Bolton, CT. January 7, 2016

Similar documents
Route 47 (North Main Street) Reconstruction

The 2012 AASHTO Bike Guide: An Overview

Community Advisory Committee

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

Central Avenue Corridor Study FPID Number:

Off-Road Facilities Part 1: Shared Use Path Design

BIKE ON ROAD NETWORKS: URBAN & RURAL. Non-motorized Transportation Networks. Madison County Council of Governments

Board of Supervisors February 27, 2017

Construction Specifications Manual

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

Active Transportation Rail to River Corridor. Community Meeting - Segment A

Bar Harbor Route 3 Gateway Project Advisory Committee September 21, 1-3 PM Atlantic Oakes Hotel Minutes

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Montgomery County Life Sciences Center Loop Trail

Lake to Sound Trail FEASIBILITY STUDY. February 2009

10.0 CURB EXTENSIONS GUIDELINE

CSAH 101 Preliminary Design

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Implementation Plan. 5.1 Improvement Program

Off-road Trails. Guidance

Owl Canyon Corridor Project Overview and Summary

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Welcome to the Open House

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

Preliminary Engineering Study

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Purpose. Process. Recommendations

City of Memphis. To: John E. Cameron, PE City Engineer. From: Kyle Wagenschutz. Cc: Manny Belen, Randall Tatum. Date: November 5, 2015

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Introduction to Roadway Design

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

Preparing a Curb Ramp Project. December 15, 2010

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

VT15 / Allen Martin Drive Intersection Scoping Study

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Souder, Miller & Associates 401 W. Broadway Farmington, NM

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Appendix 3 Roadway and Bike/Ped Design Standards

US Route 4 Traffic and Pedestrian Improvement Project

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

CTH M HIGHWAY PROJECT CTH Q to STH 113

US Bicycle Route 1 Summary Report: Selection of Preferred Route

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

ADA TRANSITION PLAN 2013

CITY OF ELKO BICYCLE AND PATHWAY PLAN

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013

Zlatko Krstulich, P.Eng. City of O9awa

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MASTER BICYCLE AND PEDESTRIAN PLAN

2.0 LANE WIDTHS GUIDELINE

FEASIBILITY STUDY MACARTHUR BOULEVARD

Planning Suburban Bike Networks

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

Connecting cyclists to work. Syracuse Metropolitan Transportation Council

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Why plan for bicycles?

Agenda. Citizen Advisory Committee. CSAH 101 (CSAH 62 to Hutchins Drive) City of Minnetonka May 29, :00 pm

MASTER BICYCLE AND PEDESTRIAN PLAN

City of Moorhead Committee of the Whole Meeting

Prince George s County plans, policies, and projects

Tonight is for you. Learn everything you can. Share all your ideas.

Safe Streets. City of Lake Forest Park. March 21, 2017

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Small Town & Rural Multimodal Networks

WalkBikeNC Plan. Presenters Anne Eshleman, EIT, LEED AP Led bike route analysis. Stephen Bzomowski, Planner Public input and data development

Tuesday, September 25 th Mount Holly Municipal Complex 400 East Central Avenue 5:30pm to 7:30pm. Activity Stations o Where do you Live?

Alternatives Public Workshop

DISTRICT BICYCLE PROGRAM

MIAMI & ERIE CANAL SHARED USE TRAIL

Click to edit Master title style

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Mark Malone, P.E. SD DOT

Scope of Services BICYCLE/PEDESTRIAN PLAN FOR THE INDIAN RIVER COUNTY MPO

5. RUNNINGWAY GUIDELINES

On Road Bikeways Part 1: Bicycle Lane Design

Chapter 3 DESIGN SPECIFICATIONS

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

Diamond Springs Parkway Project

South Carolina Department of Transportation. Engineering Directive

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

Environmental Assessment Airport Road from King Street to Huntsmill Drive Community Working Group (CWG) Orientation November 30, 2017

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Chapter 5 Future Transportation

TxDOT Bicycle Tourism Trails Study Update. April 2017 BAC Meeting April 10, 2017

Final Sidewalk Feasibility Study

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Bicyclist Signing Guidelines

Transcription:

BOLTON GREENWAY EXTENSION Preliminary Design Bolton, CT January 7, 2016

Tonight s Agenda Introduction Project Overview Review of Previous Meeting Progress since Last Meeting Review of significant impacts/issues Review Cost Estimate Looking Ahead

Bolton Greenway Extension Project Team Robert Pinckney, P.E. Project Manager Frank Vacca, P.E. Project Engineer

Overview and History Study and preliminary design for the Bolton Greenway Extension which will run along the Route 44 corridor from the west side of Quarry Road to the Coventry town line with a spur trail to the existing parking area at Indian Notch Park located along the west side of Tolland Road CT Department of Energy and Environmental Protection s (DEEP) Recreational Trails Program Grant Related Projects: The Connecticut Department of Transportation s State Project Number 12 96, the Charter Oak Greenway Extension from Highland Park in Manchester, CT to the existing parking area at Bolton Notch. The 2008 Route 44 Strategic Corridor Plan by Fitzgerald & Halliday The 2013 Route 6 Hop River Corridor Transportation Study by Clough Harbor & Associates, LLP. The 2010 Route 6 Hop River Corridor Economic and Development Strategy and Master Plan Study by LADA, PC. The Connecticut Department of Transportation, in a separate project from State Project Number 12 96, will be responsible for trail design from the existing Hop River Trail at Bolton Notch to the intersection of Route 44 and Quarry Road.

East Coast Greenway Location Map: Hop River Trail Bolton Greenway Extension Charter Oak Greenway Missing Link

Bolton Greenway Extension Project Area

Review of Previous Meeting January 9, 2015 Existing Conditions Bike Facility Feasibility On-road versus Off-road Facility vs Shared Use Side Path Dedicated Bike Lane

Review of Previous Meeting January 9, 2015 Existing Conditions Bike Facility Feasibility On-road versus Off-road Facility vs Shared Use Side Path Dedicated Bike Lane

AASHTO and ConnDOT Design Guidelines Shared Use Side Path (Route 44 Boston Tpk.) Minimum 10 wide path recommended Minimum 5 separation distance recommended Minimum 2 lateral offset from obstacles (e.g. mailboxes, utility poles) Maintain consistent path width and features Avoid excessive engineering to roadway features Follow existing road alignment Sufficient drainage area to prevent offsite storm water run-off.

PRELIMINARY DESIGN ROUTE 44 BOSTON TURNPIKE CORRIDOR

Preliminary Design: Location and Orientation of Side Path Utilize the following design criteria: 10 Wide Path 5 Wide Separation Distance (between path and Roadway) Keep all work (including earthwork) inside Route 44 Right of Way Maintain a common roadway width of 16 feet (11 foot lane/5 foot shoulder)

Preliminary Design: Typical Section

Preliminary Design: Path Orientation

Preliminary Design: Path Enlargement Right of way Boundary Area of Cut Sidepath Area of Fill BOSTON TURNPIKE S.R. 44

Preliminary Design: Multiple Iterations to determine the most beneficial layout Coordination with The Connecticut Department of Transportation (ConnDOT) Pavement Trimming Separation Distance Improvements to South Road Signal Coordination with Town of Coventry

Before

After - Shared Use Side Path

Before

After - Shared Use Side Path

PRELIMINARY DESIGN TOLLAND ROAD SECTION

AASHTO and ConnDOT Design Guidelines Marked Shared Lanes (Sharrow) Tolland Road 11 wide lanes marked as shared roadway Minimum 2 lateral offset from obstacles e.g. mailboxes, utility poles Use shared lane markings and Share the Road signage Sufficient drainage area to prevent offsite storm water run-off

Preliminary Design: Typical Section

Before

After Shared Lanes

REVIEW OF SIGNIFICANT IMPACTS/ISSUES

Issues/Impacts: Out of date base mapping Rock Cuts ROW size limitations Reduced Path width Reduced Separation Distance Retaining Walls Drainage Improvements Side Road Intersections/ Signalized Intersections

Preliminary Design Impacts:

OPINION OF PROBABLE CONSTRUCTION COST

Opinion of Probable Construction Cost: SUMMARY Bolton Greenway Extension Construction Right of Way Impacts Legal Expenses Final Design, Surveying, and Permitting Geotechnical Investigations of Rock Slopes Environmental Investigations Screening Level (Archeological / Historic / Hazardous Material / Wetland Delineation) TOTAL $ 1,830,000 $ 490,000 $ 200,000 $ 100,000 $ 20,000 $ 22,000 $ 2,662,000

Next Steps Funding Research Grant Applications Final Design Construction

Community Input

Community Input Email Question or comments to: Patrice L. Carson, AICP Director of Community Development patrice.carson@boltonct.org Please submit questions/comments by February 1, 2016