FARE COLLECTION Offboard payment using card readers and other tools at stations allows passengers to board more quickly. Pierce County Service Snohomish County Service Bellevue Service Alternative Included Bus Stops # King Street Station Link Light Rail Station Public Realm Improvements * Bellevue service via 4th/5th Ave and I-90 5TH AIRPORT WAY S S LANE ST Bellevue service alternative via Dearborn St S DEARBORN ST S BUS ENHANCED BUS STOPS Bus stops could include larger shelters, real-time arrival information, and other passenger amenities. QUEUING MANAGEMENT Organizing waiting passengers at busy stops to maintain a pedestrian through-zone. PUBLIC REALM Improvements for pedestrians and waiting bus passengers may include wayfinding, lighting, and other improvements. Bus Stop Concepts Description Necessary Improvements 1 New Bus Stop All-day drop-off stop for passengers Transit Lane 2 Existing Bus Stop 3 Existing Bus Stop 4 New Bus Stop All-day pick-up stop for passengers All-day drop-off stop for passengers All-day drop-off stop for passengers Enhanced Stop, Offboard Fare Payment, Queueing Management Enhanced Stop, Transit Lane Enhanced Stop January 26. 2017 23

Conceptual Montlake Hub Improvements RD NE PACIFIC ST E STE V E N S WAY N E Kirkland and Redmond service could continue to the U District via Pacific St NE PAC IFIC PL 6 UW MEDICAL CENTER N E J E F F E R SON RD 1 Brickyard, Kingsgate, and Woodinville P&R service could continue north on Montlake Blvd 3 5 4 UW STATION PLAZA 2 MONTLAKE BLVD NE Pedestrian Bridges to University of Washington NE W Concept Details University of Washington Station currently serves as a transfer hub between bus service in Northeast Seattle and Link Light Rail service to downtown Seattle Buses using SR 520 to reach downtown Seattle today can be reoriented to use this existing transfer hub Some routes will continue to the University District while others may serve Seattle Children s Hospital or the UW campus loop Key Improvements DEDICATED BUS LANES Bus-only lanes separate transit from traffic W PARK DR E 0 250 500 Feet Kirkland/ Redmond Service I-405 Commuter Service Included Bus Stops Link Light Rail Station # E 7 MONTLAKE BLVD E E SHELBY ST PARK DR E BUS BUS ENHANCED FARE COLLECTION Off-board payment using card readers and other tools at stations allows passengers to board more quickly. ENHANCED BUS STOPS Bus stops could include larger shelters, real-time arrival information, and other passenger amenities. TRANSIT PRIORITY Intersection improvements allow buses to bypass congestion. Bus Stop Concepts Description Necessary Improvements 1 Existing Bus Stop 2 Existing Bus Stop 3 Existing Bus Stop 4 New Bus Stop 5 New Bus Stop 6 Existing Bus Stop 7 New Bus Stop All-day drop-off stop for passengers Morning drop-off stop for passengers All-day pick-up stop for passengers Morning drop-off stop for passengers All-day drop-off stop for passengers Afternoon pick-up stop for passengers Afternoon pick-up stop for passengers Enhanced Stop None Enhanced Stop, Offboard Fare Payment, Bus Lane and Transit Priority Limited Improvements Limited Improvements Enhanced Stop, Offboard Fare Payment Enhanced Stop, Offboard Fare Payment January 26. 2017 24

SURFACE STREET OPTIONS (Union, Pike, & Pine Streets) What is the Challenge and the Opportunity? King County Metro Route 41 will continue to be a critical connection between Northgate and Downtown until the 2021 extension of Link light rail opens. Union and Pike Streets are proposed to serve as a temporary downtown routing for Route 41 (until 2021). This Northgate express service has very high ridership and new stops on Union and Pike would have very high passenger volumes. The Pike-Pine corridor a critical multimodal connection between Capitol Hill, Westlake/Convention Center, Downtown, and Seattle Waterfront. Directness, street connections over I-5, limited grade compared to other downtown streets, and access to many major destinations and transit make this street pair an important focus of future investment. Pike and Pine Streets are designated to connect Broadway and 2nd Avenue protected bike lanes with an east-west protected bike lane connection. The grade in this corridor is more favorable to cyclists than other east-west connections. Many planned public and private development projects will bring new investment to the Pike Pine Corridor, including: Seattle Waterfront Project investments, Pike Pine Streetscape Project, the Washington State Convention Center, and others. These investments offer the opportunity to create a world-class corridor linking neighborhoods and making great places for people. What Options Will You Review? Three options for operating a multimodal Union, Pike, and Pine corridor. Option A (the baseline scenario) is identical to today s street layout but with 2019 traffic and bus volumes. Options B and C are largely identical west of 8th Avenue (within downtown), and include repurposing street space for a single protected bike lane on Pike and Pine Streets running in the direction of travel on each street. Options B and C also include both improved and new bus stops along Pike and Union Streets west of 6th Avenue for Route 41. East of 8th Avenue, B and C are distinctly different: Option B: Streets remain bi-directional for auto traffic and transit east of 8th. New curbside protected bike lanes run in both directions on Pike between 8th Ave and Broadway. Option C: Pike and Pine Streets operate as a couplet, with traffic, bikes, and transit all operating eastbound on Pike and westbound on Pine. Note: See following page for maps of Pike-Pine multimodal corridor options 25

ST E V Pike-Pine Multimodal Corridor Options Option A: Baseline E DENNY WAY E HOWELL ST BOYLSTON AVE BELMONT AVE HARVARD AVE E PINE ST E PIKE ST BROADWAY 10TH AVE E E OLIV Option B: Downtown Couplet with PBL Pair on Pike East of 8th Ave E DENNY WAY E HOWELL ST BOYLSTON AVE BELMONT AVE HARVARD AVE E PINE ST E PIKE ST BROADWAY 10TH AVE E OLIVE Option C: Pike and Pine One-Way Couplet E DENNY WAY E HOWELL ST BOYLSTON AVE BELMONT AVE HARVARD AVE E PINE ST E PIKE ST BROADWAY 10TH AVE MELRO SUMMIT AVE E UNION ST BOYLSTON AVE SUMMIT AVE E UNION ST BOYLSTON AVE SUMMIT AVE E UNION ST BOYLSTON AVE SE AVE SUMMIT AVE MELROSE AVE SUMMIT AVE MELROSE AVE SUMMIT AVE HOWELL ST MINOR AVE HOWELL ST MINOR AVE MINOR AVE OLIVE WAY UNION ST UNIVERSITY ST BOREN AVE TERRY AVE OLIVE WAY UNION ST UNIVERSITY ST BOREN AVE TERRY AVE OLIVE WAY UNION ST UNIVERSITY ST BOREN AVE TERRY AVE 9TH AVE 9TH AVE 9TH AVE 8TH AVE 8TH AVE 8TH AVE 7TH AVE 0 315 630 Feet 7TH AVE 0 315 630 Feet 7TH AVE 0 315 630 Feet 6TH AVE 5TH AVE Protected Standard 6TH AVE 5TH AVE Protected Standard 6TH AVE 5TH AVE Protected Standard 2ND AVE 1ST AVE PINE ST PL PIKE ST 4TH AVE 3RD AVE Bus Lane Direction Bus Lane Direction Change to Car Travel Direction New or Improved Bus Stop UNIVERSITY ST SENECA ST 2ND AVE 1ST AVE 2ND AVE 1ST AVE PINE ST PIKE PL PINE ST PIKE ST 4TH AVE 3RD AVE Bus Lane Direction Bus Lane Direction Change to Car Travel Direction New or Improved Bus Stop UNIVERSITY ST SENECA ST 2ND AVE 1ST AVE SPRING ST 2ND AVE 1ST AVE PINE ST PIKE PL PINE ST PIKE ST 4TH AVE 3RD AVE Bus Lane Direction Bus Lane Direction Change to Car Travel Direction New or Improved Bus Stop UNIVERSITY ST SENECA ST 2ND AVE 1ST AVE SPRING ST What Happens Next with Union, Pike, and Pine Options? Members of the One Center City Interagency Team will review Advisory Group input and consider this input along with technical analysis, additional stakeholder feedback, and public comment to develop a draft set of preferred near-term projects and strategies. Draft projects and strategies will be presented for Advisory Group review at the March Advisory Group meeting. Union, Pike, and Pine corridor design recommended for implementation will be developed with stakeholder input. JOIN THE CONVERSATION AND LEARN MORE AT: onecentercity.org 26

Option A Concept Existing What is Changing? OPTION A: BASELINE OR DO NOTHING (2019) Parking / & Right-Turn South curb has parking/loading west of 5th Ave Only 3 travel lanes west of 4th Ave Pine St Pike St Union St Pine St Pike St Parking / & Right-Turn DRAFT South curb has parking/loading west of 5th Ave No change in configuration of streets 1st Avenue to 8th Avenue * Typical cross sections between 5th Ave and 6th Ave looking east. Only 3 travel lanes west of 4th Ave Small increase in traffic volumes from today due to growth Parking / & Right-Turn Parking / & Right-Turn Parking / & Left-Turn Parking / & Left-Turn May be construction impacts to Pike and/or Pine from Washington State Convention Center Expansion KEY TAKEAWAYS: Operations and street experience similar to today Slight increases in delay for transit passengers and drivers due to growth Analysis does not account for Washington State Convention Center construction impacts 8th Avenue to Broadway * Typical cross sections between Belmont Ave and Boylston Ave looking east. No change in configuration of streets Center Turn Lane Center Turn Lane Small increase in traffic volumes from today due to growth = Eastbound = Westbound 27

Option B Concept Existing What is Changing? OPTION B: DOWNTOWN COUPLET WITH PIKE STREET Pine St Pike St Union St Pine St Pike St South curb has parking/loading west of 5th Ave DRAFT Protected Westbound travel lane repurposed for single-direction protected bike lane KEY TAKEAWAYS: PROTECTED BIKE LANE PAIR EAST OF 8TH AVENUE 1st Avenue to 8th Avenue * Typical cross sections between 5th Ave and 6th Ave looking east. Curb Bulb / Sidewalk Parking / & Right-Turn Only 3 travel lanes west of 4th Ave Protected Only 3 travel lanes west of 4th Ave Bus Stop / Curb Bulb Eastbound travel lane repurposed for single-direction protected bike lane Improvements to existing bus stops at 4th and 6th Aves to accommodate Route 41 passengers Parking / & Right-Turn Parking / & Right-Turn Parking / & Left-Turn Parking / & Left-Turn Route 41 operates westbound from I-5 to 1st Ave New Route 41-only bus stop between 4th and 3rd Aves Center Turn Lane 8th Avenue to Broadway * Typical cross sections between Belmont Ave and Boylston Ave looking east. Existing bike lanes removed Center turn lane added Changes have minimal effect on transit speed or reliability downtown Traffic modeling shows significant congestion eastbound on Pike Street during PM peak period Route 41 would require improved and new bus stops and potential boarding improvements to avoid sidewalk crowding This option has most significant loss of curb parking and loading Protected Center Turn Lane Parking / & Right-Turn Protected = Eastbound = Westbound Single-direction protected bike lane on each curb On-street parking and loading retained on south side of street adjacent to protected bike lane Center turn lane eliminated east of Boren Ave and one eastbound traffic lane eliminated between Boren Ave and 8th Ave 28

Option C Concept Existing What is Changing? OPTION C: ONE-WAY COUPLET ON PIKE & PINE STREETS South curb has parking/loading west of 5th Ave = Eastbound = Westbound Pine St Pike St Union St Pine St Pike St Parking / & Right-Turn DRAFT Protected Westbound travel lane repurposed for single-direction protected bike lane KEY TAKEAWAYS: 1st Avenue to 8th Avenue * Typical cross sections between 5th Ave and 6th Ave looking east. Curb Bulb / Sidewalk Only 3 travel lanes west of 4th Ave Protected Only 3 travel lanes west of 4th Ave Bus Stop / Curb Bulb Eastbound travel lane repurposed for single-direction protected bike lane Improvements to existing bus stops at 4th and 6th Aves to accommodate Route 41 passengers Parking / & Right-Turn Parking / & Right-Turn Parking / & Left-Turn Parking / & Left-Turn Route 41 operates westbound from I-5 to 1st Ave New Route 41-only bus stop between 4th and 3rd Aves Transit lane option: (not evaluated in metrics below) loading lane option: (evaluated in metrics below) Transit Only Lane 8th Avenue to Broadway * Typical cross sections between Belmont Ave and Boylston Ave looking east. Protected Protected One-way westbound for all modes One-way protected bike lane Two traffic lanes One flexible lane could be used for transit, parking, and loading Changes have minimal effect on transit speed or reliability downtown to improve transit speed and reliability if flexible lane east of I-5 is dedicated to transit (peak or all day) Traffic modeling shows significant congestion eastbound on Pike Street during PM peak period Route 41 would require improved and new bus stops and potential boarding improvements to avoid sidewalk crowding Directional changes require greater capital investment and would take longer to design and construct Transit lane option: (not evaluated in metrics below) loading lane option: (evaluated in metrics below) Protected Protected Center Turn Lane Transit Only Lane One-way eastbound for all modes One-way protected bike lane Two traffic lanes One flexible lane could be used for transit, parking, and loading 29