SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5221 FOR PUBLIC HEARING

Similar documents
SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5068 FOR PUBLIC HEARING

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5247 FOR PUBLIC HEARING

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5194 FOR PUBLIC HEARING

May 20, 2016 PUBLIC HEARING RESULTS

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5883 FOR PUBLIC HEARING

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5756 FOR PUBLIC HEARING

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS AND PARKING AUTHORITY COMMISSION NOTICE OF MEETING AND CALENDAR

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS AND PARKING AUTHORITY COMMISSION NOTICE OF MEETING AND CALENDAR

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Red Light Camera Annual Report 2014

MUNI FORWARD Proposed Changes: Stanyan

ALTERNATIVE A ONLY. Right Turn Only. BOTH ALTERNATIVES on southbound Mission from 23rd St to 25th St and on northbound Mission from 20th St to 23rd St

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Freeway ramp intersection study

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS AND PARKING AUTHORITY COMMISSION NOTICE OF MEETING AND CALENDAR

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

BICYCLE STRATEGY UPDATE

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

THIS PRINT COVERS CALENDAR ITEM NO. : 12 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY. DIVISION: Sustainable Streets BRIEF DESCRIPTION:

Mission Bay Loop (MBL) Public Meeting

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

DPT Bicycle Program Report to the BAC 1/13/05

Vision Zero Priority Projects (March 2017)

San Francisco 2009 Collisions Report April 21, 2011

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

ROADWORK AND INFRASTRUCTURE OVERSIGHT

San Francisco Planning Department IPIC Report 2016

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

FOLSOM-HOWARD STREETSCAPE OVERVIEW

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

Compiled by the SFMTA Livable Streets Subdivision Staff

Addendum to Mitigated Negative Declaration

Extending Parking Meter Hours SAN FRANCISCO, CALIFORNIA

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

FRENCH AMERICAN INTERNATIONAL SCHOOL 1155 PAGE STREET TRANSPORTATION PROCEDURES August 2018

Proposal for Improving Muni Line 29-Sunset Service (updated August 13, 2007)

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

COMMITTEE RECOMMENDATIONS. That Council approve:

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

WELCOME WIGGLE NEIGHBORHOOD GREEN CORRIDOR COMMUNITY OPEN HOUSE

Geary Corridor Bus Rapid Transit

TRANSPORTATION IMPACT ANALYSIS GUIDELINES WALKING/ACCESSIBILITY MEMO APPENDICES

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS AND PARKING AUTHORITY COMMISSION MINUTES

FINAL REPORT DECEMBER 2011

Dewey Area Traffic Calming Project

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

BRIEF(S) SUBMITTED BY APPELLANT(S)

Marina Bay Trail Community Meeting #1

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

ABOUT THIS OPEN HOUSE

ORDER NUMBER SPECIAL EVENTS REMEMBER: SERVICE IS OUR ONLY BUSINESS

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Multi-Modal Traffic Analysis. Parisi and Associates

Upper Market Street Bike Lane Project

RED COLORED TRANSIT-ONLY LANES REQUEST TO EXPERIMENT

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

CONSTRUCTION CONTRACTS

San Francisco 2008 Collisions Report December 18, 2009

2019 Prop K 5-Year Prioritization Program Update Prop K Project Ideas - Public Survey Results

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

CONSTRUCTION CONTRACTS

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

Polk Streetscape Project

ORANGE COUNTY TRAFFIC COMMITTEE. Intersection Control. Constituent. Deepthi Arabolu. Relocate Stop Sign

City of San Francisco Pedestrian Count Report

Street Design Workshop. Existing cross section Traffic volumes Examine adjacent land uses You design future improvements

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

DRAFT TENNYSON STREET ANGLED PARKING ANALYSIS

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Compiled by the SFMTA Livable Streets Subdivision Staff

Better Market Street Project Update. Urban Forestry Council September 17, 2014

Data Analysis February to March 2018 Identified safety needs from reported collisions and existing travel patterns. SFMTA Board of

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Pedestrian and Bicycle Conditions

**PRESS RELEASE** SFMTA Weekend Transit and Traffic Advisory (Revised)

MASER ASSOCIATES. Engineers Planners Surveyors TRAFFIC IMPACT ANALYSIS FOR PROPOSED RESIDENTIAL MULTI-FAMILY SEA GULL VILLAGE TOWNSHIP OF COLTS NECK

The Wiggle Route in Context

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

City and County of San Francisco APS Safety & Access Tool. Cover Sheet. Total score = crosswalk worksheet score + intersection worksheet score

Station 1: Street & Sidewalk Upgrades

Geary Bus Rapid Transit Project

Transcription:

The Sustainable Streets Division of the San Francisco Municipal Transportation Agency will hold a public hearing on Friday, FEBRUARY 14, 2014, at 10:00 AM, in Room 416 (Hearing Room 4), City Hall, 1 Dr. Carlton B. Goodlett Place, San Francisco, CA 94102, to consider the following proposals: 1. ESTABLISH RESIDENTIAL PERMIT PARKING AREA N, 2-HOUR LIMIT, 9 AM TO 6 PM, MONDAY THROUGH FRIDAY Cabrillo Street, both sides, between 11th Avenue and 12th Avenue (1000 Block) 2(a). RESCIND TAXI STAND AFTER AT&T PARK EVENTS 2nd Street, west side, from 100 feet to 264 feet north of Townsend Street (164-foot zone)* 2(b). ESTABLISH TAXI STAND AFTER AT&T PARK EVENTS 2nd Street, east side, from 5 feet to 125 feet north of Townsend Street (120-foot zone, effective only during the post-at&t Park event period)* 3(a). RESCIND BUS ZONE 7th Street, east side, from Folsom Street to 100 feet southerly (nearside bus stop, adds 3 parking spaces) 3(b). ESTABLISH BUS ZONE 7th Street, east side, from Folsom Street to 81 feet northerly (far side bus stop, removes 1 parking space) 4. ESTABLISH PART-TIME PASSENGER LOADING ZONE, 7:30 AM TO 4:00PM, SCHOOL DAYS 361 Precita Avenue, north side, from 98 feet to 178 feet west of Harrison Street (80-foot zone) 5. ESTABLISH STOP SIGN Chattanooga Street, at 21st Street, stopping the stem of this T intersection 6. ESTABLISH PART TIME PASSENGER LOADING ZONE, 9:00 AM TO 10:00 AM AND 3:00PM TO 6:00 PM, SCHOOL DAYS 201 Diamond Street, east side, from 19th Street to 36 feet south (36-foot zone)* 7. ESTABLISH OVERSIZE VEHICLE RESTRICTION (NO PARKING, MIDNIGHT TO 6 AM, DAILY, FOR VEHICLES MORE THAN 7 FEET TALL OR 22 FEET LONG) A. Sunset District Lakeshore Drive, both sides, between Lake Merced Boulevard and Sloat Boulevard Lincoln Way, south side, between 36th Avenue and 37th Avenue

B. Mission District 15th Street, south side, between Folsom Street and Harrison Street 16th Street, both sides, between Harrison Street and Potrero Avenue 17th Street, both sides, between Harrison Street and Potrero Avenue 17th Street, both sides, between Folsom and Harrison Streets 18th Street, both sides, between Harrison Street and Potrero Avenue 18th Street, south side, between Church Street and Dolores Street 20th Street, north side, between Church Street and Dolores Street Alabama Street, both sides, between 19th Street and 20th Street Dolores Street, west side, between 18th Street and 20th Street Harrison Street, both sides, between 16th Street and 18th Street Florida Street, both sides, between 16th Street and 20th Street Folsom Street, east side, between 15th Street and 16th Street Treat Avenue, both sides, between 16th Street and 18th Street C. Bernal Heights Appleton Avenue, north side, between Holly Park Circle and Patton Street Elsie Street, west side, between Holly Park Circle and Santa Marina Street Holly Park Circle, park side (park perimeter) D. Western Addition Post Street, north side, between Scott Street and Steiner Street E. Richmond District Funston Avenue, west side, between Fulton Street and Lake Street 14th Avenue, east side, between Fulton Street and Lake Street The following items have not been environmentally cleared: 8(a). ESTABLISH TRANSIT-ONLY LANE Potrero Avenue, southbound, from 18th Street to 90 feet south of 24th Street 8(b). RESCIND TRANSIT-ONLY LANE Potrero Avenue, northbound, from 24th Street to 22nd Street 8(c). ESTABLISH NO PARKING ANYTIME Potrero Avenue, east side, from 21st Street to 65 feet southerly (5-foot sidewalk widening, Potrero Avenue, east side, from 22nd Street to 24th Street (5-foot sidewalk widening, removes 20 spaces) Potrero Avenue, west side, from Alameda Street to 25 feet northerly (6-foot sidewalk bulb, Potrero Avenue, east side, from Alameda Street to 25 feet southerly (6-foot sidewalk bulb,

Potrero Avenue, west side, from 15th Street to 25 feet northerly (6-foot sidewalk bulb, Potrero Avenue, west side, from 15th Street to 25 feet southerly (6-foot sidewalk bulb, Potrero Avenue, east side, from 15th Street to 25 feet southerly (6-foot sidewalk bulb, Potrero Avenue, west side, from 16th Street to 25 feet northerly (6-foot sidewalk bulb, Potrero Avenue, east side, from 16th Street to 25 feet southerly (6-foot sidewalk bulb, Potrero Avenue, west side, from 17th Street to 25 feet northerly (6-foot sidewalk bulb, Potrero Avenue, west side, from 17th Street to 25 feet southerly (6-foot sidewalk bulb, within existing bus zone) Potrero Avenue, east side, from 17th Street to 25 feet northerly (6-foot sidewalk bulb, Potrero Avenue, east side, from 17th Street to 25 feet southerly (6-foot sidewalk bulb, Potrero Avenue, west side, from Mariposa Street to 25 feet northerly (6-foot sidewalk bulb, Potrero Avenue, east side, from Mariposa Street to 25 feet southerly (6-foot sidewalk bulb), within existing bus zone) Potrero Avenue, west side, from 18th Street to 25 feet northerly (6-foot sidewalk bulb) Potrero Avenue, west side, from 18th Street to 25 feet southerly (6-foot sidewalk bulb, Potrero Avenue, east side, from 18th Street to 25 feet northerly (6-foot sidewalk bulb, Potrero Avenue, west side, from 19th Street to 25 feet northerly (6-foot sidewalk bulb, Potrero Avenue, west side, from 20th Street to 25 feet northerly (6-foot sidewalk bulb, Potrero Avenue, west side, from 20th Street to 25 feet southerly (6-foot sidewalk bulb, Potrero Avenue, west side, from 21st Street to 25 feet northerly (6-foot sidewalk bulb, Potrero Avenue, east side, from 22nd Street to 25 feet northerly (6-foot sidewalk bulb, Potrero Avenue, west side, from 22nd Street to 25 feet northerly (6-foot sidewalk bulb, Potrero Avenue, west side, from 22nd Street to 25 feet southerly (6-foot sidewalk bulb) 23rd Street, north side, from Potrero Avenue to 25 feet westerly (16-foot sidewalk widening Potrero Avenue, west side, from 25th Street to 25 feet northerly (6-foot sidewalk bulb,

Potrero Avenue, east side, from 25th Street to 25 feet northerly (6-foot sidewalk bulb, 8(d). ESTABLISH BUS ZONE Potrero Avenue, west side, from Alameda Street to 80 feet southerly (removes 3 spaces) Potrero Avenue, west side, from Mariposa Street to 80 feet southerly (removes 3 spaces) Potrero Avenue, west side, from 19th Street to 84 feet southerly (removes 3 spaces) Potrero Avenue, west side, from midblock crosswalk between 22nd Street and 23rd Street to 80 feet southerly (removes 3 spaces) Potrero Avenue, east side, from midblock crosswalk between 22nd Street and 23rd Street to 80 feet northerly (bus zone replaces 6-foot sidewalk widening, transit bulb) Potrero Avenue, east side, from 21st Street to 80 feet northerly (removes 3 spaces) Potrero Avenue, east side, from 19th Street to 80 feet northerly (removes 4 spaces) Potrero Avenue, east side, from Mariposa Street to 80 feet northerly (removes 2 spaces) 8(e). RESCIND FLAG STOP Potrero Avenue, west side, nearside at Alameda Street 8(f). RESCIND BUS ZONE Potrero Avenue, west side, from 17th Street to 100 feet southerly (adds 3 spaces) Potrero Avenue, west side, from 18th Street to 100 feet southerly (adds 1 space) Potrero Avenue, west side, from 20th Street to 90 feet southerly (adds 2 spaces) Potrero Avenue, west side, from 22nd Street to 75 feet southerly (adds 3 spaces) Potrero Avenue, west side, from 23rd Street to 100 feet southerly (adds 3 spaces) Potrero Avenue, west side, from 25th Street to 90 feet southerly (adds 4 spaces) Potrero Avenue, east side, from 23rd Street to 100 feet northerly (no parking changes) Potrero Avenue, east side, from 22nd Street to 110 feet northerly (adds 9 spaces) Potrero Avenue, east side, from 20th Street to 120 feet northerly (adds 1 space) Potrero Avenue, east side, from 18th Street to 120 feet southerly (no parking changes) Potrero Avenue, east side, from 17th Street to 95 feet northerly (adds 2 spaces) 8(g). ESTABLISH TOW-AWAY NO STOPPING ANYTIME Potrero Avenue, west side, from 16th Street to 110 feet southerly (6-foot transit bulb replaces 90-foot bus zone) Potrero Avenue, west side, from 24th Street to 90 feet southerly (4-foot transit bulb replaces 90-foot bus zone, Potrero Avenue, east side, from 16th Street to 110 feet northerly (6-foot transit bulb replaces 90-foot bus zone) Potrero Avenue, west side, from 18th Street to 43 feet southerly Potrero Avenue, east side, from 18th Street to 159 feet southerly (removes 2 spaces) Potrero Avenue, east side, from 80 to 104 feet north of 19th Street (removes 1 space)

Potrero Avenue, east side, from 20th Street to 104 feet northerly Potrero Avenue, east side, from 20th Street to 159 feet southerly (removes 6 spaces) Potrero Avenue, west side, from 20th Street 43 feet southerly Potrero Avenue, east side, from 80 to 104 feet north of 21st Street (removes 1 space) 8(h). RESCIND CURB BULB Potrero Avenue, west side, from 24th Street to 6 feet northerly 8(i). 8(j). ESTABLISH PERPENDICULAR PARKING Utah Street, east side, from 24th Street to 25th Street San Bruno Avenue, west side, from 24th Street to 25th Street ESTABLISH STOP SIGN 23rd Street, eastbound, at Potrero Avenue 8(k). ESTABLISH RIGHT TURN ONLY 23rd Street, eastbound, at Potrero Avenue 8(l). ESTABLISH NO RIGHT TURN Potrero Avenue, southbound, at 23rd Street 8(m). ESTABLISH RIGHT AND LEFT TURN ONLY 23rd Street, westbound, at Potrero Avenue 9. ESTABLISH TOW AWAY NO STOPPING ANYTIME Haight Street, north side, from Lyon Street to 25 feet easterly (7-foot curb bulb) Haight Street, south side, from 20 feet west of Lyon Street to 20 feet east of eastern crosswalk line (7-foot curb bulb in western crosswalk, removes 2 parking spaces) Buena Vista Avenue East, west side, from Haight Street to 45 feet southerly (7-foot curb bulb removes 3 parking spaces) Haight Street, north side, from Divisadero Street to 126 feet westerly (7-foot bus bulb replaces 100-foot bus zone and removes 1 parking space) Haight Street, south side, from Divisadero Street to 115 feet easterly (7-foot bus bulb replaces 95-foot bus zone and removes 1 parking space) Haight Street, north side, from Fillmore Street to 131 feet westerly (7-foot bus bulb replaces 103-foot bus zone and removes 2 parking spaces) Haight Street, south side, from Fillmore Street to 124 feet easterly (7-foot bus bulb replaces 96-foot bus zone and removes 1 parking space) * Items denoted with an asterisk (*) can be given final approval at the public hearing. Otherwise, the SFMTA Board will make the final approval at a later date based on the outcome at the public hearing.

The purpose of traffic engineering hearings for the San Francisco Municipal Transportation Agency (SFMTA) Sustainable Streets Division is for residents to express their concerns regarding the posted parking and traffic changes affecting their streets. At the hearing, the public hearing officer, after reviewing the items and listening to residents, will make a decision as to whether the items are approved or not. Any interested parties are encouraged to attend. Opinions on these proposed changes may be filed in writing prior to the hearing by email (link to sustainable.streets@sfmta.com) with the subject line Public Hearing. Written opinions may also be transmitted to the Sustainable Streets Division via fax at 415.701.4737 or by mail: Engineering Public Hearing, Sustainable Streets Division, One South Van Ness Avenue, 7th Floor, San Francisco, CA 94103-5417. Submitted opinions will become part of the official public record and will be brought to the attention of the person(s) conducting the hearing.