Frequently Asked Questions

Similar documents
Figure 1: Vicinity Map of the Study Area

Access Management Regulations and Standards

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Bay to Bay Boulevard Complete Streets Project

Road Diets FDOT Process

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Safety Impacts: Presentation Overview

Broadway Complete Streets Project

Active Transportation Facility Glossary

Highway 111 Corridor Study

5. RUNNINGWAY GUIDELINES

Route 29 Corridor Assessment Update. Development of Possible Solutions

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

6.4 RECOMMENDED IMPROVEMENTS

Access Management Regulations and Standards

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

TRAFFIC IMPACT ANALYSIS

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

El Paso County 2040 Major Transportation Corridors Plan

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Access Location, Spacing, Turn Lanes, and Medians

What Is a Complete Street?

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Cycle Track Design Best Practices Cycle Track Sections

Chapter 3 BUS IMPROVEMENT CONCEPTS

Public Information Meeting

Washington St. Corridor Study

INNOVATIVE INTERSECTION DESIGN

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Chapter 2: Standards for Access, Non-Motorized, and Transit

F L E T C H E R A V E N U E

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

RAISED MEDIAN EFFECTIVENESS

Hidden Oaks Elementary School

91

GARLAND ROAD/GASTON AVENUE/ GRAND AVENUE INTERSECTION IMPROVEMENT STUDY

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Final Sidewalk Feasibility Study

Defining Purpose and Need

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

Welcome! Urban Work Zone Design. Training Course 0-1

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Simulation Analysis of Intersection Treatments for Cycle Tracks

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

PennDOT Access Management Model Ordinances Training

Best Practices for the Design and Operation of Reduced Conflict Intersections

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Community Bicycle Planning

Access Management Regulations and Standards for Minor Arterials, Collectors, Local Streets

Bicycle Facilities Planning

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

PUBLIC HEARING. for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida. Financial Project ID No.

1. Provide a dedicated westbound approach bus lane at the intersection;

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

Report. Typical Sections. City of Middleton, WI

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation

HYANNIS, MASSACHUSETTS TRANSPORTATION IMPROVEMENT PROGRAM

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Non-Motorized Transportation 7-1

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Physical Implications of Complete Streets Policies

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

Route 29 Solutions Projects

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

AMATS Complete Streets Policy

Chapter 4 Traffic Analysis

ACTIVE TRANSPORTATION

2014 Wisconsin Tribal Transportation Conference. Matt Halada Transportation Planner NE Region

City of Moorhead Committee of the Whole Meeting

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

Long Island Rail Road Expansion Project Floral Park to Hicksville

City of Homewood Transportation Plan

St. Francis Drive through the City of Santa Fe Corridor Study

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Windy Ridge Elementary School

Access Management in the Vicinity of Intersections

This page intentionally left blank.

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

Transcription:

Frequently Asked Questions Business US 190 in Copperas Cove From Avenue D to Constitution Drive What is access management? A. Access Management is a growing effort by government agencies to improve how major transportation corridors are managed. Access management involves the careful planning of the location, size, and spacing of driveways, street connections, median openings, and traffic signals to optimize safety and efficiency while minimizing conflict points. https://ops.fhwa.dot.gov/publications/amprimer/access_mgmt_primer.htm What are the benefits of access management? A. Studies show that implementing access management provides three major benefits to transportation systems including increased roadway capacity, reduced crashes, and shortened travel time for motorists. All three of these benefits are a result of minimizing or managing the number of conflict points along the corridor. The access management techniques used on this project include access spacing (distance between traffic signals and median openings); driveway spacing (promotes a more orderly merging of traffic and presents fewer challenges to driver); safe turning lanes (keeps thru traffic moving, providing refuge for turning traffic); and adding medians (one of the most effective means to regulate access and reduce crashes by reducing crossing conflict points). https://ops.fhwa.dot.gov/access_mgmt/what_is_accsmgmt.htm Will the turning radii be able to accommodate large trucks? A. Yes. At controlled intersections, the turning radii will be able to safely accommodate large trucks (including semi-trucks).

Will trucks be able to make left turns and navigate the entry points to provide deliveries to businesses? A. Yes. Trucks (including semi-trucks) will be able to safely make left turns at controlled left turn access points. All left turn access points were determined from the traffic patterns along BUS US 190 (i.e. deceleration lanes and queueing lengths). Will the lack of accessibility due to the medians impact the flow into businesses? A. Generally, the restricted access allows more efficient signalization and traffic flow along the corridor, which could potentially provide more customers for the businesses. This topic was further addressed by William E. Frawley and William L. Eisele, who studied the economic impact of raised medians on adjacent businesses. Their paper, Raised Medians and Economic Impact on Adjacent Businesses, found that the installation of a raised median does not equate to economic losses by adjacent businesses. https://pdfs.semanticscholar.org/9a4a/965a9d6e53993cde2603044d4d0e2fe8cf bb.pdf How is the City going to be able to manage all the new landscaping on the center medians with its current staffing levels? A. The proposed vegetated medians in this project have been coordinated with the Parks and Recreation Director/Deputy City Manager, Joe Brown. Xeriscaping has been used to design the medians, which uses low-maintenance vegetation that will not require additional work for City staff to maintain. Will reducing the traffic lanes from three to two lanes have a drastic impact on congestion? A. No it will not impact congestion. An Intersection and Access Analysis study completed in 2016 with the proposed roadway configuration (i.e. raised medians, limited left turn opportunities, and a four lane divided highway) that used projected 2036 traffic volumes show no significant impact on congestion due to lane reduction. The table shown below further illustrates the results of this study. All intersections analyzed maintained an acceptable level of service (), which is a qualitative measure of roadway capacity and operating conditions that directly relate to vehicle delay. The green cells showed no change in between 6 to 4 lanes. The blue cells did change but still represent acceptable driving conditions in an urban environment.

Intersection Capacity Analysis Results Projected 2036 Volumes* Business 190 at Robert Griffin III Drive (Signalized) Business 190 at Constitution Drive (Signalized) Business 190 at Martin Luther King Jr Drive (Signalized) Business 190 at E Avenue D (FM 1113) (Signalized) *Intersection and Access Analysis along Business 190 in Copperas Cove by Lee Engineering. May 2016. How will emergency vehicles be able to navigate the area without a center turn lane and one less travel lane? A. The Copperas Cove Fire Chief has reviewed the proposed improvements and notes no issues with emergency vehicles being able to navigate the area after the safety improvements have been made. Will there be an increase in the number of traffic accidents due to the reduced lanes and the lack of a center turn lane? A. No, there should not be an increase in traffic accidents with the reduced travel lanes and removal of the center turn lane. The proposed improvements are to improve safety and reduce traffic accidents. The section of US BUS 190 west of the proposed project area has two travel lanes in each direction and has fewer accidents than the proposed project area, which has three travel lanes in each direction. Why will the number of lanes be reduced? A. Reducing the number of travel lanes is part of the overall plan to improve safety and provide pedestrian routes along BUS US 190.

Can the project be done without reducing the number of lanes? A. No. The proposed project cannot be done without reducing the number of lanes. Maintaining six (6) travel lanes with the design concepts utilized to improve safety along this corridor would require additional right-of-way (ROW), which would increase the cost of the project above the current available funding and possibly impact existing businesses. Will congestion increase to the same level prior to the US HWY 190 and State HWY 9 completion? A. No, traffic studies performed show no significant impact on congestion due to lane reduction. Please see the Project Webpage for a link to the Lee Engineering Analysis. Why do we need 10-foot sidewalks? A. A 10-foot sidewalk is being used on this project per Federal ADA (Americans with Disabilities Act) standards to accommodate both pedestrian and bicycle traffic. On what side of BUS US 190 will the new sidewalk be installed? A. With this project, sidewalks will be installed on the south side of BUS US 190. How will the recently installed ramps fit with this project? A. The existing ramps will have to be reconstructed to conform to the new walkway size and location. If the ramps will not be used, why were public funds spent on recent ramps? A. The recently installed ramps were installed by a separate TxDOT program. The ramps selected for the previously completed improvement project were based upon the need at the time and were approved prior to the need determination for this project. TxDOT supports the proposed upgrades along the BUS US 190 corridor and approves the replacement of the previously installed ramps, asneeded, to complete the improvements along BUS US 190. Will the project improve the timing of traffic lights? A. Yes. This project is modifying traffic light timing to promote traffic flow along the BUS US 190 corridor.

Can the project funding be used for other things like park improvements or expanding US HWY 190 to extend Interstate HWY 14 around the City? A. No, these funds were specifically awarded to this project by the Killeen Temple Metropolitan Organization (KTMPO), which is comprised of City representatives from the region that voted on this project as a priority for this region. These funds cannot be used on another Copperas Cove project and if not spent for this effort will be returned to KTMPO where it will be spent on another project within the region. Will businesses on BUS 190 lose access? A. No, businesses on BUS US 190 will not lose access and the proposed improvements will provide a safer environment for vehicles, pedestrians, and bicyclists to access businesses along the BUS US 190 corridor.