E-Beam Evaporator with Glancing Angle Deposition (GLAD) - Kurt J. Lesker Company AXXIS

Similar documents
Standard Operating Procedure Porosity Analyzer - The Micromeritics Tri-Star II (surface area) with Micrometrics VacPrep 061 (Sample Degas System)

Angstrom E-Beam Instructions. PROCESS CHECKS: the tooling factors of each metal; Ti/Au layer for wire bonding pull test.

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

Operating Procedures for Metal Evaporator I

OXFORD PLASMALAB 80PLUS (CLOEY)

Revised: June 7, 2017

Oerlikon Sputtering Evaporator SOP

Arizona State University Center for Solid State Electronic Research. Table of Contents. Issue: C Title: Oxford Plasmalab 80plus (Floey) Page 1 of 8

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

Standard Operating Manual

Standard Operating Manual

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100

Warnings: Notes: Revised: October 5, 2015

Standard Operating Procedure. For. PVD E-Beam

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager.

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Approved by BNC Managing Director Paul Lum Date: Approved by PI (s) /Super User (s): _Peter Hosemann/Andy Minor_Date:

Approved by Principal Investigator Date: Approved by Super User: Date:

Cryo-Evaporator Operation

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

Standard Operating Manual

Usage Policies Notebook for Trion RIE / ICP Dry Etch

LEO SEM SOP Page 1 of 9 Revision 1.4 LEO 440 SEM SOP. Leica Leo Stereoscan 440i

Basic ICP Operating Procedures

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

SPUTTER STATION STANDARD OPERATING PROCEDURE

Standard Operating Manual

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

Approved by Principal Investigator Date: Approved by Super User: Date:

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

EXPERIMENT XI. Careful!! Improper handling of the vacuum line may result in the release of SO 2 which is an irritating and suffocating gas.

Operation of the contact mask aligner Canon PPC 210 Projection Print Camera

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

Equipment Operating Procedure Glove Box

Equipment Standard Operating Procedure Greg Allion and Kimberly Appel

The MRL Furnaces USED FOR THIS MANUAL COVERS

Standard Operating Manual

Cover Page for Lab Report Group Portion. Flow Visualization in a Water Channel

Plasma-Therm PECVD. Operating Characteristics. Operating Instructions. Typical Processes. I. Loading. II. Operating

Armfield Distillation Column Operation Guidelines

OPERATION OF THE DIMPLER

CHEMICAL ENGINEERING SENIOR LABORATORY CHEG Initiated Chemical Vapor Deposition

TYPICAL OPERATION PROCEDURES

Usage Policies Notebook for STS DRIE System

cryokit version 1.0 cryogenic protection

Risk Assessment for: Roaches Pyrotec dyeing machines

Photolithography. Operating Instructions

MMRC PVD Evaporator Instructions

Nordiko Metal Sputtering System Standard Operating Procedure

[needs to be discussed with faculty if any new material to be done]

University of MN, Minnesota Nano Center Standard Operating Procedure

Angstrom Dielectric Sputterer Operation Manual

Eco Snow CO2 Clean System Operation

O P E R ATING INSTRUCTIONS FOR MODEL SPR-45 Automatic Screen and Stencil Printer

Arizona State University NanoFab XACTIX ETCHER. Rev A

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

Edge Isolation Tool. Standard Operating Procedure. Version 1.1. Date: Prepared by, Sandeep S S. Department of Electrical Engineering

Temescal BJD-1800 E-Beam Evaporator 1 System Overview - Cryo-pumped for typical base pressures in the low 10e-7 Torr range. - Four pockets in the

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

Unaxis PECVD. SiH4 (5% in He)

Standard Operating Manual

The SPI Sputter Coater Handbook

Notes-PECVD: Chamber 1

Approved by Principal Investigator Date: Approved by Super User: Date:

Savannah S100 ALD at SCIF, UC Merced Standard operating Procedure

University of Minnesota, MN Nano Center Standard Operating Procedure

Operation of the mask aligner MJB-55

Cover Page for Lab Report Group Portion. Boundary Layer Measurements

Xactix XeF2 OPERATION MANUAL

Standard Operating Procedure

Warnings: Notes: Revised: January 8,

KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure

[USING THE VITROBOT April 9, Using the Vitrobot

Powermax machine-side reference guide For mechanized applications with Powermax1000, Powermax1250 and Powermax1650

Roller AC Servo System

Cambridge NanoTech: Savannah S100. Table of Contents

Login to ilab Kiosk. Revised 05/22/2018. Load your sample:

Scanning Electron Microscope JEOL JSM F

BASIC Z-STACK AND TIME SERIES SCAN ON THE ZEISS LIGHTSHEET Z. 1

Overspeed governors (113 OG Моment 250 MR, 114 OG Moment 250 A3, 115 OG Moment 250 MRL, 119 OG Moment 250 MRL/1)

Unaxis ICP/RIE SOP Revision 8 09/30/16 Page 1 of 5. NRF Unaxis ICP/RIE Etch SOP

March CS-1701F Reactive Ion Etcher

University of MN, Minnesota Nano Center Standard Operating Procedure

AX5000 Operational Manual

University of MN, Minnesota Nano Center Standard Operating Procedure

Product Information News

Met One E-BAM Particulate Monitor

STS PECVD Instructions

CircuFlow Quick Setup Guide

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

OLED vacuum deposition cluster system Sunicel Plus 400 / Plus 400L (Sunic Systems)

SEM LEO 1550 MANUAL. I. Introduction. Generality

2.017 Lab Rules and Safety Rm September 9, 2009 (Version 2) Dr. Harrison H. Chin

Transcription:

Sta da d Ope ai g P ocedu e E-Beam Evaporator with Glancing Angle Deposition (GLAD) - Kurt J. Lesker Company AXXIS The Ku t J. Leske AXXI Ele t o -Bea E apo ato ith Gla i g A gle Deposiio GLAD e a les e- ea deposiio of thi il s of etals fo o ta t la e s o i oele t o i de i es. 1.0 Operation Procedures Toxic Fumes When loading and unloading samples try not to breathe the fumes or metal dust powders from inside the chamber, since many of the metals can be toxic to inhale. The walls of the chamber will be coated with metals and they can flake off. When cleaning the chamber use the vacuum cleaner to remove any loose particles. Please take a moment to review general lab safety information in section 4 of this document. Tap the main touchscreen to start up. The machine and the computer should merely be in sleep-mode. Tapping the screen will take you to the operational software. Login. Each user will have their own login and password. These credentials, and training on the machine, must be arranged with cleanroom staff to use it. 1.1

ta t PC Ve t. This ill auto at iall ope a d lose al es, a d e t the chamber with dry nitrogren (up to atmospheric pressure), in preparation to open the main chamber door to add samples for deposition. 1.3 The door cannot be opened until atmospheric pressure has been achieved. The dry nitrogen backfill pressure is intentionally slow. Please be patient. This may take several minutes. 1.2

Open upper door. It is heavy and can swing in a wide arc. Open it cautiously! 1.5 When you open the door, you should see the internal arm of the machine (the platen arm) in an upward facing position (Station 4) for the insertion of multiple or single samples. Your substrate(s)are to be secured under the provided metal clips. No other clips or tape or adhesives are to be used without specific permisssion of cleanroom staff. Use the hex head tool to tighten the clips. 1.4

If, for example, you are using microscope slides as your substrate, use the metal clips to add up to three of them in whatever pattern or configuration that you choose. Please make sure that your samples are extremely clean and dry before you begin pumping, as this will reduce pumping times and general contamination of the machine. 1.7 Ba k o the ai tou hs ee, ou a t to li k o the plate otio ta. The purpose is to set the position of the platen arm to face down (Station 1). This is to ensure that your samples stay in place during depostion. Click in the black a ea e t to the Go To statio utto. A s all s ee should pop-up. 1.6

On this pop-up screen you want to select the position. Station setting is 1 for do a d fo up. et it to a d li k ok. 1.9 Cli k the Go To tatio utto. The a ill slo l otate do a d fo ou to see if your samples remain secure or not. DO NOT TOUCH THE ARM WHEN IT IS IN MOTION!! If your samples fall off, or shift position, rotate back up to position 4 and re-attach or adjust. If they stay in place, move to the next page. 1.8

1.10 Gently seal and lock the main chamber door. Do not touch the gasket or sealing-surfaces of the chamber. This is a good time to visally inspect for dirt or contaminents, obvious fingerprints on any of the inner surfaces, cracks in the gasket, etc. 1.11 Platen arm facing down, with samples inserted and secured, ready for pumping and deposition.

Cli k ta t PC Pu p to egi the pu p-down process. 1.13 Pumping is entirely automated. This pop-up screen will remain until the automated procedure has completed. 1.12

After 1 x 10-2 rough pressure is achieved, it will open the cryopump and complete its automated process. Once the main valve opens, the pressure will drop very quickly down to 10-5 pressures and then on to 10-6. It will slow down as it gets towards low 10-6 into 10-7 levels. 1.15 When the receipe has been co pleted, ou a li k o OK to lose that pop up i do. You now wait until something close to 5 x 10-7 Torr pressure has been achieved before you continue. This generally takes 20-30 minutes in total. For best depostion results, operational pressures can be as low as 1 x 10-7 or 9 x 10-8 Torr. 1.14

O the Plate Motio ta, li k FWD, it ill tu g ee. You should hea the plate egi to rotate up to a speed of roughly 20 RPM. This motion may be stopped or started at will and at any time during the process. Its purpose is to ensure even and full coverage of metal, especially over uneven surfaces and substates. 1.16

Make sure that the manual controller is plugged in. After plugging it in, click the lit yellow button under (MENU/QUIT). This will unlock the controller. It is necessary for semiautomatic use of the E-beam, but, as a user, you will not have to do anything else with it until you have completed all other steps and are ready to shut down again. 1.18 Make sure that the power supply is in the on position. The main switch will light up green. 1.17

O the Depositio ta, li k o the little la k te t o u de the o ds C u i le etpoi t. A pop-up screen will open that allows you to enter a crucible number for deposition. All of the metals available for deposition have been predetermined and premelted. 1.19

Whe ou ha e e te ed a alue a d li ked ok, the g ee I Pos o ill shift to g e, and then after several seconds, back to green, as the crucible holder rotates to your chosen metal. 1.21 till o the depositio ta, li k E ea off to g e a d li k E ea o to g ee. This unlocks the power supply, and then turns it on and prepares the high voltage for use. 1.20

Cli k the ig a ta. The li k the ig a Lau h utto to Grey. What a second a d li k the ig a Lau h uto to G ee. It is towards the upper left hand corner of the screen. The button should be green when you start, then grey when you click it once, then green when you click it the second time. When you do this, it may open a new window a d ask fo a pass o d, the e u e tl is t o e. i pl li k ok. 1.22

To get to the ig a ee, li k o the ke oa d, holdi g the Alt a d Ta ke s together. Do this twice. It should take you to the Sigma software that is now running in the a kg ou d. ig a auto ati all o t ols pa a ete s su h as thi k ess, a p ates, and power. You must manually select your process/metal. You will enter your values for ate etpt Å/ a d thi k ess Fi al Thi k i kå). 1.24 Edit Process. 1.23

On the pop-up window you will first choose your metal from the dropdown process list in the top left ha d o e of the i do. O the La e ta, adjust ONLY etpt a d Fi al Thi k. Those a e ou deposition rate and overall desired thickness of that layer of metal. You may set your rate as high as 3-5 Å/S, and your overall thickness to whatever level is required for your layer/research. After choosing your metal, rate, and thickness, click the RED X to close the window. 1.26 If a pop-up o asks ou to ha ge Ope ati g P o ess to XXXXXX i.e. Co alt, click Yes. This pop-up is based entirely upon the last metal that was used. It is simply confirming whether or not you want to use the same metal or different one. 1.25

Press and hold the Alt key again and then press the Tab key once to return to the main Kurt J Lesker software. Click the Sigma Stop Process button. It will turn from green to grey. Then click the Sigma Start Process. It will turn from grey to green. You are now starting your deposition. In order to watch the deposition rate graphs, Live, press and hold the Alt key again and then press the Tab key twice, returning you to the Sigma software screen. 1.28 The Sigma 242 software will track and graph the rates and progress of the deposition. It will start and stop automatically. The startup is slow as it ramps up the current to the full rate. Whe o plete the te t i the uppe ight o e ill sa Phase: topped. You a oti e the P og ess % a, this tells you roughly how long until it completes deposition. 1.27

When it has completed its layer, the click- o es i the uppe left ha d o e ta t P o ess a d ta t La e ill ha ge f o ed to g ee. It is as this poi t that the p o ess has ended and power to the beam has automatically shut down. At this point you may select another metal or you may continue on to the latter series of instructions to retrieve your samples and shut down. 1.30 To add another layer: 1.30.1 go back to Edit Process 1.30.2 change the metal type, check/change your rate and thickness 1.30.3 close the pop-up window 1.30.4 Alt + Tab again to go back to the Kurt Lesker software, select the Depositio tab 1.29

1.30.5 Cli k EB Off to g ee, lo ki g the po e suppl 1.30.6 Cli k the la k o u de C u i le etpoi t and select and change to your new metal 1.30.7 Cli k EB Off to g e a d EB O to g ee. 1.33 -- HUT DOWN P OCE /EXPLANATION BEGING HE E 1.34 P ess a d hold Alt + p ess the Ta ke to etu to Ku t Leske soft a e s ee. Cli k the Depositio ta, li k EB Off to g een. This will turn off the power supply and safely lock it out. 1.32 1.30.8 Go to the ig a ta 1.30.9 Cli k ig a ta t P o ess to g ee 1.30.10 Alt + Ta to go a k to ig a soft a e 1.31 It should have begun running your new layer automatically. Additional multiple layers may be added via this same method 2.30.

Cli k the Plate Motio ta. otate the ai a a k to its up a d fa i g positio statio, o e agai li ki g i the s all a k te t o e t to Go To tatio, sele ti g 4, clicking ok on the pop-up, a d the li ki g Go To tatio to ake it so. You should also use this opportunity to stop rotation of the plate li k FWD to g e. The plate a ill e fa i g up a d all otio will have ceased. 1.36 Cli k ta t PC Ve t. This will automatically open and close valves, backfill with dry nitrogen, and raise the chamber pressure back to atmosphere so that you may safely open the chamber door. It will take a few minutes. At atmospheric pressure the main door may be opened and your samples may be removed. There will be a pop-up window to tell you that the receipe for e ti g has ee o pleted, ou a li k ok to a k o ledge a d lose it. Once you have removed your samples and have resealed the main chamber door, please click o ta t PC Pu p to auto ati all sta t the a hi e a k towards ultra high vacuum levels for the next user. Log out of the machine once you are sure that the system is pumping and that you are finished. 1.37 1.38 1.35

1.39 Unplug the manual controller. This saves screen-life for the device. ai e ea po e suppl. The po e uto should o Ma uall shut of the lo ge e lit up.

.0 Speciicaio s / Featu es.0 po ket e- ea e apo ato head Mate ials i lude: Au, C, PT, Ti, Ni, Ge fo use of io, Ge, Ag, Ni, please see the BOC Ed a ds Auto Ele t o Bea E apo ato V po e suppl, A, ea s eep, su st ate otaio GLAD gla i g a gle deposiio ith uli-posiio sa ple ou t a ua tz thi k ess o ito s Co pute o t olled deposiio D ough pu p, C opu ped ha e ith uli ate a uu of - To, T pi al a uu du i g deposiio - To Fast le i es Use Re ui e e ts The E-Beam Evaporator with Glancing Angle Deposition (GLAD) - Kurt J. Lesker Company AXXIS must be used by authorized personnel only. All authorized users are expected to read and understand this SOP and follow the operation instructions carefully. No unauthorized personnel may use this equipment. All users must wear appropriate personal protective equipment. To become an authorized user, one must: 1. Complete Environment, Health & Safety (EH&S) training 2. Complete initial orientation and training for the Davis Hall EE Cleanroom 3. Receive training on this piece of equipment from lab personnel 4. Schedule equipment time using the calendar 5. Read and fully understand this SOP General Safety 4.1 4.2 4.3 Required Personal Protective Equipment Users must wear coveralls, bouffant caps, shoe covers, safety glasses, and gloves. Shorts, open-toed shoes, high heels, and skirts, are forbidden. Emergency Procedures and Contacts For non-life threatening emergencies: use the main cleanroom phone and call the emergency contact #'s listed on the wall or for police / ambulance, call 6452222 In case of fire or other life threatening emergency: Exit the cleanroom through an emergency exit door. Pull one of the fire alarms located in the main hallway outside of the cleanroom. Dial campus police / ambulance at 645-2222. University after hours laboratory use policy No working alone, use the buddy system! 4.0

Revised by Da id Easo / Date / Modification Added afet + fo at to #.# # 1 2 3 4 5