Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project

Similar documents
Laurier Segregated Bike Lane Pilot Project July 2013 update

Alta Planning + Design

General Manager Planning and Growth Management Department

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

Bike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.

Sacramento Grid 2.0. The Downtown Transportation Study

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

City of Ottawa s Complete Streets Approach to Transportation Projects

Welcome. If you have any questions or comments on the project, please contact:

Update on Regional Bicycle, Pedestrian, & Trail Planning. Presented to TCC November 21, 2014

Appendix A-K Public Information Centre 2 Materials

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Cycle Track Design Best Practices Cycle Track Sections

Major Bike Routes 102 Avenue Workshop April 21, 2015

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

CITY OF CAMBRIDGE 2015 BICYCLE PLAN TOWARDS A BIKABLE FUTURE

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

2. Context. Existing framework. The context. The challenge. Transport Strategy

APPENDIX H Public Consultation #2

Hamilton Transportation Master Plan Public Consultation. Public Information Centre One Summary

Omaha s Complete Streets Policy

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

CONNECTING PEOPLE TO PLACES

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

ECONOMY PEOPLE ENVIRONMENT

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

Pedestrian Crossing Guidelines 2016

Zlatko Krstulich, P.Eng. City of O9awa

Transportation Assessment

Richmond-Adelaide Cycle Tracks

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Living Streets Policy

Improving intersections for people that walk in Minneapolis

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Status of Cycling Strategy Actions

Glebe Neighbourhood Cycling Plan

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

CPC Parking Lot Riverside Drive. Transportation Rationale

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Bicycle Transportation Budget Plan: Lawrence, KS

Public Works and Infrastructure Committee. General Manager, Transportation Services

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

Mumford Terminal Replacement Opportunities Neighbourhood Open House. we are here. PHASE 2 Identifying and Evaluating Candidate Sites

PEDESTRIAN ACTION PLAN

Complete Streets. Designing Streets for Everyone. Sarnia

Bus Rapid Transit Plans

Safer Cycling: How the City of Vancouver is Proactively Improving Cycling Safety

Planning Guidance in the 2012 AASHTO Bike Guide

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works

ACTIVE TRANSPORTATION

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Item No Halifax Regional Council January 16, 2018 January 30, 2018

5. RUNNINGWAY GUIDELINES

Scope of the Transit Priority Project

Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan!

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Shifting Gears for a Healthier City.

FEEDBACK SURVEY #2: WHO PARTICIPATED

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

Copenhagen Cycling Map. Red Lines Cycling facilities

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Bellevue Downtown Association Downtown Bike Series

Non-Motorized Transportation 7-1

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

Simulation Analysis of Intersection Treatments for Cycle Tracks

Bicycle Facilities Planning

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Kelowna On the Move. Pedestrian and Bicycle Master Plan

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JANUARY 10, 2017

TORONTO VISION ZERO Improving Safety for Pedestrians and Cyclists Roger Browne, Manager Traffic Safety Unit October 11, 2018

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Bicycle Master Plan Goals, Strategies, and Policies

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

City of Charlottesville Bicycle and Pedestrian Master Plan Update

2018 AASHTO BIKE GUIDE

Draft North Industrial Area-Wide Traffic Plan

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Complete Streets Successes, Opportunities, and Challenges

Transcription:

Complete Streets Initiatives City of Ottawa Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project Zlatko.Krstulic@Ottawa.ca May 27, 2013 1

Cycling Mode-Share Trends

Ottawa s Transportation Master Plan Update: Complete Streets 3

Comfortable Cycling Routes All City infrastructure projects will strive to deliver the highest practical level of comfort for cyclists, with the lowest Level of Traffic Stress. Tradeoffs between all modes are inevitable. 4

Transportation: Safe and Efficient Infrastructure New approach for infrastructure based on peak period instead of peak hour Greater focus on person trips instead of vehicle trips New policies for maximum road and intersection widths Friday, May 31, 2013 5

Active Transportation - Cycling New Cycling Plan Vision Statement that places greater emphasis on bike-transit integration New cross-town bikeways for route continuity and priority implementation Prioritize cycling connections to rapid transit and key employment and educational nodes Greater emphasis on cycling safety and education Permit new cycling facility types (e.g. segregated bike lane) New winter cycling network plan Friday, May 31, 2013 6

Perspectives on Intersection Design To reach local shops and the library I must cross Hazeldean road which is 6 lanes at the nearest crossing to my house It is quite dangerous to cross these intersections with 3 young children. For that reason, I am often forced to use my car for trips that are as little as 2-3 km, when I would much rather walk or bike comment by Ottawa resident, Feb. 2013 7

Complete Streets Plan for the Core ( Downtown Moves project) $1B+ Investment in Light Rail (incl. a downtown tunnel) frees up road space in the core Downtown streets serve over 100,000 people who work in Ottawa s compact highdensity central area Number of downtown residents will double by 2031 Increased level of service for pedestrians is essential for success of the Light Rail project 8

Downtown Street Conditions Queen Street, west of Elgin Street 9

Queen St (west of O Connor St) - Before Street Demonstrations 10

Queen St (west of O Connor St) - After 11

Albert St (at Lyon St) - Before 12

Albert St (at Lyon St) - After Street Demonstrations 13

Mackenzie King Bridge - Before 14

Mackenzie King Bridge - After 15

The Laurier Segregated Bike Lanes April 2010- Start the selection process July 2011- Lanes open (two year Pilot) July 2013- Pilot to be reviewed (Retain, modify, or remove?) I ve travelled around North America and the world, segregated bike lanes are old news, Watson said. I hope we can make it permanent, and if there are some minor tweaks that might accommodate some residents at the Bronson end, we can do 2013/2014- Incorporate into East-West Bikeway that. Mayor Jim Watson- Ottawa Citizen May 7, 2013 16

Step # 1: Project Initiation Corridor Selection Process Examine the Advantages and Challenges in Designing, Implementing, and Using Segregated Bike Lane Facilities Review of International Best Practices for Segregated Bike Lane Design and Implementation Step # 2: Choosing a Corridor 33 Potential Corridors 12 Potential Corridors 3 Potential Corridors Preliminary Screening Stage 1 Evaluation Stage 2 Evaluation Public Consultation Stage 3 Evaluation (Vélo Québec) Selected Corridor LAURIER AVE. Step # 3: Developing the Pilot Project Functional Designs for Pilot Corridor Public Consultation Detailed Design of Pilot Corridor Construction of Pilot Project Maintenance and Monitoring of Pilot Project ** WE ARE HERE **

Route Evaluation

Functional Design Intersections: Yield signs, Left-turn bike boxes, Advance signal phase, No-right-turns-on-reds for motor vehicles Laurier at Lyon

Functional Design (Elgin to Metcalfe)

Count and Communicate March 2013 21

Monitoring and Evaluation On-Going Performance Monitoring Regular communication with stakeholders On-going monitoring using existing intersection traffic cameras Automated bicycle counters with Quarterly Performance Reports to Council Pilot Evaluation Traffic Impact Assessment Report - To determine transportation impacts (travel times, intersection LOS, parking, traffic safety, accident reports, etc.) Surveys - To determine stakeholder impacts (street-level retail businesses, office towers, hotels, property management companies, taxi companies, school bus companies, street vendors, courier services, etc.)

Laurier-Lessons Learned.. Pilot Project status a key enabler Motorist yield to cyclists on right Green pavement markings Build as raised cycle track vs. pre-cast curb) Vertical vs. horizontal separation minimizes cross section needed Only one curb on each side better accommodates mobility devices Fewer flex posts needed. Use flex-posts with spring loaded bases more durable and therefore require less maintenance Full time data collection was essential Shows on-going use of facility Allows for comparison with other routes 23

Future of Bike Tracks in Ottawa Underway... Laurier Pilot (2011 -retrofit) Churchill (2014 road re-build) Beechwood (2014 development block) Under consideration... Main Street (pending EA) Albert (post Light Rail) Downtown Moves (post Light Rail)

For additional information Cycling enewsletter o News for Ottawa Cyclists Nouvelles pour les cyclistes d'ottawa Laurier Segregated Bike Lanes o Ottawa.ca/Bikelane Downtown Moves o ottawa.ca/en/city-hall/public-consultations/downtown-moves 25