Post Job Summary Cement Intermediate Casing

Similar documents
and and Norton J. Lapeyrouse CONTENTS

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Casing Design. Casing Design. By Dr. Khaled El-shreef

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

ENDEAVOR ENERGY RESOURCES

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017

Oil Well Potential Test, Completion or Recompletion Report, and Log

Why Do Not Disturb Is a Safety Message for Well Integrity

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

SUBSEA KILL SHEET EXERCISE No. 5

BLACK HILLS PLATEAU PRODUCTION COMPANY

HPHT Annular Casing Packer. Obex Annular Casing Packer

Rig Math. Page 1.

BP SIT Testing Franks Facility Lafayette

Hydro-Mech Bridge Plug

Float Equipment TYPE 925/926

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Wellwork Chronological Regulatory Report

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Extended leak off testing

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

Drilling Morning Report

Remedial Efforts for Fracture Treatment in Horizontal Laterals Robert Reyes, Halliburton

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

Deepwater Horizon Incident Internal Investigation

Practice Exam IADC WellSharp Driller and Supervisor

E NGINEERED C EMENTING S OLUTIONS

FREQUENTLY ASKED QUESTIONS

Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe

Casing and Cementing Requirements

Wellwork Chronological Regulatory Report

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Perforation Design for Well Stimulation. R. D. Barree Barree & Associates LLC

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

HydroPull. Extended-Reach Tool. Applications

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

Understanding pressure and pressure

BaraShield -664 LCM Standard Field Application Procedure

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

Colorado Oil and Gas Conservation Commission

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

Oil Well Potential Test, Completion or Recompletion Report, and Log

Hard or Soft Shut-in : Which is the Best Approach?

IWCF Equipment Sample Questions (Surface Stack)

FRAC FLUIDS AND WATER USAGE Evaluating The Commercial Viability and Success In Using Water-Free Fracs

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0

Chapter 4 Key Findings. 4 Key Findings

W I L D W E L L C O N T R O L FLUIDS

New generation of solid expandable liners help give operators a jump on trouble zones

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General...

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

Oil Well Potential Test, Completion or Recompletion Report, and Log

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Coal Bed Methane (CBM) Permeability Testing

Abstract Objective Scope of Study Introduction Procedures

Step-Rate Formation Integrity Test Method for Geothermal Wells

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

RIH intermediate section casing in Bazian-1 exploration oil well

OCEAN DRILLING PROGRAM

BaraBlend -665 LCM Standard Field Application Procedure

APPENDIX A1 - Drilling and completion work programme

PHE KE30-A8 WORKOVER PROGRAM

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Optimising Hydraulic Energy to Dramatically Improve Lateral Reach

Appalachian Basin Gas Well. Marietta College, Marietta, Ohio June 7-8, Development. Robert McKee, P.E. Design Engineer Multi Products Company

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

Dual Gas Lift Well Analysis Using WellTracer

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

1. The well has been shut in on a kick and the kill operation has not started.

DB Bridge Plug. Features. Benefits. Applications

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

Chapter 5 HORIZONTAL DRILLING

August 21, Deepwater MPD / PMCD

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

Texas Administrative Code

AADE-16-FTCE-55. Copyright 2016, AADE

FORGE Energy UL 21 Freedom 1 API Number:

The Developing Design of the Blowout Preventer in Deep Water

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick

31 st Gas-Lift Workshop

Deepwater Reservoirs Requiring High Rate/High-Volume Frac Packing

RPSEA UDW Forum June 22 & 23, Secure Energy for America

LIMITED ENTRY CLUSTER PERFORATING SYSTEM IMPROVES FRACTURING EFFICIENCY IN HORIZONTAL WELLS

Transcription:

EXXONMOBIL CORPORATION HOUSTON, Texas PCU 197-36A6 H&P 326 Post Job Summary Cement Intermediate Casing Prepared for: George McNary Date Prepared: November 16, 2010 Version: 1 Service Supervisor: ANDERSON, BENJAMIN Submitted by: Joshua Anglin PCU 197-36A6_Cement Intermediate Casing_SO #7711692_Page 1 of 12

Wellbore Geometry Type Casing Open Hole Section Casing Job Tubulars MD TVD Excess Shoe Joint Length Description Size ID Wt Top ft Bottom Top ft Bottom % ft in in lbm/ft ft ft Surface Casing 10.75 9.950 45.50 0.00 4,181.00 0.00 4,069.00 80.00 Intermediate Open Hole Intermediate Casing 9.875 4,181.00 9,482.00 4,069.00 9,335.00 100.00 7.00 6.276 26.00 0.00 9,482.00 0.00 9,335.00 80.00 Pumping Schedule Stage /Plug # Fluid # Fluid Type Fluid Name Surface Density lbm/gal Avg Rate bbl/min Surface Volume Downhole Volume 1 1 Spacer TUNED SPACER III 10.00 6.00 80.0 bbl 80.0 bbl 1 2 Cement Slurry 1 3 Spacer New Vernal Tuned Light Treated Water Displacement 11.00 6.00 1366.0 sacks 1366.0 sacks 0.00 0.00 360.0 bbl 360.0 bbl PCU 197-36A6_Cement Intermediate Casing_SO #7711692_Page 2 of 12

Fluids Pumped Stage/Plug # 1 Fluid 1: TUNED SPACER III TUNED SPACER III - SBM (483826) 59.8 lbm/bbl Barite Fluid Density: Fluid Volume: Pump Rate: 10.00 lbm/gal 80.00 bbl 6.00 bbl/min New Vernal Tuned Stage/Plug # 1 Fluid 2: Light TUNED LIGHT (TM) SYSTEM 0.75 lbm HR-601 Fluid Weight: Slurry Yield: Total Mixing Fluid: Surface Volume: Sacks: Calculated Fill: Calculated Top of Fluid: Estimated Top of Fluid: Pump Rate: 11.00 lbm/gal 2.25 ft3/sack 10.04 Gal 1366.0 sacks 1366.0 sacks 5,798.00 ft 3,684.00 ft 6.00 bbl/min Treated Water Stage/Plug # 1 Fluid 3: Displacement DUMMY MUD / FLUSH / SPACER SBC MATERIAL Fluid Density: 0.00 lbm/gal Fluid Volume: 360.00 bbl Pump Rate: 0.00 bbl/min PCU 197-36A6_Cement Intermediate Casing_SO #7711692_Page 3 of 12

Job Summary Job Information Job Start Date Job MD Job TVD Height of Plug Container/Swage Above Rig Floor Surface Temperature at Time of Job Mud Type Actual Mud Density Pipe Movement During Cementing Calculated Displacement Job Displaced by (rig/halco) Annular flow Before Job? (Water/Gas) Annular flow After Job? (Water/Gas) Length of Rat Hole 11/4/2010 8:40:00 AM 9,530.0 ft 9,530.0 ft 4.0 ft 40 degf Water Based Mud 9 lbm/gal Reciprocated 360.00 bbl Cement Unit HP Pumps Unknown Unknown 15.00 ft Cementing Equipment Did Float Equipment Hold? Plug set used? Brand of Plug set used? Did Plugs Bump? Calculated Pressure to Bump Plugs Did Stage Cementing Tool Open Properly? Yes Yes Weatherford Yes 1,272.0 psig Unknown PCU 197-36A6_Cement Intermediate Casing_SO #7711692_Page 4 of 12

Service Supervisor Reports Job Log Date/Time 11/03/2010 14:30 11/03/2010 16:00 11/03/2010 19:10 11/03/2010 19:20 11/03/2010 19:30 11/03/2010 23:45 06:30 08:40 09:02 09:06 09:15 09:37 09:40 Chart # Activity Code Call Out Pre-Convoy Safety Meeting Arrive at Location from Service Center Pre-Rig Up Safety Meeting Rig-Up Equipment Other Other Pre-Job Safety Meeting Test Lines Test Lines Pump Rate Cum Vol Pump Pressure (psig) Pump Spacer 4 312.0 Drop Bottom Plug Pump Cement 6 502.0 Comments CREW CALLED OUT, GOT TRUCKS PREPPED FOR CONVOY AND JOB DISCUSSED CONVOY PROCEDURES, ROUTE, STOPS, TRAFFIC, WILDLIFE, EMREGENCY, AND BREAKDOWN PROCEDURES RIG IS RUNNING CASING DISCUSSED RIG UP PROCEDURES, RED ZONES, HAMMERING, PINCH POINTS, LIFTING, AND SLIPS/TRIPS/FALLS RIGGED UP SAFELY AND TO BOTH HALLIBURTON AND EXXON STANDARDS RIG IS ON BOTTOM AND IS CIRCULATING FOR 2 HOURS RIG IS DONE CIRCULATING AND IS RIGGING DOWN THE CRT AND RIGGING UP THE CEMENT HEAD DISCUSSED JOB PROCEDURES, RIG ISSUES, SAFETY ISSUES, HAZARDS WITH PRESSURE, EMERGENCY, AND EVACAUTION LOW PRESSURE TEST IS 250.0 GOOD HIGH PRESSURE TEST IS 5000.0 GOOD MIXED @ 10 PPG, 80 BBLS, YLD 5.478, WTR 37.293 PLUG LEFT THE CEMENT HEAD MIXED @ 11 PPG, 1366 SKS, YLD 2.21, WTR 9.7 PCU 197-36A6_Cement Intermediate Casing_SO #7711692_Page 5 of 12

Date/Time 11:20 11:23 12:29 12:43 13:00 13:15 15:50 16:00 Chart # Activity Code Pump Rate Cum Vol Pump Pressure (psig) Comments Drop Top Plug PLUG LEFT THE CEMENT HEAD PUMPED FRESH WATER @ Pump 8.4 PPG WITH ALDACIDE 6 614.0 Displacement AND BARICORE ADDITIVES BUMPED @ 1003 PSI AND Bump Plug 2 TOOK PRESSURE 500 PSI 1672.0 OVER AS PER COMPANY MAN Check Floats FLOATS HELD, GOT 2 BBLS BACK DISCUSSED JOB OUTCOME AND DISCUSSED RIG Post-Job Safety DOWN PROCEDURES, RED Meeting (Pre ZONES, HAMMERING, Rig-Down) PINCH POINTS, LIFTING, AND SLIPS/TRIPS/FALLS Rig-Down Equipment Pre-Convoy Safety Meeting Depart Location for Service Center or Other Site RIGGED DOWN SAFELY AND TO BOTH HALLIBURTON AND EXXON STANDARDS DISCUSSED CONVOY PROCEDURES, ROUTE, STOPS, TRAFFIC, WILDLIFE, EMREGENCY, AND BREAKDOWN PROCEDURES THANKS FOR USING HALLIBURTON!!! PCU 197-36A6_Cement Intermediate Casing_SO #7711692_Page 6 of 12

Summit Version: Tuesday, November 16, 2010 09:27:00 Cementing Job Summary The Road to Excellence Starts with Safety Sold To #: 331699 Ship To #: 2807229 Quote #: Sales Order #: 7724951 Customer: EXXONMOBIL CORPORATION Customer Rep: Kelly, Whitnee Well Name: PCU Well #: 197-36A6 API/UWI #: 05-103-11185-00 Field: PICEANCE CREEK City (SAP): MEEKER County/Parish: Rio Blanco State: Colorado Legal Description: Section 36 Township 1S Range 97W Contractor: H&P Rig/Platform Name/Num: 326 Job Purpose: Cement Intermediate Casing Well Type: Development Well Job Type: Cement Intermediate Casing Sales Person: TURNER, JAMIE Srvc Supervisor: ANDERSON, MBU ID Emp #: 342843 BENJAMIN Job Personnel HES Emp Name Exp Hrs Emp # HES Emp Name Exp Hrs Emp # HES Emp Name Exp Hrs Emp # ANDERSON, 19 342843 JENSEN, RICKY 19 482815 MCCONKIE, TRAVIS 19 471264 BENJAMIN L Terry REYNOLDS, COREY 14 212159 SPENCER, WESTON 14 391271 WALSH, JAMES 19 457722 W Chad Ronald Zuniga, Ernesto 19 470422 Equipment HES Unit # Distance-1 way HES Unit # Distance-1 way HES Unit # Distance-1 way HES Unit # Distance-1 way 10713216 45 mile 10948690 45 mile 10994447 45 mile 11062230 45 mile 11076824 45 mile 11288856 45 mile 11410666 45 mile Date On Location Hours Operating Hours 4-NOV-2010 19 4 TOTAL Job Date Job Hours On Location Hours Operating Hours Date Total is the sum of each column separately On Location Hours Job Times Operating Hours Formation Name Date Time Time Zone Formation Depth (MD) Top Bottom Called Out 03 - Nov - 2010 14:00 MST Form Type BHST 210 On Location 03 - Nov - 2010 19:10 MST Job depth MD 9530. ft Job Depth TVD 9530. ft Job Started 04 - Nov - 2010 08:40 MST Water Depth Wk Ht Above Floor 4. ft Job Completed 04 - Nov - 2010 12:43 MST Perforation Depth (MD) From To Departed Loc 04 - Nov - 2010 16:00 MST Description New / Used Intermediate Open Hole Intermediate Casing Surface Casing Unknow n Unknow n Max pressure psig Size in ID in Weight lbm/ft Well Data Thread Grade Top MD ft Bottom MD ft Top TVD ft Bottom TVD ft 9.875 4181. 9482. 4069. 9335. 7. 6.276 26. HYDRIL - SERIES 500 P-110. 9482.. 9335. TYPE 513 10.75 9.95 45.5 BTC J-55. 4181.. 4069. Tools and Accessories Type Size Qty Make Depth Type Size Qty Make Depth Type Size Qty Make Guide Shoe Packer Top Plug Float Shoe Bridge Plug Bottom Plug Float Collar Retainer SSR plug set Insert Float Plug Container Stage Tool Centralizers

Cementing Job Summary Stage/Plug #: 1 Fluid # Fluid Data Stage Type Fluid Name Qty Qty uom Mixing Density lbm/gal Yield ft3/sk Mix Fluid Gal/sk Rate bbl/min Total Mix Fluid Gal/sk 1 TUNED TUNED SPACER III - SBM (483826) 80.00 bbl 10..0.0 6.0 SPACER III 38.32 gal/bbl FRESH WATER 59.8 lbm/bbl BARITE, 100 LB SK (100003680) 2 New Vernal TUNED LIGHT (TM) SYSTEM (452984) 1366.0 sacks 11. 2.21 9.7 6.0 10.04 Tuned Light 0.75 lbm HR-601, 50 LB BAG (101328348) 10.035 Gal FRESH WATER 3 Treated Water Displacement 360.00 bbl..0.0.0 Calculated Values Pressures Volumes Displacement 360 Shut In: Instant Lost Returns 0 Cement Slurry 538 Pad Top Of Cement 5 Min Cement Returns 0 Actual Displacement 353 Treatment Frac Gradient 15 Min Spacers 80 Load and Breakdown Total Job 978 Rates Circulating 6 Mixing 6 Displacement 6 Avg. Job 6 Cement Left In Pipe Amount 80 ft Reason Shoe Joint Frac Ring # 1 @ ID Frac ring # 2 @ ID Frac Ring # 3 @ ID Frac Ring # 4 @ ID Customer Representative Signature The Information Stated Herein Is Correct Summit Version: Tuesday, November 16, 2010 09:27:00

Lab Data Cementing Rockies, Vernal LAB RESULTS - Primary Job Information Request/Slurry 106482/2 Rig Name H&P 326 Date October 25, 2010 Submitted By Joshua Anglin Job Type Intermediate Casing Bulk Plant Vernal Customer ExxonMobil Location Rio Blanco Well PCU 197-36A6 Well Information Casing/Liner Size 7" Depth MD 9597 ft BHST 210 F Hole Size 9 7/8" Depth TVD 9450 ft BHCT 154 F Cement Information - Primary Design Conc UOM Cement/Additive Sample Type Sample Date Lot No. Tuned Light 100.00 % BWOC Cement Blend Bulk Oct 25, 2010 Cement Properties Slurry Density 10.999 PPG Slurry Yield 2.21 FT3 Water Requirement 9.67 GPS 36.88 % > Boral Craig Pozmix Bulk Oct 25, 2010 11 % > HGS 6000 dry blended Bulk Oct 25, 2010 53.19 % > Holcim Type V Bulk Oct 25, 2010 13 % > Silicalite - Compacted Bulk Oct 25, 2010 0.75 lb/sk HR-601 Bulk Oct 25, 2010 22Hr07X0653GW 0.50 lb/sk D-Air 3000 Bulk Oct 25, 2010 2010239AC 0.20 lb/sk FWCA Bulk Oct 25, 2010 37340 80.70 L/100kg Fresh Water Lab Jul 07, 2010 07/07/2010 Water Source Fresh Water Operation Test Results Request ID 106482/2 Thickening Time, Request Test ID:1112779, Historical Data Temp (ºF) Pressure (psi) Reached in (min) Start BC 30 Bc (hh:mm) 50 Bc (hh:mm) 70 Bc (hh:mm) 100 Bc (hh:mm) 154 4,482 60 13 04:23 04:30 04:40 04:43 Operation Test Results Request ID 106482/1 Marsh Funnel, Request Test ID:1108201, Historical Data Volume [ml] Time [Sec] Foam Quality 250 33 0 Free Water, Request Test ID:1108200, Historical Data Test Temp (ºF) 154 0 API Rheology, Request Test ID:1108197, Historical Data % FW 45 Inc Temp (ºF) 600 300 200 100 60 30 6 3 Cond Time PV/YP (min) 80 201 122 93 60 47 38 30 24 0 96.4 / 28.5 API Fluid Loss, Request Test ID:1108199, Historical Data Test Temp (ºF) Test Pressure (psi) Test Time (min) Meas. Vol (< 30 min, cc) Extr. ISO FL (cc/30 min) 154 1,000 4.83 39 194 30 Conditioning time (min) PCU 197-36A6_Cement Intermediate Casing_SO #7711692_Page 9 of 12

PCU 197-36A6_Cement Intermediate Casing_SO #7711692_Page 10 of 12

PCU 197-36A6_Cement Intermediate Casing_SO #7711692_Page 11 of 12

Data Acquisition (psi) A 6000 5000 4000 3000 2000 1000 0 3 S1 Driv-Side Pump Pressure (psi) S1 Combined Pump Rate (bpm) 4 5 6 7 8 EXXONMOBIL - PCU WELL 197-36A6-7" INTERMEDIATE 4-NOV-2010 A S1 Downhole Density (lb/gal) C 09:00 09:30 10:00 10:30 11:00 11:30 12:00 11/4/2010 Time Global Event Log Intersection SDPP Intersection 9 10 11 12:30 11/4/2010 3 Start Job 08:50:00-2.000 4 Test Lines (Low Pressure) 09:02:00 295.0 B 12 13 SDPP B 20 18 16 14 12 10 8 6 4 2 0 (lb/gal) C 20 18 16 14 12 10 8 6 4 2 0 (bpm) 5 Test Lines (High Pressure) 09:06:11 5325 6 Pump Tuned Spacer 09:15:14 4.000 7 Shutdown / Drop Bottom Plug 09:37:01 20.00 8 Pump Cement, 1366 sks, yld 2.21, wtr 9.7 09:40:58 14.00 9 Shutdown / Drop Top Plug 11:20:50 316.0 10 Pump Displacement 11:23:14 22.00 11 Bump Plug 12:29:25 1609 12 Check Floats 12:43:11 81.17 13 End Job 12:46:24 8.000 Customer: EXXONMOBIL Job Date: 04-Nov-2010 Sales Order #: 7724950 Well Description: PCU WELL 197-36A6 PUMP TRK 11076824 SVC LDR WESTON SPENCER SVC SPR STARBUCKS SVC OPR TRAVIS MCCONKIE HA LLIB U R T O N OptiCem v6.2.3 04-Nov-10 14:22 PCU 197-36A6_Cement Intermediate Casing_SO #7711692_Page 12 of 12