STRUCTURAL STABILITY ASSESSMENT

Similar documents
CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

HISTORY OF CONSTRUCTION

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

CLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia.

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

Notice of Intent to Close Inactive CCR Surface Impoundments

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

Green CCR Surface Impoundment

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Annex E Bridge Pier Protection Plan

What I ve Learned About Dam Safety Good, Bad and Ugly

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

TECHNICAL MEMORANDUM 002 EMORANNO. 001

Huntington District. For More Information Contact (304)

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

JAP Additional Information Sheet

CLAIBORNE LOCK AND DAM PERTINENT DATA

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

Coal Combustion Residuals Closure Plan

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

Water Storage for Agriculture

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

Plan B Dam Breach Assessment

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

Chutes Part 2: Synthetic linings

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

CHAPTER 5 CULVERT DESIGN

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam

22. Specialty Valves.

D.B. Wilson Station CCR Landfill

Large-scale Field Test

Scott Dam Spillway Comparing Physical Model Study Results

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB)

Design of Spillway Upgrades

OPERATION OF SPILLWAY GATES HOW TO AVOID THE PROBLEMS AND PITFALLS. Peter Allen. DERM Qld

U.S. ARMY CORPS OF ENGINEERS INSTITUTE FOR WATER RESOURCES RISK MANAGEMENT CENTER PRELIMINARY LESSONS LEARNED FROM OROVILLE INCIDENT

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

Components of a Barrage

Spillway Design for Small Dams

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

TDLP INC. The Dam & Levee Professionals. Kevin Chancey Sarah Edens. Monica Murie Jason Unruh

Holding Pond Annual Inspection Report

General Information for Culvert Design

Performance of RCC Used for Overtopping Protection and Spillways

LESSONS LEARNED AT THE TAUM SAUK REBUILD. Paul C. Rizzo, Ph.D., P.E. 1 Carl Rizzo 2 John Bowen 3 ABSTRACT INTRODUCTION

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY

TABLE OF CONTENTS LEGAL NOTICE

APPENDIX J HYDROLOGY AND WATER QUALITY

Illinois State Water Survey

INFLOW DESIGN FLOOD CONTROL PLAN

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY

NCDOT S EXPERIENCE USING HYDRAULIC SETTLEMENT GAUGES. David L. Teague,P.E. NCDOT GEOTECHNICAL ENGINEERING UNIT

Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck Project # B

Unique Challenges Influencing the Design and Construction Of Three Recent Australian RCC Dams

Holding Pond Annual Inspection Report

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

Project 184 Preferred Canal Drainage Structure and Release Point Plan

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Dams as Systems. Pat Regan Federal Energy Regulatory Commission (FERC)

HYDRAULIC JUMP AND WEIR FLOW

Storm Damage Floating Culverts & Other Inlet Issues

Emergency Action Plan

Lower Churchill Management Corporation. Nalcor Doc. No. MFA-PT-MD-0000-EN-PL

Amended Written Closure Plan

5th International Symposium on RCC Dams General Introduction

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

Appalachian Adventure Unguided Tour #5

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

Construction Dewatering

UNIT-I SOIL EXPLORATION

A LOOK AT EARTH SPILLWAY DESIGN AND EVALUATION AFTER MORE THAN 50 YEARS OF EXPERIENCE

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

FINAL Caples Lake Fisheries Management Plan. Version 4.0

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

Transcription:

STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical Engineering Services American Electric Power Service Corporation 1 Riverside Plaza Columbus, OH 43215 GERS 16 121

TABLE OF CONTENTS 1.0 OBJECTIVE 257.73(d)... 1 2.0 NAME AND DESCRIPTION OF CCR SURFACE IMPOUNDMENT... 1 3.0 STABLE FOUNDATION AND ABUTMENTS 257.73(d)(1)(i)... 1 4.0 SLOPE PROTECTION 257.73(d)(1)(ii)... 2 5.0 EMBANKMENT CONSTRUCTION 257.73 (d)(1)(iii)... 2 6.0 VEGETATION CONTROL 257.73 (d)(1)(iv)... 2 7.0 SPILLWAY SYSTEM 257.73(d)(1)(v)... 2 7.1 SERVICE SPILLWAY... 2 7.2 EMERGENCY SPILLWAY... 3 8.0 BURIED HYDRAULIC STRUCTURES 257.73 (d)(1)(vi)... 3 9.0 SUDDEN DRAWDOWN 257.73 (d)(1)(vii)... 3 iii

1.0 OBJECTIVE 257.73(d) This report was prepared by AEP Geotechnical Engineering Services (GES) section to fulfill requirements of CFR 257.73(d) and document whether the design, construction, operations, and maintenance of the CCR unit is consistent with recognized and generally accepted good engineering practices. This is the initial assessment as per the Rule. 2.0 NAME AND DESCRIPTION OF CCR SURFACE IMPOUNDMENT The Cardinal Power Plant in Wells Township, Jefferson County, near the town of Brilliant in eastern Ohio. It is owned by Buckeye Power and AEP Generation Resources (GENCO) and is operated by Cardinal Operating Company. The facility operates two surface impoundments for storing CCR; the Bottom Ash Complex and Cardinal Fly Ash Reservoir II (FAR II) Dam. The focus of this report is the FAR II Dam. The FAR II Dam is a valley filled dam with a unique structure whose current configuration is the result of the original earth fill dam and two separate raisings. The original earth fill dam (Stage 1) consisted of a 180 feet high arched earth embankment incorporating a zoned cross section. At 925 feet NGVD, the dam featured a 70 foot wide by 1,055 feet long crest. The maximum operating pool that could be achieved with the original configuration was El. 913. In 1997, the original dam was raised, referred to as Stage 2. Following this raising, the dam was 237 feet high with a 30 foot wide crest. In 2013, the dam was raised 13 feet using back to back MSE walls, bringing the dam into its current, Stage 3 configuration. The principal features of the typical section are the MSE wall themselves and a vinyl sheet pile wall extending from the existing clay core to the top of the PMF flood level for seepage cutoff purposes. 3.0 STABLE FOUNDATION AND ABUTMENTS 257.73(d)(1)(i) [Was the facility designed for and constructed on stable foundations and abutments? Describe any foundation improvements required as part of construction.] Since the overburden is saturated and appeared to be heterogeneous, with some material having a softer consistency than that of the sample tested, it was determined to be unsuitable as a foundation material, and was removed in the area beneath the dam and along the valley slopes up to approximately elevation 800 feet NGVD. Based on the design drawings, a foundation key was constructed along the centerline of the dam. The key was excavated 6 8 feet into the rock beneath the dam and along the valley slopes up to approximately elevation 800 feet NGVD. At the abutments location, a cut to rock was made at the proposed abutment. The orientation of the trimmed faces has been designed so that the upstream core of the dam intersects the abutments at right angles. This symmetrical configuration resulted in balanced seating of the clay core against the rock which reduces interface seepage and minimizes the potential for cracking of the core. A grout curtain was provided in the abutments of the dam. The dam was arched in the upstream direction and camber was provided to compensate for settlement. Slope protection consisted of RCC Page 1 of 3

Facing for stage 2 in the upstream and grass and riprap on the downstream for stage 1 and 2 slopes with riprap in the groin of the dam. Stage 3 does not require slope protection. Based on recent subsurface investigations, the density and description of the foundation materials are adequate for this CCR unit. 4.0 SLOPE PROTECTION 257.73(d)(1)(ii) [Describe the slope protection measures on the upstream and downstream slopes.] Slope protection consisted of RCC Facing for stage 2 in the upstream and grass on the downstream for stage 1 and 2 slopes with riprap in the groin of the dam. Stage 3 does not require slope protection. Any erosion that may occur is repaired within a timely period. 5.0 EMBANKMENT CONSTRUCTION 257.73 (d)(1)(iii) [Describe the specifications for compaction and/or recent boring to give a relative comparison of density.] The design drawings show that the embankment materials were to be compacted to 90% Modified proctor density. Recent borings through the embankment indicate that the material is stiff and representative of compacted earthen materials. 6.0 VEGETATION CONTROL 257.73 (d)(1)(iv) [Describe the maintenance plan for vegetative cover.] The vegetative areas are mowed to facilitate inspections and maintain the growth of the vegetative layer; and prevent the growth of woody vegetation. 7.0 SPILLWAY SYSTEM 257.73(d)(1)(v) [Describe the spillway system and its capacity to pass the Inflow Design Flood as per its Hazard Classification.] The spillway system consists of a primary weir box and pipe for normal operations and an open channel spillway to pass flood events. The CCR unit has a high Hazard rating and design flood is the PMF flood. The facility can safely pass this flood (PMF) without overtopping the dam crest. 7.1 SERVICE SPILLWAY The existing service spillway is a vertical concrete shaft structure with side opening for effluent discharge connecting into a sloping concrete shaft structure with one side opening, four feet wide, connecting into a 54 inch diameter pre stressed concrete cylinder pipe (PCCP), designed for 200 feet of internal hydraulic pressure and 200 feet of overburden pressure. During most operating conditions, discharge through the service spillway is controlled by the weir flow over the side openings in the shaft. The bottom of the sloping concrete shaft and the entire 54 inch concrete pipe were constructed within bedrock as part of the 1997 raising. Stop logs are utilized to maintain settling action and control the operating pool level. Page 2 of 3

Results of the reservoir routings establish a maximum operating level of 974.0 feet, with the 50 year design flood reaching a level of 975.5 feet, 1.5 feet above the maximum operating pool. 7.2 EMERGENCY SPILLWAY As of 2013 construction, the existing emergency was raised to El. 975.5 through the use of a mass concrete gravity section in conjunction with reinforced concrete training walls, in a manner similar to the existing configuration. The new walls direct the flow into the existing spillway outlet channel. In accordance with State of Ohio dam safety requirements for Class 1 dams, the new emergency spillway was designed to pass the design probable maximum flood (PMF) without overtopping the dam. The new spillway features a 108 foot long by 15 foot wide concrete control section positioned at El. 975.5, or 1.5 feet above the maximum operating pool. The training walls are located above elevation 975.5 and will consequently not be exposed to a continuous pool reducing corrosion concerns. Based on the flood routing, the calculated peak discharge from the dam is 5,409 cfs at a maximum pool elevation of 981.9 feet NGVD. The PMF routing was also checked with the service spillway blocked, which resulted in a maximum pool elevation of 982.8 and 0.2 feet of freeboard. 8.0 BURIED HYDRAULIC STRUCTURES 257.73 (d)(1)(vi) [Describe the condition of the sections of any hydraulic structure that in buried beneath and/or in the embankment.] The principal outlet pipe from FAR II Pond passes though the dam near the southwestern side of the impoundment. The portion of the outlet pipe that passes though the embankment is a 54 inch diameter pre stressed concrete cylinder pipe (PCCP), designed for 200 feet of internal hydraulic pressure and 200 feet of overburden pressure. The entire 54 inch concrete pipe was constructed within bedrock as part of the 1997 raising. There are no performance issues with the outlet pipe that would indicate plugging or failure of the pipe. Given that this portion of pipe is reinforced concrete, structural integrity is not considered to be an issue. In general reinforced concrete pipe has a long service life under a range of conditions and is an appropriate design for this application. Based on recent video inspection of the pipe, the concrete pipe is in excellent conditions with no signs of deformation or deterioration. 9.0 SUDDEN DRAWDOWN 257.73 (d)(1)(vii) [If the downstream slope is susceptible to inundation, discuss the stability due to a sudden drawdown.] The downstream slope of the Fly Ash Reservoir II is not expected to be inundated from any adjacent water bodies. Page 3 of 3