CITY OF VANCOUVER ADMINISTRATIVE REPORT

Similar documents
We want to hear from you!

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

122 Avenue: 107 Street to Fort Road

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Tonight is for you. Learn everything you can. Share all your ideas.

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Transportation Corridor Studies: Summary of Recommendations

Frequently Asked Questions (FAQ)

Standing Committee on Policy and Strategic Priorities. Potential Granville Bridge Connector Public Engagement

Public Works and Infrastructure Committee. General Manager, Transportation Services

Complete Streets. Designing Streets for Everyone. Sarnia

Welcome. If you have any questions or comments on the project, please contact:

Terwillegar Drive Expressway Draft Concept Plan

RICHARDS STREET BIKE LANE

Governance and Priorities Committee Report For the July 2, 2015 Meeting

(These Minutes to be adopted at the Regular Council meeting on July 10, 2007) REPORT TO COUNCIL

PEDESTRIAN ACTION PLAN

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Glebe Neighbourhood Cycling Plan

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

102 Avenue Corridor Review

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

Transportation Impacts: Toronto York Spadina Subway Extension

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

ECONOMY PEOPLE ENVIRONMENT

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works

Dowling/Beaty Cycling Route

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

Draft North Industrial Area-Wide Traffic Plan

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

City of Seattle Edward B. Murray, Mayor

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Corydon-Osborne Neighbourhood Plan Recommendations

Welcome to the Open House

1. Provide a dedicated westbound approach bus lane at the intersection;

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

Guildwood Village Traffic Response Prepared by City of Toronto Transportation Department

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Chapter 3 DESIGN SPECIFICATIONS

Sixth Line Development - Transit Facilities Plan

Boston Post Road Design Feasibility Study

- 1 - TAC SUSTAINABLE URBAN TRANSPORTATION AWARD SUBMISSION - VANCOUVER TRANSPORTATION PLAN PROGRESS REPORT (MAY 2006) SUMMARY

Tunnel Reconstruction South 5 th Street Association October 16, 2018

STONY PLAIN ROAD STREETSCAPE

Item No Halifax Regional Council January 16, 2018 January 30, 2018

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

TRASBURG RANSPORTATION

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

3.0 PROJECT DESCRIPTION

Downtown Public Spaces

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

CITY OF VANCOUVER ADMINISTRATIVE REPORT. General Manager of Engineering Services and Director of Current Planning

Why invest in the 1 Street S.W. Corridor?

Design of Stanley Park S-Curve

41st Avenue B-Line Kerrisdale Village Street Improvements

5 CIRCULATION AND STREET DESIGN

Welcome! Public Open House on UBC s Transportation Plan

Bellevue Downtown Association Downtown Bike Series

complete streets design and construction standards public primer City of Edmonton

10.0 CURB EXTENSIONS GUIDELINE

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Forest Hills Improvement Initiative

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Chapter 5 Future Transportation

Monterey Road Complete Streets

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Appendix A-K Public Information Centre 2 Materials

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

6.4 RECOMMENDED IMPROVEMENTS

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Transcription:

CITY OF VANCOUVER ADMINISTRATIVE REPORT Report Date: May 31, 2007 Author: Paul Storer Phone No.: 604.873.7693 RTS No.: 06348 VanRIMS No.: 13-5000-20 Meeting Date: June 12, 2007 TO: FROM: SUBJECT: Standing Committee on Transportation and Traffic General Manager of Engineering Services Cambie Street Bike Lanes RECOMMENDATION A. THAT during Cambie Street reconstruction, northbound bike lanes be installed between 49 th Avenue and 29 th Avenue as described in this report at a cost of $18,000, funded from 2006 Streets Basic Capital Budget for Bicycle Network Improvements. B. THAT during Cambie Street reconstruction, the northbound carriageway be widened by up to 1.4 meters between 29 th Avenue and King Edward Avenue to accommodate a wide shared curb lane. C. THAT the Streets Operating Budget be increased by $23,000 for Streets Maintenance annually to offset reductions in TransLink OMR funding as a result of these changes and by $3,800 for Signage and Pavement Marking both without offset commencing in 2009 and subject to annual Budget Review. D. THAT as opportunities arise in conjunction with ongoing development, staff pursue the widening of the southbound carriageway on Cambie Street between King Edward Avenue and 49 th Avenue to allow for a future bike facility.

Cambie Street Bike Lanes 2 COUNCIL POLICY On May 27 th, 1997, Council approved the Vancouver Transportation Plan which emphasized the need to provide more comfortable cycling and walking environments. Regarding Cambie Street, the plan specifically states: To maintain the key connections with the region and good cross-city road links, some roads will need to continue to provide a relatively high level of service for car drivers. Roads which connect with bridges, freeway ramps, and major destinations generally carry the heaviest traffic today, and are likely to in the future. Many of these roads now have parking restrictions at peak times. Existing parking restrictions would likely remain, and some additional measures to improve traffic flow and safety may be justified. These arterial roads would probably not be appropriate for bus or bike lanes. Cambie, Oak, Kingsway,1 st Avenue, Grandview- 12 th to Granville, are examples of these busiest roads which are important cross-city routes. On May 13 th, 2003, Council reiterated its support for a Richmond/Airport-Vancouver (RAV) rapid transit line as a key element in helping the City achieve its environmental, transportation and liveability objectives as part of a comprehensive, carefully-developed, adequately-funded, long-term, regional strategic transportation plan. It was also approved that good bicycle access be provided at all stations and that providing bicycle access to and on the new Fraser River transit bridge be considered. On October 19 th, 2006, Council approved widening on Cambie Street from 49 th Avenue to 29 th Avenue and asked staff to report back on the implementation of bicycle lanes from Kent Avenue to 49 th Avenue, about the potential for bicycle lanes between 49th Avenue and King Edward, and on bicycle facility issues between King Edward and the north end of the Cambie Street Bridge. PURPOSE The purpose of this report is to report back to Council about incorporating bike lanes on Cambie Street, as requested in Recommendation E passed by Council on October 19 th, 2006. Council s motion is included in Appendix A. DISCUSSION The Council-approved 1997 Transportation Plan states that Cambie Street would likely not be appropriate for bike lanes. The Canada Line and the new pedestrian/bike bridge across the Fraser River will change the transportation network significantly in ways that suggest reexamining that policy. A. Kent Avenue to King Edward Avenue Marked bike lanes can be achieved on most sections of Cambie Street between Kent Avenue and King Edward Avenue as part of the reconstruction of Cambie Street following Canada Line construction. The exceptions are for the southbound direction between King Edward and 49 th Avenue and the northbound direction between 29 th Avenue and King Edward. These two sections are described briefly below and are discussed in more detail in Appendix B.

Cambie Street Bike Lanes 3 Southbound - King Edward to 49 th Avenue Bike lanes can not be implemented in the southbound direction between King Edward and 49 th Avenue due to capacity constraints and cost. The curbs in this section are generally not affected by Canada Line construction and therefore the cost of moving the curbs is high -- $1.2 million to $3.6 million depending on the option. In addition, the afternoon peak period is busier than the morning peak and is more of a concern to the City because the southbound lanes facilitate traffic moving out of the City, relieving congestion on other streets. When the street is repaved the lane markings will be adjusted to provide wider curb lanes to improve conditions for cyclists where possible. Staff recommend pursuing opportunities to widen the southbound carriageway over time in conjunction with adjacent developments (Recommendation D). Northbound 29 th Avenue to King Edward Staff are recommending widening the northbound carriageway between 29 th Avenue and King Edward Avenue by up to 1.4 m into the median to provide for a bike friendly wide curb lane (Recommendation B). The new width will be able to accommodate a full painted bike lane. However, staff do not recommend painting a bike lane in this section at this time because this is a transition section. The wide curb lane will allow width for cyclists to travel comfortably to the Canada Line Station at King Edward Avenue. Terminating the marked bike lane at 29 th Avenue will encourage cyclists to use the 29 th Avenue bike lanes to divert to Yukon Street, a planned bikeway that will extend from 29 th Avenue to the Cambie Bridge. The proposed widening into the median will require a Heritage Alteration Permit. Heritage Considerations, 49 th to King Edward Avenue In 1993, Vancouver City Council designated the central median of Cambie Street (Cambie Heritage Boulevard) between King Edward Avenue and SW Marine Drive as a heritage landscape. As such, any permanent or temporary modifications to the Cambie Heritage Boulevard require a Heritage Alteration Permit. Recommendation B, the proposal to accommodate a northbound cyclist connection to the future King Edward Canada Line Station by widening the roadway between 29 th and King Edward Avenue, will require that the Cambie Heritage Boulevard be narrowed by 1.4m. As this is an important transportation network enhancement, staff are recommending this improvement despite the implications to the Heritage Boulevard. The alternative would be to narrow the side boulevard on these blocks, which would result in the removal of 11 mature trees that currently provide a buffer from the traffic on Cambie Street for the adjacent residential properties. Narrowing the Cambie Heritage Boulevard, rather than the side boulevard, will not impact any median trees, and this widening has already been done on a temporary basis to accommodate Canada Line Construction. Staff have investigated the possibility of creating southbound bike lanes by further narrowing the Cambie Heritage Boulevard. This additional narrowing to accommodate the bike lanes would impact a total of eight trees in localized sections of the central median. Seven of the eight trees would require pruning to accommodate the narrowing, and the remaining tree may require removal and/or transplantation. Five of the affected trees are cherry trees, four of which were donated to the city by the City of Yokohama and carry a valuable tree designation as provided by the project arborists. A valuable tree designation considers

Cambie Street Bike Lanes 4 factors of age, historical significance and condition. The impacts of this proposal from a Heritage perspective are significant. The Cambie Heritage Boulevard Society has been consulted in regards to these two proposals and has expressed opposition to both of these proposals. B. King Edward Avenue to Cambie Bridge The following is in response to the Council motion, FURTHER THAT staff report back on bicycle facility issues between King Edward and the north end of the Cambie Street Bridge. Between King Edward Avenue and the Cambie Bridge, there are many different preconstruction configurations. Many of the sections vary greatly with the introduction of medians and left turn bays. Some typical cross-sections are shown in Figures 10 and 11. Figure 1: King Edward Avenue to 12 th Avenue Typical Pre-construction Configuration Figure 2: 12 th Avenue to 6 th Avenue Typical Pre-construction Configuration For much of this section of road, the right-of-way is 80 (24.4m). Where the right-of way is 80 there are building lines in place to allow a 100 (30.5m) right-of-way in the future. As shown in Figure 1, a typical pre-construction configuration through the Cambie Village area,

Cambie Street Bike Lanes 5 the 80 right-of-way allows two narrow full time moving lanes in each direction, parking lanes that become moving lanes in the peak periods, and two 3.6m sidewalks. The dimensions of the lanes are smaller than typical City minimum. The two potential options to achieve bike lanes between King Edward Avenue and the Cambie Bridge are to remove all peak hour parking restrictions and: 1. remove one parking lane to reallocate the space to bike lanes (Figure 3), or 2. remove one general purpose travel lane to reallocate the space to bike lanes (Figure 4). Figure 3: 12 th Avenue to King Edward Avenue Bike Lanes with Parking One Side Figure 4: 12 th Avenue to King Edward Avenue Bike Lanes with Parking Both Sides Businesses along Cambie Street value the street parking fronting their businesses. The Cambie BIA expressed some opposition to removing parking, but as of the time of report submittal, hadn t provided a formal response to the concept. Capacity would be lost by removing peak hour parking restrictions. The loss of parking would have a negative impact on pedestrians and businesses and the resultant loss of peak hour capacity could result in increased shortcutting through adjacent neighbourhoods. Because of this, the first option is not recommended.

Cambie Street Bike Lanes 6 Removing an additional travel lane to maintain parking is also not recommended, as it would reduce the peak hour capacity in one direction from three lanes to one lane. That one general purpose lane would be used for all turning movements and for parallel parking as well as driving. One moving lane of traffic is not adequate to serve the needs of a major arterial street such as Cambie Street. North of 29 th Avenue cyclists will have the option of using the proposed Yukon Bikeway (one block east of Cambie Street) or the Heather Bikeway (two blocks west of Cambie Street). The availability of these alternate routes reduces the need for bike lanes on northern Cambie Street. Because of these issues, it is recommended that bike lanes not be implemented between King Edward and the Cambie Bridge. When long-term widening lines are achieved, the corridor could be reviewed for the potential for bike lanes. However, it should also be noted that the sidewalks through the Cambie Village are narrow and there is also a desire to use any additional width to improve the sidewalk conditions. C. Cambie Bridge Improving conditions for pedestrians and cyclists crossing False Creek has been a City priority for many years. The False Creek Pedestrian and Cyclist Crossing Study was reported to Council in 2002 and was the result of an extensive public consultation process and technical study. The study investigated the possibility of incorporating bike lanes on the Cambie bridge deck, but recommended widening the western sidewalk to accommodate cyclists. It recommended a long term strategy for pedestrian and cyclist improvements across False Creek, including that the City, undertake major improvements to the pedestrian and cycling environment on the deck or upper level of the Burrard Bridge first, Granville corridor second, and Cambie third with a report back to Council for confirmation of these priorities after completion of the work on the Burrard Bridge. Staff continue to support the findings of this study. D. Alternate Cycling Facilities Appendix D shows the current cycling network in the city along with some relevant future routes. Alternatives to Cambie Street Bike Lanes will be important, both to create a connection where cycling facilities can not be implemented on Cambie Street and since less experienced riders tend to feel more comfortable on local street facilities. The primary alternate routes are: Heather Street Kent Avenue to 7 th Avenue Ontario Street Kent Avenue to 1 st Avenue Yukon Street (future route) 29 th Avenue to Cambie Bridge The Yukon Bikeway is initially proposed from 29 th Avenue to 10 th Avenue, but is planned to extend to the Cambie Bridge and the Canada Line station at 2 nd Avenue. These connections for pedestrians and bikes will be completed as part of the station precinct plans. The BAC has recommended that bike lanes extend from Kent Avenue to the north end of the Cambie Bridge (Appendix C).

Cambie Street Bike Lanes 7 E. Capacity Considerations The Canada Line is expected to attract 100,000 transit passengers per day, the majority of which will be existing transit users. There will also be new ridership generated by population growth, new developments along the line, and by former auto users attracted to the higher level of transit service on the Canada Line. This modal shift will result in approximately 1600 fewer vehicles using all north-south streets in the AM peak hour, which is the equivalent capacity of two vehicle travel lanes. The northbound Cambie bike lane will remove some AM peak hour capacity on Cambie Street. Engineering Services staff will be conducting a review of options to reallocate this north-south corridor capacity as part of the next update to the Vancouver Transportation Plan. Opportunities could include: Removal of rush hour parking restrictions, which would enable on-street parking for businesses and residents along north-south routes such as Granville, Oak, Cambie, Main and Fraser Streets. Reallocation of vehicle lanes on the same routes for other sustainable modes such as bicycle lanes and shared bus-bike lanes. Despite the pending review, Cambie Street restoration offers a significant opportunity to provide a northbound arterial cycling connection up to the 29 th Avenue Bikeway and the pending Yukon Bikeway. Because of this opportunity, staff recommend that rush hour parking restrictions be removed in the northbound direction from 33 rd Avenue to 49 th Avenue to allow the permanent installation of a northbound bicycle lane. Cambie Street from Marine Drive to the north end of the Cambie Bridge is part of the Major Road Network (MRN), and therefore changes to capacity require Translink Support. Translink is currently reviewing the concepts and is expected to provide a formal response soon. The following table summarizes the recommendations of this report. Street Type of Facility Boundaries Southbound Northbound Kent Ave to W 49 th Ave W 49 th Ave to W 33 rd Ave W 33 rd Ave to W 29 th Ave W 29 th Ave to King Edward Ave King Edward Ave to North Side of Cambie Bridge Bike lane beside full-time parking Shared wide curb lane (where possible) Shared wide curb lane (where possible) Shared wide curb lane (where possible) Bike lane beside full-time parking Bike lane beside full-time parking Bike lane adjacent to curb Shared wide curb lane Capacity Implications No change AM northbound peak period - 3 lanes per direction reduced to 2 No change No change Existing Curb Lane Regulations Full-time parking Parking Restrictions 7-9:30am northbound 3-6pm southbound No Stopping Anytime Parking Restrictions 7-9:30am northbound No Stopping Anytime southbound No facility No facility No change No change

Cambie Street Bike Lanes 8 The construction of this route is anticipated to begin in 2007 and be completed in 2009. This timeline is subject to coordinating efforts with other projects underway and/or planned in the area. FINANCIAL IMPLICATIONS In October 2006, Council approved the following funding: $170,000 for the incremental cost of widening the northbound carriageway between 49 th Avenue and 29 th Avenue, and $45,000 for the cost of marking bike lanes between Kent Avenue and 49 th Avenue It is recommended that the following funding be approved: $18,000 for signage and pavement markings to implement northbound bike lanes between 49 th Avenue and 29 th Avenue Cambie Street is part of the Major Road Network (MRN). Decreasing the peak hour capacity by making parking permanent between 49 th Avenue and 33 rd Avenue will reduce funding from Translink by approximately $23,000 per year. It is recommended that the Streets Operating Budget for Street Maintenance be increased by $23,000 to cover the reduction in funding. It is also recommended that the Streets Operating Budget for Signage and Pavement Marking be increased by $3,800 annually without offset, commencing in 2009 and subject to annual Budget Review. CONCLUSION It is recommended that northbound bike lanes be implemented on Cambie Street between Kent Avenue and 29 th Avenue, and that southbound bike lanes be implemented on Cambie Street between 49 th Avenue and Kent Avenue, as recommended in this report. Staff have also concluded that it is not recommended to implement bike lanes on Cambie Street northbound from King Edward to the north end of the Cambie Bridge and southbound from the north end of the Cambie Bridge to 49 th Avenue at this time. * * * * *

APPENDIX A PAGE 1 OF 1 October 19 2006 Council Recommendations A. THAT Council approve the following improvements to Cambie Street from West 7 th Avenue to West 64th Avenue to be coordinated with the restoration of the road following the construction of the Canada Line: i. Lengthening of the northbound to westbound left turn bay at West 10 th Avenue, ii. Realignment of curbs and provision of a planted median from West 14 th Avenue to West 17th Avenue iii. Installation of pedestrian bulges at the following locations: a) Southeast corner of Cambie Street and West 18th Avenue b) Northwest corner of Cambie Street and West 17th Avenue c) Southeast corner of Cambie Street and West 17th Avenue iv. Elimination of the northbound to eastbound right turn channel and island at King Edward Avenue. B. THAT the total cost of $380,000 to implement the improvements in A. be funded from the 2006 Streets Basic Capital for Design and Construction of Geometric and Safety Modifications on Arterial Streets. C. THAT, commencing in 2008, the annual Operating Budget for Signage be increased by $1,150, without offset and subject to 2008 Budget Review, for maintenance of the new signs and pavement markings. D. THAT Council approve the funding of $170,000 from the City s 2006 Streets Basic Capital for Bicycle Network to widen the east roadway of Cambie Street: i. From West 49th Avenue to West 37th Avenue, a widening of up to 0.4 metres, ii. From West 33rd Avenue to West 37th Avenue, a widening of up to 1.1 metres, and iii. From West 33rd Avenue to West 29th Avenue, a widening of up to 1.4 metres, To align the curb line to provide consistent lane widths, to provide sufficient road space for vehicles to navigate the curved roadway, and to provide sufficient space for general vehicles to share with cyclists. E. THAT Council approve the implementation of bicycle lanes on Cambie Street between Kent Avenue and 49th Avenue and report back on how that implementation might be achieved; FURTHER THAT staff report back on the implementation of bicycle lanes from 49th Avenue to King Edward; and FURTHER THAT staff report back on bicycle facility issues between King Edward and the north end of the Cambie Street Bridge. F. THAT funding of $45,000 for the implementation of these bike facilities and parking changes be provided from 2006 Streets Basic Capital for Bicycle Network. G. THAT, commencing in 2008, the annual Operating Budget for Signage be increased by $4,500, without offset and subject to 2008 Budget Review, for maintenance of the new signs and pavement markings.

APPENDIX B PAGE 1 OF 6 Cambie Bike Lanes - Kent Avenue to 49 th Avenue The following is in response to the motion, THAT Council approve the implementation of bicycle lanes on Cambie Street between Kent Avenue and 49th Avenue and report back on how that implementation might be achieved. Kent Avenue to Marine The section of Cambie Street between Kent Avenue and SW Marine Drive is changing dramatically due to the construction of the Canada Line station and the columns for the elevated guideway. A typical configuration is shown in Figure 1, accommodating in each direction: a general purpose travel lane, a bike lane, and a parking lane where possible. Figure 1: Kent Avenue to SW Marine Recommended Typical Configuration Between SW Marine Drive and 49 th Avenue, the existing paved widths of both the northbound and southbound carriageways are typically 10.7m, with a pre-construction configuration shown in Figure 2. Figure 2: SW Marine to 49 th Avenue Typical Pre-construction Configuration

APPENDIX B PAGE 2 OF 6 As shown in Figure 3, this allows the road to be remarked to allow: a 2.5 m parking lane, a 1.8 m bike lane, and two 3.2 m general purpose travel lanes. Figure 3: SW Marine to 49 th Avenue Recommended Typical Configuration During reconstruction, this configuration could be installed at a minimal cost, since pavement markings will be re-installed following construction. 49 th Avenue to King Edward Avenue The following is in response to the motion, FURTHER THAT staff report back on the implementation of bicycle lanes from 49th Avenue to King Edward. A typical cross-section of Cambie between 49 th Avenue and King Edward Avenue is shown in Figure 4. Morning peak period parking restrictions provide for three northbound travel lanes. Afternoon peak period restrictions provide for three southbound travel lanes. Figure 4: 49 th to King Edward Avenue Typical Pre-construction Configuration

APPENDIX B PAGE 3 OF 6 There are two general ways in which bike lanes could be installed between 49 th Avenue and King Edward Avenue: 1. Make parking permanent by removing rush hour parking restrictions and constructing a cross section as shown in Figure 5, which would require some roadway widening and which would include: a 2.5 m parking lane, a 1.8 m bike lane, and two 3.2 m general purpose travel lanes. Figure 5: 49 th Ave to King Edward Avenue Bike Lanes with Full-time Parking 2. Remove all parking and re-mark the road to allow a bike lane. There are several ways in which this could be done, but one configuration, shown in Figure 6, would include: a 2.0m bike lane, two 3.4 m driving lanes, and a painted gore area along the median, varying from 0.9 to 1.5m. Figure 6: 49 th Ave to King Edward Avenue Bike Lanes with Parking Removed on West Side

APPENDIX B PAGE 4 OF 6 49 th Avenue to King Edward Avenue Northbound Carriageway The northbound carriageway has had new curb locations approved by Council, which will be implemented upon restoration of the road following Canada Line construction. On Cambie Street, as is typical throughout the City, the morning has a lower peak traffic volume than the afternoon. Because of this, the third northbound travel lane in the morning is less critical than the third southbound travel lane in the afternoon and removing the morning parking restrictions to allow a bike lane would likely not have serious capacity implications, provided four lanes are maintained at the approach to major intersections to separate left and right turns from through traffic. Between 49 th Avenue and 33 rd Avenue, staff recommend that the peak hour parking restrictions be removed and that full time parking and bike lanes be installed for the northbound carriageway, as shown in Figure 7. This would provide a bike lane and also allow residents and businesses to retain access to on-street parking. Figure 7: 49 th to 33 rd Avenue Recommended Typical Configuration for East Carriageway Between 33 rd Avenue and 29 th Avenue, Cambie acts as both a north-south and east-west arterial due to the discontinuity of 33 rd Avenue, as shown in Figure 8. 1100 LAURIER AV 4300 SELKIRK ST 4100 SELKIRK ST 4500 OSLER ST 4100 OSLER ST 4600 OAK ST 4400 OAK ST 3900-4000 OAK ST W 37TH AV 1000 W 37TH AV 1000 W 38TH AV 22ND AV 500 W 24TH AV 500 W 26TH AV 500 W 27TH AV 500 W 28TH AV W 39TH AV 500 W 39TH AV W 40TH AV 0 W 41ST AV 1100 NANTON AV 1100 W 32ND AV 4900 SELKIRK ST 4900 OSLER ST 5500 OSLER ST 1000 W 27TH AV 900 W 33RD AV OAK ST 800 W 23RD AV 800 W 24TH AV 33 rd Avenue 900 W 32ND AV 800 W KING EDWARD AV 4800 LAUREL ST 800 W 26TH AV 800 W 27TH AV 800 W 28TH AV WILLOW ST 5100-5200 WILLOW ST 5300-5400 BAILLIE ST 5300-5400 HEATHER ST 4900-5000 HEATHER ST 5300-5400 MANSON ST 4800 CAMBIE ST 5600 ASH ST 5100-5200 CAMBIE ST 700 W 33RD AV 700 W 24TH AV 4000 ASH ST 600 W 26TH AV 600 W 27TH AV 4400 HEATHER ST 600 W 41ST AV 500 W 23RD AV 4400 ASH ST Cambie St 600 W 31ST AV 4900-5200 ASH ST 500 W 29TH AV 4900-5000 KERSLAND DRIVE 0 CAMBIE ST 4000 YUKON ST 4200 YUKON ST 200-300 MIDLOTHIAN AV 300 W 37TH AV 400 W 38TH AV 300 W 39TH AV 400 W 40TH AV 300 W 41ST AV 5400 COLUMBIA ST COLUMBIA ST 100 W 22ND AV 0 E 22ND AV 100 E 22ND AV 100 E 23RD AV 100 W 23RD AV 0 MIDLOTHIAN AV 100 W 37TH AV 100 W 39TH AV MANITOBA ST 5400 ONTARIO ST 4900-5200 ONTARIO ST NTARIO ST 4500 ONTARIO ST 0 E 26TH AV 0 E 29TH AV 0 E 30TH AV 4800 JAMES ST 5400 QUEBEC ST 4900-5000 QUEBEC ST 3800 SOPHIA 200 E 29TH AV 200 E 30TH AV 100 E 32ND AV 5100 MAIN ST 200 E 24TH AV 100 W KING EDWARD AV 100 E KING EDWARD AV 100-200 PEVERIL AV 29 th Avenue 4200 MANITOBA ST 0 W 28TH AV 200 E 26TH AV 0 E 27TH AV 0 E 28TH AV 200 E 28TH AV 4800 WALDEN ST 4800 SOPHIA ST 300 E 35TH AV 200 E 37TH AV 200 E 38TH AV 5500 SOPHIA ST 100 E 39TH AV 100 E 40TH AV 100 E WOODSTOCK AV 400 E 22N 400-500 E 2 400 E 24T 400 E KING ED 300 WEBBER AV 400 E 26T 400 E 28T 400 E 29T 400 AUBREY 400 E 30T 400 E 31ST 300 E 32ND AV 33 rd Avenue 400-600 E 3 400 E 34 400 E 35 300 E 36TH AV 400-600 E 400 E 38 Figure 8: Arterial Network at Cambie St and 33 rd Avenue E EDWARD ST

APPENDIX B PAGE 5 OF 6 Prior to construction of the Canada Line, parking was not allowed on the eastern side of the road. There is little need for parking in this section since it fronts Queen Elizabeth Park, so the following configuration, shown in Figure 9, is recommended for this section: a 1.8m bike lane, and three travel lanes (3.1m, 3.0m, 3.2m) Figure 9: 33 rd to 29 th Avenue Bike Lanes with No Parking Between 29 th Avenue and King Edward Avenue, a northbound bike lane with full time parking could be implemented by removing rush hour parking regulations. This would provide a cycling connection to the King Edward Canada Line station, and to a connection along King Edward to the proposed Yukon bikeway. A widening of up to 1.4m would be required to allow the future implementation of a bike lane. In this section the curbs along the centre median have been removed for the tunnel construction, so the widening can be achieved at no cost to the City. The curbs were not removed along the east side boulevard to preserve several healthy, mature trees. Because of this, it is recommended that any widening take place by narrowing the heritage boulevard. The alternative option would be to narrow the east side boulevard which would require the removal of approximately 11 significant, mature trees and cost approximately $800,000 to $1,200,000. Modifications to the Heritage Boulevard would require that the City obtain a Heritage Alteration Permit to conduct this change. It is recommended that the roadway be widened by 1.4m to allow a bike connection between 29 th Avenue and King Edward Avenue, but that it not be marked as a bike lane at this time. The wide curb lane will allow width for cyclists to travel comfortably to the Canada Line Station at King Edward Avenue. Terminating the marked bike lane at 29 th Avenue will help encourage cyclists to divert to the Yukon Bikeway, which is planned to extend from 29 th Avenue to the Cambie Bridge.

APPENDIX B PAGE 6 OF 6 49 th Avenue to King Edward Avenue - Southbound Carriageway Between King Edward Avenue and 49 th Avenue, there are significant impediments to implementing southbound bike lanes. Retaining a third peak hour travel lane is more important than in the northbound direction, both because the peak period volumes are higher and because the afternoon movements facilitate traffic movement out of the city, relieving congestion on other city streets. Additionally, the existing roadway is not wide enough to accommodate bike lanes without either removing parking or a travel lane. The carriageway could be widened to 10.5m to allow a configuration shown in Figure 5. This width could be achieved by widening the road into either the centre boulevard or the side boulevard. The cost of widening into the Heritage Boulevard would be approximately $100,000 to $150,000 per block ($1.2 million to $1.8 million in total). Because of utilities, poles, trees, and other constraints, widening into the side boulevard would cost approximately $200,000 to $300,000 per block ($2.4 million to $3.6 million in total). Because of the reduction of peak hour capacity and the high cost, this option is not recommended. The other option would be to re-mark the roadway as shown in Figure 6 by removing parking. This is not recommended at this time because of impacts to parking for residents and businesses and because of impacts to the peak capacity of the road. There will likely be major development in the Oakridge area over the coming years which could provide an opportunity for developer-funded curb relocations on the southbound carriageway, and could help extend the proposed southbound bike lanes to the Midtown Bikeway at 37 th Avenue. It is recommended that the southbound carriageway between King Edward and 49 th Avenue be reinstated as it was pre-construction, except that bike-friendly wide curb lanes be created where possible.

BAC Resolution of May 18, 2005 Regarding the RAV Rapid Transit Project APPENDIX C PAGE 1 OF 1

` APPENDIX D PAGE 1 OF 1