WHEATLEY Series 500 Swing Check Valve

Similar documents
WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

WHEATLEY Series 822/820 Swing Check Valve

WKM Model 320F Floating Ball Valve

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

TITAN FLOW CONTROL, INC.

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

INSTALLATION, OPERATION and MAINTENANCE MANUAL

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

BSA6T and BSA64T Stainless Steel Bellows Sealed Stop Valves Installation and Maintenance Instructions

VALVES & MEASUREMENT

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Engineering Data Sheet

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

Model MTB-ASME Vertical Bladder Tanks

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

Model MTB-ASME Horizontal Bladder Tanks

Model MTB-ASME Vertical Bladder Tanks

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

Float Operated Level Controllers

Horizontal Bladder Tanks

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Vertical Bladder Tanks

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Installation, operation & maintenance manual - original version

BUTTERFLY VALVES Series 800

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

DC5A. Cyclone Separator Trap for Air. Copyright 2015 by TLV Co., Ltd. All rights reserved ISO 9001/ ISO MA-03 (DC5A) 19 June 2015

KBV21i and KBV40i Air Actuated Boiler Blowdown Valves

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

Atmospheric relief valve type 1100 Installation and maintenance instructions

Installation Operation Maintenance

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors

MEGR-1912 Instruction Manual

MEGR-1627 Instruction Manual

PC3_ and PC4_ Pipeline Connectors

299H Series. Introduction. P.E.D. Categories. Specifications. Installation. Warning. Installation Guide English September 2012

MUD 1. Vent check valves. Instruction and maintenance manual.

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

DelVal Flow Controls Private limited

1805 Series Relief Valves

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

Crosby style JCE Safety Valve Installation, Maintenance and Adjustment Instructions CROSBY

Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Manual Actuated Boiler Blowdown Valves

INSTALLATION, OPERATION AND MAINTENANCE MANUAL. Model Gauge Hatch SECTION I SECTION II

Type CT88 Backpressure Regulator

LRS(H)4 Pressure-Reducing Regulator User Manual

CA10S, CA14 and CA14S Air and Gas Traps

1800C and 1800C-HC Series Service Regulators

Nextech. Trunnion - Mounted Ball Valve. Installation and Operations Maintenance Manual

Product Bulletin No.: D99-RRV2015-PIB-001

Pressure Dump Valve Service Kit for Series 2300 Units

INSTALLATION, OPERATION & MAINTENANCE MANUAL

INSTALLATION, OPERATION AND MAINTENANCE MANUAL. Model Sanitary Vent SECTION I

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

Vertical and Horizontal Bladder Tanks

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE

THE BP-690 SERIES. Operating and Service Manual. Series includes all variants of BP-LF/MF-690/691

Pressure Dump Valve Service Kit for Series 3000 Units

Operating instruction

Model VR6 System. Installation, Operation & Maintenance

1.0 - OPENING AND CLOSING THE DOOR

64 Series Pressure Reducing Regulators

Fisher and Whisper Disk Diffusers

ARGUS MODEL C PIG VALVE

TD45 Thermodynamic Steam Trap Installation and Maintenance Instructions

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER RELIEF VALVE

INSTRUCTION MANUAL. Anchor Darling 800 Globe Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

Types 95L and 95H Pressure Regulators

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

Installation Troubleshooting Maintenance Instructions Installation / Start-up

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

INSTALLATION, OPERATION AND SERVICE MANUAL ABS AIR BAG LIFT

FLANGED TWO-PIECE BALL VALVES

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

1700ESL Kamvalok Coupler

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

SEries 29 Hydrant valves installation, operation & maintenance manual

TITAN FLOW CONTROL, INC.

BS Series Basket Strainer

Installation Instructions For Flat Seated Bolted Type RAH Series Disk Holders

Cast iron swing check valve. BS EN 12334:2001 PN16

TECHNICAL DATA CAUTION

Rate of Flow Valve Series 120

Hot Tapping Machine. OPERATIONS MANUAL and OPERATING INSTRUCTIONS

Transcription:

Document Number: TC003001-13 Revision: 02 WHEATLEY Series 500 Swing Check Valve Installation, Operation, and Maintenance Manual

TABLE OF CONTENTS BILL OF MATERIALS...3 SCOPE...5 INSTALLATION AND OPERATION INSTRUCTIONS...5 BEFORE INSTALLATION SAFETY INSTRUCTIONS...5 HORIZONTAL INSTALLATION...6 VERTICAL INSTALLATION...7 MAINTENANCE PROCEDURES...7 DISASSEMBLY...7 REASSEMBLY...8 CONTACT INFORMATION...9 All the information contained in this manual is the exclusive property of Cameron. Any reproduction or use of the calculations, drawings, photographs, procedures or instructions, either expressed or implied, is forbidden without the written permission of Cameron or its authorized agent. The procedures included in this book are to be performed in conjunction with the requirements and recommendations outlined in API Specifications. Any repairs to the equipment covered by this book should be done by an authorized Cameron service representative. Cameron will not be responsible for loss or expense resulting from any failure of equipment or any damage to any property or death or injury to any person resulting in whole or in part from repairs performed by other than authorized Cameron personnel. Such unauthorized repairs shall also serve to terminate any contractual or other warranty, if any, on the equipment and may also result in equipment no longer meeting applicable requirements. File copies of this manual are maintained. Revisions and/or additions will be made as deemed necessary by Cameron. The drawings in this book are not drawn to scale, but the dimensions shown are accurate. 2

BILL OF MATERIALS 3 2 5 4 63 1 2 1 6 7 8 5 9 FLOW 4 12 11 10 Figure 1 - Integral Seat Swing Check Table 1 - Integral Seat Swing Check Parts List Item Description 1 Bonnet O-Ring 2 Nut 3 Stud 4 Stud 5 Eyebolt 6 Cover Plug 7 Bonnet 8 Pin 9 Body 10 Drain 11 Clapper O-Ring 12 Clapper 3

3 2 1 5 4 6 7 8 9 FLOW 14 13 11 12 10 Figure 2 - Removable Seat Swing Check Table 2 - Removable Seat Swing Check Parts List Item Description 1 Bonnet O-Ring 2 Nut 3 Stud 4 Stud 5 Eyebolt 6 Cover Plug 7 Bonnet 8 Pin 9 Body 10 Removable Seat 11 Seat O-Ring 12 Retaining Ring 13 Seat Face O-Ring 14 Clapper 4

SCOPE The flanged swing check valve (Figure 1& Figure 2) features a hinged stainless steel clapper with an O-ring seal. The design allows the clapper to swing freely from the fully closed position to the fully opened position and back. Two NPT plugs secure the hinge pin in a hole drilled through the body. The bonnet is bolted to the body and sealed with an O-ring. The bonnet includes a cover plug (NPT threads). The swing check valve is a full bore type that will pass a sphere with a nominal size not less than that specified in Table 1 of API 6D. An optional removable seat (Figure 2) is secured in the valve bore with a retaining ring. Due to the critical nature of pressurized piping systems it is recommended that the compatibility to the service of the metallic and non-metallic components be confirmed prior to installation. This valve is not recommended for slurry service. INSTALLATION AND OPERATION INSTRUCTIONS BEFORE INSTALLATION SAFETY INSTRUCTIONS READ CAREFULLY BEFORE INSTALLING OR OPERATING THE VALVE Hazards are inherent with the construction, operation and maintenance of high pressure piping systems. The following information and precautions are provided to minimize these hazards: 1. The valve's nameplate indicates maximum operating pressure, as well as minimum and maximum operating temperatures. The valve may be safely operated within these limits. 2. The valve's end connections are provided in accordance with ASME flanged end requirements. 3. These check valves have been certified as fire tested to API 6FD requirements (except 1 (25mm) size). The user is responsible for the application of other devices to limit damages due to external fire, if required by local safety regulations. 4. The valve has been factory pressure tested based on the nameplate maximum operating pressure. 5. Valves 4" FP 900 ASME and larger may be provided with integral lifting lugs, otherwise the valves may be lifted using slings. Fittings and other devices, which may be attached to the valve, are not intended to be used as lifting points. Always follow local safety regulations when lifting heavy valves. 6. WHEATLEY valves are designed, manufactured, and tested under a certified quality system. Only quality parts and materials are used in the assembly of WHEATLEY valves. Pressure containing components are suitable for the minimum temperature marked on the nameplate. Factory certification is available. 5

7. If the valve, in service, is exposed to hazards such as traffic, wind or earthquake loading, contact the factory, if it is necessary, to confirm that the valve design is suitable for the application. The factory requires a complete description of the hazard before making any recommendations. 8. If the valve, in service, is exposed to hazard s such as excessive piping system reaction forces and moments, contact the factory, if it is necessary, to confirm that the valve design is suitable for the application. The factory requires a complete description of the hazard before making any recommendations. 9. If the valve, in service, is exposed to hazard s such as corrosive or abrasive fluids or atmospheric conditions, contact the factory, if it is necessary, to confirm that the valve design is suitable for the application. The factory requires a complete description of the hazard before making any recommendations. 10. The valve has been designed and manufactured so that under normal operation conditions hazards such as material fatigue, brittle fracture, creep rupture or buckling will not occur. Do not operate the valve beyond the pressures and temperatures marked on the nameplate. The factory requires a complete description of the hazard before making any recommendations. 11. The user is responsible for minimizing other hazards associated with the construction, operation, and maintenance of high pressure piping systems, such as: a. Provisions for the release or blow off of pressure b. Prevention of physical access to system under pressure c. Prevention of physical access to surfaces at extreme temperature d. Provisions for inspection e. Provisions for draining and venting f. Provisions for filling g. Provision for equipment access h. Prevention of over-pressurization, over-heating and over-filling i. Provision for fault indication 12. The user is responsible for meeting applicable local safety regulations. NOTE: If system hydrostatic tests are to be performed at pressures exceeding the rated working pressure of the valve, the valve should be pressurized from the upstream side. This prevents the clapper from experiencing these pressures while the body cavity can accept up to 150% rated working pressure. Care must be taken not to damage the seal faces and that they are clean for assembly. The end-user must provide gaskets and mating flanges of equal ratings to that of the valve for proper installation. When bolting the flanges together, threads of bolts should be lubricated to obtain the maximum loading on the bolts. The bolts should be tightened using a crisscross pattern for even loading. When ring type joints are supplied, the ring number is marked on the rim of the RTJ flange. After pressure tests, with all test pressure relieved, the body cavity should be completely drained via the attached piping system to prevent corrosion. The valve may then be placed in the required operating position. HORIZONTAL INSTALLATION 6

When installing the swing check valve in the horizontal position, install the valve with the arrow mark on the body pointing in the direction of flow and the bonnet side up. Flow through the valve (in the direction of the arrow mark) forces the clapper to lift fully. The clapper seals the valve when the flow is reversed. Gravity causes the clapper to swing closed when no flow is present. VERTICAL INSTALLATION When installing the swing check valve in vertical piping, only install the valve with the arrow mark on the body pointing in the upward direction. Flow upward through the valve will cause the clapper to swing open. This valve cannot be used with vertical downward flow. If there is no flow through the piping, gravity will keep the clapper in the closed position. Flow through the piping in the upward direction will cause the clapper to swing open. When the flow is reversed, the flow and the weight of the clapper will automatically close the valve. MAINTENANCE PROCEDURES CAUTION: Safety practices for pressurized equipment must be followed and address hazards inherent in pressurized systems. Extreme caution and safety procedures are to be exercised whenever valves, or fittings on a valve, are serviced or maintained. The frequency of the maintenance depends on the service conditions. Please contact the factory regarding the maintenance schedule for particular service conditions. DISASSEMBLY No special tools are required to disassemble the valve. With all pressure removed from the associated piping system, the valves can be serviced in-line or offline. During in-line maintenance, the swing check valve should be isolated from and relieved of all pressure on both the upstream and downstream sides. Exercise extreme caution when removing the cover plug on the bonnet, as this will release any pressure in the valve. Drain the valve fully via the drain plug on sizes 4" and above, or via piping system otherwise. Remove the bonnet by loosening and removing the nuts. Removing the NPT plugs on both sides of the body allows for removal of the hinge pin from the bod y. Once the pin is removed, the clapper can be removed from inside the body. If replacement of the optional removable seat is required, it is recommended that the valve be removed from the pipeline. The retaining ring can be snapped out from the groove with a flat head screwdriver before removing the seat from the seat pocket. Be careful not to damage the seat's sealing face and O-ring groove when removing the retaining ring. For offline maintenance, the valve shall be removed from the pipeline. Inspect the clapper, seat and O-ring seal for wear or possible damage. During the maintenance, replace the clapper O-ring (integral seat style) and seat O-rings (removable seat style) with new O-rings. Check the retaining ring (removable seat style) for any damage and change if necessary. 7

Thoroughly clean the clapper/seat sealing surfaces. Inspect both the clapper and body/seat sealing surfaces for possible scoring marks or damage. The seating surfaces must be smooth. Inspect the bonnet O-ring seal for damage. Replace the O-ring if it is damaged. Generally the bonnet O-ring will last longer than the clapper O-ring. REASSEMBLY For the removable seat model, make sure the 2 O-rings are installed in the 2 grooves on the seat. Insert the seat into the bore with sealing surface facing the clapper as shown in Figure 2 and lock this seat ring into position with the retaining ring snapped fully into the groove. For all models, insert clapper with the machined sealing surface facing the inlet port. With the clapper arm positioned into the cavity provided in the body, insert the hinge pin through the clapper and body pin holes. Ensure that the clapper swings freely inside the body. Install and tighten the pin plugs on either side of the body. The bonnet is installed on the body and secured to the body by installing and tightening the nuts to the recommended assembly torques in Table 3 below. Finally, tighten the cover plug on the bonnet and drain plug to the body (the drain plug is optional on the 1, 2" & 3" valve). The valve should be tested, as required, to the appropriate specifications. Table 3 - Cover Bolting Torque Values Stud Diameter. (in) Threads Per Inch (TPI) Torque (ft-lbf) 0.375 16 16-18 0.500 13 37-42 0.625 11 72-81 0.750 10 126-142 0.875 9 200-225 1.000 8 297-334 1.125 8 429-483 1.250 8 595-669 1.375 8 798-898 1.500 8 1043-1174 1.625 8 1334-1500 1.750 8 1673-1882 1.875 8 2066-2324 2.000 8 2515-2829 2.250 8 3600-4050 2.500 8 4958-5578 Based on the quantity of valves purchased, the following spare parts are recommended for valve maintenance purposes. Valve serial numbers must be specified when ordering spare parts/kits to ensure supply of correct parts. 8

Table 4 - Recommended Number of Spare Parts Qty. of Valves Qty. of Minor Kits Qty. of Major Kits Qty. of Comprehensive Kits 10 1 - - 25 1 - - 50 2 1-100 3 1 1 Table 5 - Repair Kit Contents Integral Seat Removable Seat Part Name Minor Major Minor Major Bonnet O-Ring Yes Yes Yes Yes Clapper O-Ring Yes Yes Yes Yes Seat O-Rings (Face & Piston) N/A N/A Yes Yes Retaining Ring N/A N/A Yes Yes Clapper Pin No Yes No Yes Clapper No Yes No Yes Seat N/A N/A No Yes CONTACT INFORMATION HEADQUARTERS 3250 Briarpark Drive, Suite 300 Houston, TX 77042 USA Tel 281 499 8511 MANUFACTURING 845 SE 29 th Street Oklahoma City, OK 73143 Tel 405 631 1321 For more information: WHEATLEY@c-a-m.com www.c-a-m.com/wheatley 9