Projects Report Starting Jan 29-Feb 04, 2018 Road Closures Lane Closures Street / Intersection UPCOMING PROJECTS Date Changes made b: Canterbur Hollhill to I-35 still in design tbd Drainage Chad Allen-Eng Fulton tbd tbd Water/WW/ Hettie tbd tbd Water/ Waste Water/ Hinkle to be bid tbd Holida Park Phase 2 es tbd tbd Malone es Summer 2018 tbd Possibl bundling with Windsor, Wtr/WW//Drainage Water Main Manhattan, Sierra, & Laguna Yellowstone to Sherman Water Main Crescent to Westminster Case Bowles-Wtr; Dust Draper- Case Bowles-Wtr; Dust Draper- Case Bowles-Wtr; Dust Draper- Case Bowles - Wtr 11/16/17 Tler Dawson 12-07-17 Water Case Bowles 12-18-17 PEC 4 - Engineering still in design tbd Engineering Project Installing Underground Box Culvert Lee Perr-Eng
Date Smith-Johnson Summer 2018 tbd Large Project: Drainage/ /Wtr/WW Thomas tbd tbd Water/WW/ Wane tbd tbd Water/ WW/ Windsor- Engineering tbd tbd RESIDENTIAL CURRENT PROJECTS Ave B es Jan 23, 2018 Feb 9, 2018 Possibl bundling with Hinkle Wtr/WW//Drainage Electric Eagle to S Ave B Chad Allen-Eng Case Bowles-Wtr; Dust Draper- Case Bowles-Wtr; Dust Draper- Case Bowles-Wtr; Dust Draper- Changes made b: Engineering Stephen Stastn 01-17-18 Congress es Jan 8, 2018 Feb 28, 2018 Congress es Jan 22, 2018 Feb 12, 2018 Denison es Feb 5, 2018 Mar 16, 2018 Egan es Feb 5, 2018 Ma 7, 2018 Gober no Jan 24, 2018 Feb 12, 2018 Electric Denton to N Carroll Electric N Carroll to Bolivar Universit to W Sherman Amarillo to Malone Mill/Overla Linden Dr to Cordell St Engineering Tim Kutas 01-12-18 Engineering Tim Kutas 01-12-18 1.24.17 Chauna Baker 01-24-18 1.24.18 Chauna Baker 01-24-18 1/9/18 Dale Mitchell 01-22-18
Date Heron Pond no Jan 2, 2018 Feb 9, 2018 Concrete Street Panel Repairs Sun Ra to Marsh Rail 12/18/17 Changes made b: Ro San Miguel 12-20-17 Holida Park Phase 2 es Nov 10-17 Dec 1, 2018 Wastewater Main Manhattan to Kings Row Wastewater 11/16/17 Seth Garcia 11-08-17 Kings Row no Aug 7, 2017 Jan 31, 2018 Curb and Gutter/Drive Approaches WB Right Ln Wellington and Sherman Engineering Rob Plato 01-09-18 Lattimore no Oct 9, 2017 Feb 5, 2018 Audra to Dead End 9/22/17 Dust Draper 10-03-17 Londonderr es Dec 22, 2017 Mar 15, 2018 Wastewater Main Teasle to Westminster Wastewater 10/16/17 Seth Garcia 12-13-17 Londonderr es Feb 1, 2018 Mar 1, 2018 Drainage Improvements Drainage 10/16/17 Tler Dawson 12-07-17 Lookout no Jan 29, 2018 Feb 28, 2018 Sidewalk Repair Windsor to Westward Ro San Miguel 01-24-18 Lovell no Jan 24, 2018 Feb 9, 2018 Mill/Overla Scripture to Egan 1/19/18 Dale Mitchell 01-09-18 Maple no Jan 22, 2018 Feb 9, 2018 Mimosa es Jan 2, 2018 Feb 23, 2018 Mockingbird es Oct 23, 2017 Feb 4, 2018 Water Line Tap/Piping/S-walk Repair Southern most Drive Lane N Carroll to Bolivar Audra to Newport Engineering Rob Plato 01-18-18 12/13/17 Chauna Baker 12-13-17 10/10/17 10.18.17 Robin Webber 01-04-18
Date Mockingbird es Oct 23, 2017 Feb 20, 2018 Oak Park no Oct 9, 2017 Feb 5, 2018 Oaktree no Oct 9, 2017 Feb 5, 2018 Paisle es Dec 20, 2017 Feb 16, 2018 Panhandle no Dec 4, 2017 Feb 12, 2018 Sagebrush Jan 2, 2018 tbd Silktree es Jan 29, 2018 Mar 5, 2018 Stanle es Nov 6, 2017 Feb 12, 2018 Westward no Jan 2, 2018 Feb 9, 2018 Whispering Oaks no Oct 9, 2017 Feb 5, 2018 Windriver no Jan 22, 2018 Mar 30, 2018 Mckinne to Paisle Oaktree to Oak Valle Audra to Lattimore Water Main Frame to Ruddell Street Resurfacing/Curb/Gutter Thomas to Bonnie Brae Water/WW/ Water is almost complete Willow to Cul de Sac Desert Mill Overla/Curb and Gutter Work Emer to Crescent Street Panel Repair Lookout to Southwa Oak Valle to Oak Park Sidewalk Repairs Loon Lake to Teasle Ln Water Wtr/WW/ 10/10/17 10.18.17 9/22/17 9/22/17 11.27.18 1.22.18 10/26/17 12/18/17 9/22/17 HOA 1/11/18 Changes made b: Robin Webber 11-01-17 Dust Draper 10-03-17 Dust Draper 10-03-17 Case Bowles 12-18-17 Chauna Baker 01-22-18 Chauna Baker 01-22-18 Chauna Bakerl 01-22-18 Chauna Baker 12-18-17 Dust Draper 10-03-17 Ro San Miguel 01-04-18
Date MAJOR ROADS CURRENT PROJECTS Changes made b: Bonnie Brae no Jul 1, 2017 Jul 31, 2019 Street Widening Engineering Rob Plato 01-09-18 Gala es Jan 4, 2018 Feb 9, 2018 Water and WW Crossing Mahill Rd to Bridges St Engineering 1/3/18 Gerr Powers 01-24-18 Hickor es Jan 2, 2018 Ma 11, 2018 McKinne no Nov 14, 2017 Apr 29, 2018 Mahill no Sep 1, 2017 Feb 1, 2020 Prominence Parkwa es Jan 31, 2018 Aug 31, 2018 Rine es Sep 29, 2017 Jul 29, 2018 Ran Rd WB es Dec 11, 2017 Jan 26, 2018 Bonnie Brae to N Texas Blvd Reconstruct Old Central Parking Lot Bolivar to Cedar Street Widening Project US380 to N Edwards Rd Water /WW Relocate/Repave Mahill to Atlanta Road Removal and Replacement N Elm to Solona Street FM1830 to Forrestridge Dust Draper 01-23-18 11.2.17 Engineering Gerr Powers 12-05-17 Engineering N Housewright 11-30-17 Engineering Gerr Powers 01-24-18 Engineering Gerr Powers 10-19-17 12/6/17 Dale Mitchell 01-04-18 Note: This provides an Estimate work to be done the next two weeks. Weather, equipment breakdowns, or other unforeseen problems could cause this schedule to change. Drainage 349-7116 / Water Distribution 349-7181 / Wastewater 349-8489 / Traffic 349-7342 / 349-7160, streets@citdenton.com Engineering 349-8910, engineering@citdenton.com / TX DOT 387-1414, romulo.bahamon@txdot.gov / Denton Count 349-3420 COMPLETED PROJECTS
Date Ave G es Dec 18, 2017 Jan 19, 2018 Emerson no Dec 27, 2017 Jan 26, 2018 Gaelic Ct no Nov 27, 2017 Jan 19, 2018 Montecito no Dec 27, 2017 Jan 26, 2018 Overlook no Oct 2, 2017 Jan 19, 2018 Vanderbuilt Ct no Dec 27, 2017 Jan 26, 2018 Electric Oak St to Hickor St Curb and Gutter Repairs Rockwood Ln to Locksle Ln Glengar Wa to Western dead end Sidewalk Repair Hazelwood to Mirror Rock Sidewalk and Panel Repairs Windsor to Westward Curb and Gutter Repair Bowling Green to Vanderbilt Ct Changes made b: Engineering Alice Province 01-23-18 12/18/17 11/13/17 12/18/17 Ro San Miguel 01-10-18 Dust Draper 01-23-18 Ro San Miguel 1-24-17 Ro San Miguel 01-24-18 Ro San Miguel 01-24-18