Org Chart. Steering. Committee. Project Advisory. Committee. Nicole Losch, PTP Senior Transportation. Bryan Davis, AICP Senior Transportation

Similar documents
Org Chart. Steering. Committee. Project Advisory. Committee. Nicole Losch, PTP Senior Transportation. Bryan Davis, AICP Senior Transportation

North Avenue Corridor Study

Environment and Public Works Committee Presentation

North Avenue Corridor Study

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

A Complete Streets Policy for Saratoga Springs. Presented By: Shared Access Saratoga

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Hennepin County Bicycle and Pedestrian Planning

Complete Streets: Policy to Pavement

EXECUTIVE SUMMARY. Vision

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Bellevue Transportation: Challenges, Opportunities and Priorities Bellevue Downtown Association September 20, 2018

Living Streets Policy

Bicycle Master Plan Goals, Strategies, and Policies

2014 Bellingham Bicycle Master Plan

Major Bike Routes 102 Avenue Workshop April 21, 2015

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Omaha s Complete Streets Policy

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

A Step-by-Step Guide to Complete Streets Implementation. Mark A. Cole, PE Charlotte Department of Transportation

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Making Phoenix Streets Complete. City of Phoenix Complete Streets Initiative

LOUISIANA COMPLETE STREETS POLICY. Ellen W. Soll, AICP Principal Soll Planning

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

New Castle County Bicycle Plan. Heather Dunigan ext

PEDESTRIAN ACTION PLAN

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Sacramento Grid 2.0. The Downtown Transportation Study

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

CHAPTER 7.0 IMPLEMENTATION

MASTER BICYCLE AND PEDESTRIAN PLAN

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

North Avenue Corridor Study

City of Birmingham Draft Multi-modal Transportation Plan

City of Charlottesville Bicycle and Pedestrian Master Plan Update

East Burke Transportation, Safety and Capacity Improvements

Chapter 5. Complete Streets and Walkable Communities.

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

and older adults and people with disabilities still face barriers when using the pedestrian network and public transportation.

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Public meeting: Introductions Jason Charest (CCRPC) starts the meeting by introducing the project leaders of the scoping study:

Item No. 14 Town of Atherton

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Lincoln Neighborhood Corridor Plan The LiNC

BIKE PLAN CONTENTS GATEWAY

CHAPTER 3: Vision Statement and Goals

CONNECTING PEOPLE TO PLACES

City of Waterloo Complete Streets Policy

PEDESTRIAN ACTION PLAN

Complete Streets for Louisiana

Bicycle Friendly Niagara Falls

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

North Shore Transportation Improvement Strategy

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Louisiana Complete Streets Policy Overview and Status

Central Avenue Corridor Study FPID Number:

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Beyond First First Last Last Mile Strategies. APA National Conference April 3, 2016 Chelsea Richer, AICP Fehr & Peers

Arlington s Master Transportation Plan

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

City of San Diego Vision Zero Draft Strategic Plan FY 2017

MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN. Public Workshop

TECHNICAL MEMO #1 EXISTING CONDITIONS

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Prince George s County plans, policies, and projects

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

CTDOT Pedestrian and Bicycle Safety Initiatives

Physical Implications of Complete Streets Policies

Appendix A-2: Screen 1 Alternatives Report

City of Moorhead Committee of the Whole Meeting

4. Mobility and Transportation Element. Page Bikes and Pedestrians

MTP BICYCLE ELEMENT UPDATE. November 2017

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Monterey Road Complete Streets

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Bicycle Facilities Planning

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

CITY OF NEW ORLEANS. Department of Public Works. Baronne Street Bike Lane

Public Information Centre

MASTER BICYCLE AND PEDESTRIAN PLAN

PEDESTRIAN ACTION PLAN

Transcription:

1

Org Chart Project Advisory Committee Steering Committee Nicole Losch, PTP Senior Transportation Planner Bryan Davis, AICP Senior Transportation Planner Jonathan Slason, PE Project Manager Diane Meyerhoff Public Engagement Specialist Lucy Gibson, PE Senior Planner Mark Smith, PE Senior Engineer Michael Lydon Principal Planner Chris Sargent, AICP Planner Roxanne Meuse, EIT Associate Engineer Sam Goater, PE Planning Engineer Sophie Nichol Sauve, ASLA, LEED AP Landscape Architect David Grover, PE Project Engineer Dana Wall Project Designer Julia Ursaki, EIT Planner Corey Mack, PE Project Engineer 2

Introduction to the Winooski Ave Transportation Study Project Advisory Committee Meeting #1 Study Kickoff May 2, 2018

What is this study? A comprehensive transportation study of the entire Winooski Avenue corridor, developing multimodal improvement strategies that address safety, capacity, and connectivity. Final deliverable: An actionable implementation plan with near-term and longer-term recommendations. 4

Scope/Schedule 5

BTV Complete Streets Vision Burlington streets will evolve into complete streets corridors that provide safe, inviting, and convenient travel for all users of all ages and abilities including motorists, pedestrians, bicyclists, and public transportation riders. Within each neighborhood, the need to move people through the corridor will be balanced with the need to provide access to homes, businesses, and local institutions within the corridor. The most effective use of finite public space will be determined through interdisciplinary collaboration with a wide range of community members considering economic, environmental, and equity concerns. The corridor will develop into an attractive public space through creative streetscape, signage, and other site design features. The corridor will become more livable and desirable by promoting social interaction and public health. 6

Past Studies and Plans PLANS: STUDIES: Winooski-Howard-St. Paul Intersection Scoping Study (2018) Winooski Ave Circulation Study Technical Assessment (2017) N. Winooski Ave & Archibald Street Intersection: Pedestrian Safety and Mobility Evaluation (2011) Great Streets Downtown Standards GMT NextGen Plan PlanBTV Walk Bike South Winooski Ave Lane Reduction (2002) CCRPC Active Transportation Plan VTrans On-Road Bicycle Plan PlanBTV Downtown & Waterfront 7

Winooski Ave Circulation Study Technical Assessment (2017) 5 traffic circulation scenarios Scenario #1 Complete Street on Winooski Ave has least impact on traffic, has two-way vehicle traffic, and two-way bicycle facilities entire corridor 4-to-3 lane conversion Pearl to Main Changes to on-street parking likely; must consider tradeoffs Other scenarios: #2 Two-way flow on North Winooski Ave #3 Two-way flow on all of Winooski Ave; Union Street as primary bicycle corridor #4 One-way pair with Union Street: Counter-Clockwise Flow #5 One-way pair with Union Street: Clockwise Flow 8

PlanBTV Walk Bike (2017) Multimodal connectivity 7 of the 20 priority intersections are located along Winooski Ave Proposed long-term network: protected bike lanes (low-stress) entire corridor to improve connectivity Relevant guidance: Serve all ages and abilities Expand use of pilot and demonstration projects Improve integration of cycling and bus travel Improve pavement markings at bus stop conflict points Continue to design/retrofit streets to include sufficient snow storage space 9

CCRPC Active Transportation Plan (2017) 1. Benefits of active transportation 2. Enforcement & education 3. Connecting to transit and carsharing 4. Maintenance 5. Snow clearance 6. Universal design, accessibility 7. Project coordination Winooski Ave is identified as a High Priority, Medium Feasibility project 10

Capital Projects Projects proposed, approved, in design, under construction or completed since the passage of the capital bonds in November 2016 Source: Burlington DPW Construction Portal 11

Public Participation Objective: The public will be engaged during every stage of the study using a variety of tools and formats to arrive at recommendations that reflect the needs of the community and minimize undesirable impacts. Four Elements: 1. Stakeholder Interviews 2. Project Advisory Committee 3. Public Forums 4. Continuous Communication Guided by a Public Participation Plan based on: CCRPC Public Participation Plan DPW Public Engagement Plan Spectrum of Participation 12

Draft Public Participation Plan 1. Stakeholder Group Interviews Public Health & Safety Students/Schools Colleges Under-represented groups Community spaces Businesses on Winooski Ave 2. Public Advisory Committee (5 meetings) Planning & Zoning City Council CEDO BBA Church Street Marketplace Old North End Arts & Business Network Burlington Walk-Bike Council Green Mountain Transit AARP Vermont Central, East, and South Districts 3. Public Forums Innovative formats Interpretation and stipends as needed Advertisement through multiple channels Documents posted ahead of time Sign-in sheet for tracking participation Feedback collected, shared, addressed 4. Continuous Communication Two-way communication Notification of project updates and available documents Coordinate with community liaisons (NPAs, churches, schools, etc) Pop-up meetings Online surveys, crowd-sourced mapping 13

Humans of Winooski Ave

@ Winooski Laundry Dan Lives on Riverside Ave and drove here today because of his laundry. Has emphysema and COPD and walks the entire corridor for exercise. The hills are a good challenge. Currently reading about mindfulness and really enjoys noticing the little things while walking, especially in spring. Used to be in construction and enjoys looking at all the different houses on Winooski Ave. 15

@ Old Spokes Home Laura Jacoby Executive Director A lot of our customers rely on bikes for transportation. They can t afford a car, and the bus system isn t complete. This is a social equity issue. There s a segment of the City s population that can t get in a car. We have to accommodate them. 16

@ City Market Steph Nurse at UVMMC Drove to City Market this morning on her way to go kayaking. Winooski Ave: I avoid it like the plague (whether driving or bicycling). Bicycling is terrifying (on Winooski Ave). Uses Union Street as an alternative. 17

@ City Market Tom Drove to City Market today and dropped his wife off elsewhere downtown. Lives on Shelburne Road and has lived in Burlington his whole life. Both drives and rides a bicycle on Winooski Ave. Bikes the whole city just for fun. Enjoys observing the urban landscape. 18

Existing Conditions Overview

Space Use and Connectivity 40-foot paved CURB-TO-CURB WIDTH 35-foot paved 40-foot paved 30-foot paved 20

Space Use and Connectivity TRAVEL LANES 21

Space Use and Connectivity BIKE LANES SHARROWS 22

Space Use and Connectivity PARKING LANES 23

Space Use and Connectivity SIDEWALKS 24

Space Use and Connectivity TRAVEL LANES BIKE LANES SHARROWS PARKING LANES SIDEWALKS 25

Volumes Average Annual Daily Traffic (AADT) Bicycle and pedestrian count data is still being compiled 2016 data Source: VTrans via Vermont Open Geodata Portal 26

Where Winooski Ave Traffic Comes From Region-level 2015 data Source: CCRPC Regional Model 27

Where Winooski Ave Traffic Comes From City-level 2015 data Source: CCRPC Regional Model 28

High Crash Locations @Riverside/Hyde @North Approx. between Crombie St and Riverside Ave @Pearl @Main Approx. between King St and Spruce St 2012-2016 data Source: VTrans 29

WINOOSKI AVE Bicycle and Pedestrian Crashes NORTH ST For reference, there were 6 bicycle or pedestrian crashes at the Winooski Ave-Main Street intersection in this period PEARL ST MAIN ST 2013-2017 data (5 years) Source: VTrans Crash Data Tool 30

What have we heard? Complete Street goals and visions of multimodal corridor Heavily utilized corridor Access to heart of the city Regional connections Inconsistent mobility facilities Timing for action is now Opportunity to enhance safety 31

What s Next? Draft vision and goals Public engagement Get people on mailing list 32

Discussion Time! 1. Why is this project important to you? 2. What are your goals for the study? 3. How can this study and its outcomes be most useful? 4. Specific issues or opportunities that we should know about? 33

Thank You!

CONTACTS JONATHAN SLASON PROJECT MANAGER RSG Jonathan.Slason@rsginc.com 802.861.0508 BRYAN DAVIS CCRPC bdavis@ccrpcvt.org 802.861.0129 NICOLE LOSCH CITY OF BURLINGTON PUBLIC WORKS nlosch@burlingtonvt.gov 802.865.5833 Steering Committee Consultant Team