PNWA Conference Update

Similar documents
Mouth of the Columbia River Jetties Three-Phase Construction Plan

Response of a Newly Created Marsh-Wetland Affected by Tidal Forcing, Upland Discharge, and Groundwater Interaction

Grays Harbor Federal Project

Grays Harbor O&M and Deepening Dredging

Towed Barge Standard of Care

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

Building Coastal Resiliency at Plymouth Long Beach

100-YEARS OF SHOAL EVOLUTION AT THE MOUTH OF THE COLUMBIA RIVER: IMPACTS ON CHANNEL, STRUCTURES, AND SHORELINES

Oregon Estuaries defined: (Goal 16)

Nome Harbor Page 2 of 12

Columbia River Navigation

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

Ketchikan Harbors Thomas Basin and Bar Point Harbor

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT

CORPS ON THE COAST. North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, Jim Medlock Chief, Programs Management Branch

Summary of 2014 Oregon Ocean Salmon Seasons Including: Regulations, Effort, and Landings

Salmon Seasons and Fishery Information. Presented to the Ocean Salmon Industry Group Meeting. Eric Schindler, Oregon Dept. of Fish and Wildlife

2016 Ocean Salmon and Terminal Area Fishery Regulations

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

FINDING OF NO SIGNIFICANT IMPACT

2007 Adult Returns and 2008 Expectations Columbia River

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

Public Meetings to Discuss the Pacific Halibut Catch Sharing Plan for Portland July 31 North Bend August 6 Newport August 7

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

U.S. Army Corps of Engineers Navigation Fiscal Overview

Southwest Washington Littoral Drift Restoration Project: Design, Construction, and Monitoring

Water Resources Report RKLD Annual Meeting July 30, 2016

Saco River Maintenance Dredge PROJECT PLAN AND TIMELINE JUNE 15, 2017

Mouth of the Columbia River North Jetty Erosion Stabilization

2017 OREGON SPORT OCEAN REGULATIONS FOR SALMON, HALIBUT, AND OTHER MARINE SPECIES

2016 OREGON SPORT OCEAN REGULATIONS FOR SALMON, HALIBUT, AND OTHER MARINE SPECIES

2017 OREGON SPORT OCEAN REGULATIONS FOR SALMON, HALIBUT, AND OTHER MARINE SPECIES

Code of Federal Regulations

Ninilchik Harbor Page 2 of 11

X.B WETLANDS ROGUE RIVER ESTUARY

FY-16 Ongoing Contracts FY-16 Scheduled Contracts

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii.

2018 OREGON SPORT OCEAN REGULATIONS FOR SALMON, HALIBUT, AND OTHER MARINE SPECIES

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

Cordova Harbor Page 2 of 9

4/20/17. #32 - Coastal Erosion Case Histories - Lake Michigan

Sport catch of Spring Chinook salmon in Oregon streams and rivers, Run Year

North Shore of Long Island, Feasibility Study

Protecting our Beaches

Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA

Evaluation of Placement Alternatives for Matagorda Ship Channel Bottleneck Removal

Juneau Douglas Harbor

ort of Ilwaco & Port of Chinook Washington Public Ports Association Port Report November 17, 2016 Guy Glenn, Manager

Recycling of Surplus Sand to Extend the Time Between Beach Fill Episodes

Maltester Channel Dredging. Shoreline Marina Committee. November 18, 2008

for Salmon and Watersheds

KEYNOTE PRESENTATION FSBPA olsen

1-44. SITKA HARBOR, ALASKA (Western Channel, Crescent Bay Basin, Channel Rock Breakwaters) (CWIS NOS , 16840, 10322, 55030, 13787)

ST. LUCIE COUNTY, FLORIDA

Coho. Oregon Native Fish Status Report 13

B OATING G UIDE. & Willamette Rivers

Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)

County of Santa Barbara Permit Option Analysis Goleta Beach JULY 13, 2017

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update

THE OREGON. PLAN for Salmon and Watersheds. Stock Assessment of Anadromous Salmonids, Report Number: OPSW-ODFW

Assateague Island National Seashore North End Restoration Project Timeline

Impacts of breakwaters and training walls

Nearshore Sediment Transport What influences the loss of sediment on Beaches? - Waves - Winds - Tidal Currents - River discharge - Runoff

Dave Clugston U.S. Army, Corps of Engineers, Portland District. Tami Clabough, Eric Johnson, Dan Joosten, and Chris Peery

TESTIMONY OF THE COLUMBIA RIVER TREATY TRIBES BEFORE PACIFIC FISHERIES MANAGEMENT COUNCIL

Oregon Coast Coastal Cutthroat Trout

Huntington District. For More Information Contact (304)

Juneau Aurora Harbor

What happens to Oregon s tidal wetlands with sea level rise?

Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )

FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA

Early Marine Migrations. General geography Four general patterns Influence of genetics

arehabilitation REPAIR, EVALUATION, MAINTENANCE, AND RESEARCH PROGRAM TECHNICAL REPORT REMR-CO-3 Report 6 NORTH PACIFIC DIVISION

Stock Assessment of Anadromous Salmonids, 2003 Report Number: OPSW-ODFW

2018 Beach Preservation Project Information

Northwestern Division COMMAND BRIEF

Building Beaches with Navigation Sand, Just Don t Forget the Dunes!!

الاسكندريه مصر Tel Fax: (+2) Mob: (+2)

Savannah River, Georgia and South Carolina

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME

OREGON SPORT OCEAN REGULATIONS FOR SALMON, HALIBUT AND OTHER MARINE FISH SPECIES

ADAPTATION TO SEA LEVEL RISE AND COASTAL IMPACTS

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

New Jersey Coastal Zone Overview. The New Jersey Beach Profile Network (NJBPN) 3 Dimensional Assessments. Quantifying Shoreline Migration

Public Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA])

2008 Adult Returns and 2009 Expectations Columbia River

Recreational Sturgeon Commercial Shad MANAGEMENT GUIDELINES

Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT SUMMER FACT SHEET NO.

Proposed Changes to the Catch Sharing Plan

Steelhead Overview and Catch Statistics

Coastal Environments Oceanographic and Engineering Expertise

2018 Adult Returns and 2019 Expectations Columbia River Revised Draft December 12, 2018

2013 FEDERAL STORM RESPONSE

Imagine that you can see a side view of a wave as it approaches a beach. Describe how the wave changes as the wave approaches the beach.

Pre-Season Testing Protocol for the Tri-State Coastal Dungeness crab Commercial Fishery. Revised September 2013

Commercial Anchovy Fishery Public Meeting

Transcription:

PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014 US Army Corps of Engineers

Projects Mouth of the Columbia (MCR) Jetties Columbia River Status Coastal Dredging Navigation Structures 2017 Navigation Lock Work at The Dalles PORTLAND DISTRICT 2

Pacific Mouth of the Columbia Long Beach (MCR) Jetties N North Head Peacock Spit MCR Navigation North Jetty Channel Ilwaco Jetty A Clatsop Spit South Jetty Baker Bay Sand Island Sand Island Pile Dikes Chinook Washington Ocean PORTLAND DISTRICT 3 Lower Columbia River Nav Channel Hammond Oregon Columbia River Estuary Astoria

North Jetty - construction North jetty construction 1914 Modern Day Peacock Spit & Benson Beach Old Peacock Spit PORTLAND DISTRICT 4

South Jetty Dune Stabilization FY13 O&M Funding Prevents further dune erosion and Pacific Ocean connecting to Trestle Bay Completed 30 October 2013 Dynamic cobblestone revetment: over 35,000 CY of stone placed PORTLAND DISTRICT 5

North Jetty Lagoon Fill and Critical Repairs (O&M) FY14 & Proposed FY 15 O&M funds: North Jetty Lagoon Fill: Completion June 2015 North Jetty Critical Repairs: Completion September 2016 Critical Repairs Stabilization Areas Oct. 2012 PORTLAND DISTRICT 6

MCR Jetty Major Rehabilitation FY14 New Construction start for Major Rehab Project $257M project includes repairs to all 3 jetties $1M received in FY14 to start Jetty A repairs $1M in FY15 PBUD to initiate North Jetty repairs PORTLAND DISTRICT 7

Coastal Dredging FY14 Funding Pot Allocation & Work: Yaquina Dredging: Chetco River- 9,101CY in June Rogue River- 39,155CY in June Coquille River- 28,177CY in July and September Umpqua River- 169,634CY in July and September Siuslaw River- 74,670CY in June Yaquina Bay 156,442CY in April through September Coast Clamshell Contract: Port Orford 34,774CY in July Charleston 40,630 CY in July Yaquina Bay 238,245 CY in August State Funded: Rogue River- 15,000CY in July Winchester Bay- 26,302CY in August USCG Funded Rogue River SARDET 5,766Cy in July PORTLAND DISTRICT 8

Oregon MOA for Low-Use Harbor Maintenance MOA signed on August 28, 2013 Up to $5 million a year for 5 years State funds leverage Appropriations and USCG funds FY14 Accomplishments Over 360,000 cubic yards dredged in a clamshell contract (Rogue, Port Orford, Charleston, Winchester Bay, and Yaquina Bay) 641,633 cubic yards dredged with the dredge Yaquina (Chetco, Rogue, Coquille, Umpqua, Siuslaw, Yaquina Bay and Skipanon) Estimated 45,000 cubic yards to be dredged with a pipeline contract (Depoe Bay and Garibaldi Boat Basin) HME Yaquina HME PORTLAND DISTRICT 9

Columbia River Channel Status MOUTH OF COLUMBIA RIVER 57 57 52 MOUTH OF COLUMBIA RIVER 42 MOUTH OF COLUMBIA RIVER 52 53 52 MOUTH OF COLUMBIA RIVER 42 LOWER DESDEMONA SHOAL 46 47 49 50 UPPER DESDEMONA SHOAL 44 45 44 41 FLAVEL BAR 43 43 44 36 UPPER SANDS 41 43 44 42 UPPER SANDS 41 44 43 40 TONGUE POINT CROSSING 40 44 44 44 TONGUE POINT CROSSING 41 44 42 38 MILLER SANDS 39 45 44 36 MILLER SANDS 41 45 44 40 MILLER SANDS 42 44 45 41 PILLAR ROCK RANGES 40 44 43 38 PILLAR ROCK RANGES 46 48 45 42 BROOKFIELD-WELCH ISLAND 46 48 46 44 BROOKFIELD-WELCH ISLAND 46 49 42 31 SKAMOKAWA BAR 38 43 42 40 SKAMOKAWA BAR 45 45 45 42 PUGET ISLAND BAR 52 55 52 47 PUGET ISLAND BAR 42 43 44 42 WAUNA & DRISCOLL RANGES 40 43 42 38 WAUNA & DRISCOLL RANGES 40 44 44 42 WESTPORT BAR 42 43 43 42 WESTPORT BAR 42 44 44 39 EUREKA BAR 41 43 42 40 EUREKA BAR 45 46 42 41 EUREKA BAR 41 43 44 42 GULL ISLAND BAR 43 45 43 41 GULL ISLAND BAR 49 45 44 38 STELLA-FISHER BAR 47 48 46 42 STELLA-FISHER BAR 42 43 43 40 WALKER ISLAND REACH 46 48 46 40 WALKER ISLAND REACH 44 45 44 40 WALKER ISLAND REACH 47 48 43 41 SLAUGHTERS BAR 41 43 43 41 SLAUGHTERS BAR 41 43 43 41 LOWER DOBELBOWER BAR 42 43 45 41 LOWER DOBELBOWER BAR 45 45 44 40 UPPER DOBELBOWER BAR 45 42 43 37 UPPER DOBELBOWER BAR 41 43 43 42 KALAMA BAR 47 57 57 57 KALAMA BAR 41 45 44 33 KALAMA BAR 41 44 43 40 LOWER MARTIN BAR 39 44 44 42 LOWER MARTIN BAR 43 44 44 41 LOWER MARTIN BAR 44 44 45 39 UPPER MARTIN BAR 48 45 44 41 UPPER MARTIN BAR 42 43 43 43 UPPER MARTIN BAR 41 43 43 41 ST. HELENS BAR 39 42 43 37 ST. HELENS BAR 42 44 41 38 WARRIOR ROCK BAR 49 50 50 45 WARRIOR ROCK BAR 40 42 42 43 WARRIOR ROCK BAR 39 43 44 43 HENRICI BAR 39 43 41 38 HENRICI BAR 43 43 43 41 WILLOW BAR 44 44 40 WILLOW BAR 40 43 42 41 MORGAN BAR 42 44 44 44 MORGAN BAR 44 46 49 50 MORGAN BAR 43 44 43 43 LOWER VANCOUVER BAR 47 47 46 36 LOWER VANCOUVER BAR 42 42 42 38 LOWER VANCOUVER BAR 45 44 41 40 VANCOUVER TURNING BASIN 39 33 41 VANCOUVER TURNING BASIN 30 24 22 03 October 2014 Astoria Longview Kalama Portland & Vancouver Comparison of Draft Restrictions Year Days Percent of Time 2014 39 11 2013 67 18 2012 121 33 2011 258 71 7 or more feet above project depth 5 or 6 feet above project depth 3 or 4 feet above project depth 1 or 2 feet above project depth At or 1 foot below project depth 2 or 3 feet below project depth 4 feet or more below project depth PORTLAND DISTRICT 10

Coastal Structures District Portfolio: 44 Jetty and Breakwater Structures Over 230 Pile Dike Structures Condition: 14 have a structural condition rating of D or lower (D = An extensive portion of the structure has deteriorated to a condition that repairs are required) Need to protect the Federal investment and maintain function PORTLAND DISTRICT 11

Pile Dikes Passive Channel Maintenance Pile Dikes: decreased dredging requirements and increased habitat creation Focusing Attention 2013 OCA review of 4 most critical near Mouth of the Columbia River Poor condition and expensive rehab requirements PORTLAND DISTRICT 12

The Dalles 2017 Extended Lock Outage Plan Scope of work limited to critical items Improve life safety concerns Improve lock reliability 2017 Scope: Replace downstream gate gudgeon hardware Replace upstream gate Upgrade controls Current Status (Fall 2014) Completing Design Reports Initiating Plans & Specifications PORTLAND DISTRICT 13

PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014 US Army Corps of Engineers