Usage Policies Notebook for BMR HIDEP Low Temperature Plasma Enhanced CVD (LTPECVD)

Similar documents
Usage Policies Notebook for Trion RIE / ICP Dry Etch

Usage Policies Notebook for Thermco Atmospheric Diffusion Furnace system

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

Usage Policies Notebook for Parylene Coating System

Usage Policies Notebook for STS DRIE System

Usage Policies Notebook for Quintel 2001 Mask Aligner

Usage Policies Notebook for HITACHI S Field Emission Scanning Electron Microscope System

Usage Policies Notebook for Karl Suss MA6 Mid / Deep UV Mask Aligner

Plasma-Therm PECVD. Operating Characteristics. Operating Instructions. Typical Processes. I. Loading. II. Operating

UCSC Laboratory Standard Operating Procedure (SOP) Compressed Gas Cylinder Change for MOCVD and CVD Systems

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

OXFORD PLASMALAB 80PLUS (CLOEY)

University of Minnesota Nano Center Standard Operating Procedure

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

Unaxis PECVD. SiH4 (5% in He)

Arizona State University Center for Solid State Electronic Research. Table of Contents. Issue: C Title: Oxford Plasmalab 80plus (Floey) Page 1 of 8

Operating Procedures for Metal Evaporator I

Arizona State University NanoFab PLASMATHERM 790 RIE. Version A

Laboratory Safety Committee

SAFE WORK PROCEDURE:

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

Ruptured Gas Cylinder Destroys Laboratory Hood at the University of Nevada

University of Minnesota, MN Nano Center Standard Operating Procedure

Approved by BNC Managing Director Paul Lum Date: Approved by PI (s) /Super User (s): _Peter Hosemann/Andy Minor_Date:

Department of Physics Standard Operating Procedures (SOP) Approved by: Physics Safety Committee

Standard Operating Manual

Standard Operating Manual

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100

Standard Operating Procedure

Standard Operating Manual

PURPOSE OF THE POLICY

Birck Nanotechnology Center

Basic ICP Operating Procedures

Approved by Principal Investigator Date: Approved by Super User: Date:

Notes-PECVD: Chamber 1

Lecture Demonstrations Safety Manual & New Staff Induction

School of Chemistry SOP For Operation Of Glove Boxes

STS ICP-RIE. Scott Munro (2-4826,

STS PECVD Instructions

Standard Operating Procedure #COE-SOP-0001 Chemical Fume Hood Operation

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE

CHEMISTRY FACULTY LABORATORY SAFETY CONTRACT CENTRAL CAMPUS

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

Standard Operating Manual

Arizona State University NanoFab XACTIX ETCHER. Rev A

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

OCCUPATIONAL SAFETY AND ENVIRONMENTAL HEALTH GUIDELINE

Intermountain Specialty Gases 520 North Kings Rd, Nampa, Idaho Phone: Fax:

Inert Air (N2) Systems Manual

Savannah S100 ALD at SCIF, UC Merced Standard operating Procedure

Application Note. ASTRON Remote Plasma Source Ignition Best Practices PROBLEM

OXYGEN ACETYLENE WELDING & CUTTING EQUIPMENT

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

March CS-1701F Reactive Ion Etcher

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

University of MN, Minnesota Nano Center Standard Operating Procedure

ACCU-PULSE Installation and Operation Instructions

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

Discovery HP-TGA 75/750. Site Preparation Guide

SAFETY TRAINING LEAFLET 06 CARBON DIOXIDE

Cambridge NanoTech: Savannah S100. Table of Contents

Oxford Instruments Plasma Technology. PlasmaPro NGP80. Installation Data Sheet. Original Instructions.

Portable Oil Lube Air Compressors

Safety Data Sheet. Zero Air 1 PRODUCT AND COMPANY IDENTIFICATION. Manufacturer NorLab a division of Norco 898 W. Gowen Rd.

M3060 Handling Compressed Gas Cylinders Safely. Leader s Guide

CHEMICAL ENGINEERING SENIOR LABORATORY CHEG Initiated Chemical Vapor Deposition

Completed by: Anthony Jones (BE Design Laboratory Manager) Staff/Student number: School/Unit: BE Design Laboratory. Current version: V_01

Ingredient CAS Number Weight % ACGIH TLV PEL STEL Hydrochloric acid % %

EHS Laboratory Guidance: Cryogenic Material

POWER FLUSH KIT INSTRUCTIONS

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7

Equipment Operating Procedure Glove Box

Xactix XeF2 OPERATION MANUAL

I. Subject: Medical Gas Systems Utility Failure Interim Procedure III. Purpose:

Standard Operating Procedures for Hazardous Chemicals

University of MN, Minnesota Nano Center Standard Operating Procedure

GUIDELINES ON SAFE HANDLING AND STORAGE OF COMPRESSED GASES CHEMICAL MANAGEMENT CENTRE

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

Approved by Principal Investigator Date: Approved by Super User: Date:

PSSI 36 General Confined Spaces, Tunnels, Culverts and Similar Spaces

SUBSTATION MAINTENANCE ELECTRICAL OPERATING PROCEDURE

Approved by Principal Investigator Date: Approved by Super User: Date:

Rejuvenation Instructions

RAPID THERMAL PROCESSOR (Annealsys AS-ONE 150) Lab Manual

Environmental and Safety Concerns with SF 6 Gas

Section 2: Composition/Information on Ingredients. Section 3: Hazards Identification

Safety Rules for the Science Lab

Agilent ICP-MS Interactive Troubleshooting tool for Plasma ignition problem

Working with Cryogenic Liquids

Safety Manual Section 6 Confined Space

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

99% Isopropyl Alcohol

STORAGE AND USE OF HIGH HAZARD GAS

Compressed Gas Cylinders - Guideline

CALCIUM HYPOPHOSPHITE

Standard Operating Procedure for Solvent use in EMAL

Transcription:

Usage Policies Notebook for BMR HIDEP Low Temperature Plasma Enhanced CVD (LTPECVD) Revision date September 2014

2 Emergency Plan for BMR HIDEP Low Temperature Plasma Enhanced CVD (LTPECVD) Standard Operating Procedures for Emergencies Contact information Person Lab Manager Director Staff Super User Phone number Jake Hes, 949-824-8239 (day), 562-522-8328 (alternate) G.P. Li: 949-824-4194 (day), 949-824-2047 (alternate) Mo Kebaili: 949-824-8239 (day), 949-494-5892 (alternate) Carlos Ruiz (818) 527-6349 (Anytime, voicemail or text only) Hazardous chemicals, gases, and conditions Hazard name Description of hazard Vacuum Implosion High temperature Burn or ignition source High voltage Electrical shock, ignition source Isopropyl alcohol Flammable solvent SiH 4 (silane) gas Pyrophoric (explodes on contact with air) O 2 (oxygen) gas Oxidizer gas H 2 (hydrogen) gas Flammable gas N 2 (nitrogen) gas Asphyxiant

3 Alarms or indications of danger Alarm type Alarm on the scrubber in the utility room Alarm on the console Pungent or foul smell Condition and response Problem with scrubber. Halt any running process. Correct the problem or notify the staff or the lab manager before continuing. Problem with process state. Halt the process. Correct the problem or notify the staff or the lab manager before continuing. Gas leak. Shutdown the machine at once and evacuate the area. Contact the staff and the lab manager. Emergency shutdown plan #1 In the event of an emergency, when there is very little time, press the large red emergency shut-off button at the front of the machine. This will shutdown the system and will stop the gas flow into the system. Leave the facility at once. Then contact the lab manager or the staff. Emergency shutdown plan #2 In the event of an emergency, when there are a few minutes available, press the large red emergency shut-off button at the front of the machine. This will shutdown the system, and stop gas flow into the system. Next, check the gases in the utility room w2331, adjacent to the Plasma-therm room. If there is no fire, and no smell of gases, enter the room and shut off all gas cylinders valves by turning them fully clockwise. Check the oxygen tank in room w2336, feel the door for possible fire, and if safe, close the oxygen tank by turning fully clockwise. Leave the facility at once, then, contact the staff and the lab manager.

4 Usage Policies for BMR HIDEP Low Temperature Plasma Enhanced CVD (LTPECVD) Standard policies for usage The HIDEP system from BMR Technology opens a new horizon for plasma-enhanced chemical vapor deposition (PECVD), BMR s new high density plasma CVD system HIDEP, can deposit high quality dielectric films at temperature below 100 C with high deposition rates based on BMR s patented Hybrid Electromagnetic Energy Coupling technology (US Patent 6310577 B). Conventional PECVD processes typically need operating temperatures in excess of 400 C to produce films with necessary electrical or physical properties at economically viable deposition rates. In typical PECVD systems, as the deposition temperature decreases below 300 C, film morphology and integrity also decrease rapidly due to pinholes. Contact information The INRF staff or the lab manager may be reached at 824-8239 or 824-9831. Authorized users Only INRF registered users who have completed the training and passed the certification may use this equipment. Users may only use the portion of the system for which they have been trained. Training Users must have received direct training from the staff in order to use this equipment. Users are expected to understand the nature of the system, as well as the proper control and use of the gases. Training varies slightly, depending on the process to be performed. Contact the staff for details and to arrange for a training session. Usage logs Users are required to log all activity in the log sheets provided. All users must log in when they used the BMR HIDEP System (date and time), which gases they used and quantity, and when they completed their process in the user log sheets. If users notice anything unusual, they should record it in the user log sheets, and add details in the maintenance log sheets. Any maintenance to the machine must be logged in the maintenance log sheets (maintenance staff only). Safety equipment There is no specific safety equipment for use on this tool, however, cleanroom gloves and tweezers should be used when handling pieces in the chamber. Care should be taken to avoid burns when working near the chamber hot plate.

5 Standard equipment and materials The laboratory provides the following gases: O 2, SiH 4, N 2, and H 2. Other gases must be cleared with the lab manager. User maintenance Users are requested to clean the chambers after use by first, wiping them down with the isopropanol, then run the required cleaning process. Spray the isopropanol into a lint-free cloth and wipe the inside of the chamber, (you must wait until the unit is cool to do this). Dispose of the cloth in a waste container marked for flammable solid waste. Pollution Control Turn on the scrubber when using the following gases: SiH 4, H 2. Dispose of the alcohol soaked wipes in a waste container marked for flammable solid waste. Purge the gas lines after using corrosive gases. Scheduling Reservations can be done online, also, the system can be used on a first come, first served usage if no reservation was made. Other issues Users should remain physically present in the cleanroom facility during the entire use of the BMR HIDEP System. This includes the time when the chamber hotplate is warming up. Gases should be turned off at the cylinders valves when finished. Users should not modify any standard recipe in the software. New recipes can be created, but once created, they should stay unedited. A modified recipe should be given a new name. This allows us to track down the history of a problem later, if necessary. At no time should a user adjust a pressure regulator on a gas line. Gas control should be on or off only, using only the valves appropriate. For most gases, this is usually the valve at the cylinder head. Non-standard use Users may not modify any hardware on this equipment. For use of non-standard processes, gases or materials, contact the staff or the lab manager.

6 Usage Notes for BMR HIDEP Low Temperature Plasma Enhanced CVD (LTPECVD) Guide for using the BMR HIDEP LTPECVD correctly!"# %&'() *+)(,-'./0123 425267120 8948:/ ;900<=9712; >:70370?/ @0954 1932AB76/954 3745219= C92:;0 2D=912;?/ 7 0>2=97::/ ;209452; 7512557 7667/ 71 67;9< C62E@25=/ F#GHI 1890 >6<>692176/75125577667/>6<B9;20182%&'()>:7037J9188948><J262CC9=925=/<B267J9;2 67542 <C <>2671954 >6200@62 75; ><J26 02119540K L 0>2=97: 3745219= C92:; 90 :<=7:9M2; 71 182 =873?26=96=@3C2625=21<C@6182625875=22:2=16<5=<5C952325175;825=2;2><0919<5>6<>261920K L;;919<57:#G><J26=75?27>>:92;1<1821<>2:2=16<;275;1<182J7C26=8@=NK+82027;;919<57: #G ><J260 762 @02C@: 95 =<516<::954 C9:3 =8767=1269019=0 0@=8 70 C9:3 016200I =<5C<637:91/I C9:3 ;25091/I21=K&1=75?27:0<@02;C<6752CC2=19B2=873?26=:275954>6<=200K!"##%&'"%()"*+(!#,-+"&#.(/#-0(12234 +828948:/;900<=9712;>:70370<C%&'()09459C9=751:/:<J2618262E@962;>6<=200123>2671@62 C<62D=2::251E@7:91/;92:2=169=C9:300@=870.9OP75;.9QRS;2><0912;?2:<JTUUV,K +890 =7>7?9:91/ 257?:20 ;92:2=169= C9:3 ;2><0919<5 <5 123>2671@62 0250919B2 3712697:0I 95=:@;954 ><:/3260K Gas cylinders All gas cylinders should be turned on or off at the cylinders valves. At no time should a user adjust a pressure regulator. Clockwise for all valves, means CLOSED. The standard off configuration for the system is to close the cylinders valves, but leave all other valves alone.

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lose the gas cylinders in w2331, by turning the main valves on the cylinder heads clockwise. Record the date and time in the user log sheets. Also record your process recipe and any problems encountered during your session.