EDMI Baseline Calibration Field Steps

Similar documents
Viva TPS. TS11/15 Total Stations Check and Adjust Procedure. October Summary

Running Track Certification. ASBA Technical Meeting December 2013

TO RECEIVE the most benefit from a

ali-q TM Gravimetric Verification Procedure

Using Surveying Equipment

1811G/H PITOT-STATIC TEST SET

September 2008 REVISIONS (1) SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) TURNING LANE LENGTHS 15.

Version 2.0 English. Leica NA720/724/ 728/730/730 plus User Manual

Stadium Project - DP-70 Atlanta, GA, 9/30/2014

EDM Height Traversing Levelling Survey Report

PERMIT-REQUIRED CONFINED SPACES PROGRAM

2 Field Practices & Measurements

Site Engineering Guide

T. O. PHILLIPS, CDR, Tank Vessel and Offshore Division

USA Swimming Measuring and Certifying Competition Pools

DISTANCE MEASUREMENT

Instrument Installation and Performance Verification

Mott Manufacturing Limited

Jackie May* Mark Bourassa. * Current affilitation: QinetiQ-NA

TXDOT DESIGNATION: TEX-922-K

Advisory Circular. Legal Land Survey for AZR Clearance Attestation

2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A

SECTION 5 POLE VAULT ART. 1...Inclination shall be limited to 2:100 (2%) laterally and 1:1000 (0.1%) in the running direction.

SAN DIEGUITO WETLANDS RESTORATION PROJECT 08 JANUARY 2018 BEACH PROFILES CITY OF DEL MAR, CALIFORNIA. Data Report

TXDOT DESIGNATION: TEX-922-K

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

Environmental Protection Division

TECHNICAL MANUAL CALIBRATION INSTRUCTIONS FUEL PRESSURIZING & DUMP VALVE TEST STAND 1TL

State of Nevada Department of Transportation Materials Division

Measurement of Atmospheric Pressure. Atmospheric Instrumentation

APPENDIX J REQUIRED NAVIGATION PERFORMANCE IMPACTS EVALUATION REPORT

ACFM vs. SCFM vs. ICFM Series of Technical White Papers from Squire-Cogswell


WIND DATA REPORT. Paxton, MA

WIND DATA REPORT. Swan s Island, ME

Wade Reynolds 1 Frank Young 1,2 Peter Gibbings 1,2. University of Southern Queensland Toowoomba 4350 AUSTRALIA

Surveying Fundamentals and Practices, 5/e

The following were determined to be confined spaces; they may not be permit required that employees of the Division of Facilities may encounter:

WIND DATA REPORT. Bourne Water District

METHODS EMPLOYED IN LOCATING SOUNDINGS

M-06 Nitrogen Generator (Nitrogen Making Machine)

Figure 1 Example feature overview.

Subject: ALTITUDE REPORTING EQUIPMENT AND TRANSPONDER SYSTEM MAINTENANCE AND INSPECTION PRACTICES

CONFINED SPACE ENTRY PROGRAM

Statesville, NC. Results of AM ASHRAE 110 Laboratory Fume Hood Performance Evaluations Venturi Hood

Surveying & Measurement. Distance Measurement

Summary Report for Individual Task Install Survey Stakes for Horizontal Projects Status: Approved

Investigation of the Impact of Beach Raking on Beach Accretion/Erosion: West End Beaches of Galveston Island, Texas 2007/ 2008

Practical part -1- Distance measurement By Tape and pacing CONTENTS 10/16/2017

TAMPA ELECTRIC COMPANY ENERGY SUPPLY CONFINED SPACE PROGRAM

Evaluation of the Klein HydroChart 3500 Interferometric Bathymetry Sonar for NOAA Sea Floor Mapping

SECTION TRAFFIC REGULATIONS

Air Monitoring Directive Chapter 7: Calibration

UNDERGROUND SURVEY WITH MINEMODELLER

BOTTOM MAPPING WITH EM1002 /EM300 /TOPAS Calibration of the Simrad EM300 and EM1002 Multibeam Echo Sounders in the Langryggene calibration area.

The table below shows how the thinking distance and braking distance vary with speed. Thinking distance in m

ADA Operations Contact Info

USING THE CS400/CS405 (KPSI SERIES 169/173) SUBMERSIBLE PRESSURE TRANSDUCER WITH CAMPBELL SCIENTIFIC DATALOGGERS INSTRUCTION MANUAL

Test Review: Geometry I Period 2,4,6. TEST DATE: All classes Wednesday April 9. Things it would be a good idea to know:

WIND DATA REPORT. Vinalhaven

DeFelsko PosiTector Dew Point Meter DPM & DPMD Probes

Sontek RiverSurveyor Test Plan Prepared by David S. Mueller, OSW February 20, 2004

Confined Space Entry Policy

BEFORE THE BOARD OF COUNTY COMMISSIONERS FOR THE COUNTY OF TILLAMOOK IN THE STATE OF OREGON ) )

Digital Vacuum Regulator

Confined Spaces. County of Henrico Risk Management Loss Prevention October 2 nd 2013

THE FUNDAMENTALS OF THE AIR SAMPLER CALIBRATION-VERIFICATION PROCESS

White Paper. Chemical Sensor vs NDIR - Overview: NDIR Technology:

ACCURACY, PERFORMANCE, AND HANDLING OF OIL-FILLED DIGIQUARTZ PRESSURE INSTRUMENTATION

Activities for Measuring Acceleration and Deceleration due to Gravity and Friction. Grade Level: Middle School

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.

Gettysburg College. Confined Space Program

City of Mebane, North Carolina Health and Safety Manual Confined Space Program CONFINED SPACE PROGRAM

Outside Air Nonresidential HVAC Stakeholder Meeting #2 California Statewide Utility Codes and Standards Program

one foot. being called.

FAIR-COURT OFFICIAL BASKETBALL EQUIPMENT TESTING SYSTEM

Committee Input No. 35-NFPA [ Chapter 1 ] Submitter Information Verification. Committee Statement

Data Collection and Processing: Elwha Estuary Survey, February 2013

CONFINED SPACE ENTRY PROCEDURE

Protocol Gas Verification For Compressed Gas Cylinders Containing Either SO 2, NO or CO. Quality Assurance Plan/Standard Operating Procedure

Method of Test for Flat & Elongated Particles

WATER HEATER THERMAL EXPANSION TANKS Owner s Manual. Safety Instructions Installation Maintenance Warranty. Models: 2-5 Gallon Capacity

Tru Flight TRUFLIGHT INSTALLATION GUIDE TRUGOLF.COM

FAQs: Confined Spaces in Residential Construction

Altimeter and Compass Watch Instruction Manual

Levelling A Practical Guide The process of Levelling explained

OBJECTIVE 6: FIELD RADIOLOGICAL MONITORING - AMBIENT RADIATION MONITORING

Key Technology, Inc. Confined Space Entry Program. July, 2017

Customer Responsibilities. Important Customer Information. Agilent 6400 Series Triple Quad LC/MS Site Preparation Checklist

CHAPTER 91 TRACKED VEHICLE FOR CONTINUOUS NEARSHORE PROFILES. Richard J. Seymour* Alan L. Higgins** David P. Bothman***

Impact of Dredging the Lower Narrow River on Circulation and Flushing

DT 630 ALTIMETER, BAROMETER AND COMPASS WATCH OPERATING INSTRUSTIONS

User Manual. GPL 3000 e. gas detector

DX2/DXX Operating Instructions

Calibration Requirements for Direct Reading Confined Space Gas Detectors

Experiment. THE RELATIONSHIP BETWEEN VOLUME AND TEMPERATURE, i.e.,charles Law. By Dale A. Hammond, PhD, Brigham Young University Hawaii

FAA-S-ACS-6 June 2016 Private Pilot Airplane Airman Certification Standards. Task ACS Settings

Release Performance Notes TN WBMS _R _Release_Presentation.pptx 22 September, 2014

MILITARY SPECIFICATION POWDER, BLACK

Backflow Preventer Test and Inspection Report Instructions

Transcription:

EDMI Baseline Calibration Field Steps

Page 1 of 12 Park Safely o Wear Safety Apparel o Observe All Safety Regulations / Stay Alert! Respect Other Surveyors Utilizing Baseline o Offer Assistance If Appropriate Verify Radios / Phones / Misc. Equip. Operational

Page 2 of 12 Record Field Constant Data o Date o EDMI: Model & Manufacturer Serial Number Specified Vertical Circular Accuracy Ex: 6 arc second Specified EDMI Accuracy Ex: +/- (5mm + 5 PPM) o CBL Name & Location o Constant Field Abnormalities or Comments

Page 3 of 12 Prism @ 150.0 (m) Monument o Properly set-up and level o Record Prism Height (ft & mm) o Record Prism Offset (mm) Note: prism offset should remain constant

Page 4 of 12 EDMI @ 0.0 (m) Monument o Position Tripod / Affix EDMI o Position Parasol o

Page 5 of 12 o Properly Level EDMI Verify 360 (deg) Plumb w/monument o

Page 6 of 12 o Record EDMI Height (ft & mm) o Acclimate EDMI (per manufacture s recommendations) NOTE: once acclimated EDMI should remain so throughout calibration, however if EDMI is moved between set-ups in a vehicle utilizing AC / Heater than reasonable acclimation time must be allocated at each set-up Record Specific Data (unique for each completed Baseline Data Form) o Occupied Station / Observed Station o EDMI Operator / Note Keeper o Local Time ( Watch / Cell Phone) 202-762-1401 & 202-762-1069 o Weather ( Weather Radio / Internet / Text Messaging Service ) Temperature

Page 7 of 12 Record at EDMI height (after acclimation) Barometric Pressure P.P.M. Set at Wind Speed / Direction Humidity o NOTE: Set the EDMI to match this Meteorological data! o Zenith Angle Check 1 Direct 1 Reverse o Instrument Settings Instrument Constant Set to o Specific Field Abnormalities and Comments Record Elevations o From (Station #) o To (Station #) o Make & Record Independent Observations o Record Independent Distance Observations After each Direct and Reverse single observation, the EDMI must: Be removed from the Tribrach Reattached to Tribrach Properly Releveled for use

Page 8 of 12 5 Direct (Slope Dist., Horiz. Dist. & Vert. Height Diff.) 5 Reverse (Slope Dist., Horiz. Dist.& Vert. Height Diff.)

Page 9 of 12 NOTE: Repeat above steps as necessary at each monument. Remember: Each set of observations from any station to any other station, requires you to complete a separate N.J. EDMI Calibration Baseline Data Form for verifiable submittal. An additional continuous company private logbook, provides a history of the instrument that may be used later either to isolate changes in instrument characteristics or for legal verification purposes. (National Oceanic and Atmospheric Administration, National Geodetic Survey, Use of Calibration Base Lines: NOAA Technical Memorandum NOS NGS-10. By Fronczek, Charles J. (Dec. 1997)

Page 10 of 12 Using: 3 Tripods & 3 Tribachs (example) Order of Observations1: EDMI Prism1 Prism2 Notes Obs. From - To 0.0m 400.0 m 0.0 m 400.0 m Move Prism2 1000.0 m 0.0 m 150.0 m 1000.0 m 0.0 m 150.0.0 m Remove Prism1 from Tribach 0.0 m 1000.0 m 0.0 m 1000.0 m Swap EDMI w/prism1 150.0 m 0.0 m 1000.0 m 150.0 m -0.0 m 150.0 m 0.0 m 1000.0 m 150.0 m 1000.0 m Move Prism1 400.0 m 150 0 m 400.0 m 1000.0 m Prism2 Reversed 150.0 m 400.0 m Swap EDMI w/prism1 400.0 m 150.0 m 1000.0 m 400.0 m 150.0 m Move Prism1 0.0 m 400.0 m 0.0 m 1000.0 m 400.0 m 1000.0 m 400.0 m 0.0 m 1000.0 m 400.0 m 0.0 m Swap EDMI w/prism2 1000.0 m 0.0 m 400.0 m Prism1 Reversed 1000.0 m 400.0 m Move Prism 2 150.0 m 1000.0 m 0.0 m 150.0 m Prism1 Reversed 1000.0 m 150.0 m Breakdown Prism1 Forward Prism2 1000.0 m 0.0 m 1000.0 m 0.0 m

Page 11 of 12 Using: 1 Tripod w/tribach & 2 Prism Poles w/bipods(example) Order of Observations2: EDMI Prism1 Prism2 Notes Obs. From To 0.0 m 400.0 m 0.0 m 400.0 m 150.0 m Move Prism2 to 1000.0 m 0.0 m 150.0 m 1000.0 m Prism2 Reversed 0.0 m 150.0 m Remove Prism1 0.0 m 1000.0 m Prism2 Forward 0.0 m 1000.0 m Move EDMI 400.0 m Replace Prism1 400.0 m 150.0 m 1000.0 m 400.0 m 150.0 m Move Prism1 to 0.0 m 400.0 m 0.0 m 1000.0 m 400.0 m 1000.0 m 400.0 m 0.0 m 1000.0 m 400.0 m 0.0 m Move EDMI 150.0 m 150.0 m 0.0 m 1000.0 m 150.0 m 1000.0 m Move Prism2 to 400.0 m 150.0 m 0.0 m 400.0 m 150.0 m 0.0 m 150.0 m 0.0 m 400.0 m 150.0 m 400.0 m Move EDMI 1000.0 m 1000.0 m 0.0 m 400.0 m Prism1 Reversed 1000.0 m 400.0 m Breakdown Prism2 1000.0 m 0.0 m 1000.0 0.0 m Move Prism 1 to 150.0 m 1000.0 m 150.0 m 1000.0 m 150.0 m